Loading...
HomeMy WebLinkAbout20220503 Ver 1_21-161_310 DULA SPRINGS_site plan_6-1-22_20220601DRAWING INDEX: COVER: G1: M1: M2: M3: Cl: D1: D2: NCG01: NCG01: COVER SHEET GENERAL NOTES USGS MAP LOCATION SOILS MAP EXISTING CONDITION EROSION CONTROL PLAN EROSION CONTROL DETAILS NCDEQ CREEK CULVERT CROSSING DETAILS GROUND STABILIZATION AND MATERIALS HANDLING SELF -INSPECTION, RECORDKEEPING AND REPORTING �]le4 Mar{ Yf elfin aderJae'sI PROJECT SITE VICINITY MAP ENGINEERING EXCELLENCE CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com PROJECT DATA PROJECT: OWNER/DEVELOPER: CONTACT: CONTACT NUMBER: ENGINEER: SURVEYOR: PROJECT PIN: DEED BOOK: PROJECT ADDRESS: ZONING: PROPERTY SIZE: DIRTURBED AREA: 310 DULA SPRINGS 310 DULA SPRINGS LLC 310 DULA SPRINGS LLC 14301 W. PALOMINO DR. SOUTHWEST RANCHES, FL 33330 MERCER DESIGN GROUP. PC P.O. BOX 1516 8 8A 645VI 70$8NC 28787 CONTACT: MARVIN MERCER, PE MMERCER@IVIDGENG.COM McMAHAN & BROCK, P.A. P.O. BOX 1296 WEAVERVILLE, N.C. 28787 (828)645-5554 9743-91-8616 BOOK 6135, PAGE 1289 310 DULA SPRINGS RD. WEAVERVILLE, NC 28787 OU (OPEN USE) 108 ACRES 2.40 AC. I- o REVISIONS/SUBMISSIONS 0 J w CO a I I- 0 I— Z 0 a_ O z Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 12:15pm TIDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com Sheet No.: WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY DRAWING TITLE: 1 OF 11 Sheet: © COW Project No: 21 - 161 E Q CV CV CD CV O DRAWING -NAME EROSION CONTROL SPECIFICATIONS GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE APPROVED EROSION CONTROL PLANS. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. OBTAIN LAND -DISTRIBUTING PERMITS AS REQUIRED. 2. INSTALL ALL EROSION CONTROL MEASURES AS PER PLANS. SPECIAL CONSIDERATION, AS TO SEQUENCING:: A) INSTALL ALL DOWN -SLOPE MEASURES SUCH AS SEDIMENT BASINS, DIVERSION DITCHES, SILT FENCING, ETC. AHEAD OF GRADING ACTIVITIES. B) IMMEDIATELY UPON SUBSTANTIAL COMPLETION OF ANY SEGMENT OF CUT -BANK GRADING, CONSTRUCT REQUIRED DIVERSION DIKE/DITCH ALONG TOP OF CUT SLOPES. C) IMMEDIATELY INSTALL DRAINAGE PIPING AND OR OTHER REQUIRED ROUTING FEATURES THROUGH THE DISTURBED AREAS TO DISCHARGE AS INDICATED ON THE DRAWINGS. 3. PROCEED WITH GRADING, CLEARING AND GRUBBING. 4. TEMPORARY AND PERMANENT SEEDING SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SPECIFICATIONS 6.10 THROUGH 6.14. SEED AND MULCH DENUDED AREAS WITHIN 14 WORKING DAYS AFTER FINISHED GRADES ARE ESTABLISHED. ALL SLOPES SHALL WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 5. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE (CONFIRM WITH LATEST DESIGN MANUAL SPECIFICATIONS): VEGETATIVE STABILIZATION FOR CUT AND FILL SLOPES TOTALS 3.0 AC. GRADING CONTRACTOR RESPONSIBLE FOR EROSION CONTROL MAINTAINANCE AND REPORTING SHALL BE MIKE SHULER. WINTER TEMPORARY SEEDING SPECIFICATIONS PERMANENT SEEDING SPECIFICATIONS SUMMER STEEP SLOPES, AVERAGE SOIL; LOW MAINTENANCE SEEDING DATES: ABOVE 2500 FEET: FEB. 15 - MAY 15 BELOW 2500 FEET: FEB. 1 - MAY 1 SPECIES: RYE (GRAIN) ANNUAL LESPEDEZA (KOREAN IN MOUNTAINS) RATE: (LB/ACRE) 120 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SEEDING DATES: MAY 15 - AUG. 15 SPECIES: GERMAN MILLET RATE: (LB/ACRE) 40 SEEDING DATES: BEST POSSIBLE ABOVE 2500 FEET: JULY 25 - AUG. 15 JULY 15 - AUG. 30 MAR. 20 - APR. 20 MAR. 5 - MAY 15 BELOW 2500 FEET: AUG. 15 - SEPT. 1 JULY 25 - SEPT 15 MAR. 1 - APR. 1 MAR. 1 - MAY 10 NURSING PLANTS: BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE LEPEDEZAS IN MARCH. SPECIES: TALL FESCUE SERICEA LESPEDEZA KOREAN LESPEDEZA REDTOP KENTUCKY BLUEGRASS MATE: (LB/ACRE) 100 20 10 5 5 COMPLETE SEEDING EARLIER IN FALL, AND START LATER IN SPRING ON NORTH - AND EAST - FACNC SLOPES. SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERIILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SOIL AMMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 5-10-10 FERTILIZER. MULCH: APPLY 4,000 - 5,000 LB/ACRE GRAIN STRAW OR EQUIVELENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR. REFERIIUZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, FERTIUZE, AND MULCH DAMAGED AREAS IMMEDIATELY. 7. INSTALL ROLLED EROSION CONTROL FABRIC ON ALL CUT AND FILL SLOPES COMPLETED BETWEEN OCTOBER 15TH AND MARCH 15TH. 8. IT IS RECOMMENDED FOR CONTRACTOR TO STOCKPILE TOPSOIL TO ASSIST IN GRASSING. 9. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 10. AFTER PERMANENT GROUND COVER STABILIZATION HAS BEEN APPROVED BY NCDENR, REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 11. REQUEST FINAL APPROVAL BY REGULATORY AUTHORITIES IF REQUIRED. 12. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. 13. SEDIMENT TRAPS SHALL BE CONTINUOUSLY CHECKED, INSPECTED AND MAINTAINED. TRAPS SHALL BE CLEANED OUT WHENEVER THE SEDIMENT REACHES 50% OF THE TOTAL CAPACITY (DEPTH) OF THE TRAP. THE DESIGNATED DISPOSAL AREA FOR SEDIMENT TRAP CLEAN OUT MATERIAL SHALL HAVE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCING MINIMUM) AND SHALL BE STABILIZED IMMEDIATELY. 14. FOR ALL CUT OR FILL SLOPES STEEPER THEN 2:1, A SLOPE STABILITY ANALYSIS AND CERTIFICATION BY A LICENSED GEOTECHNICAL ENGINEER SHALL BE PERFORMED UPON INITIATION AND DURING CONSTRUCTION OF SAID SLOPES. SUBMIT GEOTECHNICAL ENGINEERS CERTIFICATION TO CITY OF ASHEVILLE CONTROL OFFICE UPON COMPLETION OF PROJECT. FOR SLOPES STEEPER THAN 4:1, PROVIDE TURF -REINFORCEMENT MATTING TO ACCELERATE VEGITATIVE STABILIZATION. 15. A ROCK REVETMENTS SHALL BE INSPECTED BY A LICENSED GEOTECHNICAL ENGINEER DURING CONSTRUCTION. A CERTIFICATION OF THE ROCK REVETMENTS SHALL BE SUBMITTED TO THE NCDENR OFFICE UPON COMPLETION OF CONSTRUCTION. 16. PROVIDE TEMPORARY INLET PROTECTION FOR ANY EXISTING CULVERTS (DISCOVERED DURING CONSTRUCTION) LOCATED WITHIN THE DISTURBANCE AREA. CONSIDERATIONS FOR CONSTRUCTION SCHEDULING CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION 1. CONSTRUCTION ACCESS. CONSTRUCTION ENTRANCE, CONSTRUCTION ROUTES, EQUIPMENT PARKING AREAS. FIRST LAND -DISTURBING ACTIVITY --STABILIZE BARE AREAS IMMEDIATELY WITH GRAVEL AND TEMPORARY VEGETATION AS CONSTRUCTION TAKES PLACE. 2. SEDIMENT TRAPS AND BARRIERS. BASIN TRAPS, SEDIMENT FENCES, AND OUTLET PROTECTION. INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE IS ACCESSED. INSTALL ADDITIONAL TRAPS AND BARRIERS AS NEEDED DURING GRADING. 3. RUNOFF CONTROL DIVERSIONS, PERIMETER DIKES, WATER BARS, AND OUTLET PROTECTION. RUNOFF CONVEYANCE SYSTEM. STABILIZE STREAMBANKS, STORM DRAINS, CHANNELS, INLET AND OUTLET PROTECTION, SLOPE DRAINS. INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT TRAPS AND BEFORE LAND GRADING. INSTALL ADDITIONAL RUNOFF -CONTROL MEASURES DURING GRADING. 4. LAND CLEARING AND GRADING. SITE PREPARATION-- CUTTING, FLUNG AND GRADING, SEDIMENT TRAPS, BARRIERS, DIVERSIONS, DRAINS, SURFACE ROUGHENING. WHERE NECESSARY, STABILIZE STREAMBANKS AS EARLY AS POSSIBLE. INSTALL PRINCIPAL RUNOFF CONVEYANCE SYSTEM WITH RUNOFF -CONTROL MEASURES. INSTALL REMAINDER OF SYSTEM AFTER GRADING. 5. SURFACE STABILIZATION. TEMPORARY AND PERMANENT SEEDING, MULCHING, SODDING, RIPRAP. BEGIN MAJOR CLEARING AND GRADING AFTER PRINCIPAL SEDIMENT AND KEY RUNOFF -CONTROL MEASURES ARE INSTALLED. CLEAR BORROW AND DISPOSAL AREAS ONLY AS NEEDED. INSTALL ADDITIONAL CONTROL MEASURES AS GRADING PROGRESSES. MARK TREES AND BUFFER AREAS FOR PRESERVATION. 6. BUILDING CONSTRUCTION. BUILDINGS, UTILITIES, PAVING. APPLY TEMPORARY OR PERMANENT STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE WORK IS DELAYED OR COMPLETE. 7. LANDSCAPING AND FINAL STABILIZATION. TOPSOILING, TREES AND SHRUBS, PERMANENT SEEDING, MULCHING, SODDING, RIPRAP. INSTALL NECESSARY EROSION AND SEDIMENT CONTROL PRACTICES AS WORK TAKES PLACE. LAST CONSTRUCTION PHASE --STABILIZE ALL OPEN AREAS, INCLUDING BORROW AND SPOIL AREAS. REMOVE AND STABILIZE ALL TEMPORARY CONTROL MEASURES. 1. MAINTENANCE INSPECTIONS SHOULD BE PERFORMED WEEKLY. 2. AFTER PERIODS OF RAINFALL, MAINTENANCE REPAIRS SHOULD BE MADE IMMEDIATELY. 3. SEDIMENT TRAPS SHALL BE CLEANED OUT WHENEVER THE SEDIMENT REACHES 50% OF THE TOTAL CAPACITY (DEPTH) OF THE TRAP. THE DESIGNATED DISPOSAL AREA FOR SEDIMENT TRAP CLEAN OUT MATERIAL SHALL HAVE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCING MINIMUM) AND SHALL BE STABILIZED IMMEDIATELY. GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIME FRAME TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. (SECTION II.B(2)(b)) COA CONSTRUCTION SEQUENCE NOTES: 1. SUBMIT PLANS FOR REVIEW. 2. OBTAIN GRADING PERMIT (MAY INCLUDE PRECONSTRUCTION CONFERENCE) 3. SUBMIT FOUR (4) COPIES STORMWATER SHOP DRAWINGS (TO BE SUBMITTED AT PRECONSTRUCTION MEETING) 4. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN. 5. ON -SITE INSPECTION BY INSPECTOR TO APPROVE PERIMETER EROSION CONTROL DEVICES. 6. PROCEED WITH GRADING. 7. CLEAN SEDIMENT BASINS WHEN ONE-HALF FULL. 8. REPAIR OR REPLACE ALL EROSION CONTROL MEASURES AS NEEDED. 9. SEED AND MULCH DENUDED AREA, AS REQUIRED, AFTER FINISHED GRADES ARE ESTABLISHED. 10. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 11. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. 12. REMOVE ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. ENGINEER'S NOTES: 1. THE SURVEYOR HAS MADE DILIGENT ATTEMPTS TO LOCATE EXISTING UTILITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION AND TO NOTE ANY CONFLICTS. ANY DAMAGE TO UTILITIES INCURRED DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN A TIMELY MANNER AND AT THE CONTRACTOR'S EXPENSE. CALL CAROLINA ONE -CALL AT LEAST 48 HOURS PRIOR TO DIGGING (EXCLUDES WEEKENDS AND HOLIDAYS) AT 1-800-632-4949. 2. THESE PLANS WERE PREPARED BY: MERCER DESIGN GROUP, PC, P.O. BOX 1516, WEAVERVILLE, NORTH CAROLINA 28787; PHONE (828) 645-7088, FAX (828) 645-7714; CONTACT: MARVIN MERCER, P.E. 3. THE EXISTING BOUNDARIES FOR THIS PLAN WAS PROVIDED BY FIELD SURVEY. ALL CONSTRUCTION ITEMS CONTAINED IN THIS DESIGN PACKAGE SHALL BE PERFORMED BY A N.C. LICENSED CONTRACTOR AND SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH APPLICABLE N.C. BUILDING CODE. ALL UTILITY SYSTEM CONSTRUCTION (WATER & SEWER) SHALL BE PERFORMED BY NC LICENSED UTILITY CONTRACTOR. 4. THIS PROJECT SITE DOES NOT LIE WITHIN A REGULATED FLOOD ZONE AS DETERMINED BY FEMA. 5. ANY BORROW SOIL, IF REQUIRED SHALL BE OBTAINED FROM PERMITTED SITES ONLY. IF NECESSARY, THE CONTRACTOR SHALL SUBMIT THE PERMIT NUMBER OF THE BORROW SITE TO THE APPROPRIATE REGULATORY AGENCY ISSUING THE LAND DISTURBANCE PERMIT.. 6. THE CONTRACTOR SHALL MAKE ALL EXCAVATIONS IN ACCORDANCE WITH THE RULES AND REGULATIONS PROMULGATED BY THE DEPARTMENT OF LABOR, OCCUPATION SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION. THE CONTRACTOR SHALL FURNISH, PUT IN PLACE, AND MAINTAIN SUCH SHEETING, BRACING, ETC. AS MAY BE NECESSARY TO SUPPORT THE SIDES OF THE EXCAVATION AND TO PREVENT ANY MOVEMENT OF EARTH WHICH COULD IN ANY WAY DIMINISH THE WIDTH OF THE EXCAVATION TO LESS THAN THAT NECESSARY FOR PROPER CONSTRUCTION, OR COULD OTHERWISE INJURE OR DELAY THE WORK, OR ENDANGER ADJACENT STRUCTURES, ROADS, UTILITIES, OR OTHER IMPROVEMENT. 7. ALL CUT SLOPES SHALL HAVE A MAXIMUM SLOPE OF 1.5 TO 1; FILL SLOPES SHALL HAVE A MAXIMUM SLOPE OF 2 TO 1 UNLESS OTHERWISE PROVIDED FOR BY RETENTION SYSTEMS. 9. THE LIMITS OF DISTURBANCE HAVE BEEN SHOWN ON THE PLAN, APPROXIMATELY BY THE LIMITS OF THE PROPOSED SILT FENCE INSTALLATION. THE TOTAL AREA TO BE DISTURBED FOR THIS PROJECT IS INDICATED ON PLANS. 10. THE ESTIMATED COMPLETION TIME OF THIS PROJECT IS SPRING OF 2022. 11. ALL ACCESSIBLE SITE ELEMENTS SHALL COMPLY WITH ANSI ICC A117.1-2009 AND THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN. MAINTENANCE PLAN: 1. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR NO LESS THAN ONCE A WEEK OR AFTER RUN-OFF PRODUCING RAIN EVENT. ANY REPAIRS SHOULD BE MADE IMMEDIATELY. 2. CONTRACTOR WILL MAINTAIN THE GRAVEL PADS TO THE CONSTRUCTION ENTRANCES TO PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP -DRESSING WITH 2-INCH STONE. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, TRACKED OR WASHED ONTO PUBLIC ROADS. 3. CONTRACTOR WILL INSPECT TEMPORARY DIVERSIONS AT LEAST ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE DIVERSION AND CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND STABILIZE IT. 4. CONTRACTOR WILL INSPECT INLET PROTECTION STRUCTURES AFTER EACH RAINFALL AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL AND EITHER SALVAGE OR DISPOSE. BRING THE DISTURBED AREA TO PROPER GRADE, SMOOTH AND COMPACT. 5. CONTRACTOR WILL INSPECT SEDIMENT FENCES AND SILT FENCE OUTLET STRUCTURES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL EVENT. IF THE FABRIC OF A SEDIMENT FENCE COLLAPSES, TEAR, DECOMPOSES OR BECOMES INEFFECTIVE, REPLACE IMMEDIATELY. REPLACE FABRIC EVERY 90 DAYS. REMOVE SEDIMENT DEPOSITS AS NEEDED TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE FENCING MATERIAL. 6. SHOULD SEDIMENT REMOVAL BE REQUIRED, CONTRACTOR WILL INSPECT OUTLET STABILIZATION STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP -RAP HAS TAKEN PLACE OR IF ANY STONES HAVE BEEN DISLODGED. CONTRACTOR WILL IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. CONTRACTOR WILL REPAIR ANY DAMAGE TO FILTER FABRIC BY REMOVING THE RIP -RAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP AT LEAST ONE FOOT. IF THE DAMAGE TO THE FABRIC IS EXTENSIVE, REPLACE ENTIRE FILTER CLOTH. 7. ALL DISTURBED AREAS NOT TO BE SURFACED WILL BE RESEEDED, REFERTILIZED AND MULCHED AS NECESSARY BY THE CONTRACTOR TO MAINTAIN A DENSE VEGETATIVE COVER. GENERALLY A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE YEAR PAST PLANTING. 8. CONTRACTOR WILL INSPECT ALL MULCHES AFTER EACH RAINFALL, CHECK FOR EROSION AND DISLOCATION. WHERE EROSION IS OCCURRING, CONTRACTOR SHALL APPLY ADDITIONAL MULCH. CONTRACTOR WILL CONTINUE INSPECTIONS UNTIL VEGETATION IS FULLY ESTABLISHED. GENERAL CONSTRUCTION NOTES: 1. FINISH GRADE TOLERANCES SHALL REFLECT THOSE SHOWN IN THE DRAWINGS. THE ENGINEER MAY MAKE GRADE CHANGES AS REQUIRED IN THE FIELD WITHOUT EFFECTING THE UNIT BID PRICE FOR UNCLASSIFIED EXCAVATION. 2. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM THICKNESS WITH WATER ADDED OR SOIL CONDITIONED TO THE OPTIMUM MOISTURE CONTENT AS DETERMINED BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION EQUAL TO OR GRATER THAN 95% (100% IN THE TOP 2' OF THE SUB -GRADE BELOW ROADWAYS AND PARKING LOTS) OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE --DENSITY RELATIONSHIP TEST, ASTM D698 OR AASHTO-99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. 3. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE REPLACED ON ANY AREA NOT CLEARED AND GRUBBED. 4. EXISTING EROSION CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH THE APPROVED PLANS OF RECORD. ALL EROSION CONTROL DEVICES SUCH AS SILT FENCE, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE COUNTY'S APPROVAL. PAYMENT SHALL BE INCIDENTAL TO CLEARING AND GRUBBING. IF DURING THE LIFE OF THE PROJECT A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR CREATES "GULLIES" AND "WASHED AREAS", THESE SHALL BE REPAIRED AT NO EXTRA COST, AND ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY APPROVED EROSION CONTROL PLANS WHETHER INDICATED IN THE CONSTRUCTION PLANS OR UNDER SEPARATE COVER. 5. DISPOSABLE MATERIAL a. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERWISE. b. SOIL WASTE TO BE REMOVED, HOWEVER, MATERIAL SUCH AS GRAVEL, SIDEWALKS, CURBS, PAVEMENT, ETC. MAY BE PLACED IN SPECIFIC DISPOSAL AREAS DELINEATED ON THE PLANS OR REMOVED FROM THE SITE AS REQUIRED BY THE SPECIFICATIONS. IF DISPOSED OF ONSITE, THIS MATERIAL SHALL HAVE A MINIMUM COVER OF 2'. THE CONTRACTOR SHALL MAINTAIN SPECIFIED COMPACTION REQUIREMENTS IN THESE AREAS. WHEN DISPOSAL SITES ARE NOT PROVIDED, THE CONTRACTOR SHALL REMOVE THIS WASTE FROM THE SITE AND PROPERLY DISPOSE OF IT AT HIS EXPENSE. c. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE APPURTENANCES, UTILITY POLES, ETC. SHALL BE PROPERTY OF THE SPECIFIC UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, DESTROY, SALVAGE, REUSE, SELL, OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. d. ON SITE BURNING IS NOT AN ACCEPTABLE METHOD OF DISPOSING OF FLAMMABLE WASTES. 6. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL INSTALL NECESSARY UNDER DRAINS AND STONE AS DIRECTED BY THE ENGINEER. ALL WORK SHALL BE PAID BASED UPON UNIT BIDS, UNLESS SPECIFIED OTHERWISE. 7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 8. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREA SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED, AND MULCHED ACCORDING TO THE SPECIFICATIONS. THE FINISHED SURFACE SHALL BE TO GRADE AND SMOOTH, FREE OF ALL ROCKS LARGER THAN 3", EQUIPMENT TRACKS, DIRT CLODS, BUMPS RIDGES, AND GOUGES PRIOR TO SEEDING; THE SURFACE SHALL BE LOOSENED TO A DEPTH OF 4"-6" +/- TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. ALL SEEDING SHALL BE PERFORMED BY A MECHANICAL "HYDRO -SEEDER". HAND SEEDING SHALL BE AUTHORIZED ON AN AREA BY AREA APPROVAL BY THE ENGINEER. 10. ALL CORRUGATED METAL STORM DRAINPIPES (CMP) SHALL BE ALUMINIZED TYPE 2 CORRUGATED STEEL MANUFACTURED IN ACCORDANCE WITH THE REQUIREMENTS OF AASHTO M-36. THE PIPE SHALL BE MANUFACTURED FROM ALUMINIZED STEEL TYPE 2 MATERIAL CONFORMING TO THE REQUIREMENTS OF AASHTO M-274. ALL PIPES SHALL BE FURNISHED WITH ROLLED ENDS AND SHALL BE JOINED WITH HUGGER BANDS. THE USE OF DIMPLE BANDS WILL NOT ALLOWED. PIPE THROUGH 24" DIAMETER SHALL BE 16 GAUGE, PIPE THROUGH 42" DIAMETER SHALL BE 14 GAUGE, AND PIPE THROUGH 54" DIAMETER SHALL BE 12 GAUGE FOR CMP PIPE INSTALLED AT 15% GRADIENT OR HIGHER, PROVIDE WATER TIGHT GASKETS. ALL HDPE STORM DRAINAGE PIPING SHALL BE CORRUGATED PROFILE WALL POLYETHYLENE PIPE AND FITTINGS WITH AN INTERIOR LINER AS PER ASTM DESIGNATION F 2306/F 2306M-05. FOR HDPE PIPE INSTALLED AT 15 FPS VELOCITY OR HIGHER, PROVIDE WATER TIGHT 0-RING JOINTS. 11. CONTRACTOR SHALL VERIFY ELEVATIONS BEFORE INSTALLATION OF FACILITIES. 12. CATCH BASINS (PRE -CAST ONLY) SHALL CONFORM TO THE REQUIREMENTS OF NCDOT STANDARDS SPECIFICATIONS FOR ROADS AND STRUCTURES (LATEST EDITION) ARTICLES 840-1 THROUGH 810-3 CURB INLET CAT BASIN SHALL CONFORM TO NCDOT STANDARD DETAILS 840.02 THROUGH 80.04. DROP INLET CONFORMS TO STANDARD DETAIL 840.14. JUNCTION BOX SHALL CONFORM THE STANDARD DETAIL 840.31. 13. CURB INLET FRAME, GRATE AND HOOD SHALL BE NEENAH R-3233D, PRODUCTS BE DEWEY BROS. U.S. FOUNDRY OR EQUAL. DROP INLET FRAME AND GRATE SHALL BE NEENAH R-33339A OR EQUAL. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.04. OPENING FACING UPSTREAM. 14. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF REQUIREMENTS OF SECTION 900, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 940, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND / OR 834. 15. TOPS OF PROPOSED FRAMES AND GRATES SHALL BE FLUSH WITH FINISHED GRADE. 16. TYNDALL PRE -CAST, CONCRETE BOXES ARE ACCEPTABLE ALTERNATIVES FOR PROPOSED CATCH BASINS. 17. WATER SYSTEM MUST MEET CITY OF ASHEVILLE STANDARD DETAILS FOR CONSTRUCTION. WATERMAIN GENERAL NOTES: 1. MATERIALS AND INSTALLATION OF WATER LINES SHALL CONFORM TO THE CITY OF ASHEVILLE "STANDARD DETAILS FOR CONSTRUCTION', THE PROVISIONS OF CITY OF ASHEVILLE CODE AND CURRENT DESIGN GUIDELINES UNDER THE INSPECTION OF THE CITY OF ASHEVILLE INSPECTIONS DEPT. AND SHALL BE INSTALLED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. 2. THE CENTERLINE AND/OR EDGE OF PROPOSED PAVEMENT SHALL BE ACCURATELY STAKED PRIOR TO INSTALLATION OF THE WATER LINES. WATER LINES ARE TO BE LOCATED UNDER THE PAVED PORTION OF THE ROADS WITHIN THE DEVELOPMENT APPROXIMATELY 4 FEET FROM E. P. 3. MAINTAIN 10' MINIMUM HORIZONTAL SEPARATION OR 18" VERTICAL SEPARATION BETWEEN WATER LINE AND SANITARY SEWER LINES. IN THE CASE THESE SEPARATIONS CANNOT BE MAINTAINED, SEWER LINES SHALL BE DUCTILE IRON FORA LENGTH OF 10' FROM THE POINT OF INTERSECTION WITH WATER LINE. 4. MAINTAIN MINIMUM 12" CLEARANCE BETWEEN WATER LINE AND STORM DRAINAGE FOR 90 DEGREE (APPROX.) CROSSINGS AND A MINIMUM OF 24" WHERE WATER LINE PARALLELS STORM DRAINAGE PIPES, CATCH BASINS OR MANHOLES. 5. ALL INLINE VALVES SHALL BE INSTALLED WITH DEADMAN RESTRAINT IN ACCORDANCE WITH STANDARD DETAIL W-4. 6. ALL MECHANICAL JOINT FITTINGS SHALL BE EQUIPPED WITH MECHANICAL JOINT RESTRAINTS IN ADDITION TO THRUST BLOCKING AND RODDING SHOWN ON THE DETAILS. 7. ALL WATER METERS SHALL BE LOCATED WITHIN THE STREET RIGHT-OF-WAY ADJACENT TO THE FRONT PROPERTY LINE OF THE LOT TO BE SERVED. PROPERTY CORNERS SHALL BE IN PLACE TO SERVE AS A GUIDE BEFORE METERS ARE LOCATED. B. WATER FOR TESTING, FLUSHING AND DISINFECTION WILL BE PROVIDED AT THE "POINT OF CONNECTION" ONLY THROUGH AN APPROVED BACKFLOW PREVENTION DEVICE AND UNDER THE DIRECT SUPERVISION OF THE TOWN. NO PERMANENT TIE-IN CONNECTION WITH THE TOWN'S EXISTING SYSTEM WILL BE PERMITTED UNTIL THE NEW WATER LINES HAVE BEEN FLUSHED, PRESSURE TESTED AND DISINFECTED IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED HEREIN. 9. PRIOR TO DISINFECTION (CHLORINATION), ALL NEW WATER LINES SHALL BE FILLED TO ELIMINATE ALL AIR POCKETS AND THEN FLUSHED AT A MINIMUM VELOCITY OF 25 Ft/Sec (APPROX. 400 GPM FOR 8" WATER LINE) TO REMOVE ALL CONTAMINANTS. THE REQUIRED BACKFLOW PREVENTION DEVICE AT THE "POINT OF CONNECTION" SHALL BE OF SUFFICIENT SIZE TO ALLOW ADEQUATE FLOW FOR FLUSHING. 10. AFTER FILLING AND FLUSHING AS OUTLINED IN 7 ABOVE THE NEW WATER LINES SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE TESTING PROCEDURES OUTLINED IN THE TOWN OF WEAVERVILLE STANDARD DETAILS FOR CONSTRUCTION. 11. AFTER FLUSHING AND PRESSURE TESTING, THE NEW WATER LINES SHALL BE DISINFECTED IN ACCORDANCE WITH AWWA C651 BY THE "CONTINUOUS -FEED METHOD" OUTLINED IN C651 SECTION 443. CHLORINE GRANULES OR TABLETS PLACED IN THE LINE DURING CONSTRUCTION WILL NOT BE CONSIDERED AS ADEQUATE DISINFECTION UNDER THIS METHOD. 12. AFTER DISINFECTION, FINAL FLUSHING SHALL BE COMPLETED IN ACCORDANCE WITH AWWA C651 SECTION 4.5. AFTER FINAL FLUSHING SAMPLES WILL BE FOR ANALYSIS AS REQUIRED BY THE TOWN. THE FINAL TIE IN AT THE POINT OF CONNECTION WILL BE ALLOWED ONLY AFTER COMPLETION OF ALL TESTING, DISINFECTION, AND SAMPLING AND WILL BE MADE ONLY UNDER THE DIRECT SUPERVISION OF THE TOWN. 13. CROSS -CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE OF HEALTH HAZARD AS LISTED IN APPENDIX-B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS IN NORTH CAROLINA. THESE GUIDELINES ARE THE MINIMUM REQUIREMENTS. THE DEVICES SHALL BE LISTED ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVED ASSEMBLIES. THEY SHALL BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC TESTING THEREAFTER) IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR THE LOCAL CROSS -CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT. 14. PRIOR TO INSTALLATION OF THE WATERLINE THE STAKING OF THE R/W LIMITS, PROPOSED STRUCTURES, LANDSCAPE TREES, PROPERTY CORNERS, WATER LINES, VAULTS, BACKFLOWS, APPURTENANCES, ETC. Lu o O J w CO aI Q 0 I- z Iz REVISIONS/SUBMISSIONS O z Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 12:16pm LMDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY u) W 1 0 Z J w CC W Z z W Q �R � 0 Sheet No.: 2 OF 11 Sheet: e- Project No: 21 - 161 E Q co CV CV 0 CV O 0 -7 DRAWING -NAME -82.6250' 35.7500" 39571.00eN 56 55 53 52 51 50 49 48 47 45 35.6250° 53 -82-6250" 7r4USGS U.S. DEPARTMENT ERIOR U.S. GEOLOGICAL SURVEY science fora changing world 154°°omE 55 French 6reoi7 Olivet --Ee 54 Produced by the United States Geological Survey North American Datum of 1983 I11A0831 World Geodetic System of 19841WG5841. Projection and 1 000.meter grid:Universal. Transverse Mercator, Zone 175 This map 1S not a legal document- 0ollndarle5 may 5e generalized For this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands. Imagery Roads.. Names Hydragraphy National Hydrography 0ataset. 2003 - 2019 Contours National Elevation 0ataset. 2008 Boundaries Multiple sources, see metadala file 2017 - 2018 55 Garrison Cem • NAIR, June 2016 • November 2016 U.S. Census Bureau, 2016 614I5, 1980 - 2019 Wetlands. FWS National Wetlands Inventory 1984 - 1986 56 56 ira7' 321 MILS. Re66' 16 MILS uTM GRID AND 2019 MAGNETIC NORTH DECT I HANCE. AT CENTER OE SHEET ps. Nrtlon» Grid 100o0 mSquare in LV Cau Zme aeryetlon PS 57 The Helfand Map 4 US Topo 58 59 it. I dtLLREST Rp 57 it ti 1 Dealtr` ■7 777`�_JJJ HILL .� •N16N• � I\III GA,,,„k Rpm 58 SCALE 1:24 000 0.5 0 KILOMETERS 59 60 2 1000 5o0 0.5 METERS 1000 7000 MILES 1000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET CONTOUR INTERVAL 20 FEET NORTH AMERICAN VERTICAL DATUM OF 1980 This map was produced to conform with the National Geospatlal Program .US Topo Product Standard. 2011. A metadata life associated with this product i5 draft version 0.6.18 61 Whitted Knob 61 0112OWNGLE TOTER. 6 7 1 Marshall 2 Mars Hill 3 Bernardsville 4 Leicester 5 Craggy Pinnacle 6 Enka 7 Asheville 6 ()teen ADJOINING QUADRANGLES 62 Expressway Secondary Hwy Ramp WEAVERVILLE QUADRANGLE NORTH CAROLINA - BUNCOMBE COUNTY 7.5-MINUTE SERIES Chos07.it,,�..,., iii[tle ='Mid Mtn Hemphill Knob 63 ROAD CLASSIFICATION 10 Interstate Route 64 -82.5000' 0 P 35.7500" 57 56 55 54 53 52 51 50 49 47 46 45 -944°31'N 164momE -92.5000" 35.6250" Local Connector Local. Road 4W0 .0 U5 Route O State Route WEAVERVILLE, NC 2019 DATE O J w m w REVISIONS/SUBMISSIONS 1— Q a 1— z_ 11 CL 0 z 0L0llllll1111/ Y�' CAF? /,, �. O 0..'--•eq.�S E I pN9�j : 1 ,,�A�/ �2 arg- NGINEj•c\ Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: AS NOTED Plot Date: Jun 01, 2022 - 12:17pm 01/11DG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING. STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY Sheet No.: 3 OF 11 Sheet: e- Jun 01, 2022 - 12:17pm DRAWING -NAME Project No: 2 1 - 161 35° 42'51"N 35° 42' 1" N r 82° 33' 3" W 82° 33' 3" W A 360000 360000 360200 CkC2 TaC r �I CkC-2 EVD2 360203 Map Scale: 1:10,700 if printed on A landscape (11" x 8.5") sheet. Soil Map -Buncombe County, North Carolina 361200 • r - C Wd2 _EuD2. FrA ~ E�D2: EvD2 Meters 0 150 300 600 900 Feet 0 500 1000 2000 3000 Map projecbon: Web Mercator Comer coordinates: WG584 Edge tics: UTM Zone 17N WG584 USDA Natural Resources Conservation Service EwD TPD`\. EVE; Ed E EvD2 Ew )EdF 361000 Web Soil Survey National Cooperative Soil Survey 361400 TaD EwF 361200 TaD EdE 361403 361600 361800 MEMO 82° 31' 37 W small 362000 1/26/2022 Page 1 of 3 35° 42'51" N 35° 42' 1" N Soil Map -Buncombe County, North Carolina MAP LEGEND Area of Interest (AOI ) Area of Interest (AOI) Soils Soil Map Unit Polygons 0 / Soil Map Unit Lines O Soil Map Unit Points Special Point Features Blowout ▪ Borrow Pit • Clay Spot Closed Depression • Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop • Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot 41, 0 0 2- Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:12,000. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Buncombe County, North Carolina Survey Area Data: Version 19, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: May 3, 2020-May 7, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/26/2022 Page 2of3 Soil Map -Buncombe County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CkC2 Clifton clay loam, 8 to 15 percent slopes, moderately eroded 17.0 3.6% EdE Edneyville-Chestnut complex, basin, 30 to 50 percent slopes, stony 50.0 10.8% EdF Edneyville-Chestnut complex, 50 to 95 percent slopes, stony 38.7 8.3% EvD2 Evard-Cowee complex, 15 to 30 percent slopes, moderately eroded 87.8 18.9% EvE2 Evard-Cowee complex, 30 to 50 percent slopes, moderately eroded 71.2 15.3% EwD Evard-Cowee complex, basin, 15 to 30 percent slopes, stony 20.0 4.3% EwE Evard-Cowee complex, basin, 30 to 50 percent slopes, stony 63.5 13.6% EwF Evard-Cowee complex, basin, 50 to 95 percent slopes, stony 12.7 2.7% ExC Evard-Cowee-Urban land complex, 8 to 15 percent slopes 0.7 0.2% FrA French loam, 0 to 3 percent slopes, occasionally flooded 23.0 4.9% PwE Porters-Unaka complex, 30 to 50 percent slopes, stony 0.2 OM% PxF Porters-Unaka complex, 50 to 95 percent slopes, rocky 6.4 1.4% TaB Tate loam, basin, 2 to 8 percent slopes 10.0 2.2% TaC Tate loam, basin, 8 to 15 percent slopes 37.1 8.0% TaD Tate loam, basin, 15 to 30 percent slopes 22.3 4.8% TpD Toecane-Tusquitee complex, 15 to 30 percent slopes, very bouldery 4.1 0.9% WtB Whiteside loam, 2 to 8 percent slopes 0.6 0.1% Totals for Area of Interest 465.4 100.0% USDA Natural Resources 1410 Conservation Service Web Soil Survey National Cooperative Soil Survey 1/26/2022 Page 3 of 3 DATE 4 41 41 41 41 41 4 i * i i PRINT DATE BELOW * * * * * * * * REVISIONS/SUBMISSIONS O z Y5 CA.R ",/ ��FESSIp• �j• 7782 /14 *.:^iGINEEEi lrrR V I `"• Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: AS NOTED Plot Date: Jun 01, 2022 - 12:19pm 174DG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING. STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY DRAWING TITLE SOILS MAP Sheet No.: 4 OF 11 Sheet: Jun 01, 2022 - 12:19pm DRAWING -NAME Project No: 2 1 - 161 N.C. GRID COORDINATES N: 732737.5' E: 948502.1' NAD 1983 2011) 0.1 CAKE "\ g Z 2, sy 23" OA •----------------- -- -2 1 ALFRED BOTTEGO D.B. 1664/522 P.B. 59/7 S 86°52'21" E ---- --- - ^ 1 -, flf1: • ITTLE ' •-. T (CLASS 18" RED DON JACKSON D.B. 3452/164 P.B. 49/148 S 87°Oc'33" " n DULA SPRINGS ROAD S.R. 2130 s. MICHAEL SCHOEPPLER /J/AA,A Ire NARK SAWICKI D.B. 4771/1714 I 1 ? 118 19 L2 G f� fl L1 f L8_ L9�-10 In) \l1\1i11i11 MERLE WALTON D.B. 1062/31 JORDAN STANLEY D.B. 5682/1770 P.B. 188/48 ]'�'t-t• QO r 2 (J) J• 0 0 N ( H U NTE D.B. — LITTLE F_AT GRAPHIC SCALE ERIC USH D.B. 5585/ P.B. 213/ S1 r9d3 S1116409 raoJ■ep,r ad. NI Ir. he EMT �jc$r,Gl�r�e ._ €ylh•�.ok VICINITY MAP Not To Scale PROJECT DATA PROJECT: OWNER/DEVELOPER: 310 DULA SPRINGS LLC CONTACT: CONTACT NUMBER: ENGINEER: SURVEYOR: PROJECT PIN: DEED BOOK: PROJECT ADDRESS: ZONING: PROPERTY SIZE: 310 DULA SPRINGS 310 DULA SPRINGS LLC 14301 W. PALOMINO DR. SOUTHWEST RANCHES, FL 33330 MERCER DESIGN GROUP. PC P.O. BOX 1516 WEAVERVILLE NC 28787 828-645-7088 CONTACT: MARVIN MERCER, PE MMERCER©MDGENG.COM McMAHAN & BROCK, P.A. P.O. BOX 1296 WEAVERVILLE, N.C. 28787 (828)645-5554 9743-91-8616 BOOK 6135, PAGE 1289 310 DULA SPRINGS RD. WEAVERVILLE, NC 28787 OU (OPEN USE) 108 ACRES °02'47„ 85 ' OCUST soc�; o` y0 MATTHEW CHILDS D.B. 1920/264 120 0 60 120 240 360 ( IN FEET ) 1 inch = 120 ft. STUMP BARBARA MARS D.B. 4184/1701 IRON PIPE DATE 9 J w m w REVISIONS/SUBMISSIONS Q 0 i_ z 11 0 O z Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: 1 "=120' Plot Date: Jun 01, 2022 - 12:12pm ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING. STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com Sheet No.: Sheet: Project No: 2 1 - 161 Jun 01, 2022 - 12:12pm DRAWING -NAME LEGEND PROPOSED P-1 XX L.F. XX" CMP/HDPE STA. XX+XX.XX INV IN = XXXX.XX INV OUT = XXXX.XX • N O 0 0 0 PROPOSED CULVERT/INLET/MANHOLE LABEL PROPOSED SEWER MANHOLE PROPOSED SEWER UNE PROPOSED WATER HYDRANT PROPOSED WATER VALVE PROPOSED WATER UNE O PROPOSED SILT FENCE EXISTING WATER UNE - EXISTING SEWER UNE EXISTING SEWER MANHOLE UNITS OF DISTURBANCE - EXISTING STORM PIPE PROPOSED STORM PIPE PROPOSED TEMPORARY STORM PIPE PROPOSED INLET PROTECTION 0 N PROPOSED CATCH BASINS PROPOSED JUNCTION BOX PROPOSED OUTLET DISSIPATOR FLOW ARROW SILT FENCE OUTLET PROPOSED CATCH BASIN REFRENCE LABEL PROPOSED STORM JUNCTION REFRENCE LABEL EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED FENCE I.C. GRID C00D \ATES N: 732737.5' E: 948502.1' \AD 1983 2011) -------------- AD.2230 0\ PIPE GO '2 S 86°52'21" .D 3 3 80 0 N GRAPHIC SCALE 40 80 ( IN FEET ) 1 inch = 80 ft. 160 SILT FENCE PROPOSED CULVET 1, DULA SPRI\GS ROAD 20 LF DOU3LE 36" (SEE DETAIL, SHEET S.R. 2130 D-1) a .��7 240 PROJECT DATA PROJECT: OWNER/DEVELOPER: CONTACT: CONTACT NUMBER: ENGINEER: SURVEYOR: PROJECT PIN: DEED BOOK: PROJECT ADDRESS: ZONING: PROPERTY SIZE: DIRTURBED AREA: 310 DULA SPRINGS 310 DULA SPRINGS LLC 310 DULA SPRINGS LLC 14301 W. PALOMINO DR. SOUTHWEST RANCHES, FL 33330 MERCER DESIGN GROUP. PC P.O. BOX 1516 WEAVERVILLE NC 28787 828-645-70$8 CONTACT: MARVIN MERCER, PE MMERCER®MDGENG.COM McMAHAN & BROCK, P.A. P.O. BOX 1296 WEAVERVILLE, N.C. 28787 (828)645-5554 9743-91-8616 BOOK 6135, PAGE 1289 310 DULA SPRINGS RD. WEAVERVILLE, NC 28787 OU (OPEN USE) 108 ACRES 2.40 AC. NEW CULVET EXIST \G CULVET WeIven 31DDil1 I . p..128187. C0'�g Vc-c• 2.7.31!ce MA VICINITY MAP Not To Scale EXISTI\G CULVET, 20 LF DOU3LE 36" < SAWIC 4771 / 14 411, �>� -- 17119 �2� DATE 0 J w m w Q 0 1- z REVISIONS/SUBMISSIONS 11 0 0 z Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: 1"=80' Plot Date: Jun 01, 2022 - 3:43pm 01/11DG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING. STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY z 0 0 CC 1 Z 0 0 Z O N 0 CC W wadJ ~W Qy Sheet No.: 6 OF 11 Sheet: C� Project No: 2 1 - 161 Jun 01, 2022 - 3:43pm DRAWING -NAME EROSION CONTROL NOTES: GENERAL: ALL EROSION MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF HAYWOOD COUNTY. FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPILED WITH FOR ALL WORK. 1. OBTAIN LAND -DISTRIBUTING PERMITS. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY HAYWOOD COUNTY. 3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF HAYWOOD COUNTY PLANNING DEPARTMENT. 4. PROCEED WITH GRADING, CLEARING AND GRUBBING. TH E 5. SEED AND MULCH DENUDED AREA WITHIN 15 WORKDAYS AFTER FINISH GRADES ARE ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE: LIME 4,000 LBS. FERTILIZER (10-10-10) 1,000 LBS. KY-31 FESCUE 100 LBS. STRAW MULCH 60-80 BALES FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN 10 LBS. CROWN VETCH 15 - 20 LBS. FOR ALL SLOPES 2 TO 1 OR STEEPER ADD TO THE ABOVE: SERICEA LESPEDEZA 40 LBS. IF HYDRO SEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE RATE OF 1,000 LBS. PER ACRE. 6. IT IS RECOMMENDED FOR CONTRACTOR TO STOCKPILE TOPSOIL AT ASSIST IN GRASSING. 7. IT IS ANTICIPATED THAT THIS PROJECT WILL BE COMPLETED EXPEDITIOUSLY, THEREFORE NEGATING ANY EFFECT THAT TEMPORARY SEEDING WOULD HAVE ON PROJECT. THE PERMANENT SEEDING SPECIFICATION SHOWN ON THE PLAN SHOULD BE ADEQUATE. 8. MAINTAIN SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 9. REMOVE SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 10. REQUEST FINAL APPROVAL BY HAYWOOD COUNTY. 11. IF COMPLETION DATE GOES BEYOND ENTER DATE, THE CONTRACTOR TEMPORARY GROUND COVER. 12. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. EROSION CONTROL NOTES NOT TO SCALE NOTES: 1. A STABIUZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. 2. STONE TO BE 2 - 3 INCH STONE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABIUZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL so, 6" MIN 2-3" COARSE AGGREGATE GEOTEXTILE FRABIC TO BE UNDERNEATH AGGREGATE MA, STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE PROPOSED hEAD/ENDWALLS GRADE ELEVATION VARIES BACKFILL CULVERT WITH SELECT MATERIAL IN 12" LIFTS TO 98% MAX. DENSITY L--- z_ EXISTING GRADE N DOUBLE 300 CULVERT (TYP.) STREAMBED MATERIAL LINE WIRES STEEL "T" POST WIRE FABRIC FILTER FABRIC FZ0- �� \\/ //�� N.\\/.\\ . \\/\\//%\//j\//j\/% ANCH❑R FABRIC AS SHOWN SECTI❑N VARIABLE AS DIRECTED BY EXISTING GROUND LINE THE ENGINEER (8' MAX.) TOP AND BOTTOM STRAND MIN. 10 GA., TYP. STAY WIRES, 12" SPACING MIN. 14 GA. • • IN ¢ ti O�'i....►.. • /\\/\\//\\/\\ wN - - MAX. WIRE 0 FABRIC MESH N ❑PENING SIZE = 36 SQ, IN. NOTES! STEEL "T" POST (TYP.) SECURELY ANCHOR FABRIC TO WIRE WITH WIRE TIES /\/\/\\ \/\/\\/\/ /i. /% /ice �/i�li✓i�l.i�/i./ FILTER FABRIC TO BE POLYPROPYLENE NYLON, POLYESTER OR POLY- ETHYLENE YARN OF MANUFACTURER TO BE APPROVED BY ENGINEER ELEVATI❑N 0 (U \ J w („ wo , 0 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REM❑VING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2, FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (@ 20% MAX, EL❑NGATION) OF 301bs/LIN. IN., WIRE FABRIC REQUIRED. 3, IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 50 lbs/LIN. IN. @ MAX. 20% EL❑NGATI❑N), WIRE FABRIC IS ❑PTIONAL, MAXIMUM POST SPACING = 6 FEET. SILT FENCE DETAIL NOT TO SCALE PROPOSED TOP OF HEADWALL DBL. CULVERT No. 1 WALL = 22E3.84 DBL. CULVERT No. 2 WALL = 2259.80 T\ PROPOSED TOP OF ENDWALL DBL. CULVERT No. 1 WALL = 2269. 19 DBL. CULVERT No. 2 WALL = 2259.51 EXISTING GRADE UNDISTURBED SOILS DOUBLE 36" CULVERT INSTALLATION- SECTION NOT TO SCALE _ E, PROPOSED HEAD/ENDWALLS (DESIGN BY OTHERS) PROPOSED TOP OF DBL. CULVERT No. 1 WALL = 2269. 19 PROPOSED TOP OF DBL. CULVERT No. 2 WALL = 2259.5 1 -\ HEADWALL WINGS OMITTED FOR CLARITY. (DESIGN BY OTHERS) PROPOSED HEADWALL DBL CULVERT No. I INV.=2263.84 DBL CULVERT No.2 INV.-2253.80 PROPOSED ENDWALL - DBL CULVERT No. I INV.=2263. 1 9 DBL CULVERT No.2 INV. = 2253.5 1 CREEK PROPOSED DBL CULVERT No. I INV. = 2263. 1 9 DBL CULVERT No.2 INV.=2253.5 1 (1' EMBEDMENT) d WIRE FENCE HARDWARE CLOTH FILTER OF 1" DIA. WASHED STONE BURY WIRE FENCE AND HARDWARE CLOTH SECTION TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE 4' MIN. STEEL FENCE POST SET MAX. 2' APART MIN. 18" ONTO SOLID GROUND SLIT FENCE BELOW TOP OF STONE 3' FILTER FABRIC ON GROUND BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH FILTER OF 1" DIA. WASHED STONE bDRAINAGE PIPE (SEE SCHED.) PROVIDE END SECTION AS REQUIRED ON PLAN rr 4 ire 4 e- r r r v r r .4 r r rr r r r r r 4 n r r r t r f%*te*te 4 4 4,*te i*G*G*G�i*G*G*G *te*G 4 •4' ' rr r r r n r r t.t t r r r r r r r rr v t r r t :Or •4•4e"4e" 4 1, •4 4"Se fe` Se`Ye'4e.le• c` Se` le"Yi'YeYe Ye4e` 4 4"Se a n..rr r t t..I t t t.t t t t.t t t t.r r v r rr r t r t r.n..rr rr rr r.n 4 ,4 4tSY'.w rt eFYe�let'iety*4et�e� eF4 Se*Yct t t r.a FRONT VIEW rSILT FENCE STEEL FENCE POST SET MAX. 2' APART MIN. 18" ONTO SOLID GROUND SILT FENCE OUTLET STRUCTURE NOT TO SCALE SEE SCHEDULE GRADE AS REQUIRED TO PROVIDE APRON SLOPE = 0% FILTER FABRIC, MIRAFI 700x OR EQUAL ENERGY DISSIPATOR NOT TO SCALE 4 4 4 UNDISTURBED EARTH N.C.D.O.T. CLASS I RIP -RAP, MINIMUM 18" THICK, TYPICAL - PROPOSED TOP OF DBL. CULVERT No. 1 WALL = 2269.84 PROPOSED TOR OF DBL. CULVERT No. 2 WALL = 2259.80 HEADWALL WINGS OMITTED FOR CLARITY. (DESIGN BY OTHERS) UNDISTURBED SOILS PROPOSED 49± LF OF 54" CREEK CULVERT INSTALLATION STREAMBED MATERIAL DOUBLE 36" CULVERT INSTALLATION- SECTION NOT TO SCALE PROPOSED DBL CULVERT No. I INV.=2263.84 DBL CULVERT No.2 INV.=2253.80 (1' EMBEDMENT) I- o REVISIONS/SUBMISSIONS O J w CO wI Q 0 1- z m w O z \,0IIIIIII/o, �: CARdiii„ „so- E'ssi'o' . r -" • 7782 .E7\ RVI1`j liIII�111���\\\\\ Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 3:39pm TIDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P:828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY Sheet No.: 8 OF 11 Sheet: D) e- Jun 01, 2022 - 3:39pm DRAWING -NAME Project No: 21 - 161 IMPERVIOUS DIKE`\ (SEE NOTE 8) 1 1 1 1 WORKING AREA FLEXIBLE HOSE DEWATERING PUMP SPECIAL STILLING BASIN (SEE DETAIL, NEXT SHEET) FLOW 1 TEMPORARY 1 1 1 1 CLEAN WATER PUMP -AROUND PUMP TEMPORARY FLEXIBLE HOSE EXISTING CHANNEL BOTTOM \ X1 1 A 1 1 I 4' X5 L PLAN VIEW TOP OF BANK IMPERVIOUS DIKE (SEE DETAIL, THIS SHEET) TEMPORARY STABILIZED OUTLET (SEE NOTES 5 AND 6) FLOW APPROXIMATE BASE FLOW WATER LEVEL X10 X11 SANDBAG / STONE (SEE NOTE 8) WORKING AREA IMPERVIOUS DIKE DETAIL IMPERVIOUS MEMBRANE (SEE NOTE 8) DIMENSIONS (VALUES TO BE PROVIDED BY DESIGNER) VARIABLE VALUES TYPICAL UNIT DESCRIPTION X1 FT. SPLASH PAD / STABILIZED OUTLET WIDTH X2 FT. SPLASH PAD LENGTH X3 IN. SPLASH PAD / STABILIZED OUTLET THICKNESS X5 FT. STREAM BED WIDTH X6 FT. SEDIMENT BAG PAD LENGTH X7 FT. SEDIMENT BAG SETBACK FROM TOP OF BANK X8 IN. SEDIMENT BAG PAD THICKNESS X9 FT. IMPERVIOUS DIKE LENGTH X10 FT. IMPERVIOUS DIKE HEIGHT X11 FT. OR IN. APPROXIMATE BASE FLOW WATER LEVEL X12 IN. D50 OF STABILIZED OUTLET STONE/IMPERVIOUS DIKE STONE TEMPORARY FLEXIBLE HOSE FILTER FABRIC (SEE NOTE 7) APPROXIMATE BASE FLOW WATER SURFACE TOP OF BANK 7>7—V--C \, / / SPECIAL STILLING BASIN / (SEE NOTE 4) X8 SPECIAL STILLING BASIN X11 — 8" STONE OR APPROVED ALTERNATIVE TOP OF BANK STABILIZED OUTLET OR NATIVE STREAMBED STONE MATERIAL RIP RAP X3 X2 X5 TOE OF BANK TEMPORARY FLEXIBLE HOSE (SEE NOTE 5) c>\ /.\\/\\/\\ TEMPORARY STABILIZED OUTLET - SECTION A - A' EXAMPLE PUMP AROUND FLOW DIVERSION AND DEWATERING CONFIGURATION O APPROXIMATE BASE FLOW WATER SURFACE NOTES: / 1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND KEPT DE -WATERED. 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW AROUND WORKING AREA (CLEAN TO CLEAN WATER), WITH PUMPS ADEQUATELY SIZED AS SPECIFIED BY THE DESIGNER. DE -WATERING PUMP SHALL REMOVE WATER WITHIN WORK AREA, BE FILTERED THRU A SPECIAL STILLING BASIN AND DISCHARGE DOWNSTREAM AT A NON -EROSIVE FORCE, AS SPECIFIED BY THE DESIGNER. 4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DEWATERING. THE DESIGNER MAY SPECIFY A SPECIAL STILLING BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A SPECIAL STILLING BASIN IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE IMPACTED FOR BASIN EXCAVATION, ETC.). 5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED). IF NATIVE STREAMBED STONE MATERIAL IS DEEMED SUITABLE BY DESIGNER AT DISCHARGE LOCATION, NO TEMPORARY STABILIZED OUTLET IS REQUIRED. 6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS, UNLESS NATIVE STREAMBED STONE MATERIAL IS DEEMED SUITABLE BY DESIGNER AT DISCHARGE LOCATION. THE DESIGNER SHALL APPROVE ALL MATERIALS AND DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS. 7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH PADS. 8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM WORKING AREA. AN IMPERVIOUS FABRIC MEMBRANE, AS APPROVED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES. 9. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS FOLLOWS: A. INSTALL SPECIAL STILLING BASIN AND TEMPORARY STABILIZED OUTLETS AT THE DOWNSTREAM END OF WORKING AREA. B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE. C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER) DOWNSTREAM TO STABILIZED OUTLET. D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP. E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE WORKING AREA. F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SPECIAL STILLING BASIN AND TEMPORARY STABILIZED OUTLET. G. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND HOSE. H. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN. DATE O J w m w 1- Q a 1- z REVISIONS/SUBMISSIONS 11 0 0 z 16, CAR 8� .oFEssi.Ol otir 27?82 ',CSC *'NGINE���, 0 ...... \\`‘ ///;AIi V I Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 4:28pm OMDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING. STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY ▪ -I z aI ZW O � Z y0 CC WQ CI 0 O Z II'0 CI CI) Z� 2Z 0C CC aW CI. Jw 0 W gim Sheet No.: 9 OF 11 Sheet: D) Jun 01, 2022 - 4:28pm DRAWING -NAME Project No: 2 1 - 161 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 0 V 0 <0 �SANDBAGS (TYR) OR STAPLES U SILT FENCE o' <o o%0 0D0 LA CONCRETE WASHOUT CLEARLY MARKED SIGNAGE NOTING DEVICE (18'X24' MIN.) PLAN 14 SIDE SLOP (TYP ❑NSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FILTRATION SOIL BERM 10 MIL PLASTIC SANDBAGS (TYP,) LNG FOR STAPLES SFCTTf1N A -A NOTES, 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE 10' MIN A A A A / 0\ V�V /�> <0> <0> <0> <0> <U ID 0A Aop > /VVVV CONCRETE WASHOUT SANDBAGS (TYP,) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18'X24' MIN.) PLAN ABOVE GRADE NOT 10 MIL PLASTIC NIB DE SLOP (TYP.) SECTION B-B4 SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM NOTES, 1. ACTUAL LOCATION DETERMINED IN FIEL➢ 2, THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SDLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. WASHOUT STRUCTURE TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10 At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 w o es- 0 J w m wl 0 I- Z 0 IZ REVISIONS/SUBMISSIONS 0 z I,,,, Es s 'oN9` r ' .•FA/GINE..... Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 12:22pm LMDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com C:' zZ Pe4 :E � W d Cis W W Ay 0 M WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY Sheet No.: 10 OF 11 Sheetrjrj Jun 01, 2022 - 12:22pm DRAWING -NAME Project No: 2 1 - 161 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self below. personnel which greater performed -inspections are required during When adverse weather or to be in jeopardy, the inspection it is safe to perform the inspection. than 1.0 inch occurs outside upon the commencement were delayed shall be noted in the Inspect Frequency {during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous substances per Item location of the spill or release. 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(rn)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(rn)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that may endanger noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)1 prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 w Q o REVISIONS/SUBMISSIONS 0 J w m w1 1- Q 0 I- z 0 a_ 0 z \0�IIIIIIII/�,, CARol%,,, D'S' . F Cs' ' si'o. l %moo N9c ; Designed: JMM Graphics: MDG Checked: JMM Reviewed: JMM Scale: NTS Plot Date: Jun 01, 2022 - 12:24pm LMDG ENGINEERING EXCELLENCE C-2383 CIVIL ENGINEERING . STRUCTURAL ENGINEERING MUNICIPAL INFRASTRUCTURE . CONSTRUCTION ADMINISTRATION P.O. BOX 1516 WEAVERVILLE, NORTH CAROLINA 28787 P: 828.645.7088 F: 828.645.7714 info@mdgeng.com www.mdgeng.com WEAVERVILLE, NORTH CAROLINA BUNCOMBE COUNTY DRAWING TITLE: Z a W W Ci 0 0 W Z 0C� Z vH Wcc 0 ZW gc J� wz Sheet No.: 11 OF 11 Sheetrjr] Jun 01, 2022 - 12:24pm DRAWING -NAME Project No: 21 - 161