HomeMy WebLinkAboutNCS000540_Internal Annual Review_20220609AGENDA
Construction Document Review Process
February 21, 2020
Attendees: Engineering: Jon Symoniak, Ashton Walker, Cami Weckerly
Planning: Maureen Gable, Craig Culberson
Fire: Geoff Woolard
Misc. TRC Items Public Education & Outreach
• Regional Stormwater Partnership of the
Carolinas (RSPC)
Public Participation/Involvement
• RSPC?
Illicit Discharge Detection & Elimination
• "Draft" IDDE Program
• Area that probably needs attention
Construction Site Runoff Control
• Iredell County handles Erosion Control
Post -Construction Runoff Control
• Have Stormwater Manual, Program
• SCM Maintenance & Inspection Program
Pollution Prevention/Good Housekeeping
• Municipal Staff Training — Illicit Discharge,
Spill Prevention, and Good Housekeeping
October 2, 9:00-11:30 in China Grove
• Need assistance here as well
NPDES Annual Report Due October 31
Additional Comments and Notes:
i l l
Minimum
Measure
Notes on existing
information
Recommendations
Public
Education
SW website
good information
Creat spreadsheet to track education items for FY 2020
Add hotline # and text to website on the "report a stormwater issue" tab
Plan items for FY 2020 with target dates
Public
Involvement
Volunteer oppurtunities
on website
Creat spreadsheet to track education/participation events for FY 2020
Plan items for FY 2020 with target dates
Must conduct at least 1 public meeting during permit term to allow public commont on SW Plan
IDDE
Link to ordinance on website
Good info on website
Make a plan to update your mapped system (Waters of the US, Major Outfalls) (incl. pipes, open channels,
structures, flow direction) Establish timeframe - ie: 25% each year
Update IDDE Plan (must maintain a written IDDE Program)
Update your IDDE Tracking / Reporting
Establish (or update) SOP for dry weather detection & update tracking
Establish (or update) SOP for investigating identified illicit discharges
Update training for employees who may observe illicit discharges - and track
Promote hotline & establish response procedures
ESC
little info on website
Add a link to Iredell Co's page. https://www.co.iredell.nc.us/269/Erosion-Control-Section
Establish (or update) procedures for site plan review/inspection/enforcement - is that all DEQ?
Post-Constr
Link to ordinance on website
O&M agreements available
Inspection forms available
Are the documents (O&M agreements) on the website current?
Create or update spreadsheet to inventory SCMs and track inspections & O&M docs
Establish & track plan reviews for SCMs
Establish SOP for maintaining O&M agreements & annual inspection submittals - and tracking
PP/GH
Good plans, just not
updated on a regular
basis
Inventory of municipal facilities with potential polluted runoff
Locate/establish/update O&M Plans for municipal facilities above
Make sure all O&M plans for required facilities include a spill response plan
Provide spill respons training
Inventory and O&M for municipal SCMs
Update sw system (incl catch basins) & SCM inspection schedule - establish frequencies
Create spreadsheet to track/document MS4/SCM inspections
Training for staff who apply pesticides, herbicides, and fertilizers - & document
Establish BMPs for vehicle/equipment cleaning. Training for staff who maintain vehicles & equipment - &
document
Evaluate BMPs to reduce polluted runoff from public streets & parking lots. (street sweeping)
Month Date Event/Action Rem
Details
letters reminding SCM owners about Phase ll Annuallmpectlon Report requirements must be Post Construction Runoff
January 1 Mail letters requesting required annual Inspection reports for Phase ll KMs
mailed by January)(per Town Ordinance)
Controls
Post Constructions Rumff
January anyhow Annual Inspection of Townowned SCMs
iapem and have PE sign off on Annual lmpection report for all Town owned Kids
Controls
owners of Phase 11 KMs must submit completed annual inspection reports by this date,
Post Construction Rumff
March 31 Phase ll Annual lnspecton Reports Due
follow up with all owners who submit reports thatstate the KM 4 not in compliance
Controls
owners of Watershed KMs are to submit completed annual inspection reports by this date,
March 31 Watershed KM Annual lmpection Reports Due
follow up with all owners who submit reports that scale the KM u not in compliance
Mist..
advertise the storm drain marking volunteer program in the Town Voice or thin other
methods fdisplayhq Men advertisingthe program at various town flakes). If advertising in
Publichramomentand
Apra anytime Advertise Volunteer Program
the Town Voice Newsletter,mussubmit article to Joseph Shook by the loth of the month.
Partklpation
Saturday of Charlotte
Street festival In May. Town has a booth and hands out Dyers and other information an
Public Education and
May Rare Week each May Rare City Festival
programs and services offered by the Town.
Outreach
Kickoff for Umory
.Each
Ubrary's kickoffevent for summer reading prOgom. Rormati eo about
Summer Reading
th it pror
Wrtern ss. set up in the library, to display information about Dletr program,
Public Education and!
June Program Know -It -All
or uhas sin
service or business.
Outreach
Contact Barbara Johnsen at the Winnie Nmper Center each summer tip ask R Stmnm rter can
Foulard. Use Watershed Model or Play Interactive games with attendeesef the summer
Public EduaDon and
June no set date Summer Camp
camp to educate children about sternamer pollution prevention.
Colonists
Street festival in August and Is a community-polke awareness -raising swam. Town has a
booth and hands out Dyers and other Information on programs and services offered by the
Public Education and
August first Tuesday National Night Out
Town.
Outreach
Tale October, shed
Chamber of
Mooresville -South lredell Chamber of Commerce Event Town has a booth and hands out
Public Education and
October Commerce WeAfte Community & Business Doe
flyers and other Information on programs and services offered by the Town.
Outreach
TBD TBD Annual Permit Fee
Annual Dennis renewal fee to be paid to NCDEQ within 30 days after being billed by NCDEQ
General
September/
Review and update )as needed) all programs required by the Phase II permit. Identify areas
October anytime Review programs required by Phase it permit
that require Improvement and whether or not comant methods have been effective.
General
Annual reports must be submitted to NCDFQ Within 12 months from the effective date of this
Permit. Subsequent opens must be submitted every 13 months from the scheduled date of
the first submittal )see Part 111.8 of the Phase If Permit). Post pc f report on stormwater
I
October by October 31 Annual Report Due
molle
Permit Requirement I
I
Train employeeswho would have exposure to normwater on Illicit discharges and good
I
housekeeping and pollution prevention. Email PD and other departments to redo training or
November anytime Annual Employee Training
request that Minlry presentations are madded m training pladorm.
Permit Requirement
Ma0 afters reminding Phase It KM owners about Annual Inspection Report
Mail letters explaining and reminding Phase ll KM owners en submit annual inspection
Pen Comosm.. Rumff
December anytime Requirements
reports as required by the Phase ll Ordinance.
Controls
Mail attars reminding Watershed KM Oman about Annual Inspection Report
Mall letters explaining and reminding Watershed SCIA omem to submit annual lmpectlon
Oecamber anytime Requirements
remits to show they are maintaining their KM In accordance wish the Watershed Ordinance.
Miss.
submit approdmately 3 ankles on smrmwater pollution prevention and other stormwatef
topics to Joseph Shook to he included In monthly, Town Vole newsletter that is included with
Throughout
the uRlity bills. See Public Education and Outreach foster for Ideas for topics and a record of
Public Education and
the Year any month Town Voice Articles
topics already done.
Outreach
Necessary Information
Letter templates and BMP inventory
which details the maRhg address
Town owned and malntalnM SCAss to be
Inspected by a certlRed staff member
tog Inspection reports In the BMP
Inventory. There are tabs In the Inventory
database for Phase II and Watershed SCM
Inspections.
q/A
tee all folders In stormwater program
Jpdate Stormwater Management
tlan/Annual Report with information for
he reporting year
Jther opt or training flyer for the
bllowing departments: all maintenance
sanlutlon, Wallops & 8arunds, fire
Ind polite
use template letter save under letters In
the Post ConnmcUon insist. There era
letters for both Phase II and Watershed
BMPs. MaBing list an be found with the
BMP Inhuman,
a
Ordinance Most Recent Review Date
Post Construction and Illicit Discharge and Detection Ordinance 10/24/2018
Stormwater Utility Ordinance 10/23/2018
Floodplain Development Ordinance