Loading...
HomeMy WebLinkAboutNCC213803_NOT Closeout Documents_20220603Georgoulias, Bethany From: Jeff Watson <watson@oysterdvp.com> Sent: Friday, June 3, 2022 7:13 AM To: Georgoulias, Bethany; laserfiche@ncdenr.gov; Clark, Paul Subject: [External] Fwd: Notice of Termination NCC213803 Attachments: Retail Drive Thru NOT.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Stormwater Team, I may have attached the wrong form for Stormwater NCC213803. Please see attached the correct form from the city to closeout the project. Thank you and have a great day! Jeff Watson Oyster Development, Inc. 704-906-4491 Watson@Oysterdvp.com CHA RLOTTE . Storm Water Services Land Development June 03, 2022 Grading Permit Notice of Termination Jeff Watson 568 Jetton Street Suite 200 Davidson, NC 28036 Reference: Retail Coffee House with Drive-Thru Permit Number: LDGP-2021-00145 You or your firm are on record as the owner or financially responsible party for land- disturbing activity at the subject site covered under the above referenced grading permit number. Per the completion of your project or your request, the City of Charlotte is closing the grading permit. Any further land -disturbing activity of one or more acres will require an application for a new grading permit. If you have any questions or feel the grading permit should remain open, please contact the Erosion Control Coordinator assigned to your project. Issued by, J . James Wilson, CPESC Erosion Control Administrator Thursday, June 2, 2022 at 12:53:57 Eastern Daylight Time Subject: City of Charlotte - Application LDAB-2022-00009 has been approved Date: Wednesday, April 20, 2022 at 8:00:37 AM Eastern Daylight Time From: noreply@accela.com To: Jeff Watson, Jeff Watson, tmcmannis@dewberry.com, tmcmannis@dewberry.com The plan review for LDAB-2022-00009 is completed and the plan has been approved. You may now download your approved & stamped plan set through the Plan Room in Citizen Access and view any conditions noted during the review process, • Download Approved Documents • View Conditions • View Notes Video Tutorial: Download Approved Documents If you have questions about this message or to discuss this matter further, please contact us. Address: 4019 BROOKSHIRE BV Record Number: LDAB-2022-00009 Application Name: Retail Coffee House with Drive-Thru Description: Stormwater as built submittal for the recently constructed retail coffee house located at 4019 Brookshire Boulevard. Thank you! City of Charlotte CLT Development Center 704-336-6692 CHARLOTTE: PROD Page 1 of 1 WOODMAN AVENUE (CDOT MAINTAINED)N.C. HWY #16BROOKSHIRE BOULEVARD/749 748747748749750751751 752753750754755757756758755 754 753 7 5 2 7 5 1 763762761 764 760759758757757756 757758759759758757758759760 761750749 75175275375475775475575775175775075075574975175275375475375675175074910+0011+0012+0013+0013+5210+0011+0012+00 12+40 760758759755749750751752753 754755756758759751757756756 755754753 752 758758 760 761 7 6 0 757756745743744746747748749750751750751748747746745757 757756 75375575675810+0010+2710+0010+3410+0010+5010+7910+00757757756757 10+0011+0011+35761762763 763 76 2 759760749N 556607.23E 1438431.830+501+001+502+002+503+003+504+004+505+005+506+006+506+75XS 0+50.00XS 1+00.00XS 1+50.00XS 2+00.00XS 2+50.00XS 3+00.00XS 3+50.00XS 4+00.00XS 4+50.00XS 5+00.00XS 5+50.00XS 5+92.32XS 5+92.32XS 6+00.00XS 6+12.16XS 6+50.00XS 0+00.00 XS 0+50.00 XS 1+00.00 XS 1+50.00 XS 2+00.00XS 2+50.00XS 3+00.00XS 3+50.00XS 4+00.00XS 4+50.00XS 5+00.00XS 5+12.490+001+002+003+004+005+005+12756.94757.54 757.22 757.17 757.7 0 757.2 8 756.0 0 757.4 9 758.6 9 760.8 9 757.20756.96 756.62 756.78 757.5 5 758.0 5 758.4 8 758.8 6 759.9 0 761.2 3 756.06 PROPOSED2,347 SFBUILDINGFFE = 759.00EXISTING 68.00DUKE ENERGY R/W20' FRONT SETBACK20' FRONT SETBACK20' FRONT SETBACKEXISTING PROPERTY LINE (TYP.)EXISTING PROPERTY LINE (TYP.)470 SFPATIOSDE S D E SDESDESDESDESDESDESDESDESDESDESDEPCCEPCCEPCCEPCCEPCCEPCCEPCCEPCCEPCCEPCCESDETPROP. 2' SIDEWALK EASEMENTPROP. 2' SIDEWALK EASEMENTEXISTING R/WPROP. 2' SIDEWALK EASEMENTHW-B4JB-B3EX-CB-B5JB-B2EX-CB-B7JB-B1CB-A3JB-A2CB-A4CB-A5JB-A1CB-A6CB-C12 4 " R C P C L A S S I I I24" RCP CLASS III24" RCP CLASS III15" RCP CLASS III24" RCP CLASS I I I 18" RCP CLASS III18" CMP18" RCP CLASS I I I 18" RCP CLASS III18" RCP CLASS III18" RCP CLASS I I ITW 756.00BW 752.00TW 755.00BW 752.00TW 755.00BW 752.00TW 755.00BW 752.00TW 755.88TW 755.49BW 752.004:14:1321C B A SEALSCALE:4DE5APPROVED BYCHECKED BYREVISIONSTITLEDRAWN BYDATESHEET NO.RETAIL COFFEE HOUSE WITH DRIVE-THRU 100% CONSTRUCTION DOCUMENTS 4019 BROOKSHIRE BLVD. CHARLOTTE, NORTH CAROLINADEI PROJECT NO: 50130258FEBRUARY 17, 2021Dewberry Engineers Inc.9300 Harris Corners Pkwy - Suite 220Charlotte, NC 28269Phone: 704.509.9918Fax: 704.509.9937www.dewberry.comNCBOLA #C-478Know what'sbelow.before you dig.CallRNCBELS #F-0929KEY PLAN:TMMTMMJGLC4.01GRADING ANDSTORM DRAINAGEPLAN20'0'40'1" = 20'SEE UNDERGROUNDDETENTIONENLARGEMENT THISSHEETPROPOSED STORMJUNCTION BOX (TYP.)PROPOSED STORMHEADWALLPROPOSED STORMCATCH BASIN (TYP.)86 90-LF 48" CMP0.5% MIN.86 90-LF 48" CMP0.5% MIN.INV. 745.04 744.63INV. 745.00 744.63INV. 745.45 745.14INV. 745.49 745.14PROPOSED CATCH BASINWITH ATRIUM GRATE(SEE DETAILS)15 10-LF OF 12"SCH. 40 PVC @3.73 5% MAX.INV. 746.97 745.1413-LF 48" CMP0.0 0.5% MIN.PROPOSED 2' DIA.MANHOLE ACCESSWITH STEPS (TYP.)13-LF 48" CMP 0.0 0.5% MIN.PROPOSED 5'x6.5' OUTLETCONTROL STRUCTURE(SEE DETAILS)36" CMP INV. 745.00 744.74DETENTION PIPE CONNECTION TO CONTROLSTRUCTURE SHALL BE WATER TIGHTALL JOINTS AND WELDS SHALLBE WATER TIGHT ANDCORROSION RESISTANTPROPOSED DETENTION PIPESSHALL BE ALUMINIZED CMPAND INSTALLED IN BEDDINGAS RECOMMENDED BYMANUFACTURER3.00' MIN.12" SCH. 40 PVC FROM OVERFLOWORIFICE - SEE DETAILS1.00' MIN.(TYP.)EXISTING36" RCPUNDERGROUND DETENTION ENLARGEMENTSCALE: 1" = 5'PROPOSED RETAINING WALL SHOWN FORINFORMATION ONLY. IF STRUCTURAL DESIGN ISREQUIRED, CONTRACTOR SHALL BE RESPONSIBLEFOR HAVING THE DESIGN COMPLETED BY OTHERS. WALL SHALL INCLUDE 4' MIN. HEIGHT BLACK, VINYLCOATED CHAIN LINK AROUND PERIMETER - SEEDETAILS. CONTRACTOR SHALL PROVIDE SHOPDRAWINGS TO CITY AND ENGINEER FOR REVIEWPRIOR TO CONSTRUCTION5.00'NOTE: CONTRACTOR IS RESPONSIBLE FOR HAVING SHOPDRAWINGS FOR UNDERGROUND DETENTION SYSTEMPREPARED BY A STRUCTURAL ENGINEER LICENSED INNC AND SUBMITTED TO DESIGNER OF RECORD ANDDEVELOPER PRIOR TO CONSTRUCTION.PROPOSED 24" BYPASSSTORM PIPE (TYP.)1.CONTRACTOR IS RESPONSIBLE FOR OBTAINING A BUILDING PERMIT FORRETAINING WALL CONSTRUCTION PER STATE AND LOCAL BUILDINGCODES. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF RETAININGWALL TO CITY OF CHARLOTTE AND ENGINEER FOR REVIEW PRIOR TOCONSTRUCTION.RETAINING WALL NOTES LEGENDEXISTING PROPERTY LINEEXISTING SANITARY SEWER MANHOLEEXISTING CURB AND GUTTEREXISTING WATER VALVEEXISTING WATER METEREXISTING TREE LINEEXISTING FENCEEXISTING OVERHEAD POWER LINEEXISTING POWER POLEFHEXISTING FIRE HYDRANTEXISTING LIGHT POLEEXISTING CATCH BASINEXISTING MAJOR COUNTOUREXISTING MINOR CONTOURSEXISTING GAS LINEEXISTING WATER LINEEXISTING SANITARY SEWER LINEPROPOSED MAJOR COUNTOURPROPOSED MINOR CONTOURSPROPOSED HEADWALLPROPOSED STORM DRAIN MANHOLEPROPOSED CATCH BASINPROPOSED RETAINING WALLPROPOSED BOTTOM OF WALL ELEVATION600.00 TWPROPOSED TOP OF WALL ELEVATION600.00 SPPROPOSED SPOT ELEVATION600.00 BW600.00 SWPROPOSED SIDEWALK ELEVATION600.00 TCPROPOSED BOTTOM OF CURB ELEVATION600.00 TSPROPOSED TOP OF SLAB ELEVATION600.00 EPPROPOSED EDGE OF PAVEMENT ELEVATIONPROPOSED SIDEWALK SHALL HAVEMAXIMUM 2% CROSS SLOPE AND5% RUNNING SLOPE (TYP.)NORTH ORIENTED TONC GRID (NAD83/2011)NORTH ORIENTED TONC GRID (NAD83/2011)PROPOSED EDGE OFSIDEWALK TURN DOWNANY PROPOSED WORKWITHIN 25' OF EXISTINGSTEEL POWER POLE SHALLBE DONE WITH HAND TOOLSWHERE PRACTICABLE.CONTRACTOR SHALL LIMITWORK AROUND THE BASEOF THE POWER POLE TOTHE MAXIMUM EXTENTPRACTICABLE.PROPOSEDOUTLET CONTROLSTRUCTURE - SEEDETAILSPROPOSED 6" PVC ROOFDRAIN AT 1% MIN.SEE SHEETS C5.03-C5.06 FORMORE INFORMATIONSEE SHEETS C5.03-C5.11 FORMORE INFORMATIONPROPOSED CLEANOUT(TYP.) - SEE DETAILSSTA. 3+77.16 END CURB ANDGUTTER REMOVALINV. OUT: 741.98 741.90NOTE: END OF NCDOTSTATE MAINTENANCEAT OUTLET CONTROLSTRUCTUREEX. R/W (TYP.)EX. R/W (TYP.)PROPOSED PCCE MIN.20' WIDTH (TYP.)PROPOSED RIPRAP/STONE FOREBAYPROPOSEDRIGHT-IN/RIGHT-OUTDRIVEWAYINV. OUT: 741.98CONTRACTOR SHALL CONSTRUCTNEW CATCH BASIN WITHIN CURB LINEAND MAINTAIN EXISTING INVERTS755.11755.15755.80755.83755.80750.0741.61750.30755.21750.20750.10BMP CERTIFICATION:THE AS-BUILT STORM WATER MEASURES, CONTROLS, ANDDEVICES ARE IN COMPLIANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS AND WITH THEREQUIREMENTS OF THE POST-CONSTRUCTION CONTROLSORDINANCE.RECORD DOCUMENTSDECEMBER 17, 2021RECORD DRAWINGORIGINAL CONSTRUCTION DRAWINGSWERE SEALED BY TRISTAN M. MCMANNIS(NC PLA #1622) ON 25 MAY 2021DRY DETENTION AS-BUILTTOPOGRAPHIC INFORMATION:AREA @ ELEV. 749 = 400 SFAREA @ ELEV. 750 = 676 SFAREA @ ELEV. 751 = 1,159 SFAREA @ ELEV. 752 = 1,159 SFAREA @ ELEV. 753 = 1,159 SFAREA @ ELEV. 754 = 1,159 SFAREA @ ELEV. 755 = 1,159 SF15" CORRUGATED PLASTICPIPE ADDED DUE TO FIELDCHANGE TO ADDRESSOFF-SITE RUNOFF15" CORRUGATED PLASTICPIPE ADDED DUE TO FIELDCHANGE TO ADDRESSOFF-SITE RUNOFF.INV. IN = 746.762/28/2022City of Charlotte Engineering Department Phase _____ Map ______ Storm Drainage Detention Water Quality As-built approved as noted By:___________________ Date:__________ 11Keith Schell04/20/2022X 321C B A SEALSCALE:4DE5APPROVED BYCHECKED BYREVISIONSTITLEDRAWN BYDATESHEET NO.RETAIL COFFEE HOUSE WITH DRIVE-THRU 100% CONSTRUCTION DOCUMENTS 4019 BROOKSHIRE BLVD. CHARLOTTE, NORTH CAROLINADEI PROJECT NO: 50130258FEBRUARY 17, 2021Dewberry Engineers Inc.9300 Harris Corners Pkwy - Suite 220Charlotte, NC 28269Phone: 704.509.9918Fax: 704.509.9937www.dewberry.comNCBOLA #C-478Know what'sbelow.before you dig.CallRNCBELS #F-0929KEY PLAN:TMMTMMJGLC7.07STORM DRAINAGEDETAILS(SHEET 2 OF 2)AAOUTLET CONTROL STRUCTURETOP VIEWNTS6'5'7.5'6.5'2' DIA. MANHOLEFRAME AND LID -SEE DETAILS48" W RECTANGULARWEIR CAST IN BOXBY MANUFACTURER36" CMP FROMUNDERGROUNDDETNETION SYSTEM4" ORIFICE WITHTRASH RACKEXISTING 36" RCPOUTFALL24" RCPBYPASSSTORMPRE-CAST STRUCTURE WALLS SHALLBE DESIGNED TO MEET OR EXCEEDHS-20 RATED LOADING (TYP.)2' DIA. MANHOLEFRAME AND LID -SEE DETAILSEPOXY COATEDSTEPS TO BE CASTINTO SIDE WALL OFVAULT (TYP.)OUTLET CONTROL STRUCTURESECTION A-ANTS6'36" CMP FROMDETENTIONSYSTEMINVERT = 745.00' 744.74'4" DIA. OPENINGWITH TRASH RACKEXISTING 36" RCPOUTFALLINVERT = 741.98' 741.6148" W RECTANGULARWEIR CAST IN BOXBY MANUFACTUREREPOXY COATEDSTEPS CAST INTOSIDE OF STRUCTURE@14" O.C. MAX (TYP.)HS-20 RATEDMANHOLE FRAMEAND LID (TYP.) - SEEDETAILS24" BYPASS STORM745.00 744.74747.50 747.39RIM: 751.50 749.91 748.50 (EC PHASE 1)PRE-CAST STRUCTURE WALLS SHALLBE DESIGNED TO MEET OR EXCEEDHS-20 RATED LOADING (TYP.)CONNECTION OF CMP TO CONTROLSTRUCTURE SHALL BE WATER TIGHTOUTLET CONTROL STRUCTUREELEVATION VIEWNTSCONTECH STORMRAX OR APPROVEDEQUAL BMP TRASK RACK WITH 0.75"ØORIFICE IN PLATE OVER 4" OPENINGIN BOX INV: 745.0048" W RECTANGULARWEIR CAST IN BOXBY MANUFACTUREREPOXY COATEDSTEPS CAST INTOSIDE OF STRUCTURE@14" O.C. MAX (TYP.)HS-20 RATEDMANHOLE FRAMEAND LID (TYP.) - SEEDETAILSPRE-CAST STRUCTURE WALLS SHALLBE DESIGNED TO MEET OR EXCEEDHS-20 RATED LOADING (TYP.)747.50 747.39745.00 744.742-YR ELEVATION = 746.98 747.0410-YR ELEVATION = 747.59 747.5225-YR ELEVATION = 747.69 747.6050-YR ELEVATION = 747.79 747.664.0'36" CMP FROMUNDERGROUND DETENTION36" RCP OUTLETCONCRETE PIPE TREATMENT FOR PIPES THROUGH RETAINING WALLNOT TO SCALENOTES:1.CONTRACTOR SHALL COORDINATE INSTALLATION OF CONCRETE AT PIPE OUTFALLWITH INSTALLATION OF SEGMENTAL BLOCKS.2.CONTRACTOR SHALL PROVIDE SHOP DRAWING SUBMITTAL OF DESIGN OFCONCRETE TREATMENT PRIOR TO CONSTRUCTION.12" MIN.12" MIN.12" MIN.6" MIN.CONCRETE FLUSHTO PIPE6"4,000-PSI. CONCRETESEGMENTALBLOCK (TYP.)OVERFLOW ORIFICENOT TO SCALENOTES:1.CONTRACTOR SHALL COORDINATE INSTALLATION OF PONDOVERFLOW ORIFICE AND PIPE WITH INSTALLATION OFSEGMENTAL BLOCKS.6"749.00 750.5712" PVC FROMPOND ATRIUMINLETSEGMENTALBLOCK RETAININGWALL25-YR ELEVATION = 753.41 753.921.5'ATRIUM GRATE DETAILCONTRACTOR SHALL CAST-IN-PLACETHIS PORTION OF CONCRETE WITHINOUTLET CONTROL STRUCTURE747.50 745.7012" PVC CAPWITH 0.5"ORIFICEAADDUCTILEIRONRAI NST O W A T E R W A Y SNYLOPLAST D O NOTPOLLUTESECTION A-A5.00"Ø19.50"DIMENSIONS ARE FOR REFERENCE ONLYACTUAL DIMENSIONS MAY VARYDIMENSIONS ARE IN INCHESQUALITY: MATERIALS SHALL CONFORM TO ASTM A536 GRADE 70-50-05PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINTLOCKING DEVICE AVAILABLE UPON REQUESTAPPROX. DRAIN AREA = 175.59 SQ INAPPROX. WEIGHT = 32.00 LBS1899CGDCONTRACTOR SHALL INSTALLCONCRETE COLLAR PER WALLMANUFACTURER/SUPPLIERINSTRUCTIONS753.78BMP CERTIFICATION:THE AS-BUILT STORM WATER MEASURES, CONTROLS, ANDDEVICES ARE IN COMPLIANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS AND WITH THEREQUIREMENTS OF THE POST-CONSTRUCTION CONTROLSORDINANCE.RECORD DOCUMENTSDECEMBER 17, 2021RECORD DRAWINGORIGINAL CONSTRUCTION DRAWINGSWERE SEALED BY TRISTAN M. MCMANNIS(NC PLA #1622) ON 25 MAY 2021PIPE NOT INSTALLED DUE TOPROXIMITY OF UNDERGROUNDINFRASTRUCTURE - SEE STAND PIPEINSTALLED BELOW12" DIA. PVC STANDPIPE INSTALLEDAS FIELD CHANGE TO PREVIOUSLYAPPROVED OPENING IN RETAININGWALL1438431.83556607.232/28/2022 DocuSign Envelope ID: 96BF9D6B-F94E-4DOB-9630-AD7D39BOF8D6 OWNER: 404 MIDLAND AVENUE LLC 256 BROOKSIDE AVENUE WYCKOFF, NJ 07481 LEGEND: CP - CALCULATED POINT DB. - DEED BOOK ECM - EXISTING CONCRETE MONUMENT EIP - EXISTING IRON PIPE EIR - EXISTING IRON ROD EMM- EXISTING METAL MONUMENT EN - EXISTING NAIL (M) - MEASURED MB. - MAP BOOK NCM - NEW CONCRETE MONUMENT N.G.S. - NATIONAL GEODETIC SURVEY NIR - NEW IRON ROD NN - NEW NAIL (P) - PLATTED PIN - PARCEL IDENTIFICATION NUMBER PG. - PAGE (R) - RECORDED RIW - RIGHT-OF-WAY (I) - TOTAL PROPERTY LINE PROPERTY LINE (NOT SURVEYED) - - - - - - - RIGHT-OF-WAY RIGHT-OF-WAY (NOT SURVEYED) ----------- EASEMENT SETBACK PCSO & TREE SAVE AREA PLAT FOR THE: 404 MIDLAND AVENUE LLC PROPERTY For Registration Fredrick Smith Register of Deeds Mecklenburg County, NC Electronically Recorded 2022 Feb 17 11:05 AM RE Excise Tax: $ 0.00 B L, 70 P 248 - 248 Fee' $ 21 00 \\ %dw . age. Instrument Number: 2022025948 OWNER: 404 MIDLAND AVENUE LLC 4007 & 4019 BROOKSHIRE BOULEVARD CITY OF CHARLOTTE, MECKLENBURG COUNTY, NC LOTS 1 & 2, M.B. 28-893 McCLURE REAL ESTATE PROPERTY - MAP 1 DEED REFERENCE: 36971-561 TAX PARCEL NO: 039-015-06 BOUNDARY LINE TABLE: LINE BEARING DISTANCE L1 S17'35'08"E 35.04' L2 S72°24'52"W 3.00' L3 S17'35'08"E 10.01' L4 N72'24'52"E 3.00' L5 S11'52'30"E 8.50' L6 I S11'58'57"E 11.62' L7 S17°41'35"E 26.66' L8 S10'29'49"W 6.96' L9 S15°49'28"E 14.96' EASEMENT LINE TABLE: LINE BEARING DISTANCE L 10 S2J'40'51 E 9.98' L 1 1 S27'41 01 'E 45.9 1' L 12 N55'47 32'E 23.37' L 13 S54'0941 "W 1.86' L 14 S54'0941 "W 24.93' L 15 I N55'47 32'E 27.36' EASEMENT CURVE TABLE: CURVE RADIUS ARC LENGTH CHORD BEARING CHORD LENGTH C 1 52.00' 7.72' N88°59'40'E 7.72' C2 0.50, 0.65, S58'0458'E 0.60, C3 33.50' 12.4 1' S31 '30'52'E 12.33' C4 1.46' 0.50' N47'5236E 0.50' C5 33.00' 5.47' S46'52'14'E 5.46' C6 54.00' 26.33' S37'38'57'E 26.07' C7 1061.21 ' 80. 06' 525'04' 1 1 'E 80.04' C8 22.00' 5.22' S81'5459"W 5.20' C9 49.50' 8.87' S80° 15,19 "W 8.86' C 10 49.50' 52. 19' N64°24 26"W 49.8 1' C 11 26.55' 25.93' S70'5938'E 24.9 1' C 12 10.00' 8.76' N47'4755 E 8.48' C13 1694.57' 26.84' S21'41'17'E 26.84' C 14 15.00' 27.83' S71 '03'37' E 24.01 ' C 15 1694.51 ' 104.71 ' S19°27'50'E 104.69' C 16 1694.5 1' 176.98' S25'08'02'E 176.90' 1/9-SR \ \ \ / G �\4Pp \\\ \ \ \ / taw 02'p3! E 46R,02082�!!! O�V� __► - - - APM4OX/MA # �[W r \ q p R/W ACQV SI T �N Wl Ty I 16 (TIE TO NAIL3 PERMANENT UTILITY I 3 D P ) / / / / / / REMAINDER OF LOT 3 M.B. 28, PG. 893 SHREEJI PROPERTIES, INC. / D.B. 9439, PG. 896 PIN: 039-015-08 / / / / / / / L___________________________________ /rE� SURVEYOR'S CERTIFICATE: c4 ^N 2 e� PRO EASEMENT R Ug W ON" (R/W ACQUISITION 0&6iD N R/W R kl C �/C \ OCD D.B. 15310, PG. 301) l 15310, \ R AT/ \ 15310-296 \ 20' 3i733p1 g0 \ \ 20• APPRO Iz?34,\ kIN14UMX. S OpA110 \ PERMANENT UTILITY EF 2pN1NG Na9\Nf /_\ \ \ EASEMENT re� l l \ j/2. \ \ D BR/ 5310, PIG. 2 6) Li�vR PERMANENT DRAINAGE EASEMENT \ \ L7 \ \ � (R/W ACQUISITION IS BASED ON THE LOCATION 20' SETBACK SHOWN \ �� D.B. 15310, PG. 296) OF THE R/W PRIOR TO THE 1 2 R/W ACQUISITION IN DEEDS G1�� RECORDED IN REMAINDER OF LOTS 1 & 2 15310-296 & 15310-301. 4¢6E s M.B. 28, PG. 893 (PZR REPORT NEEDED TO ` 75 _ 404 MIDLAND AVENUE LLC DETERMINE UP TO DATE S33'45 49'E 91.J4 (TOT D.B. 36971, PG. 561 SETBACKS) - - - - - PIN: 039-015-06 AREA: 56,591 SO. FT. OR - - 1.2991 ACRES R' 16y4 51' AI-) POST -CONSTRUCTION CONTROLS EASEMENT C1 CH, S22 5435E 30g 50 I AREA: 5,037 SQ. FT. OR 0.116 ACRES 308,T S33 47 55'E 170.59' / /4. C5 Cj STORM DRAIN EASEMENT DUKE POWER R/W AREA / G2 v I AREA: 4,898 SQ. FT. OR 0.112 ACRE RELEASED PER M.B. 38, PC. 961 / N34'12 35"W 166.60' N . (M.B. 28, PG. 893) 20' MINIMUM SETBACK LINE (SEE ZONING NOTE) 2I N34°11'49"W 188.55' DUKE POWER EASEMENT ao PER M.B. 38, PG. 961 fO N34'11'49"W 382.68' PERMANENT UTILITY EASEMENT (R/W ACQUISITION D.B. 15310, PG. 296) Ste. os� 5 SITE coo tiw��� 00 �+� ¢10 A�• 1 VICINITY MAP NOT TO SCALE NOTES: 1. ALL CORNERS MONUMENTED AS SHOWN. 2. NO RECOVERABLE NGS MONUMENT LOCATED WITHIN 2,000 FEET OF SUBJECT PROPERTY. 3. BROKEN LINES INDICATE PROPERTYLINES NOT SURVEYED. 4. BROOKSHIRE BOULEVARD IS SHOWN AS A "FREEWAY EXPRESSWAY" ON THE MECKLENBURG-UNION METROPOLITAN PLANNING ORGANIZATION THOROUGHFARE PLAN OF 2004 AND MAYBE SUBJECT TO A FUTURE RIGHT-OF-WAY OF 175' FROM CENTERLINE. 5. THE OFF -SITE RIGHT-OF-WAY SHOWN HEREON IS FOR ILLUSTRATIVE PURPOSES ONLY. THE UNDERSIGNED CERTIFIES ONLY TO THE RIGHT-OF-WAYS SURVEYED, AND DOES NOT CERTIFY TO THE RIGHT OF WAY WIDTH OF ANYADJA CENT PROPERTIES. 6. PHYSICAL IMPROVEMENTS MAY EXIST ON THIS PROPERTY THAT ARE NOT SHOWN HEREON. 7. THE PURPOSE OF THIS PLAT IS TO RECORD TREE SAVE AREA, STORMDRAIN EASEMENT (SDE) AND POST CONSTRUCTION CONTROLS EASEMENT (PCCE) ON THE SUBJECT PROPERTY, ALL AS SHOWN HEREON. 8. ALL AREAS SHOWN HEREON WERE DETERMINED BY COORDINATE COMPUTATION. 9. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND MEASUREMENTS. 10. HORIZONTAL DATUM IS BASED ON NCGS MONUMENT "McDOWELL ", AS SHOWN HEREON. 11. BOUNDARY INFORMATION SHOWN HEREON TAKEN FROMA SURVEY PREPARED BY R.B. PHARR & ASSOCIATES, P.A., DATED JULY27, 2020, LAST REVISED JUNE 16, 2021, BEARING JOB NO. 91765. 12. THIS MAP WAS PERFORMED WITHOUT BENEFIT OF A TITLE COMMITMENT REPORT. R.B. PHARR & ASSOCIATES, P.A. DOES NOT CLAIM THAT ALL MATTERS OF RECORD, WHICH MAY OR MAY NOT AFFECT THE SUBJECT PROPERTY, ARE SHOWN HEREON. 13. THE PURPOSE OF THE POST -CONSTRUCTION CONTROLS EASEMENT (PCCE) IS TO PROVIDE STORM WATER CONVEYANCE AND CONTROL AND TREATMENT OF STORM WATER RUNOFF. BUILDINGS OR ANY OTHER OBJECTS WHICH IMPEDE STORM WATER FLOW, SYSTEM PERFORMANCE, OR SYSTEMMAINTENANCE ARE PROHIBITED. THIS EASEMENT ALSO PROVIDES FOR UNRESTRICTED ACCESS FOR INSPECTION AND MAINTENANCE PURPOSES TO BE PERFORMED ON THE BMP AS REQUIRED BY THE CITY OF CHARLOTTE POST -CONSTRUCTION STORMWATER ORDINANCE. 14. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER CONVEYANCE. BUILDINGS ARE NOT PERMITTED IN THE EASEMENT AREA. ANY OTHER OBJECTS WHICH IMPEDE STORM WATER FLOW OR SYSTEM MAINTENANCE ARE ALSO PROHIBITED. MAINTENANCE OF PIPES AND CHANNELS IN THESE PLATTED AREAS IS THE INDIVIDUAL PROPER TYOWNER'S RESPONSIBILITY. 15. THERE IS A 10' NO BUILD ZONE AROUND THE TREE SAVE AREAS. Submitted electronically by R. B. Pharr & Associates, PA in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Mecklenburg County Register of Deeds. =wRONE qTE OLD S 00 C16 _ 20 EMU8(TIE) - 1 /N"NIR - - - N TREE SAVE ;AREA: 8,676 SQ. FT. 0.1992 ACRES s i II NGS MONUMENT II r----� "McDOWELL" N43-23 N34'08'31 W 189.20' o g22.67'( GRO ND) i CHORD NATES011) 99 844187 I E:1,452,816.02' 1/4-OR20'80 N:558,384.47' CGF' ELEV. 681.79' E:1,438.511.47' WOODMANAVENUE -- -- -- - i -- -- -- (M.B. 28, PG. 893) - - - - - - - �[8_ IR 1/4"EIR 1/4"EIR r8"EIR - - - - - - /4'EIP-------------5/8:;P��������� 1�/4'EIR 'aR������� BBE�N�TT))(BOM STATE OF NORTH CAROLINA COUNTY OF MECKLENBURG I, THE UNDERSIGNED SURVEYOR, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEYMADE UNDER MYSUPERVISION (DEED BOOK 36971, PG. 561); THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM INFORMATION AS REFERENCED ON THE FACE OF THISPLAT; THAT THE RATIO OF PRECISION AS CALCULATED EXCEEDS 1: 10, 000 LINEAR FEET, THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH G.S. 47-30 AS AMENDED. WITNESS MY ORIGINAL GINAL SIGNATURE, LICENSE NUMBER AND SEAL THIS 26TH DAY OF JANUARY, A.D., C A 2. S S SIO THIS PLAT IS OF A SURVEY OF ANOTHER CATEGORY, SUCH AS THE RECOMBINATION OF EXISTING PARCELS, A COURT ORDERED SURVEYOR OTHER EXCEPTIONS TO THE _ ° a SEAL DEFINITION OF A SUBDIVISION. = o r L-4542 DocuSigned by:., ,p 2/17/2022 QI/l, - IJ° IjA�cW AND 3WAKEW BPLW (L-4542) DATE 77j/llll l I I I I I I I\\I���\ GPS CERTIFICATION: I, ANDREW B. BAKER, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL GPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY. (1) CLASSOFSURVEY.- A(1:10,000) (2) POSITIONAL ACCURACY- HORZ. NORTH=0.00045 EAST=0.0016 VERT. =0.005 (3) TYPE OF GPS FIELD PROCEDURE: REAL-TIME KINEMATIC (4) DATE OF GPS SURVEY. JULY 21, 2020 (5) DATUM/EPOCH: NAVD 88; NAD 83(2011) (6) PUBLISHED/FIXED-CONTROL USE: NGS MONUMENT "MCDOWELL" (7) GEOID MODEL: GEOIDI8(CONUS) (8) COMBINED GRID FACTOR(S): 0.99984487 (9) UNITS: US SURVEY FEET ZONING: SUBJECT PROPERTY ZONED: B-2(CD) FOR FURTHER INFORMATION CONTACT THE CHARLOTTE-MECKLENBURG ZONING DEPARTMENT AT 704-336-3569. TREE SAVE REQUIREMENTS: 15% OF SITE PRESERVED OR REPLANTED FOR TREE SAVE AREA. REQUIRED: 8,488.65 SQ. FT. OR 0.195 ACRES. PROVIDED: 8,676 SQ. FT. OR 0.199 ACRES. REVIEW OFFICER: Keith Schell I, REVIEW OFFICER OF MECKLENBURG COUNTY, CERTIFY THAT THE MAP OR PLAT TO WHICH THIS CERTIFICATION IS AFFIXED MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING. Ft5z DocuSigned by: S&& 2/17/2022 REVI F(QF051B4E6... DATE GRAPHIC SCALE 15 30 60 1 FLOOD CERTIFICATION ( IN FEET) THIS IS TO CERTIFY THAT THE SUBJECT PROPERTY IS NOT LOCATED INA SPECIAL FLOOD HAZARD AREA AS SHOWN ON 1 inch = 30 ft. MAPS PREPARED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY, FEDERAL INSURANCE ADMINISTRATION, DATED S_E_PT_E_M_B_E_R_2, 2015 MAP NUMBER 3710453500K; ZONE X PLOTTED: 2/17/2022 G:\93\7\93767\DWG\93767.DWG OF \_Oj 3 RE0WA V pG•j 9 INC. SNR� gJt 0 0 g�, o, 5,08 PIN' MISC. NOTES 1):This is not a certified boundary survey, Boundary information taken for existing site conditions on Survey by Piedmont Land Development. Referenced in Civil Plans for Retail Coffee House dated July 27, 2020 having Job No., 91765 2): Certification is limited to building locations and elevations shown (x), and Storm Sewer shown as found in field on 11 3): Tax Parcel ID: — 039-015-06 4): Deed Reference — Deed Book 21899 Page 982 Deed Book 17125 Page 547 5): Legal Description: Remainder of Lots 1 & 2, PB 28 PG 893 6): All elevations provided by Tri—County Land Surveying have been measured as accurate as conditions would allow. STANDPIPE/OVERFLOW ORIFICE NOT TO SCALE This is to certify that on the 13th Day of December An actual survey was made under my supervision of the property shown on this plat, and that the improvements if any, are shown hereon, (As—Builts), except as noted. Professional Land Surveyor License No. L-3598 BOTTOM POND Point Elevation At 750.0' A2 750.0' A3 750.3' A4 750.2' A5 750.1' A6 750.0' TOP SLOPE Point Elevation 81 750.0' B2 750.1' B3 750.1 B4 750.0' B5 750.1' B6 750.0' � BOTTOM POND Point Elevation D 1 748.9' D2 748.8' D3 749.1 BOTTOM SLOPE Point Elevation C1 749.1' C2 749.3' C3 749.4' C4 749.0' C5 749.2' C6 749.2' OUTLET CONTROL STRUCTURE LEGEND "x EIP EXISTING IRON PIN IPS IRON PIN SET'';�z::, R/W RIGHT—OF—WAY E/P EDGE OF PAVEMENT E/G EDGE OF GRAVEL CAR �'•., CM CONCRETE MONUMENT ,•' Q-��•""" ���i '• dy PP POWER POLE 2��` BMP CERTIFICATION: `2 M.B.L. MINIMUM BUILDING LINE T. THE AS -BUILT STORM WATER MEASURES, CONTROLS, AND ` LP LIGHT POLE * ;w� 1622 * N �; DEVICES ARE IN COMPLIANCE WITH THE APPROVED STORM 11 --E-- OVERHEAD SERVICE LINES _ :? '0ay WATER MANAGEMENT PLANS AND DESIGNS AND WITH THE Ay A lo'(' 'SST •'......... REQUIREMENTS OF THE POST -CONSTRUCTION CONTROLS 5°'y US PT. POINT �'•;NM MG`'•1'., I ORDINANCE. P/L PROPERTY LINE IN...:..... 1 n I j' 400o,,,�naCA'R,O2gy„ As —Built Survey RETAIL COFFE HOUSE DATE: BY: N0. SURVEYED: �Q�:•'FESS�O'•�i'°-; 11/24/21 Ta , As —Built Location '? e�� Brookshire Blvd 4019 BROOKSHIRE BLVD CHARLOTTE, NC 28227 2/,7/2, Ta 2 Revised title block and Detail of Standpipe No. 3598= �, o x - ';ry Off: TRI—COUNTY LAND SURVEYING ,, - '.. SUR o �, Charlotte, NC SBUX HOLDING - 16, LLC STREET 'TMo "ASVILLE '�ii,,,eu N.C. 2 aEnnm 000..• 568 Jetton Street, Suite 200 THoms ux ♦ (910) 472-94DB By: TC Drawn By: LC Reviewed By: LC Davidson, NC 28036 LUINDesigned WINSON—TON ♦ ((910 288-079 WINSfON—SALEM ♦ (910) 788-0703 Ph. 704-895-2084 C-7706 SCALE: 1' = 20' DATE: 11/24/21 JOB No. 215064 214904