HomeMy WebLinkAboutNCG030085_Monitoring Report_20210916DAIMLER
September 10, 2021
NCDEQ- Division of Water Resources
610 East Center Avenue
Suite 301
Mooresville, North Carolina 28115
To whom it may concern:
tEP 16 2021
C'ENR,
A:'ULR
�I and
ory"'j,eJR 9ESection
ce
Sean Quarry
Sr. Environmental Engineer
Daimler Trucks
1800 North Main Street
Mount Holly, NC 28120
704.822.7034 Phone
Please find the enclosed August Stormwater Discharge Outfall (SDO) #001 and #002 forms for
the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The August
stormwater samples were not collected during this month. According to rainfall data collected
for the month, there was no qualifying rain event (as defined by General Permit No.
NCG030000). Shield was successful in September at collecting an adequate sample.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue
to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling
frequency by Daimler.
Should you have any questions, please contact me at 704-822-7034 or
sean.quarry@daimler.com.
Sincerely,
Daimler Trucks NA, LLC
Sean Quarry
Sr. Environmental Engineer
Enclosures — Shield Engineering, Inc. Cover Letter and DTNA signed DMR forms
SHIELD
ENGINEERING
September 3, 2021
Mr. Sean Quarry
Daimler Trucks North America, LLC
1800 North Main Street
Mount Holly, NC 28120
o 'O iO (�11
101"
odo;
Subject: Monthly Sampling — August 2021
NPDES General Permit No. NCG030000
Daimler Trucks of North America LLC - Mount Holly, North Carolina
Shield Project No. 1140109-08
Dear Mr. Quarry:
There were no qualifying rainfall events for the month of August 2021 as defined by General Permit No.
NCG030000. As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfalls
(SDO) #001 and SDO #002 at the Daimler Trucks — Mount Holly Facility in August. According to rainfall
data' collected for the month, five rain events or group events occurred on August 31a, August 61h, August
10", August 250', and August 31", producing 0.28 inches, 0.04 inches, 2.35 inches, 0.32 inches and 0.60
inches of rain, respectively. However, each of these events took place after normal business hours, within
72 hours of the rain event, or did not produce enough rainfall to collect a sample. Shield will continue to
monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate
adequate sample collection. A partially completed Discharge Monitoring Report form is attached to this
cover letter for signature of the appropriate authorized permittee and submittal to the State.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc, Copper and TSS. Shield will continue to
perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by
Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks,
North America. If you have any questions in reference to this document or require further information,
please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC.
Magdaline Tzannis
Senior Project Manager
elfin . Gre ne, E T
Senior gineer
Attachment: Discharge Monitoring Report — August 2021
' Rainfall data collected from www.wunderen>und.com
Robert L. Griffin, PE /�
President/CEO
4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913
Charlotte, NC 28208 License No. F-0856
NCDEQ Division of Energy, Mineral and Land Resources
Stormwater Discharge Monitoring Report (DMR) Form for
Metal Fabrication
Click here for instructions
Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DM load m within
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the apomprial a UE M7 Reeinnal Office.
Certificate of Coverage No. NCG03 0085
Facility Name: Daimler Trucks - Mount Holly
Person Collecting Samples: NA
Laboratory Name: NA
Facility County: Gaston
I Laboratory Cert. No.: NA
Discharge during this period: Yes + No (if no, skip to signature and date)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes [Z]NO
If so, which Tier (I, II, or III)?
A copy of this DMR has been uploaded electronically via https//edocs.deg.nc.gov/Forms/SW-DMR + Yes No
Date uploaded: 9 /3 L/
Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red)
Parameter
Parameter
Outfall001
Outfall002
Outfall
Outfall
Outfall
Code
N/A
Recelving Stream Class
WS-IV; CA
WS-IV; CA
N/A
Date Sample Collected MM/DD/YYYY
NOE
NOE
46529
24-Hour Rainfall in inches
C0530
TSS in mg/L (100 or 50')
00400
pH in standard units (6.0-9.0 FW,
6.8-8.5 SW)
01119
Copper, total recoverable In mg/L
(0.010 FW, 0.0058 SW)
Lead, total recoverable in mg/L
01051
0.075 FW, 0.22 SW
01094
Zinc, total recoverable in mg/ L(0.126
_
FW, 0.095 SW)
00340
Chemical Oxygen Demand (COD) in
mg/L (120)
00552
Non -Polar Oil & Grease in mg/L (15)
" Outfalls to Outstanding Resource Waters (ORW), High Quality Waters (HOW), Trout Waters (Tr) and Primary Nursery Areas (PNA)
have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional):
"1 certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properlygather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information
submitted is, a best of my k edge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false infor i t , includingt p sibilitylyf fines and imprisonment for knowing violations."
Signature of,Permittee or Delegated
Authorized Individual
G�0i y . 2rdshv dolm/GI.Cok
Email Address
7 //1 A
Date
?rA-/-n z - 7M
Phone Number
DAIMLER
Sean Quarry
Sr. Environmental Engineer
Daimler Trucks
1800 North Main Street
Mount Holly, NC 28120
704.822.7034 Phone
September 10, 2021
NCDEQ- Division of Water Resources
610 East Center Avenue
Suite 301
Mooresville, North Carolina 28115
To whom it may concern:
Please find the enclosed August Stormwater Discharge Outfall (SDO) #001 and #002 forms for
the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The August
stormwater samples were not collected during this month. According to rainfall data collected
for the month, there was no qualifying rain event (as defined by General Permit No.
NCG030000). Shield was successful in September at collecting an adequate sample.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue
to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling
frequency by Daimler.
Should you have any questions, please contact me at 704-822-7034 or
sean.quarry@daimler.com.
Sincerely,
Daimler Trucks NA, LLC
Sean Quarry
Sr. Environmental Engineer
Enclosures — Shield Engineering, Inc. Cover Letter and DTNA signed DMR forms
SHIELD
ENGINEERING
September 3, 2021 'p
Mr. Sean Quarry
Daimler Trucks North America, LLC
1800 North Main Street
Mount Holly, NC 28120
°10
Subject: Monthly Sampling — August 2021
NPDES General Permit No. NCG030000
Daimler Trucks of North America LLC - Mount Holly, North Carolina
Shield Project No. 1140109-08
Dear Mr. Quarry:
There were no qualifying rainfall events for the month of August 2021 as defined by General Permit No.
NCG030000. As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfalls
(SDO) #001 and SDO #002 at the Daimler Trucks — Mount Holly Facility in August. According to rainfall
data' collected for the month, five rain events or group events occurred on August 31, August 6'h, August
10'", August 25 ", and August 31 ", producing 0.28 inches, 0.04 inches, 2.35 inches, 0.32 inches and 0.60
inches of rain, respectively. However, each of these events took place after normal business hours, within
72 hours of the rain event, or did not produce enough rainfall to collect a sample. Shield will continue to
monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate
adequate sample collection. A partially completed Discharge Monitoring Report form is attached to this
cover letter for signature of the appropriate authorized pennittee and submittal to the State.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc, Copper and TSS. Shield will continue to
perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by
Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks,
North America. If you have any questions in reference to this document or require further information,
please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC.
Magdaline Tzannis
Senior Project Manager
elfin . Grc ne
Senior gineer
Attachment: Discharge Monitoring Report — August 2021
' Rainfall data collected from www.wundemround.com
Robert L. Griffin, PE ��
President/CEO
4301 Taggart Creek Road www.shieldengineering.com Telephone 704.394.6913
Charlotte, NC 28208 License No. F-0856
NCDEQ Division of Energy, Mineral and Land Resources i
Stormwater Discharge Monitoring Report (DMR) Form for NCG030000
Metal Fabrication
Click here for instructions A Ym
Complete, sign, scan and submit the DMR via the Stormwater NPDLS Permit Data Monitoring Report (UMR) Uploa` J�1R1 wi(K
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the appropriate DF MLR ft aaeMil Office.
Certificate of Coverage No. NCG03 0085
Facility Name: Daimler Trucks - Mount Holly
Person Collecting Samples: NA
Laboratory Name: NA
Facility County: Gaston
Laboratory Cert. No.: NA
Discharge during this period: Yes r
No (if no, skip to signature and date)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes + No
If so, which Tier (I, II, or III)?
A copy of this DMR has been upl aded electronically via hops fedocs dec .nguu/forms SW -DMI< + Yes No
Date Uploaded: % /3 L
Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red)
Parameter
Parameter
Outfall 001
Outfall 002
Outfall
Outfall
Outfall
Code
N/A
Receiving Stream Class
WS-IV; CA
WS-IV; CA
N/A
Date Sample Collected MM/DD/YYYY
NOE
NOE
46529
24-Hour Rainfall in inches
C0530
TSS in mg/L (100 or 50•)
pH in standard units (6.0-9.0 FW,
00400
6.8-8.5 SW)
Copper, total recoverable in mg/L
01119
(0.010 FW, 0.0058 SW)
Lead, total recoverable in mg/L
01051
(0.075 FW, 0.22 SW)
Zinc, total recoverable in mg/ L(0.126
01094
FW, 0.095 SW)
Chemical Oxygen Demand (COD) in
00340
mg/L(120)
00552
Non -Polar OII &Grease in mg/L (15)
" Outfalls to Outstanding Resource Waters (ORW), High Quality Waters (HOW), Trout Waters (Trl and Primary Nursery Areas (PNA)
have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L
FW (Freshwater) SW (Saltwater)
Notes (optional):
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information
submitted is, to best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false inforgurfigeincluding the pgssijtih�r of fines and Imprisonment for knowing violations."
rt r
Email
Individual
16i. t--
9 ij z-
Date
?K/-b2 t -7St�S
Phone Number