Loading...
HomeMy WebLinkAbout20220737 Ver 1_Stormwater Infiltration Basin Details #3_20220606\l/ Pt - III/ ZIP m z� Coastal Wetlands Line(TYp•) --..e%•.� •• �. ;5L _—..—.. Sf�===:� =`�_ ...�I[ 404Wetlands 404 Wetlands " ` CL 30' CAMA Buffer � Line T � � � �lNb"W: ._ ..� .. � y .. � .IV _ : �' :;rss ...r r \ , - ' • \ • \ Line (Typ.) Line (TYP•) •,-PIPE, antItt :-- _ ..• . •41 as � i�• 3'•� ... s€- • '— CL % / 3-� C=M sp • \ \ Uffer PtF r' \ \\ r. \ 0000' IF, to Fammos 500 ..... .:, �1 x "•.. Coastal Wetlands .•�-• �,`',� ,,....... �.....:.... \ \\ \ sp .\ �iC,•\. \IF \ ..� y // Infiltration Basin by Bottom Elev.4.50 Drainage \ �� i i a Utility \ \ \ . , �+� - F`FFF._ — — — — — _ 350' Overflow Inv. Out - Easement / \ \ - Inv. OutFOOF"1 Spillway At Elev. 5,50 4.50 (width varier) �/ � 4,50 / oFoe 5.50 � 5.0 5.0 .� .>, — — — — — — — — — — — — — — — — — — — — —.�— — — — — — — — — — — — — — — — — — — — — — — — — — — — — V.. \ � 4:1 Slopes, ' Skimmer For Erosion Control —� — — ip / \V / i \ \ This Infiltration Basin Only i mage ( ing Initial Utility Easement Land rDisturbance /• _ \ 30 31 / Infiltration Basin #3 Scale: 1"=20' 0 20 40 60 _ FEET Notes: 1. Notify Engineer 48 hours prior to beginning construction. 2. The Infiltration Basin requires inspection during construction by the certifying Engineer and upon completion requires a - Certification of Construction letter issued to the North - - - - - - Carolina Division of Water Quality by a North Carolina - - - Professional Engineer. - - All cut slopes 3. It is the intent of the design that the sediment traps be - 8' Min. Berm Width - to basin bottom At Overflow Spillway to have grass sod installed in the same locations as the Infiltration Basins, then 1.0' Freeboard -- upon stabilization of the upslope areas, the sediment shall be - removed and the Infiltration Basin graded to its final design. 4. Excavate and grade the side slopes and bottom of the basin To Elev. 6.50 /- �'• to size and elevations shown on plan. Water Quality Volume - / Spillway Elev. 5.50 5. Contractor shall measure basin to ensure correct size. to All fill singes pipes, pipes P to have grass sod txng gradeti Ex•• 5IQPe'..—.vari� 6. Install inlet i es, all sediment in i es to be removed prior g 1.0' Maximum to final certification. i"-"' Water Depth hti " 7. Contractor shall contact Engineer to verify/approve basin 4" Min. Clean Sand Inlet Pipe construction prior to seeding or sodding. - - (1-2 % fines or less) - 8. Sod cut and fill slopes with centipede or bermuda sod - 9. See plans for required basin sizes and elevations. Grade •� - - Ex.6i- Bottom Elev. 4,50 10. For additional information, see Stormwater Management Permit. " _ - - - 12' Min. 12" Min. Undisturbed In -Situ Soil .. - Seasonal High Water Table Elev. 2.50 ... Infiltration Basin Typical Section Not to scale Infiltration Basin #3 Detail Sheet 011511111#p,,, .•���,tN.... goy BRI DGE VIEW �OPOFasSid •4;i••y�•. Q r9� SEAL Town of Cedar Pointy Carteret County, North Carolina `.E 37928 c i _ O ;LP�Owner/Developer. Poe 9j2�q� Cedar Point Developers, LLC N ,,rNa'L MG ttt 0 %%%% 166 Center Street Jacksonville, North Caroline 28546 (910) 938-5900 .. . DATE: 08/20/2021 SCALES As Noted BELL AND PHILLIPS Coco: 20779.erd Consulting Engineers - Land Surveyors - Land Planners _ - - Filename: BridgeView-ESC CAD.dwB - Cedar Point, North Carolina < Drawn By: AS 604E Cedar Point Boulevard Job No.: S200 e G Phone (252) 393-6101- www.BellandPhilli s com "Job No.: S200316-7321 Sheet 1v Of 18 Firm License Number. F-0108 P