Loading...
HomeMy WebLinkAboutNCG030085_Monitoring Report_20210916DAIMLER September 10, 2021 NCDEQ- Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 To whom it may concern: tEP 16 2021 C'ENR, A:'ULR �I and ory"'j,eJR 9ESection ce Sean Quarry Sr. Environmental Engineer Daimler Trucks 1800 North Main Street Mount Holly, NC 28120 704.822.7034 Phone Please find the enclosed August Stormwater Discharge Outfall (SDO) #001 and #002 forms for the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The August stormwater samples were not collected during this month. According to rainfall data collected for the month, there was no qualifying rain event (as defined by General Permit No. NCG030000). Shield was successful in September at collecting an adequate sample. Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by Daimler. Should you have any questions, please contact me at 704-822-7034 or sean.quarry@daimler.com. Sincerely, Daimler Trucks NA, LLC Sean Quarry Sr. Environmental Engineer Enclosures — Shield Engineering, Inc. Cover Letter and DTNA signed DMR forms SHIELD ENGINEERING September 3, 2021 Mr. Sean Quarry Daimler Trucks North America, LLC 1800 North Main Street Mount Holly, NC 28120 o 'O iO (�11 101" odo; Subject: Monthly Sampling — August 2021 NPDES General Permit No. NCG030000 Daimler Trucks of North America LLC - Mount Holly, North Carolina Shield Project No. 1140109-08 Dear Mr. Quarry: There were no qualifying rainfall events for the month of August 2021 as defined by General Permit No. NCG030000. As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfalls (SDO) #001 and SDO #002 at the Daimler Trucks — Mount Holly Facility in August. According to rainfall data' collected for the month, five rain events or group events occurred on August 31a, August 61h, August 10", August 250', and August 31", producing 0.28 inches, 0.04 inches, 2.35 inches, 0.32 inches and 0.60 inches of rain, respectively. However, each of these events took place after normal business hours, within 72 hours of the rain event, or did not produce enough rainfall to collect a sample. Shield will continue to monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate adequate sample collection. A partially completed Discharge Monitoring Report form is attached to this cover letter for signature of the appropriate authorized permittee and submittal to the State. Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc, Copper and TSS. Shield will continue to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks, North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at (704) 394-6913. Respectfully, SHIELD ENGINEERING, INC. Magdaline Tzannis Senior Project Manager elfin . Gre ne, E T Senior gineer Attachment: Discharge Monitoring Report — August 2021 ' Rainfall data collected from www.wunderen>und.com Robert L. Griffin, PE /� President/CEO 4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913 Charlotte, NC 28208 License No. F-0856 NCDEQ Division of Energy, Mineral and Land Resources Stormwater Discharge Monitoring Report (DMR) Form for Metal Fabrication Click here for instructions Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DM load m within 30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the apomprial a UE M7 Reeinnal Office. Certificate of Coverage No. NCG03 0085 Facility Name: Daimler Trucks - Mount Holly Person Collecting Samples: NA Laboratory Name: NA Facility County: Gaston I Laboratory Cert. No.: NA Discharge during this period: Yes + No (if no, skip to signature and date) Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes [Z]NO If so, which Tier (I, II, or III)? A copy of this DMR has been uploaded electronically via https//edocs.deg.nc.gov/Forms/SW-DMR + Yes No Date uploaded: 9 /3 L/ Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red) Parameter Parameter Outfall001 Outfall002 Outfall Outfall Outfall Code N/A Recelving Stream Class WS-IV; CA WS-IV; CA N/A Date Sample Collected MM/DD/YYYY NOE NOE 46529 24-Hour Rainfall in inches C0530 TSS in mg/L (100 or 50') 00400 pH in standard units (6.0-9.0 FW, 6.8-8.5 SW) 01119 Copper, total recoverable In mg/L (0.010 FW, 0.0058 SW) Lead, total recoverable in mg/L 01051 0.075 FW, 0.22 SW 01094 Zinc, total recoverable in mg/ L(0.126 _ FW, 0.095 SW) 00340 Chemical Oxygen Demand (COD) in mg/L (120) 00552 Non -Polar Oil & Grease in mg/L (15) " Outfalls to Outstanding Resource Waters (ORW), High Quality Waters (HOW), Trout Waters (Tr) and Primary Nursery Areas (PNA) have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L FW (Freshwater) SW (Saltwater) Notes (optional): "1 certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properlygather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, a best of my k edge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false infor i t , includingt p sibilitylyf fines and imprisonment for knowing violations." Signature of,Permittee or Delegated Authorized Individual G�0i y . 2rdshv dolm/GI.Cok Email Address 7 //1 A Date ?rA-/-n z - 7M Phone Number DAIMLER Sean Quarry Sr. Environmental Engineer Daimler Trucks 1800 North Main Street Mount Holly, NC 28120 704.822.7034 Phone September 10, 2021 NCDEQ- Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 To whom it may concern: Please find the enclosed August Stormwater Discharge Outfall (SDO) #001 and #002 forms for the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The August stormwater samples were not collected during this month. According to rainfall data collected for the month, there was no qualifying rain event (as defined by General Permit No. NCG030000). Shield was successful in September at collecting an adequate sample. Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by Daimler. Should you have any questions, please contact me at 704-822-7034 or sean.quarry@daimler.com. Sincerely, Daimler Trucks NA, LLC Sean Quarry Sr. Environmental Engineer Enclosures — Shield Engineering, Inc. Cover Letter and DTNA signed DMR forms SHIELD ENGINEERING September 3, 2021 'p Mr. Sean Quarry Daimler Trucks North America, LLC 1800 North Main Street Mount Holly, NC 28120 °10 Subject: Monthly Sampling — August 2021 NPDES General Permit No. NCG030000 Daimler Trucks of North America LLC - Mount Holly, North Carolina Shield Project No. 1140109-08 Dear Mr. Quarry: There were no qualifying rainfall events for the month of August 2021 as defined by General Permit No. NCG030000. As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfalls (SDO) #001 and SDO #002 at the Daimler Trucks — Mount Holly Facility in August. According to rainfall data' collected for the month, five rain events or group events occurred on August 31, August 6'h, August 10'", August 25 ", and August 31 ", producing 0.28 inches, 0.04 inches, 2.35 inches, 0.32 inches and 0.60 inches of rain, respectively. However, each of these events took place after normal business hours, within 72 hours of the rain event, or did not produce enough rainfall to collect a sample. Shield will continue to monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate adequate sample collection. A partially completed Discharge Monitoring Report form is attached to this cover letter for signature of the appropriate authorized pennittee and submittal to the State. Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc, Copper and TSS. Shield will continue to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks, North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at (704) 394-6913. Respectfully, SHIELD ENGINEERING, INC. Magdaline Tzannis Senior Project Manager elfin . Grc ne Senior gineer Attachment: Discharge Monitoring Report — August 2021 ' Rainfall data collected from www.wundemround.com Robert L. Griffin, PE �� President/CEO 4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913 Charlotte, NC 28208 License No. F-0856 NCDEQ Division of Energy, Mineral and Land Resources i Stormwater Discharge Monitoring Report (DMR) Form for NCG030000 Metal Fabrication Click here for instructions A Ym Complete, sign, scan and submit the DMR via the Stormwater NPDLS Permit Data Monitoring Report (UMR) Uploa` J�1R1 wi(K 30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the appropriate DF MLR ft aaeMil Office. Certificate of Coverage No. NCG03 0085 Facility Name: Daimler Trucks - Mount Holly Person Collecting Samples: NA Laboratory Name: NA Facility County: Gaston Laboratory Cert. No.: NA Discharge during this period: Yes r No (if no, skip to signature and date) Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes + No If so, which Tier (I, II, or III)? A copy of this DMR has been upl aded electronically via hops fedocs dec .nguu/forms SW -DMI< + Yes No Date Uploaded: % /3 L Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red) Parameter Parameter Outfall 001 Outfall 002 Outfall Outfall Outfall Code N/A Receiving Stream Class WS-IV; CA WS-IV; CA N/A Date Sample Collected MM/DD/YYYY NOE NOE 46529 24-Hour Rainfall in inches C0530 TSS in mg/L (100 or 50•) pH in standard units (6.0-9.0 FW, 00400 6.8-8.5 SW) Copper, total recoverable in mg/L 01119 (0.010 FW, 0.0058 SW) Lead, total recoverable in mg/L 01051 (0.075 FW, 0.22 SW) Zinc, total recoverable in mg/ L(0.126 01094 FW, 0.095 SW) Chemical Oxygen Demand (COD) in 00340 mg/L(120) 00552 Non -Polar OII &Grease in mg/L (15) " Outfalls to Outstanding Resource Waters (ORW), High Quality Waters (HOW), Trout Waters (Trl and Primary Nursery Areas (PNA) have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L FW (Freshwater) SW (Saltwater) Notes (optional): "I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false inforgurfigeincluding the pgssijtih�r of fines and Imprisonment for knowing violations." rt r Email Individual 16i. t-- 9 ij z- Date ?K/-b2 t -7St�S Phone Number