HomeMy WebLinkAboutNCG030130_Monitoring Report_20220131SHIELD
ENGINEERING
January 17, 2022
Mr. Ryan Pennington
Gastonia Components and Logistics
Daimler Trucks North America, LLC
1400 Tulip Drive
Gastonia, NC 28052
RECEIVED
JAN 312022
DENR-DEMLR
Land Quality Section
Mooresville Regional Office
Subject: Stormwater Sampling —Third Quarter (revised) & Fourth Quarter, 2021
NPDES General Permit No. NCG030000 - CoC No. NCG030130
Daimler Trucks, Gastonia Components and Logistics, LLC
1400 Tulip Drive Gastonia, North Carolina
Shield Project No. 1140099-09
Dear Mr. Pennington:
Shield Engineering, Inc. (Shield) successfully collected the 3rd Quarter 2021 stormwater samples
for Stormwater Discharge Outfall (SDO) #001 at the Daimler Trucks Gastonia facility during the
month of July 2021. A cover letter dated August 10, 2021, a competed Stormwater Discharge
Monitoring Report (DMR), a Qualitative Monitoring Report and the analytical results were
emailed to you on August 13, 2021. The rain event on July 811 did not produce enough rain to
collect the stormwater samples for SDO #002 and SDO #003.
3rd Quarter (revised)
Shield continued to monitor daily weather conditions to collect stormwater samples at these
outfalls, for the 3" quarter 2021 (July —September 2021). However, other than the July 811 rainfall
event, there were no other qualifying rainfall events for the 3rd quarter 2021 as defined by
General Permit No. NCG030000. As a result, no stormwater samples were collected for SDO #002
and SDO #003 at the Daimler Trucks — Gastonia Facility during this quarter. According to rainfall
data' collected for this time period, four rain events or group events occurred on July 2nd, July
71n July 181h and July 2511, producing 0.19, 2.05, 1.78 and 0.79 inches of rain, respectively for the
month of July; four rain events or group events occurred on August 3rd, August 14tn, August 25tn
and August 311t, producing 0.30, 2.08, 0.29 and 0.56 inches of rain, respectively for the month of
August; four rain events or group events occurred on September lst, September 81n, September
161n, and September 20tn, producing 1.34, 0.14, 0.15 and 0.91 inches of rain, respectively for the
month of September. Each of the other events took place after normal business hours, within 72
hours of the rain event, or did not produce enough rainfall to collect a sample. The revised DMR
for the 3rd Quarter is attached to this cover letter.
Wh Quarter
There were no qualifying rainfall events for the 411 quarter 2021 as defined by General Permit
No. NCG030000. As a result, no stormwater samples were collected for Stormwater Discharge
Outfalls (SDO) #001, SDO #002 and SDO #003 at the Daimler Trucks — Gastonia Facility during
4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913
Charlotte, NC 28208 License No. F-0856
Stormwater Sampling— 31d & 4th Quarters 2021 January 17, 2021
Daimler Truck NA —Gastonia Facility
Shield Project No. 1140099-09 Page 2
this quarter. According to rainfall data' collected for this time period, two rain events or group
events occurred on October V, and October 25th, producing 0.49 and 0.69 inches of rain,
respectively for the month of October; four rain events or group events occurred on November
411, November 11th, November 22nd and November 261h, producing 0.13, 0.36, 0.21 and 0.02
inches of rain, respectively for the month of November; three rain events or group events
occurred on December 8th, December 181h, and December 29th, producing 1.38, 0.71, and 0.15
inches of rain, respectively for the month of December. Shield attempted to collect samples
during the November 4th rain event, however there was not enough rain for the SDOs to flow.
Each of the other events took place after normal business hours, within 72 hours of the rain
event, or did not produce enough rainfall to collect a sample. The DMR for the 4th Quarter is
attached to this cover letter.
According to www.drought.gov, Gaston County is in D2 — Severe Drought category. The U.S.
Drought Monitor (USDM) shows the location and intensity of drought across the country using a
five -category system, from Abnormally Dry (DO) to Exceptional Drought (D4). The USDM is a joint
effort of the National Drought Mitigation Center, USDA, and NOAA.
Shield will continue to monitor daily weather conditions and attempt coordination of appropriate
staff and resources to facilitate adequate sample collection. A partially completed Discharge
Monitoring Report form is attached to this cover letter for signature of the appropriate
authorized permittee and submittal to the State.
Daimler remains in Tier 1 for Copper at SDO #001 and Tier 1 for TSS at SOO #002. Shield greatly
appreciates the opportunity to provide environmental services to Daimler Trucks of North
America. If you have any questions in reference to this document or require further information,
please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC.
Magdaline Tzannis
Senior Project Manager
r
MelindIaGVren e,EIT
Senior Engineer
Robert L. Griffin, PE
President/CEO
Attachment: Discharge Monitoring Reports — Third Quarter (revised) and Fourth Quarter, 2021.
' Rainfall data collected from www.wunderground.com and/or www.waterdata.usgs.gov
OSHIELD
ENGINEERING
NCDEQ Division of Energy, Mineral and Land Resources RECEIVED
Stormwater Discharge Monitoring Report (DMR) Form for NCG03N 3 12022
Metal Fabrication JHA
Click here for instructions OENR-DEMLR
tared Oua Section
Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitorino Reporrmmoat orm within
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the appropriate DEMLR Regional Office.
Certificate of Coverage No. NCG03 0130
Person Collecting Samples: NA
Facility Name: Daimler Trucks - Gastonia
Laboratory Name: NA
Facility County: Gaston
Laboratory Cert No.: NA
Discharge during this period:
Yes
U
No (if no, skip to signature and date)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances7 0 Yes � No
If so, which Tier (I, II, or III)?
A copy of this DMR has been uploaded electronically via https,//edocs.deg.nc.gov/Forms/`SW-DMR • Yes No
Date Uploaded: 1/26
Gnalvtiral Monitoring Reaulrements for Outfalls with Industrial Activities— Benchmarks in (Red)
Parameter
Parameter
Outfall001
Outfall002
Outfall003
Outfall
Outfall
Code
N/A
Receivingstream Class
C
C
C
N/A
Date Sample Collected MM/DD/YYYY
No Flow
No Flow
No Flow
46529
24-Hour Rainfall in inches
C0530
TSS in mg/L (100 or Si
pH in standard units (6.0-9.0 FW,
00400
6.8-8.S SW
Copper, total recoverable in mg/L
01119
(0.030 FW, 0.0058 SW)
Lead, total recoverable in mg/ L
01051
(0.075 FW, 0.22 SW)
Zinc, total recoverable in mg/ L (0.126
01094
FW, 0.09S SW)
Chemical Oxygen Demand (COD) in
00340
mg/L (120)
-
00552
Non -Polar Oil & Grease In mg/L (1S)
` Outfalls to Outstanding Resource Waters (ORVA, High Quality Waters (HQW), Trout Waters [Tr) and Primary Nursery Areas (PNA)
have a benchmark TSS limit of 50 mg/L All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional): NQE during 4th Quarter 2021 for all SDOs — I
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false information, intWdlog_the possibility of fines and imprisonment for knowing violations."
Permittee or Delegated Authorized Individual
, co ru -
Address
/ jz6 2L
Date
Phone Number
NCDEQ Division of Energy, Mineral and Land Resources
Stormwater Discharge Monitoring Report (DMR) Form for NCG030000
Metal Fabrication
Click here for instructions
Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DMR) Upload form within
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the appropriate DEMLR Regional Office.
Certificate of Coverage No. NCGO3 0130
Person Collecting Samples: TJ Gladden
Facility Name: Daimler Trucks- Gastonia
Laboratory Name: Pace Analytical
Facility County: Gaston
Laboratory Cert. No.: 329
Discharge during this period:
U
Yes
No (if no, skip to signature and date)
Has your facility implemented mandatoryTier response actions this sample period for any benchmark exceedances? Yes No
If so, which Tier (1, II, or III)?
A copy of this DMR has been uploaded electronically via https://edocs.deg.nc.gov/Forms/SW-DMR Yes No
Date Uploaded: ;L
Analytical Monitoring Requirements for Outfalls with Industrial Activities- Benchmarks in (Red)
Parameter
Parameter
Outfall 001
Outfall 002
Outfall 003
Outfall
Outfall
Code
N/A
Receiving Stream Class
C
C
C
N/A
Date Sample Collected MM/DD/YYYY
07/08/2021
NQE
NQE
46529
24-Hour Rainfall in inches
023
C0530
TSSin mg/L(100or50')
31
pH in standard units (6.0-9.0 FW,
8.0
00400
6.8-8.SSW)
Copper, total recoverable in mg/L
01119
(0.010 FW, 0.0058 SW)
0.016
Lead, total recoverable in mg/ L
01051
(0.075 FW, 0.22 SW)
0.0011
Zinc, total recoverable in mg/ L (0.126
01094
FW, 0.095 SW)
0.0046
Chemical Oxygen Demand (COD) in
00340
mg/L (120)
45
00552
Non -Polar Oil &Grease in mg/L (15)
<5.0
• Outfalls to Outstanding ResourceWaters (ORW), High Quality Waters (HQW), Trout Waters (Tr) and Primary Nursery Areas (PNA)
have a benchmark TSS limit of 50 mg/L All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional): Benchmark exceedance for Copper (Outfall 001, July 2021). NQE during 3rd Quarter 2021 for SDOs 002
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false Information, incWing the possibility of fines and imprisonment for knowing violations."
of Permittee or Delegated Authorized Individual
Long
Email Address
-2'
Date
%b5% bz8. �76v
Phone Number
SHIELD
ENGINEERING
January 17, 2022
Mr. Ryan Pennington
Gastonia Components and Logistics
Daimler Trucks North America, LLC
1400 Tulip Drive
Gastonia, NC 28052
RECEIVED
JAN 312022
DENR-DE
Land Quality Section
'dooresville Regional OKce
Subject: Stormwater Sampling —Third Quarter (revised) & Fourth Quarter, 2021
NPDES General Permit No. NCG030000 - CoC No. NCG030130
Daimler Trucks, Gastonia Components and Logistics, LLC
1400 Tulip Drive Gastonia, North Carolina
Shield Project No. 1140099-09
Dear Mr. Pennington:
Shield Engineering, Inc. (Shield) successfully collected the 3rd Quarter 2021 stormwater samples
for Stormwater Discharge Outfall (SDO) #001 at the Daimler Trucks Gastonia facility during the
month of July 2021. A cover letter dated August 10, 2021, a competed Stormwater Discharge
Monitoring Report (DMR), a Qualitative Monitoring Report and the analytical results were
emailed to you on August 13, 2021. The rain event on July 8th did not produce enough rain to
collect the stormwater samples for SDO #002 and SDO #003.
3rd Quarter (revised)
Shield continued to monitor daily weather conditions to collect stormwater samples at these
outfalls, for the 3td quarter 2021 (July— September 2021). However, other than the July 81n rainfall
event, there were no other qualifying rainfall events for the 3rd quarter 2021 as defined by
General Permit No. NCG030000. As a result, no stormwater samples were collected for SDO #002
and SDO #003 at the Daimler Trucks — Gastonia Facility during this quarter. According to rainfall
data' collected for this time period, four rain events or group events occurred on July 2nd, July
7tn July 181n and July 25tn, producing 0.19, 2.05, 1.78 and 0.79 inches of rain, respectively for the
month of July; four rain events or group events occurred on August 31, August 14tn, August 25tn
and August 315t, producing 0.30, 2.08, 0.29 and 0.56 inches of rain, respectively for the month of
August; four rain events or group events occurred on September 15L, September 8tn, September
16tn, and September 20tn, producing 1.34, 0.14, 0.15 and 0.91 inches of rain, respectively for the
month of September. Each of the other events took place after normal business hours, within 72
hours of the rain event, or did not produce enough rainfall to collect a sample. The revised DMR
for the 3rd Quarter is attached to this cover letter.
4th Quarter
There were no qualifying rainfall events for the 4tn quarter 2021 as defined by General Permit
No. NCG030000. As a result, no stormwater samples were collected for Stormwater Discharge
Outfalls (SDO) #001, SDO #002 and SDO #003 at the Daimler Trucks — Gastonia Facility during
4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913
Charlotte, NC 28208 License No. F-0856
Stormwater Sampling — 3rd & 4th Quarters 2021 January 17, 2021
Daimler Truck NA— Gastonia Facility
Shield Project No.1140099-09 Page 2
this quarter. According to rainfall data' collected for this time period, two rain events or group
events occurred on October 3rd, and October 25th, producing 0.49 and 0.69 inches of rain,
respectively for the month of October; four rain events or group events occurred on November
4th, November 11th, November 22" d and November 26th, producing 0.13, 0.36, 0.21 and 0.02
inches of rain, respectively for the month of November; three rain events or group events
occurred on December 8th, December 18th, and December 29th, producing 1.38, 0.71, and 0.15
inches of rain, respectively for the month of December. Shield attempted to collect samples
during the November 4th rain event, however there was not enough rain for the SDOs to flow.
Each of the other events took place after normal business hours, within 72 hours of the rain
event, or did not produce enough rainfall to collect a sample. The DMR for the 4th Quarter is
attached to this cover letter.
According to www.drogght.eov, Gaston County is in D2 — Severe Drought category. The U.S.
Drought Monitor (USDM) shows the location and intensity of drought across the country using a
five -category system, from Abnormally Dry (DO) to Exceptional Drought (D4). The USDM is a joint
effort of the National Drought Mitigation Center, USDA, and NOAA.
Shield will continue to monitor daily weather conditions and attempt coordination of appropriate
staff and resources to facilitate adequate sample collection. A partially completed Discharge
Monitoring Report form is attached to this cover letter for signature of the appropriate
authorized permittee and submittal to the State.
Daimler remains in Tier 1 for Copper at SDO #001 and Tier 1 for TSS at SDO #002. Shield greatly
appreciates the opportunity to provide environmental services to Daimler Trucks of North
America. If you have any questions in reference to this document or require further information,
please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC.
Magdaline Tzannis
Senior Project Manager
Melinda . Gr ene, EIT
Senior Engineer
Robert L. Griffin, PE
President/CEO
Attachment: Discharge Monitoring Reports —Third Quarter (revised) and Fourth Quarter, 2021.
1 Rainfall data collected from www.wunderground.com and/or www.waterdata.uses.gov
SHIELD
ENGINEERING
NCDEQ Division of Energy, Mineral and Land Resources
(RECEIVED
Stormwater Discharge Monitoring Report (DMR) Form for NCG0300 1.DZZ
Metal Fabrication
Click here for instructions
e-and
complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DMR( Upload form within
30 days of receiving sampling results. Mail the original signed hard copy of the DMR to the appropriate DEMLR Regional Office.
Certificate of Coverage No. NCG03 0130
Person Collecting Samples: NA
Facility Name: Daimler Trucks - Gastonia
Facility County: Gaston
Laboratory Name: NA
Laboratory Cert. No.: NA
Discharge during this period:
Yes
No (if no, skip to signature and date)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes No
If so, which Tier (I, II, or III)?
A copy of this DMR has been uploaded electronically via https�//edocs.deo.nc.gov/Forms/SW-DMR Yes nNo
Date Uploaded: 1/26
__r fnr nutfalls with Industrial Activities— Benchmarks in (Red)
Parameter
Parameter
Outfall 001
Outfall 002
Outfall 003
Outfall
Outfall
Code
N/A
Receiving Stream Class
C
C
C
N/A
Date Sample Collected MM/DD/YYYY
No Flow
No Flow
No Flow
46529
24-Hour Rainfall in inches
C0530
TSS in mg/L (100 or 50')
pH in standard units (6.0 — 9.0 FW,
00400
6.8-8.5 SW)
Copper, total recoverable in mg/L
D1119
(0.010 FW, 0.0058 SW)
Lead, total recoverable in mg/ L
01051
(0.075 FW, 0.225W)
Zinc, total recoverable in mg/ L (0.126
01094
FW, 0.095 SW)
Chemical Oxygen Demand (COD) in
D0340
mg/L (120)
00552
i Non -Polar Oil & Grease in mg/L (25)
• Outfalls to Outstanding Resource Waters (ORW), High Qual"dy, Waters (HQw), Trout waters t i rianu rnmdry ..ul �c. y re cam tr i—,
have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional): NQE during 4th Quarter 2021 for all SDOs.
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my
Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false information, in ding the possibility of fines and imprisonment for knowing violations."
of Permittee or Delegated Authorized Individual
co et.--
Address
/ tz(, z7-
Date
IC71?68..f (,o
Phone Number
NCDEQ Division of Energy, Mineral and Land Resources
Stormwater Discharge Monitoring Report (DMR) Form for NCG030000
Metal Fabrication
Click here for instructions
Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DMR) Upload form within
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the appropriate DEMLR Regional Office.
Certificate of Coverage No. NCGO3 0130
Person Collecting Samples: TJ Gladden
Facility Name: Daimler Trucks - Gastonia
Laboratory Name: Pace Analytical
Facility County: Gaston
Laboratory Cert. No.: 329
Discharge during this period:
Lvj
Yes
No (ff no, skip to signature and date)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes No
If so, which Tier (I, II, or III)?
A copy of this DMR has been uploaded electronically via https://edocs.deg.nc.gov/Forms/SW-DMR M Yes No
Date Uploaded:
Analytical Monitoring Requirements for Outfalls with Industrial Activities— Benchmarks in (Red)
Parameter
Parameter
Outfall 001
Outfall 002
Outfall 003
Outfall
Outfall
Code
N/A
Receiving Stream Class
C
C
C
N/A
Date Sample Collected MM/DD/YYYY
07/08/2021
NQE
NQE
46529
24-Hour Rainfall In Inches
0.23
C0530
T55 in mg/L (100 or 50•)
31
pH in standard units (6.0-9.0 FW,
00400
6.8-8.5sW)
8.0
Copper, total recoverable in mg/L
01119
(0.010 FW, 0.0058 SW)
0,016
Lead, total recoverable in mg/ L
01051
(0.075 FW, 0.22 SW)
0.0011
Zinc, total recoverable in mg/ L (0.126
01094
FW, 0.095 SW)
0.0046
Chemical Oxygen Demand (COD) in
00340
mg/L (120)
45
00552
Non -Polar Oil & Grease in mg/L (15)
c5.0
' Outfalls to Outstanding Resource Waters (ORW), High Quality Waters (HOW), Trout Waters (Tr) and Primary Nursery Areas (PNA)
have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional): Benchmark exceedance for Copper (Outfall 001, July 2021). NQE during 3rd Quarter 2021 for SDOs 002 8 003.
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false Information, ingp*ding the possibility of fines and imprisonment for knowing violations."
of Permittee or Delegated Authorized Individual
S-77-1a64iini ®�Airn�e/f7�cr�, LoM
Email Address
1 J( .ZZ_
Date
7W, k6$. 574v
Phone Number