Loading...
HomeMy WebLinkAbout20201937 Ver 3_Post Construction Documentation_20220607 (2) Mitigation Project Information Upload ID#* 20201937 Version* 3 ......................................................................................................................................................................... Select Reviewer:* Katie Merritt Initial Review Completed Date 06/07/2022 Mitigation Project Submittal - 6/7/2022 ...................................................................................................................................................................................................................................................................................................................................................................................................... Is this a Prospectus,Technical Proposal or a New Site?* 0 Yes ® No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Email Address:* Barrett Jenkins bjenkins@restorationsystems.com Project Information ID#:* 20201937 Version:* 1 Existing ID# Existing Version Project Type: DMS Mitigation Bank Project Name: Dead Tree Phase B County: Edgecombe Document Information ...................................................................................................................................................................................................................................................................................................................................................................................................... Mitigation Document Type:* Mitigation As-Built Plans File Upload: Dead Tree Phase B Post Construction 5.84MB Documentation.pdf Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Barrett Jenkins Signature:* E ?S RESTORATION SYSTEMS I LLC June 7, 2022 From: Barrett Jenkins, Project Manager, Restoration Systems To: Katie Merritt, NCDWR, Nutrient Offset Banking SUBJECT: NCDWR# 2020-1937v3 Post Construction Documentation for Dead Tree Umbrella Bank Phase B In accordance with section VI. Post Construction Documentation for the Bank Parcel, of the Dead Tree Nutrient Offset Umbrella Banking Instrument, Restoration Systems is providing the following post construction documentation for Dead Tree Bank Parcel B (Site), DWR# 2020- 1937v3. The site is in Edgecombe County on either side of Red Hill Church Road east of Whitakers, NC. The conservation easement was recorded, survey boundaries were marked with t posts, soil was prepared, trees and seeds planted between January and April of 2022. The installation of monitoring plots was completed in the last 30 days. The following more detailed summary of activities is provided and a figure including location of installed monitoring plots, riparian restoration, riparian enhancement and riparian preservation is attached. Conservation Easement: The map of record for Dead Tree (Phase A and B) was recorded at the Edgecombe County Register of Deeds, Plat Cabinet 13 Slide 219-223. Two conservation easements were recorded for Dead Tree Phase B at the Edgecombe County Register of Deeds: 1) The Harris Family conservation easement at DB 1754 and DP 992-1008, and 2) The Eureka Etheridge Farms, LLC conservation easement at DB1754 and DP 1024-1049. There were not significant changes to the easement boundary from those presented in the final BPDP. Easement corners are currently marked with t posts. Parcel Preparation: Agricultural fields slated for restoration were historically in no till agriculture and in good condition. Typical field treatments were continued through the end of 2021. In early 2022 prior to planting these areas were ripped to break hardpans, establish microtopography, and promote diffuse flow. Grading of head cuts and culvert removal were implemented in accordance with the BPDP to increase diffuse flow. Planting Summary: The conservation easement area was planted with bare root hardwood species on March 13, 2022. Approximately 123 acres were planted at an average density greater than 680 stems per acre on approximate 8 x 8 spacing. Tree species planted varied slightly from what was proposed in the BPDP and is listed below in Table 1 in red. In addition to planting bare root hardwoods the site was seeded with the following mix of native annual and perennial herbaceous cover, Table 2. Species not initially reported in the approved BPDP have been added in red. Seeding was completed the last week of April, 2022. Table 1: Final Bare Root Planting Plan by Species (Changes from BPDP in ) %of Total AsBuilt AsBuilt Canopy Common Name Scientific Name Planted %of Total #Planted Type Trees Planted Trees Yp River birch Betula nigra 9% 7,450 9% Canopy Tulip poplar Liriodendron tulipifera 9% 7,200 9% Canopy Red mulberry Morus rubra 9% 7,200 9% Midstory Black gum Nyssa sylvatica 5% 4,325 5% Midstory Sycamore Platanus occidentalis 5% 4,250 5% Canopy Red Oak Carya illinoinensis 3% 2,150 3% Canopy Swamp Quercus michauxii 9% 1 7,200 9% Canopy chestnut oak Water oak Quercus nigra 9% 7,200 9% Canopy White oak Quercus alba 9% 7,200 9% Canopy American elm Ulmus americana 9% 7,200 9% Canopy Hackberry Celtis occidentalis 5% 4,325 5% Midstory Red Bud Cercis canadensis 0% 4,325 5% Midstory Green Ash I Fraxinus pennsylvanica 0% 4,325 5% Canopy Persimmon Diospyros virginiana 0% 7,200 9% Canopy Arrowwood 0% 1,850 2% Midstory Crab Apple ,,,0 1,000 1% Midstory Total: 84,400 Table 2:AsBuilt Seed mix(species added from BPDP in RED) Common Name Scientific Name Annual/Perennial Plains Coreopsis Coreopsis tinctoria Annual Deertongue,Tioga Panicum clandestinum Perennial Blackeyed Susan Rudbeckia hirta Perennial Purpletop Tridens flavus Perennial Lanceleaf Coreopsis Coreopsis lanceloata Perennial Clasping Coneflower Rudbeckia amplexicaulis Annual Oxeye Sunflower Heliopsis helianthoides Perennial Common Yarrow Achillea millefolium Perennial Perennial Gaillardia (Blanketflower) Gaillardia aristata Perennial Purple Coneflower Echinacea purpurea Perennial Winter Bentgrass Argostis hyemalis Perennial Bluefalse indigo Baptisia australis Perennial Cosmos Cosmos bipinnatus Annual Rocket Larkspur Consolida ajacis Annual Showy Tick trefoil Desmodium canadense Perennial Virginia Wildrye Elymus virginicus Perennial Narrowleaf Sunflower Helianthus angustifolius Perennial Wild Bergamot Monarda fistulosa Perennial No Diffuse Flow Credit Deduction Required; Edge of Easement is Start of Ditch Flow into Parcel, Remainder of Ditch Subject to Phase B Easementand Replanting. Diffuse Flow Credit Deduction RequiredArea Planted & No Credit Given Feature 11 - Intermittent/Perennial Feature 9A - Ditch Feature 9B - Ditch Feature 7B - Ditch Feature 7Intermittent/Perennial Feature 9Intermittent/Perennial Feature 8B - Ditch Feature 8A - Ditch Feature 8Intermittent/Perennial Feature 5D - Ditch Feature 6D - Ditch Feature 6 - Intermittent/Perennial Feature 7B - Ditch Feature 4DDitch Feature 3A - Ditch Feature 3 - Intermittent/Perennial Feature 5Intermittent/Perennial Feature 4 - Intermittent/Perennial Diffuse Flow Credit Deduction RequiredArea Planted & No Credit Given Diffuse Flow Credit Deduction RequiredArea Planted & No Credit Given Feature 10A - Ditch Feature 10A - Intermittent/Perennial Feature 3B - Ditch Utility Line: 30-Foot Right-Of-Way (ROW)Easement is 5-Feet Byond ROW 200 0 200 400 600 800 1,000100 Feet Legend Dead Tree - Subject Fee-Simple Parcels Dead Tree Phase B (TP 02) - Conservation Easement: 150.94 Acres Dead Tree Phase A (TP 01) - Conservation Easement: 65.15 Acres Dead Tree Phase B (TP 02) - Installed CVS Plots (105 Total) Dead Tree - Surveyed Top of Bank TOB Offsets - Surveyed Top of Bank Offsets TOB to 50 Feet TOB to 100 Feet TOB to 200 Feet Dead Tree - Phase B (TP 02) - NOC Areas No Credit (DWR Memo #2008-019, Diffuse Flow) No Credit - Less Than 50-Feet Restoration (TOB - 200-ft) - NOC Preservation (TOB - 200-ft) - No Credit FIGURE Drawn by: Date: Scale: Project No.: Title: Project: Prepared for: 1³ Edgecombe County RJH 1:4,500 CREDIT AND MONITORING MAP DEAD TREE PHASE B (TP 02)NUTRIENT OFFSETBANK PARCEL ASBUILT MEMO NC DEQ Division of Water Resources 401 & Isolated Wetlands/Waters Program & 401 Stormwater Imagery: 2017 NC OneMap MAY 2022 2020-1937 V3 Construction Notes: - Soil work & grading was completed Q1 2022 - Planting occured March 13, 2022 - Veg. plots were installed April 25-28, 2022 - Veg. measurements taken April 27, May 5, 9, & 10, 2022