Loading...
HomeMy WebLinkAboutSW6220505_Supplement-EZ Form_20220607SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Pro'ect Name Utility Improvements to Serve Shabain Reserve - Phase 1 2 _ Pro'ect Area ac 115.32 - 3 _ Coastal Wetland Area (ac) 4 Surface Water Area ac - 5 Is thts projoct Ht h or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .100(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the ve etated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 021-1.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 3 13 Wet Pond 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Stri LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 Storm Filter 0 24 Silva Cell 0 25 Bayfilter 0 0 26 Filterra FORMS LOADED DESIGNIM CERTIFICATION — -- 27 Name and Title: _ Organization: _ _ _ Street address: Carlo Pardo, PE 28 Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 Raleigh. NC 27609 30 City, State, Zip: IPhone number(s): Email: 31 919-553-6570 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CARO SEAL - 051571 Signature of Designer y/a y/aa Date DRAINAGE AREAS 1 Is this a high densi ro ect? Yes 2 If so, number of draina a areas/SCMs 4 3 Does this project have low density areas? No 4 If so number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM Wet Pond Infiltration Basin Wet Pond Wet Pond 5 Total drainage area ft 5023339 sf 883772 394402 176822 874858 6 Onsite drainage area (sq ft 883772 394402 176822 874858 7 Offsite drainage area (sq ft 8 Total BUA In project s R 980497 sf 371638 sf 171155 sf 86745 sf 350959 sf 9permitting) New BUA on subdivided lots (subject to s ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 75573 sf 27645 sf 15376 sf 5672 sf 26880 sf Roof (sq ft 680000 sf 272000 sf 112000 sf 64000 sf 232000 sf - Roadway s ft 215004 sf 71993 sf 43779 sf 17073 sf 82159 sf Future (sq ft Other, please specify in the comment box below (sq ft 9920 sf 9920 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existin_q BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.52% 42.1% 43% 490/6 40% 19 Design storm inches 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 31555 cf 14480 cf 7243 cf 29967 cf 21 Calculation method for dest n volume Simple Method Simple Method Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to proide anvy additional information about the 22 drainage area(s): 12-Postal Kiosk for additional BUA INFILTRATION SYSTEM 1_Dralnage area number 2 2 Minimum required treatment volume (cu ft)1446V c 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? I Yes 9 What is the method for dewatering the SCM for maintenance? Pump (pre 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM designed by an NC licensed professional? es 18 1 Proposed slope of the subgrade surface (%) 0% 19 jAre terraces or bafflesprovided? No 20 IType of pretreatment: Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the Infiltrations stem? Yes 22 SHWT elevation fmsl 189.00 23 . Depth to SHWT per soils report in 120 in 24 Ground elevation at boring in soils report fmsl 199.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate in/hr 4.00 27 IFactor of safety FS 2 is recommended , 2.00 IElevations 29 Bottom elevation fmsl 199 ft 30 IStoraga elevation (fmsl) 200.8 ft 31 B ass elevation fmsl 2 4.5 ft mr erasins vnl 32 Bottom surface area (tt) 7230 ft 33 [Storage elevation surface area ft2 9805. ft For Trenches Only 34 Length ft 35 Width ft 36 Perforated pipe diameter, if applicable inches 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity. %) 41 Is stone free of fines? 42 Is the stone wra2ped in geotextile fabric? 43 Has at least one Inspection port beenprovided? Volumes/Drawdown 44 1Design volume of SCM cu ft 14480 cf 45 ITime to draw down (hours) 7.8 hrs 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 12:19 PM 4/29/2022 WET POND 1 [Drainage area number 7 3 4 _ 21 Minimum required treatment volume cu ft 31555 cf 1 7243 cf 29967 cf ENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM H:V ? 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump referred Pump referred Pump referred 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC 02)? Yes Yes Yes 16 D_oes the SCM follow the devicespecific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensed rofesslonal? Yes Yes Yes ET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA SA1DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 206.00 189.00 202.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 207.00 190.00 203.00 22 Elevation of the bottom of the vegetated shelf fmsl 211.50 195.50 206.50 23 Elevation of the permanent pool fmsl 212.00 196.00 207.00 24 Elevation of the top of the vegetated shelf fmsl 212.50 196.50 207.50 25 Elevation of the temporary pool fmsl) 213.90 197.50 208.70 26 Surface area of the main permanent pool (square feel 11390 2950 13155 27 Volume of the main permanent pool cubic feet 43138 cf 8526 cf 42764 cf 26 Avera a depth of the main pool (feet) 4.22 ft 3.66 It 3.58 ft 29 Average depth equation used Equation 3 Equation 3 Equation 3 30 If using equation 3, main pool perimeter.feet)423.0 It 237.0 fl 442.0 It 31 If using equation 3, width of submerged veq. shelf (feet) 3.0 It 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet 6715 cf 1583 cf 7964 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes Yes 34 Clean -out depth for foreba inches 48 in 48 in 48 in 35 Desi n volume of SCM cu ft 31555 cf 7243 cf 29967 cf 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter (inches) 2.00 in 1 in 2 in 38 If weir, weir height inches 39 If weir, weir length (inches) 40 Drawdown time for the tempospool (days) 2.44 3.61 3.71 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes Yes 43 Depth of forebay at entrance inches 60 in 60 in 60 in 44 Depth of forebay at exit (inches) 24 in 18 in 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes 46 Width of the vegetated shelf feet 6 ft 6 ft 6 ft 47 Slope of vegetated shelf H:V 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the ermanent pool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No No 51 Is a trash rack or other device provided to protect the oullet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes 53, S ecies of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda Hybrid Bermuda 541 Has a planting Ian been provided for the ve etated shelf? Yes Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 12:20 PM 4/29/2022