HomeMy WebLinkAbout20220737 Ver 1_No Written Concurrence Email_20220609Strickland, Bev
From: Perry, John M
Sent: Thursday, June 9, 2022 2:33 PM
To: Bodnar, Gregg; Hair, Sarah E SAW <Sarah.E.Hair@usace.army.mil>
(Sarah.E.Hair@usace.army.mil)
Subject: RE: FW: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point
Developers LLC
Attachments: 20220737_Bridge_View_CarteretCo_June22.docx.pdf
Good afternoon all,
Please see the attached Non Written Approval for Cedar Point Developers, LLC.
Please let me know if you have any questions.
John Perry
Environmental Specialist II
Division of Water Resources
Department of Environmental Quality
127 Cardinal Drive Extension
Wilmington, NC 28405
Office: (910) 796-7341
Cell: (910) 617-9577
From: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Sent: Tuesday, June 7, 2022 8:49 AM
To: Perry, John M <John.Perry@ncdenr.gov>; Hair, Sarah E SAW <Sarah.E.Hair@usace.army.mil>
(Sarah.E.Hair@usace.army.mil) <Sarah.E.Hair@usace.army.mil>
Subject: FW: FW: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point Developers LLC
Hey all,
A little bit more detail below as well.
Gregg
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
(252) 515-5416 (NEW OFFICE NUMBER)
Gregg.Bodnar@ncdenr.gov
Find a Field Rep (arcgis.com)
Email Correspondence to and from this address is hubject to the
North Carolina Public Records Law and may be disclosed to third parties.
i
From: Roy Brownlow <RBrownlow@TidewaterENC.com>
Sent: Monday, June 6, 2022 4:15 PM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: Re: FW: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point Developers LLC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Roger that. I didn't include the stormwater drawings, in line with what you stated, I figured since DEMLR Stormwater
already issued the SW permit, they would not need that. I even mentioned in the narrative there would be no wetland
impacts. Regardless, the certified SW plans shows there are no impacts to any of the wetlands. No basins or trenches are
within the noncoastal or coastal either.
When the designs are ready to submit for the community dock (9 slips) modification, there is no dredging proposed so
I'm not sure about the dredging comment from DWR, but when we finalize those plans, it will show the existing water
depths. (And having a lengthy career in CAMA permitting, I certainly am aware of the "historical dredging" requirement,
especially in ORW.Q) I'll send you the stormwater plan once I get the scanning done and have an opportunity to
discuss with Jonathan McDaniel. I can send directly to them if you prefer and copy you. Just let me know.
Thanks Gregg, I really appreciate your assistance.
Roy Brownlow, Environmental Specialist
604E Cedar Point Blvd
Cedar Point NC, 28584
252-393-6101
TIDEWATER
ASSOCIATES, INC.
On 6/6/2022 3:35 PM, Bodnar, Gregg wrote:
I did advise them that the S&E and SW has been approved and was part of the application.
Gregg
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
(252) 515-5416 (NEW OFFICE NUMBER)
Gregg.Bodnar@ncdenr.gov
Find a Field Rep (arcgis.com)
Email Correspondence to and from this address is hubject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Roy Brownlow <RBrownlow@TidewaterENC.com>
Sent: Monday, June 6, 2022 3:19 PM
2
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: Re: FW: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point Developers
LLC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Thanks, Gregg. I'm getting the information they need, no problem. I'll get it out either today or
tomorrow.
Hope you are doing well.
Best
Roy Brownlow, Environmental Specialist
604E Cedar Point Blvd
Cedar Point NC, 28584
252-393-6101
TIDEWATER
ASSOCIATES, INC.
On 6/6/2022 1:30 PM, Bodnar, Gregg wrote:
More info for the request.
Gregg
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
(252) 515-5416 (NEW OFFICE NUMBER)
Gregg.Bodnar@ncdenr.gov
Find a Field Rep (arcgis.com)
Email Correspondence to and from this address is hubject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Perry, John M <John.Perry@ncdenr.gov>
Sent: Monday, June 6, 2022 11:12 AM
To: Hair, Sarah E CIV USARMY CESAW (USA) <Sarah.E.Hair@usace.army.mil>; Bodnar,
Gregg <gregg.bodnar@ncdenr.gov>; Styron, Heather M.
<heather.m.styron@ncdenr.gov>
Subject: RE: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point
Developers LLC
Good morning all,
3
I echo Liz's thoughts on the infiltration basin designs. The DWR typically does not allow
stormwater BMPs to be constructed in wetlands. I am also unsure of the drainage
easement on lot 59. Will this be trenched, and if so then what depth. Ditches that run
adjacent to wetlands should not be dug deep enough to impact the hydrology, this
depth is typically one foot. Also, it is worth noting that the future proposal for a docking
facility should not have a dredging component unless they can provide historical
dimensions for past dredging activities. I would like to see more info on the basin foot
prints. If they avoid the wetlands then an Individual 401 Water Quality Certification
would not be needed from DWR for this project.
Thanks,
John Perry
Environmental Specialist II
Division of Water Resources
Department of Environmental Quality
127 Cardinal Drive Extension
Wilmington, NC 28405
Office: (910) 796-7341
Cell: (910) 617-9577
From: Hair, Sarah E CIV USARMY CESAW (USA) <Sarah.E.Hair@usace.army.mil>
Sent: Friday, June 3, 2022 6:02 PM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Styron, Heather M.
<heather.m.styron@ncdenr.gov>
Cc: Perry, John M <John.Perry@ncdenr.gov>
Subject: [External] RE: EXPRESS - New CAMA Major Permit Application - Cedar Point
Developers LLC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all
suspicious email as an attachment to Report Spam.
Hi guys,
Happy Friday. Tom Charles approved the JD this week before he went on leave. SAW-
2022-00474. At first glance I was going to say that a Corps permit would not be
required, but when I looked closer at the plans a couple red flags went up. See attached
plans with highlighted areas of concern/question. Specifically, the areas proposed for
infiltration basins within the common areas. It appears they would be in close proximity
to the wetlands onsite, and I didn't see a clear description of their dimensions or
footprints.
I highlighted the water access area, but that was before I read through the project
description that the applicant will be coming back a later time for a dock permit.
If I could get some clarification on the infiltration basins that would be super helpful to
me.
Thanks!
Liz
From: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov>
Sent: Friday, May 27, 2022 9:48 AM
To: Tracy Barnes <tracyb@carteretcountync.gov>; Steffey, Zachary
<zsteffey@capecarteret.org>; Love-Adrick, Rachel A <rachel.love-adrick@ncdenr.gov>;
4
Hair, Sarah E CIV USARMY CESAW (USA) <Sarah.E.Hair@usace.army.mil>; Padrick, Lee
<Ipadrick@commerce.nc.gov>; DCR - Environmental_Review
<Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding,
Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harrison, James A
<James.Harrison@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins,
Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon
<sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike
<mike.moser@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sullivan,
Shelton <shelton.sullivan@ncdenr.gov>; Perry, John M <John.Perry@ncdenr.gov>;
Snider, Holley <holley.snider@ncdenr.gov>; Dunn, Maria T.
<maria.dunn@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov>
Cc: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Howell, Jonathan
<jonathan.howell@ncdenr.gov>; Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: [Non-DoD Source] EXPRESS - New CAMA Major Permit Application - Cedar
Point Developers LLC
EXPRESS MAJOR— Please note comments are due by June 10th, thank
you!
Hello All!
Please accept this correspondence as the official distribution of CAMA application from
Cedar Point Developers, LLC in Carteret County.
Attachments include: Field Investigative Report, work plans, comment sheet, and any other
documents intended for you.
NOTE: Please complete the bottom portion of the comment sheet with your
information and signature.
*RETURN TO GREGG BODNAR at
gregg.bodnar@ncdenr.gov*
The plans are oversized. Ifyou would like a hard copy
mailed to you, please let me know.
For questions or concerns, please contact Gregg Bodnar at gregg.bodnar@ ncdenr.gov
or (252)-515-5416
Thank you!
Anianaa Cannon
Permit Support Coordinator Division of Coastal Management
North Carolina Deparmient of Environmental Quality
252. 515, 5406 (Office)
Arnancla.cannon@ncdenr.gov
Ernax ate xxxhY A;E:.: X1 fr r. ... J. J.:?:..... ...... s . .. S . Fliic Roco tYa • r
rrTTV tW' rlhrf'na r'+ 9'a 'hrri rre
Click HERE to Find the DCM Field Rep in your CAMA region.
5