HomeMy WebLinkAboutNC0026565_Pretreatment Compliance Inspection Report_20220607ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Terry Lewallen
Town of Ramseur
P.O. Box 545
Ramseur, North Carolina 27316
NORTH CAROLINA
Environmental Quality
June 7, 2022
SUBJECT: Pretreatment Compliance Inspection (PCI)
Town of Ramseur
NPDES# NC0026565
Randolph County
Dear Mr. Lewallen:
On May 13, 2022' a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski
of the Winston-Salem Regional Office. You were present for the inspection along with Ms. Lisa
Osthues, Pretreatment Coordinator for the Town of Ramseur. The purpose of this inspection was
to determine the effectiveness of the Town's pretreatment program, which includes reviewing the
files, POTW plant performance, industry monitoring data, and adherence to the enforcement
response plan (ERP).
Background
This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which
is categorical. The publicly owned treatment works (POTW) has not had any limits violations since
the last pretreatment compliance inspection.
POTW Interview
There are no plant problems related to pretreatment issues and there are no NPDES permit limit or
monitoring violations recorded from September 2021 through April 2022. The facility is very
well operated.
Pretreatment Program Elements Review
The Headworks Analysis (HWA) renewal was submitted on December 20, 2017. The HWA was
approved on February 8, 2018. The next HWA was due on October 1, 2022, but an extension was
granted to May 15, 2023.
TD_E
Deparbnerd of Enfrm onmlal Ouali\
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
The last Industrial Waste Survey (IWS) was submitted on April 1, 2021: The IWS was approved
on May 5, 2021. The next IWS is due on April 14, 2026.
The Sewer Use Ordinance (SUO) was approved on October 2, 2015.
The Enforcement Response Plan (ERP) was approved on October 5, 2021.
The Short Term Monitoring Plan (STMP) was approved on June 2, 2022.
STMP File Review
The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and
frequencies.
Industrial User Permit (IUP) File Review
A review of the file for Matlab, Inc. (#002) revealed that the monitoring data was well organized
and compliant.
The slug control plan for Matlab, Inc (#002) was in good order.
Action Items
No other action items were noted.
The pretreatment program is considered satisfactory. Ms. Osthues maintains an excellent
pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336)
776-9800.
Sincerely,
E-01.. DocuSigned bbyy:
�. I.JMgtr
145B49E225C94EA...
Lon T. Snider
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ — WSRO
Enclosure: PCI Report
cc: PERCS Unit — Michael Montebello (Electronic Copy)
Lisa Osthues (Electronic Copy)
WSRO Electronic Files
Laserfiche Files
.D_EQ�/
?)
bpM ubnaelEmMM.beW WMYte
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105
336.776.9800
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
Water Resources
ENVIRONMENTAL QUALITY
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)1
1. Control Authority (POTW) Name: Town of Ramseur
2. Control Authority Representative(s):
Lisa Osthues. Terry Lewallen
3. Title(s): Contract Pretreatment Coordinator ORC
4. Last Inspection Date: 9/10/21 Inspection Type (Check One): ® PCI 0 Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO
Order Type, Number, Parameters: Are Milestone Dates Being Met? 0 YES ❑ NO
ICIS CODING
Main Program Permit Number
MM/DD/YY
1 NICIO 10 1 2 I 615 16 1 5 I f 05 113 1 22 1
7. Current Number Of Significant Industrial Users (SIUs)?
1
8. Number of SIUs With No IUP, or With an Expired IUP?
0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year?
0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year?
0
11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual
Periods?
0
12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods?
0
13. Number of SIUs in SNC with Pretreatment Schedule?
0
14. Number of SIUs on Schedules?
0
15. Current Number Of Categorical Industrial Users (CIUs)?
1
16. Number of CIUs in SNC?
0
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during
either of the Last 2 Semi -Annual Periods? Not Been Published for
Public Notice?(May refer to PAR if Excessive SIUs in SNC)
SNC for
SNC for
Not Pul
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
❑ YES // NO
❑ YES /1 NO
Limits: 0
Reporting: 0
lished: None
None
❑ YES ►1 NO
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES LINO Requested extension
for the Headworks analysis — Due October 2022; need to conduct STMP with Tox; will only have June and September. Approved
extension to 5/15/23.
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? Z YES 0 NO Is Table Adequate? ❑ YES ❑ NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify
yourself!
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1
26. If NO to 23 - 26, list violations
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ® YES ❑ NO
If yes, which ones? Eliminated: Added: PFAS (when EPA method is determined), 1,4 dioxane,
Hardness, Selenium, Oil and Grease, Total Phosphorus, Total Nitrozen
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2
28. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element
in their files, complete with sunnortin:7 documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA)
12/20/2017
/1 Yes ❑ No
2/8/2018
// Yes ❑ No
5/15/2023
Industrial Waste Survey (IWS)
4/1/2021
►1 Yes ❑ No
5/5/2021
// Yes ❑ No
4/14/2026
Sewer Use Ordinance (SUO)
9/22/2015
/1 Yes ❑ No
10/2/2015
/1 Yes ❑ No
NA
Enforcement Response Plan (ERP)
7/26/2021
/1 Yes ❑ No
10/5/2021
Yes ❑ No
NA
Short Term Monitoring Plan (STMP)
5/9/2022
/1 Yes ❑ No
6/2/2022
E1 Yes ❑ No
NA
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION)
29. User Name
1. Matlab, Inc.
2.
3.
30. IUP Number
0002
31. Does File Contain Current Permit?
/1 Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
32. Permit Expiration Date
12/31/25
33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A
433
34. Does File Contain Permit Application Completed Within One Year Prior
to Permit Issue Date?
/1 Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
35. Does File Contain an Inspection Completed Within Last Calendar Year?
/1 Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
36. a. Does the File Contain a Slug/Spill Control Plan?
b. If No, is One Needed? (See Inspection Form from POTW)
a. ►Yes ❑No
b. •Yes ■No
a. •Yes ■No
b. ■Yes ■No
a. ■Yes •No
b. •Yes ■No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
Organic Management Plan (TOMP)?
®Yes❑No❑N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
38. a. Does File Contain Original Permit Review Letter from the Division?
b. All Issues Resolved?
a. ►Yes ❑No
b.❑Yes❑No❑N/A
a. ■Yes •No
b.❑Yes❑No❑N/A
a. •Yes •No
b.❑Yes❑No❑N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete
its Sampling as Required by IUP, including flow?
I Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
40. Does File Contain POTW Sampling Chain -Of -Custody Forms?
/1 Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
41. During the Most Recent Semi -Annual Period, Did the SIU Complete its
Sampling as Required by IUP, including flow?
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
4 lb. During the Most Recent Semi -Annual Period, Did SIU submit all reports
on time?
®Yes❑No❑N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
42a. For categorical IUs with Combined Wastestream Formula (CWF), does
file include process/dilution flows as Required by IUP?
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
42b. For categorical IUs with Production based limits, does file include
production rates and/or flows as Required by IUP?
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
43a. During the Most Recent Semi -Annual Period, Did the POTW Identify
All Limits Non -Compliance from Both POTW and SIU Sampling?
❑ Yes ❑ No
NONE
❑ Yes ❑ No
❑ Yes ❑ No
43b. During the Most Recent Semi -Annual Period, Did the POTW Identify
All Reporting Non -Compliance from SIU Sampling?
❑Yes❑No®N/A
❑Ycs❑No❑N/A
❑Yes❑No❑N/A
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
c. If applicable, Did POTW resample within 30 days of becoming aware
of SIU limit violations in the POTW's sampling of the SIU?
a.❑Yes❑No®N/A
b.❑Yes❑No®N/A
c.❑Yes❑No®NIA
a.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
c.❑Yes❑No❑N/A
a.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
c.❑Yes❑No❑N/A
46. During the Most Recent Semi -Annual Period, Was the SIU in SNC?
❑ Yes /1 No
❑ Yes ❑ No
❑ Yes ❑ No
47. During the Most Recent Semi -Annual Period, Was Enforcement Taken
as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)?
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
48. Does the File Contain Penalty Assessment Notices?
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
49. Does The File Contain Proof Of Penalty Collection?
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
50. a. Does the File Contain Any Current Enforcement Orders?
b. Is SIU in Compliance with Order?
a.❑Yes❑No®N/A
b.❑Yes❑No®N/A
a.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
a.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
Requested Information For You?
❑ Yes r No
❑ Yes ❑ No
❑ Yes ❑ No
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3
FILE REVIEW COMMENTS: A very well run pretreatment program. In the headworks analysis, it appears that the facility is
over allocated for silver. This is due to the sample having been tested previously with a PQL higher than 0.001 mg/L. This will be
resolved in the next headworks analysis.
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MM/DD/YY
I. Industry Inspected:
2. Industry Address:
3. Type of Industry/Product:
4. Industry Contact:
Phone:
Title:
Fax:
5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview ❑ YES ❑ NO
B. Plant Tour El YES ❑ NO
C. Pretreatment Tour El YES ❑ NO
D. Sampling Review ❑ YES ❑ NO
E. Exit Interview ❑ YES ❑ NO
Industrial Inspection Comments:
OVERALL SUMMARY AND COMMENTS:
Comments:
Requirements:
Recommendations:
NOD: ❑ YES ❑ NO
NOV: ❑ YES ❑ NO
QNCR: ❑ YES ❑ NO
POTW Rating:
Satisfactory X Marginal UnSatisfactory
PCI COMPLETED BY:
Jim Gonsiewski DATE: 06/07/2022
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction
1
21IIIIII
671
Code
IN I 2 15 I
NPDES yr/mo/day Inspection
3 I NC0026565 111 121 22/05/13 117
Type
18 I o I
IIIIIIIII
Inspector Fac Type
19 w 291
IIIIIIIIIII IIIIIII I IIIIII
II p6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
I 7015 I 711I 72 I N I 73179 I I I I I I I80
I 174
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Ramseur WWTP
4737 Roundleaf Rd
Ramseur NC 27316
Entry Time/Date
12:40PM 22/05/13
Permit Effective Date
22/05/01
Exit Time/Date
01:44PM 22/05/13
Permit Expiration Date
27/01/31
Name(s) of Onsite Representative(s)fTitles(s)/Phone and Fax Number(s)
/11
Terry Cheyenne Lewallen/ORC/336-824-3939/
Other Facility Data
Name, Address of Responsible OfficialfTitle/Phone and Fax Number
Contacted
Terry Cheyenne Lewallen,PO Box 725 Ramseur NC 27316//336-824-3939/
No
Section C Areas Evaluated During Inspection (Check only those areas evaluated)
Pretreatment
Section D. Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Jim J Gonsiewski
of Inspector(s) Agency/Office/Phone and Fax Numbers Date
—Docusignedby: DWR/Division of Water Quality/336-776-9704/ 6/7/2022
rn- ottisi cuxki
E 197B66F179045E.
Signature
of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
6/7/2022
ned by:by�
DocuSiig{J
•.A. l . M1u-
t 145849E225C94EA...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES
NC0026565
111 121
yr/mo/day
22/05/13
17
Inspection Type
18101
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On May 13, 2022' a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of
the Winston-Salem Regional Office. Mr. Terry Lewallen was present for the inspection along with Ms.
Lisa Osthues, Pretreatment Coordinator for the Town of Ramseur. The purpose of this inspection was
to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files,
POTW plant performance, industry monitoring data, and adherence to the enforcement response
plan (ERP).
Background
This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is
categorical. The publicly owned treatment works (POTW) has not had any limits violations since the
last pretreatment compliance inspection.
POTW Interview
There are no plant problems related to pretreatment issues and there are no NPDES permit limit or
monitoring violations recorded from September 2021 through April 2022. The facility is very well
operated.
Action Items
No action items were noted.
Page# 2
Permit: NC0026565
Inspection Date: 05/13/2022
Owner - Facility: Ramseur WNTP
Inspection Type: Pretreatment Compliance
Yes No NA NE
Page# 3