Loading...
HomeMy WebLinkAboutNC0026565_Pretreatment Compliance Inspection Report_20220607ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Terry Lewallen Town of Ramseur P.O. Box 545 Ramseur, North Carolina 27316 NORTH CAROLINA Environmental Quality June 7, 2022 SUBJECT: Pretreatment Compliance Inspection (PCI) Town of Ramseur NPDES# NC0026565 Randolph County Dear Mr. Lewallen: On May 13, 2022' a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. You were present for the inspection along with Ms. Lisa Osthues, Pretreatment Coordinator for the Town of Ramseur. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is categorical. The publicly owned treatment works (POTW) has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from September 2021 through April 2022. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on December 20, 2017. The HWA was approved on February 8, 2018. The next HWA was due on October 1, 2022, but an extension was granted to May 15, 2023. TD_E Deparbnerd of Enfrm onmlal Ouali\ North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 The last Industrial Waste Survey (IWS) was submitted on April 1, 2021: The IWS was approved on May 5, 2021. The next IWS is due on April 14, 2026. The Sewer Use Ordinance (SUO) was approved on October 2, 2015. The Enforcement Response Plan (ERP) was approved on October 5, 2021. The Short Term Monitoring Plan (STMP) was approved on June 2, 2022. STMP File Review The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for Matlab, Inc. (#002) revealed that the monitoring data was well organized and compliant. The slug control plan for Matlab, Inc (#002) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. Osthues maintains an excellent pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, E-01.. DocuSigned bbyy: �. I.JMgtr 145B49E225C94EA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Enclosure: PCI Report cc: PERCS Unit — Michael Montebello (Electronic Copy) Lisa Osthues (Electronic Copy) WSRO Electronic Files Laserfiche Files .D_EQ�/ ?) bpM ubnaelEmMM.beW WMYte North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105 336.776.9800 NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)1 1. Control Authority (POTW) Name: Town of Ramseur 2. Control Authority Representative(s): Lisa Osthues. Terry Lewallen 3. Title(s): Contract Pretreatment Coordinator ORC 4. Last Inspection Date: 9/10/21 Inspection Type (Check One): ® PCI 0 Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? 0 YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY 1 NICIO 10 1 2 I 615 16 1 5 I f 05 113 1 22 1 7. Current Number Of Significant Industrial Users (SIUs)? 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 1 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) SNC for SNC for Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ❑ YES // NO ❑ YES /1 NO Limits: 0 Reporting: 0 lished: None None ❑ YES ►1 NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES LINO Requested extension for the Headworks analysis — Due October 2022; need to conduct STMP with Tox; will only have June and September. Approved extension to 5/15/23. 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? Z YES 0 NO Is Table Adequate? ❑ YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself! NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ® YES ❑ NO If yes, which ones? Eliminated: Added: PFAS (when EPA method is determined), 1,4 dioxane, Hardness, Selenium, Oil and Grease, Total Phosphorus, Total Nitrozen NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 28. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element in their files, complete with sunnortin:7 documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 12/20/2017 /1 Yes ❑ No 2/8/2018 // Yes ❑ No 5/15/2023 Industrial Waste Survey (IWS) 4/1/2021 ►1 Yes ❑ No 5/5/2021 // Yes ❑ No 4/14/2026 Sewer Use Ordinance (SUO) 9/22/2015 /1 Yes ❑ No 10/2/2015 /1 Yes ❑ No NA Enforcement Response Plan (ERP) 7/26/2021 /1 Yes ❑ No 10/5/2021 Yes ❑ No NA Short Term Monitoring Plan (STMP) 5/9/2022 /1 Yes ❑ No 6/2/2022 E1 Yes ❑ No NA INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Matlab, Inc. 2. 3. 30. IUP Number 0002 31. Does File Contain Current Permit? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 12/31/25 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 433 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 35. Does File Contain an Inspection Completed Within Last Calendar Year? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. ►Yes ❑No b. •Yes ■No a. •Yes ■No b. ■Yes ■No a. ■Yes •No b. •Yes ■No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ►Yes ❑No b.❑Yes❑No❑N/A a. ■Yes •No b.❑Yes❑No❑N/A a. •Yes •No b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? I Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 4 lb. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 42b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? ❑ Yes ❑ No NONE ❑ Yes ❑ No ❑ Yes ❑ No 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑Yes❑No®N/A ❑Ycs❑No❑N/A ❑Yes❑No❑N/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? a.❑Yes❑No®N/A b.❑Yes❑No®N/A c.❑Yes❑No®NIA a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes /1 No ❑ Yes ❑ No ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes r No ❑ Yes ❑ No ❑ Yes ❑ No NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 FILE REVIEW COMMENTS: A very well run pretreatment program. In the headworks analysis, it appears that the facility is over allocated for silver. This is due to the sample having been tested previously with a PQL higher than 0.001 mg/L. This will be resolved in the next headworks analysis. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY I. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Phone: Title: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour El YES ❑ NO C. Pretreatment Tour El YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES ❑ NO NOV: ❑ YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory X Marginal UnSatisfactory PCI COMPLETED BY: Jim Gonsiewski DATE: 06/07/2022 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction 1 21IIIIII 671 Code IN I 2 15 I NPDES yr/mo/day Inspection 3 I NC0026565 111 121 22/05/13 117 Type 18 I o I IIIIIIIII Inspector Fac Type 19 w 291 IIIIIIIIIII IIIIIII I IIIIII II p6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved I 7015 I 711I 72 I N I 73179 I I I I I I I80 I 174 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Ramseur WWTP 4737 Roundleaf Rd Ramseur NC 27316 Entry Time/Date 12:40PM 22/05/13 Permit Effective Date 22/05/01 Exit Time/Date 01:44PM 22/05/13 Permit Expiration Date 27/01/31 Name(s) of Onsite Representative(s)fTitles(s)/Phone and Fax Number(s) /11 Terry Cheyenne Lewallen/ORC/336-824-3939/ Other Facility Data Name, Address of Responsible OfficialfTitle/Phone and Fax Number Contacted Terry Cheyenne Lewallen,PO Box 725 Ramseur NC 27316//336-824-3939/ No Section C Areas Evaluated During Inspection (Check only those areas evaluated) Pretreatment Section D. Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Jim J Gonsiewski of Inspector(s) Agency/Office/Phone and Fax Numbers Date —Docusignedby: DWR/Division of Water Quality/336-776-9704/ 6/7/2022 rn- ottisi cuxki E 197B66F179045E. Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date 6/7/2022 ned by:by� DocuSiig{J •.A. l . M1u- t 145849E225C94EA... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 NPDES NC0026565 111 121 yr/mo/day 22/05/13 17 Inspection Type 18101 (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On May 13, 2022' a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Mr. Terry Lewallen was present for the inspection along with Ms. Lisa Osthues, Pretreatment Coordinator for the Town of Ramseur. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is categorical. The publicly owned treatment works (POTW) has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from September 2021 through April 2022. The facility is very well operated. Action Items No action items were noted. Page# 2 Permit: NC0026565 Inspection Date: 05/13/2022 Owner - Facility: Ramseur WNTP Inspection Type: Pretreatment Compliance Yes No NA NE Page# 3