Loading...
HomeMy WebLinkAbout20071843 Ver 1_Year 2 Monitoring Report Ph 2-3 Year 2_20140529Stone Farm Regional Mitigation Bank Annual Monitoring Report — Year 2 (Phase Two and Three) Brunswick County, NC Lumber River Basin (Cataloging Unit #03040207) Prepared on behalf of- Stone Farm Mitigation Bank, LLC (Sponsor) Prepared by., LMG LAND MANAGEMENT GROUP iNc. Environmental Consultants Wilmington, N.C. May 2014 TABLE OF CONTENTS 1.0. EXECUTIVE SUMMARY 2.0. 3.0 4.0 5.0 PROJECTOVERVIEW ................................................................................. ..............................2 A. INTRODUCTION ............................................................................................ ..............................2 B. MITIGATION GOALS AND OBJECTIVES .................................................... ..............................2 C. PROJECT IMPLEMENTATION ..................................................................... ..............................2 MONITORING REQUIREMENTS .............................................................. ..............................6 A. WETLAND RESTORATION SUCCESS CRITERIA ....................................... ..............................6 MONITORING RESULTS (YEAR 2) ..... A. PHASE II ...................... ............................... 1. VEGETATION MONITORING .................. 2. HYDROLOGIC MONITORING ................. 3. STREAM MONITORING .......................... (a) Photo Documentation ......................... (b) Ecological Function ............................ (c) Channel Stability /Survey Procedures (1.) Cross - Sections ........................... (2.) Longitudinal Profiles .................. (3.) Pebble Counts ............................. (4.) Stream Flow Monitoring ............. 4. CONTINGENCY MEASURES ................. B. PHASE III ..................... ............................... 11 13 13 13 14 14 14 15 15 19 20 CONCLUSION................................................................................................ .............................22 Figure 1... Figure 2 .. Figure 3. . Figure 4... Figure 5... LIST OF FIGURES, TABLES, AND APPENDICES ... Phase II Restoration Plan /As -Built ..Phase III Restoration Plan /As -Built .......Phase Boundary Overview Map Phase II Plot and Well Location Map ............ Cross Section Location Map Table 1 ............................................. ............................... Phase II Planting List (March 2011 /February 2012) Table 2 ................................................. ............................... Summary of Tasks Completed — Phase II and III Table 3 ................................................. ............................... Vegetation Plots and Wells by Community Type Table 4 ................................. ............................... Annual Monitoring Data Sheets, Year 2 — Planted Species Table 4A .... ............................... .........................Annual Monitoring Data Sheets, Year 2 — Volunteer Species Table 413 ............................. .........................Annual Monitoring Data Sheets, Year 2 — Unidentified Volunteer Table 4C ........................................................ ............................... Stem Counts By Year (Phase 11— Planted) Table 5 . ............................... ........................Summary of Year 2 Hydrologic Monitoring (Phase 11— Streams) Table 6 ............................... ............................... .........................Stream Lengths and Cross Section Stations Table 7 ................................................................ ............................... Longitudinal Profiles by Stream Reach Table 8 ................... ............................... Summary of Year 2 Bankfull Event Monitoring (Phase 11— Streams) Table 9 ........................................ ............................... Summary of Year 2 Hydrologic Monitoring — Phase III AppendixA .......................................................................................... ............................... Site Photographs Appendix B ................................. ............................... Individual Plot Data Sheets (Year 2 Monitoring — 2013) Appendix C .......................................... ............................... Hydrographs (January 2013 — December 2013) Appendix D .......................................... ............................... NC Division of Water Resources Drought Maps Appendix E ................ ............................... Longitudinal /Cross- Section Surveys, Cross - Section Photographs Appendix F ............................................................ ............................... Ordinary High Water Mark Indicators 1.0 EXECUTIVE SUMMARY On behalf of the Bank Sponsor (Stone Farm Bank, LLC), Land Management Group (LMG) has completed Year 2 annual monitoring of Phase Two and Phase Three of the Stone Farm Regional Mitigation Bank. Phase Two consists of 418 acres of the total 968 -acre mitigation bank site and includes 15,338 linear feet of stream restoration, 103 acres of Riparian (Non - Riverine) Wetland Restoration (i.e. small stream swamp); 28 acres of Riparian (Non - Riverine) Wetland Preservation; 40 acres of Riparian (Non - Riverine) Wetland Restoration (i.e. headwater swamp forest); 66 acres of Non - Riparian Wetland Enhancement; 160 acres of Non - Riparian Wetland Preservation; and 21 acres of upland buffer (Figure 1). Phase Three consists of 192 acres and includes 7.40 acres of Riparian (Non - Riverine) Wetland Restoration; 31.5 acres of Non - Riparian Wetland Restoration; 68 acres of Non - Riparian Wetland Enhancement; and 85 acres of Non - Riparian Wetland Preservation (Figure 2). The Phase Two project area connects the 145 -acre Carolina bay on the southern portion of the tract to the Little Caw Caw Canal (a third -order tributary of the Waccamaw River) on the north boundary of the Bank site. The Phase Three project area comprises the entire headwater wetlands of the South Tributary. As was documented in the Mitigation Plan, the streams and wetlands of these watersheds had been historically impaired by agricultural and silvicultural practices for over a hundred years. The wetlands of the Main Stem and its tributaries (North Tributary and South Tributary) had been cleared and drained for rice production. A network of dirt roads and canals dissected the site and resulted in the disconnection of first - order tributaries from adjacent, former floodplain wetlands. Restoration work in Phase Two and Phase Three involved the removal of over two miles of dirt roads, backfilling of four miles of canals, plugging of an approximate 5,000 -If section of canal, 15,388 -If of Priority I stream restoration, restoration of valley grades, and planting of approximately 96 acres of restored wetlands. Construction of the South Tributary of Phase 2 was completed in October 2011. The remaining areas of Phase Two and Phase Three were completed in February 2012. The following Annual Monitoring Report (AMR) presents the findings of the second year of monitoring for both Phase Two and Phase Three. Stone Farm Regional Mitigation Bank 1 Phase Two and Three — Year 2 Annual Monitoring Report 2.0 PROJECT OVERVIEW A. Introduction As approved by the Mitigation Bank Review Team (MBRT), the bank Sponsor began implementation of Phase Two of the restoration project in September 2010. Figure 3 depicts the location and extent of the three phases of the project. One remaining phase (Phase 4) consists of stream restoration within an independent watershed (Hunters Creek) on the western portion of the site. Implementation of Phase Three of the restoration project began in January of 2012. Placement of fill material within existing ditches (Figure 2) was authorized under Nationwide Permit 27 issued by the US Army Corps of Engineers (USACE) on January 25, 2008 (Action ID# 2003 - 00682) and the corresponding 401 Water Quality Certification issued on January 2, 2008 (DWQ Project #20071843). B. Mitigation Goals and Objectives The larger Bank restoration project is intended to provide suitable, high - quality wetland and stream restoration to mitigate for authorized impacts within the Lumber River Basin (USGS 8 -digit Hydrologic Unit 03040207; DWQ Subbasin 03- 07 -57). The objective of the project is to restore natural vegetative and hydrologic conditions throughout the nonriparian, riparian, and Coastal Plain stream habitat that have been compromised by previous land use activities. The primary functions to be restored or enhanced as a result of the restoration project include: surface water storage (i.e. flood attenuation); sediment /nutrient retention; organic carbon transport to downstream food -webs; and wildlife habitat. The project provides an invaluable opportunity to restore an entire watershed within a region currently experiencing acute development pressures. C. Project Implementation Earthwork initially included the construction of a dry Priority I stream channel. The first stream channel restored was the South Tributary. As construction progressed downstream, existing ditches and canals were filled. Clay plugs were used at prescribed intervals to reduce potential subsurface drainage within backfilled ditches. Soil removed for the construction of the Priority 1 channel was used to fill in the existing channels. Existing roadbeds and adjacent spoil piles were removed, and the material was used to backfill the road -side canals. Construction of the Main Stem and North Tributary was implemented in a similar manner. Stream valleys were restored through converted agricultural fields to re- establish the natural hydrologic connection of small stream swamp and headwater bay forest (Carolina bay) and swamp forest Stone Farm Regional Mitigation Bank 2 Phase Two and Three — Year 2 Annual Monitoring Report wetlands to the first -order reach of Little Caw Caw Canal. Restored wetlands were planted with characteristic wetland trees corresponding to the targeted community type (headwater swamp forest and small stream swamp). Approximately 63,250 hardwood tree seedlings were planted throughout the restored small stream swamp and swamp forest communities between March 2011 and February 2012. Seedlings were planted on approximate 9 -ft centers, corresponding to an average density of 659 seedlings per acre. Planting was supervised by LMG personnel to ensure proper spacing and planting depths. Swamp black gum (Nyssa sylvatica) and bald cypress (Taxodium distichum) comprised a majority of the seedlings planted, totaling approximately 30,400. Species such as swamp chestnut oak (Quercus michauxii), tulip poplar (Liriodendron tulipifera), Atlantic white cedar (Chamaecyparis thyoides), pond pine (Pinus serotina), and river birch (Betula nigra) were also planted (See Table 1 for seedling quantities by species). Tulip poplar, Atlantic white cedar, and pond pine were planted in slightly higher landscape positions in the swamp forest communities, while the remaining species were planted in the small stream swamp communities that will likely experience longer flooding durations. The transition between the small stream swamp community and the swamp forest community in the outer Coastal Plain represents subtle shifts in composition rather than distinct breaks between wetland types. An overlap of planted species occurs along the boundaries between the two wetland communities. In addition, live stakes were planted on approximate 4 -ft centers and interspersed along the top of bank and side bank of the stream channels to provide for enhanced bank stabilization and vegetative cover. Restoration work for Phase Three consisted of the installation of four (4) armored earthen clay plugs at prescribed locations and backfilling 200 -ft upstream of each plug along a channelized ditch upstream of the Southern Tributary. Given the limited amount of earthwork required for the hydrologic restoration and the existing forested condition, there were no additional planting requirements for Phase Three. Refer to Table 2 for a list of tasks and associated completion dates for the implementation of Phase 2 and Phase 3. Stone Farm Regional Mitigation Bank 3 Phase Two and Three — Year 2 Annual Monitoring Report Table 1. Phase Two Planting List (March 2011/February 2012) Non - Riverine Restoration 2011 Southern Tributary Swamp Forest 6 -ac Common Name Scientific Name # Planted Yellow Poplar Liriodendron tulipifera 1,000 Pond Pine Pinus serotina 1,350 Green Ash Fraxinus pennsylvanica 1,200 Bald Cypress Taxodium distichum 2,000 Swamp Black Gum Nyssa sylvatica 2,000 Total 7,550 Riverine Restoration (2011) Southern Tributary Small Stream Swamp 14 -ac Common Name Scientific Name Ironwood Carpinus caroliniana 1,000 Green Ash Fraxinus pennsylvanica 800 Bald Cypress Taxodium distichum 1,000 Swamp Black Gum Nyssa sylvatica 1,000 Elderberry Sambucus canadensis 2,000 Buttonbush Cephalanthus occidentalis 2,000 Total 7,800 Non - Riverine Restoration 2012 Mainstem /North Trib. Swamp Forest 20 -ac Common Name Scientific Name Yellow Poplar Liriodendron tulipifera 4,300 Bald Cypress Taxodium distichum 6,000 Swamp Chestnut Oak Quercus michauxii 3,000 Swamp Black Gum Nyssa sylvatica 3,500 Pond Pine Pinus serotina 2,400 Atlantic White Cedar Chamaecyparis thyoides 2,000 Total 21,200 Riverine Restoration (2012) Mainstem /North Trib. Small Stream Swamp 56 -ac Common Name Scientific Name Bald Cypress Taxodium distichum 10,000 River Birch Betula nigra 2,000 Swamp Black Gum Nyssa sylvatica 4,900 Swamp Chestnut Oak Quercus michauxii 2,000 Yellow Poplar Liriodendron tulipifera 2,000 Silky Dogwood Corpus amomum 500 Elderberry Sambucus canadensis 2,300 Buttonbush Cephalanthus occidentalis 500 Black Willow Salix nigra 1,500 Silky Willow Salix sericea 1,000 Total 26,700 Grand Total 63,250 Stone Farm Regional Mitigation Bank Phase Two and Three — Year 2 Annual Monitoring Report Table 2. Summary of Tasks Completed on Phases Two and Three Description of Task Date Logging within Limits of Clearing September 2009 Completion of Earthwork (Southern Tributary) October 2010 Site Planting (Southern Tributary) March 2011 Completion of Earthwork (Mainstem & Northern Tributary) October 2011 On -site Meeting with COE Staff - Construction Review November 2011 Site Planting (Mainstem & Northern Tributary) February 2012 Completion of Earthwork Phase III February 2012 On -Site Meeting with COE Staff March 2012 Year 1 Monitoring November 2012 Year 1 Monitoring Report Submitted March 2013 Year 2 Monitoring September 2013 On -Site Meeting with COE Staff - Phase II & III Review November 2013 Year 2 Monitoring Report Submitted May 2014 Per the approved restoration plan, monitoring of Phase Two includes the assessment of both hydrologic and vegetative conditions over the course of a five year monitoring period. Following the completion of the earthwork, a total of twenty -nine (29) permanent 0.10 acre plots were established throughout the planted and restored (i.e. former) small stream swamp and swamp forest communities (Table 3). A total of fourteen (14) automated shallow groundwater monitoring wells were installed within the Phase Two project area (Table 3). In addition, a total of seven (7) automated water level gauges have been installed within the stream banks to document bankfull and normal flow events (Table 3). Wells and gauges have collected data from January 2012 through the present. Table 3. Vegetation Plots and Wells by Community Type Community Type Acreage Vegetation Plots Monitoring Wells Stream Gauges Phase II - Swamp Forest 315 15 6 0 Phase II - Small Stream 103 14 8 7 Phase III - Swamp Forest 190 0 8 0 TOTAL 608 29 22 7 Monitoring of Phase Three includes the assessment of hydrologic conditions over a five year monitoring period. Following the completion of earthwork, a total of eight (8) automated shallow groundwater Stone Farm Regional Mitigation Bank 5 Phase Two and Three - Year 2 Annual Monitoring Report monitoring wells were installed within the project area (Table 3). Wells have collected data from mid -March 2012 through the present. 3.0 MONITORING REQUIREMENTS Annual monitoring is being conducted near the end of each growing season for a period of five years. The monitoring includes both a vegetative and hydrologic component per the approved mitigation banking instrument. The specific success criteria for the bank are listed below. A. Wetland Restoration Success Criteria (1) Demonstrated density of planted species to meet or exceed 320 trees per acre at the end of 3 years (post - planting) and 260 trees per acres at the end of 5 years (post - planting). 1 (2) No single volunteer species (most notably, red maple, loblolly pine, and sweet gum) will comprise more than 50% of the total composition at year 2 or 3. If this occurs, remedial procedures will be implemented. During years 4 and 5, no single volunteer species, comprising over 50% of the total composition, may be more than two times the height of the planted trees. If this occurs, remedial procedures will be implemented. (3) Hydrology during the growing season must be sufficient to at least meet the guidelines set forth within the 1987 Corps of Engineers Wetlands Delineation Manual (Technical Report Y- 87 -1). Therefore, the hydrologic criterion will be the establishment of a static water table at, or within, 12" of the soil surface for 12% of the growing season2 (equivalent to 32 days based upon SCS- established growing season March 7th through November 28th) during periods of normal rainfall. The vegetative component for Phase Two includes an assessment of the conditions within each of the twenty -nine (29) permanent monitoring plots that have been established throughout the project area (Figure 4). Hydrologic monitoring is being conducted via fourteen (14) automated shallow groundwater monitoring 1 Volunteer species may be counted toward meeting the success criteria upon evaluation of site - specific conditions and concurrence by IRT members. 2 As defined by the Soil Conservation Service, the growing season for Brunswick County is 266 days. Stone Farm Regional Mitigation Bank 6 Phase Two and Three — Year 2 Annual Monitoring Report wells for Phase Two and eight (8) for Phase Three recording on daily intervals (refer to Figure 4 for location of the monitoring wells). Data from the wells are downloaded on approximate three -month intervals and imported into graphing software for analysis. Phase Three monitoring consists of collection of groundwater level data (once daily) over the course of the five -year monitoring period through the use of eight (8) automated wells. Monitoring reports are being submitted annually to the USACE and the IRT. These reports include results of vegetative and hydrologic monitoring and photographic documentation of site conditions. Monitoring reports also identify any contingency measures that may need to be employed to remedy any site deficiencies (e.g. major stream design failures). 4.0 MONITORING RESULTS (YEAR 2) A. PHASE TWO 1. Vegetation Monitoring Year 2 monitoring data were collected in September and November 2013 over a four -day period (September 24th -26th, November 8th). A total of 4,912 stems were counted throughout the twenty -nine (29) plots (Table 4). Inclusive within this total were 1,356 stems of planted species (correlating to a mean density of 468 stems per acre) (refer to Table 4). Bald cypress (Taxodium distichum) and swamp black gum (Nyssa sylvatica) were the most abundant woody species, with a total of 695 and 212 individuals, respectively. Swamp chestnut oak (Quercus michauxii) and tulip poplar (Liriodendron tulipifera) were also prevalent within certain plots. In review of Year 2 monitoring data it appears that the site is progressing well towards the required planted vegetative densities. In addition to the planted species, numerous volunteers were observed within swamp forest plots (Table 4A). A majority of these individuals, such as fetterbush (Lyonia lucida), redbay (Persea palustris), wax myrtle (Morella cerifera), and gallberry (Ilex glabra) are considered desirable volunteers since these plants are representative of the target wetland community type. It should be noted that a majority of pines were undistinguishable between loblolly pine and pond pine due to the relatively young age of the seedlings and Stone Farm Regional Mitigation Bank 7 Phase Two and Three — Year 2 Annual Monitoring Report lack of identifiable pine characteristics (resinous buds, needle bundles, rounded cone, stem foliage sprouts). Unidentified Pinus spp. have not been counted toward the success criterion (Table 4B). The mean stem density observed for both planted and characteristic (desirable) wetland species for the project area is 1,121 stems /acre. Note that this observed density excludes individuals of the following species: (1) red maple (Acer rubrum); (2) sweet gum (Liquidambar styraciflua); (3) horse sugar (Symplocos tinctoria); (4) baccharis ( Baccharis halimifolia); and (5) unidentified Pinus spp.. Please refer to Table 4C for Planted Stem Counts by Year. Individual plot data sheets are provided in Appendix B. The most abundant volunteer species identified within the restored small stream swamp and swamp forest communities are (in order of abundance): (1) fetterbush (780 total stems); (2) sweet gum (591 total stems); (3) red bay (395 total stems); (4) gallberry (357 total stems); and (5) wax myrtle (217 total stems). Refer to Table 4A for volunteer species identified by plot. In general, the observed volunteer species are considered characteristic of the target wetland community type (small stream swamp and swamp forest). The most prevalent non - target species observed during Year 2 monitoring was unidentified Pinus spp. and sweet gum. While considered non - desirable (due to their potential to out - compete planted species), both loblolly pine and sweet gum are commonly occurring as early successional species in the Outer Coastal Plain. Based upon the data, Plot 3 and Plot 6 both contain volunteer species that comprise more than 50% of total plot composition. However, Plot 3 contains an abundance of gallberry and fetterbush stems, both desirable species, while Plot 6 contains and abundance of fetterbush and unidentified pine. These predominant volunteers (e.g. fetterbush, red bay, gallberry, etc.) are desirable and consistent with the restoration goals of the project (i.e. characteristic of the target vegetative community). While certain Stone Farm Regional Mitigation Bank 8 Phase Two and Three — Year 2 Annual Monitoring Report TABLE 4. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - PLANTED SPECIES PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT9 PLOT10 PLOT11 PLOT12 PLOT13 PLOT14 PLOT15 PLOT16 PLOT17 PLOT18 PLOT NT1 PLOT NT2 PLOT NT3 PLOT NT4 PLOT NT5 PLOT NT6 PLOT ST1 PLOT ST2 PLOT ST3 PLOT ST4 PLOT ST5 TOTAL Bald Cypress 24 21 11 23 25 5 19 40 32 12 14 26 4 14 31 48 27 13 25 36 15 30 26 47 28 19 21 33 26 695 Black Gum 12 17 7 9 19 6 9 0 14 1 3 12 2 3 4 4 6 2 7 4 2 9 18 0 0 12 3 11 16 212 Atlantic White Cedar 0 0 2 1 0 4 0 0 0 5 10 0 11 10 0 1 0 7 0 0 6 0 2 0 0 0 0 0 1 60 Pond Pine 0 0 9 0 0 10 0 0 0 0 11 0 0 12 0 5 0 1 0 0 4 0 1 0 0 11 0 0 0 64 Tulip Poplar 21 9 10 0 1 1 0 16 0 0 1 2 1 1 0 0 1 6 4 5 3 0 8 6 0 0 0 0 0 96 Swamp Chestnut Oak 8 2 3 6 7 0 4 0 6 5 11 8 3 2 8 0 4 2 11 6 0 3 5 7 0 0 0 0 1 112 River Birch 0 16 0 0 0 0 12 0 4 0 0 1 4 0 7 0 2 1 0 4 0 27 0 0 0 0 0 0 0 78 Green Ash 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 4 22 2 33 Ironwood 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 4 6 TOTAL 65 65 42 39 52 26 44 56 56 23 50 49 25 42 50 58 40 32 47 55 30 69 60 60 33 42 30 66 50 1356 TABLE 4A. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - VOLUNTEERS SPECIES PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT9 PLOT10 PLOT11 PLOT12 PLOT13 PLOT14 PLOT15 PLOT16 PLOT17 PLOT18 PLOT NT1 PLOT NT2 PLOT NT3 PLOT NT4 PLOT NT5 PLOT NT6 PLOT ST1 PLOT ST2 PLOT ST3 PLOT ST4 PLOT ST5 TOTAL Water Oak 3 1 0 0 0 8 0 2 0 0 0 0 0 0 0 0 0 9 0 0 4 0 0 0 1 0 0 0 0 28 Tulip Poplar 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 0 16 Gallberry 6 1 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 357 Sweetbay 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 3 Red Bay 17 9 150 0 0 60 0 3 0 3 0 0 20 0 0 0 0 45 5 0 27 0 0 0 9 34 13 0 0 395 Wax Myrtle 37 5 0 5 21 0 1 2 5 0 0 8 18 34 8 0 0 14 4 3 12 1 0 8 1 17 0 13 0 217 American Holly 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 11 Fetterbush 2 0 350 0 0 300 0 0 0 0 0 0 0 0 0 0 0 120 0 0 0 0 0 0 8 0 0 0 0 780 Highbush Blue Berry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 0 3 0 0 0 0 0 11 0 0 34 Horse Sugar 0 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 Blue Huckleberry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 40 Red Chokeberry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 15 Baccharis 3 0 0 1 0 0 0 0 3 0 0 1 0 0 10 0 16 0 0 12 0 0 0 0 0 0 0 10 0 56 Sweet Gum 10 9 58 1 2 50 0 33 4 28 25 15 46 28 17 0 0 38 0 14 7 0 14 50 10 47 10 43 32 591 Red Maple 0 0 0 0 0 0 0 0 0 50 20 0 0 30 0 0 0 0 0 0 0 0 0 0 40 0 30 0 0 170 TOTAL 81 25 938 7 23 418 1 40 12 81 45 24 84 92 35 0 16 309 9 29 56 1 14 58 69 98 64 82 32 2743 TABLE 4B. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - UNIDENTIFIED VOLUNTEERS Stone Farm Regional Mitigation Bank Phase Two and Three — Year 2 Annual Monitoring Report PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT SPECIES PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT PLOT9 PLOT10 PLOT11 PLOT12 PLOT13 PLOT14 PLOT15 PLOT16 PLOT17 PLOT18 TOTAL NT1 NT2 NT3 NT4 NT5 NT6 ST1 ST2 ST3 ST4 ST5 Unidentified 13 77 30 1 1 300 2 35 0 10 26 10 46 33 13 0 0 90 0 0 61 0 0 0 10 39 6 10 0 813 Pine 1 TOTAL 13 77 30 1 1 300 2 35 0 10 26 10 46 33 13 0 0 90 0 0 61 0 0 0 10 39 6 10 0 813 Stone Farm Regional Mitigation Bank Phase Two and Three — Year 2 Annual Monitoring Report TABLE 4C. STEM COUNTS BY YEAR (Stone Farm Phase II) - PLANTED SPECIES YEAR PLOT 1 PLOT 2 PLOT 3 PLOT 4 PLOT 5 PLOT 6 PLOT 7 PLOT 8 PLOT 9 PLOT 10 PLOT 11 PLOT 12 PLOT 13 PLOT 14 PLOT 15 PLOT 16 PLOT 17 PLOT 18 PLOT NTt PLOT NT2 PLOT NT3 PLOT NT4 PLOT NT5 PLOT NT6 PLOT STi PLOT ST2 PLOT ST3 PLOT ST4 PLOT ST5 TOTAL Survivorship Rate (by year) 0 24 19 12 25 25 6 18 43 31 18 16 27 4 14 31 58 35 15 24 40 18 29 31 49 33 18 25 34 32 754 N/A Bald Cypress 1 23 20 12 27 26 5 20 40 32 17 16 26 4 14 33 56 33 15 25 37 16 33 28 54 28 19 24 34 32 749 99 2 24 21 11 23 25 5 19 40 32 12 14 26 4 14 31 48 27 13 25 36 15 30 26 47 28 19 21 33 26 695 92 0 13 22 12 8 20 11 '11 0 17 2 3 13 4 3 5 5 10 5 15 6 5 12 21 3 0 42 26 7 29 330 N/A Black Gum 1 12 20 8 7 20 8 11 0 12 2 3 13 3 3 4 4 8 4 11 6 4 9 22 3 0 9 7 8 20 241 73 2 12 17 7 9 19 6 9 0 14 1 3 12 2 3 4 4 6 2 7 4 2 9 18 0 0 12 3 11 16 212 64 0 0 0 2 1 0 5 0 0 0 9 12 0 20 14 0 4 0 7 0 0 8 0 1 0 0 0 0 0 0 83 N/A Atlantic White Cedar 1 0 0 2 1 0 5 0 0 0 8 11 0 18 13 0 4 0 7 0 0 8 0 2 0 0 0 0 0 1 80 96 2 0 0 2 1 0 4 0 0 0 5 10 0 11 10 0 1 0 7 0 0 6 0 2 0 0 0 0 0 1 60 72 0 0 0 14 0 0 18 0 0 0 0 19 0 0 17 0 8 0 10 0 0 12 0 1 0 0 11 1 0 6 117 N/A Pond Pine 1 0 0 11 0 0 12 0 0 0 0 12 0 0 15 0 6 0 4 0 0 4 0 1 0 0 8 0 0 0 73 62 2 0 0 9 0 0 10 0 0 0 0 11 0 0 12 0 5 0 1 0 0 4 0 1 0 0 11 0 0 0 64 55 0 8 1 23 0 5 8 0 33 0 5 2 5 8 8 7 0 7 14 12 18 5 0 10 2 0 4 0 3 4 192 N/A Tulip Poplar 1 20 6 17 0 4 3 0 25 0 1 1 4 4 2 5 0 2 10 5 8 3 0 8 4 0 0 2 0 0 134 70 2 21 9 10 0 1 1 0 16 0 0 1 2 1 1 0 0 1 6 4 5 3 0 8 6 0 0 0 0 0 96 50 0 9 7 4 8 11 0 3 0 8 10 12 8 5 4 12 0 9 4 11 7 0 4 5 12 0 0 0 0 0 153 N/A Swamp Chestnut Oak 1 8 6 5 7 10 0 3 0 8 7 10 7 4 2 9 0 8 3 11 7 0 5 5 11 0 0 0 0 2 138 90 2 8 2 3 6 7 0 4 0 6 5 11 8 3 2 8 0 4 2 11 6 0 3 5 7 0 0 0 0 1 112 73 0 0 16 0 0 0 0 15 0 3 0 0 1 3 0 7 0 3 0 0 4 0 26 0 0 0 0 0 0 0 78 N/A River Birch 1 0 23 0 0 0 0 14 0 3 0 0 1 4 0 7 0 2 1 0 4 0 23 0 0 0 0 0 0 0 82 105 2 0 16 0 0 0 0 12 0 4 0 0 1 4 0 7 0 2 1 0 4 0 27 0 0 0 0 0 0 0 78 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 4 15 38 21 100 N/A Green Ash 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 3 7 22 1 40 40 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 4 22 2 33 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 N/A Ironwood 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 5 6 150 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 4 6 150 Stone Farm Regional Mitigation Bank 10 Phase Two and Three — Year 2 Annual Monitoring Report volunteer species can potentially out - compete planted species, the overall composition of the species observed is characteristic of small stream swamp and swamp forest wetlands of the outer Coastal Plain and appear to be well- adapted to the restored wetland hydrology. The unidentified pine growth recorded in Plot 6 will continue to be monitored, but remedial action is not recommended at this time. 2. Hydrologic Monitoring (Wetlands) Per the approved mitigation plan, a total of fourteen (14) shallow groundwater monitoring wells were installed throughout Phase Two. Following the completion of stream construction, discharge rates decreased throughout the site, and static water table depths have remained within 12" of the surface for extended periods. Of the fourteen (14) wells within Phase Two, all fourteen (14) wells exhibited hydroperiods greater than 12% (corresponding to 32 consecutive days) of the growing season between March 7th and November 28th, 2013 (Table 5). The observed mean hydroperiod duration for these wells was 100 days. During Year 2 (2013), normal to very moist hydrologic conditions persisted throughout the entire growing season. January through May exhibited normal moisture, June was moderately moist, July and August were very moist, September was moderately moist, and October through December exhibited normal moisture. During Year 1 (2012), moderate to extreme drought conditions caused one (Well #12) of the fourteen wells to not meet the 12% success criterion. It was believed that readings were being influenced by the material of the former road bed which may have been influencing lateral groundwater movement. An additional well (Well #12B) was installed outside of the former roadbed as a comparison for Well #12 (now labeled Well #12A). Both Well #12A and Well #12B exhibited hydroperiods greater than 12% of the Year 2 growing season. Well #12B was not installed until June 26th, 2013, yet still exhibited longer hydroperiods than Well #12A. These results suggest that underlying road bed material is affecting groundwater movement in the vicinity of Well #12A. A summary of these results are provided in Table 5. Complete hydrologic monitoring data are provided in Appendix C. NC Division of Water Resources Drought maps are provided in Appendix D. Stone Farm Regional Mitigation Bank 11 Phase Two and Three — Year 2 Annual Monitoring Report Table 5. Summary of 2013 Hydrologic Monitoring (Phase 2) 2013 Growing Season March 7 - November 28 Well Number Community y Type Total Number f days within 12" (Jan 1 thru Dec 31) Longest Number Of Consecutive Days Meeting Wetland Hydrology Criteria (in growing season) Dates of Longest Number of Consecutive Days Meeting Wetland Hydrology Criteria Percentage of Growing Season 12% Success Criteria (32 Days) >6 0 12.5 /° 12.5 - 25% 25 °' 75 /° >75% MS -1 SS 308 100 Jun 4—Sept 11 37.5 Yes -- -- X -- MS-5 SS 288 72 Mar 7 — May 17 27.0 Yes -- -- X -- MS-7 SF 282 97 Jun 4 — Sept 8 36.3 Yes -- -- X -- MS-8A SF 267 73 Mar 7 — May 18 27.3 Yes -- -- X -- MS -813 SF 365 267 Mar 7 - Nov 28 100.0 Yes -- -- -- X MS -10 SF 293 99 Jun 4 — Sept 10 37.1 Yes -- -- X -- MS-12A SS 216 64 Mar 7 — May 9 24.0 Yes -- X -- -- MS-12B SS 108* 70 Jun 26 — Sept 3 26.2 Yes -- -- X -- MS-17 SS 307 195 Mar 7 — Sept 17 73.0 Yes -- -- X -- NT-2 SS 268 72 Mar 7 — May 17 27.0 Yes -- -- X -- NT-3 SF 271 92 Jun 4 — Sept 3 34.5 Yes -- -- X -- NT-6 SS 225 67 Mar 7 — May 12 25.1 Yes -- -- X -- ST-1 SS 282 95 Jun 4 - Sep 6 35.6 Yes -- -- X -- ST-3 SS 228 71 Mar 7 — May 16 26.6 Yes -- -- X -- ST-4 SF 244 69 Mar 7 — May 14 25.8 Yes -- -- X -- MS = Mainstem * - Well MS -12B was installed on June 26, 2013. NT = Northern Tributary ST = Southern Tributary SS = Small Stream SF = Swamp Forest Stone Farm Regional Mitigation Bank 12 Phase Two and Three — Year 2 Annual Monitoring Report 3. Stream Monitoring The primary success criterion for the stream portion of the mitigation bank is identified below: No less than two bankfull flow events must be documented through the monitoring period. These events will be documented through the use of well monitoring data and on -site photo documentation. If less than two bankfull events occur during the first 5 years, monitoring will continue until the second bankfull event is documented. The bankfull events must occur during separate monitoring years. In the event that the required bankfull events do not occur during the five -year monitoring period, the MBRT may determine that further monitoring is not required. Level 1 Monitoring was implemented for the stream portion of the Stone Farm Regional Mitigation Bank as detailed in the Stream Mitigation Guidelines, April 2003. Monitoring will occur every year for the five year monitoring period. Level 1 Monitoring includes Sections (a), (b), and (c) listed below. (a) Photo - Documentation Extensive photo documentation was implemented during Year 2 for the stream monitoring phase of this project. Site visits were conducted and photographs were taken within 24 hours of a 0.5, 1.0, and 2.0 inch rain event at each gauge location during Year 2 monitoring. Photographic and video evidence of Ordinary High Water Mark indicators (OHWM) and flow evidence were also collected. Photos were taken at all permanent cross - sections and are provided in Appendix E. OHWM indicators are provided in Appendix F. Please refer to the enclosed CD for video evidence of flow. (b) Ecological Function The health of the riparian vegetation was documented as part of the wetland restoration monitoring efforts. Multiple 0.10 ac. permanent monitoring plots were established throughout the riverine wetland restoration including areas directly adjacent to the restored channel. Reference the vegetation monitoring section for monitoring results. Stone Farm Regional Mitigation Bank 13 Phase Two and Three — Year 2 Annual Monitoring Report Subsequent to communication with the Corps of Engineers Wilmington Regulatory Branch in February 2012, macroinvertebrate sampling will no longer be required as part of the Phase Two monitoring requirements. (c) Channel Stability /Survey Procedures 1. Cross - Sections The Stone Farm Phase Two area has restored 15,338 If of Coastal Plain stream. The restored channels mimick low gradient, low velocity stream reaches characteristic of the outer Coastal Plain. No hardened materials (i.e. rock structures) were used. Rather, natural materials (such as root wads and log vanes) have assisted with channel stabilization and grade control. Given the size, uniform design, and gentle slope (0.005) of the project, cross - sections were established every 1,000 feet of stream length (totaling 14 permanent stations). Placement of these stations was designed to assess the performance of potential problem areas (i.e. severe erosion, structural failure). These stations were also evenly distributed between riffles and pools throughout the project. Refer to Table 6 for the number of cross - sections and Figure 5 for the locations of the cross - section monitoring stations. Year 2 cross - section surveys are provided in Appendix E. Table 6. Stream Lengths and Number of Cross - Section Stations 2. Longitudinal Profiles Guidelines regarding longitudinal profiles for projects totaling over 3,000 If suggest that 30% of the area be surveyed on an annual basis. Based on this guideline, a total of 4,200 If of profile is required for the Stone Farm project. The 4,200 If of survey was divided throughout the individual reaches and includes the permanent cross - sections (Table 7). Reference the longitudinal surveys in Appendix E in comparison to as -built conditions. Stone Farm Regional Mitigation Bank 14 Phase Two and Three — Year 2 Annual Monitoring Report Proposed (If) Final Design Reach Name Mitigation Length As -Built Length Cross - sections Plan Mainstem 8,073 8,609 8,613 8 Northern Tributary 2,668 3,473 3,474 3 Southern Tributary 2,641 3,288 3,251 3 Total Length 13,382 15,370 15,338 14 2. Longitudinal Profiles Guidelines regarding longitudinal profiles for projects totaling over 3,000 If suggest that 30% of the area be surveyed on an annual basis. Based on this guideline, a total of 4,200 If of profile is required for the Stone Farm project. The 4,200 If of survey was divided throughout the individual reaches and includes the permanent cross - sections (Table 7). Reference the longitudinal surveys in Appendix E in comparison to as -built conditions. Stone Farm Regional Mitigation Bank 14 Phase Two and Three — Year 2 Annual Monitoring Report Table 7. Longitudinal Profiles by Stream Reach Reach Name Proposed (If) Final Design Length As -Built Length % of Project Profile (If) Mainstem 8,073 8,609 8,613 35.6 2,400 Northern Tributary 2,668 3,473 3,474 14.4 900 Southern Tributary 2,641 3,288 3,251 13.4 900 Total Length 13,382 15,370 15,338 63.4 4,200 3. Pebble Counts Streams in the Stone Farm Phase Two project area are composed of sandy substrates typical in the outer Coastal plain. Since all sediment falls into the sand category, gravelometer readings were not conducted. All sediment in the constructed stream beds is less than 2mm and would be placed in the <2mm category for Wolman pebble count analysis. 4. Stream Flow Monitoring As indicated above, the 1 st -order streams of Phase Two occur within three distinct valleys that connect the 145 -acre Carolina bay on the southern portion of the tract to the Little Caw Caw Canal on the north side (a third order tributary of the Waccamaw River). The three valleys are identified as the mainstem, the northern tributary, and the southern tributary. A total of 5 gauges were installed in the stream beds to document the elevations of surface water in the channels on a daily basis. These gauges capture the upper end of each stream reach (3 gauges in the mainstem, 2 gauges in the northern tributary, and 2 gauges in the southern tributary). Refer to Figure 3 for a map depicting the location of 1st -order gauges. Indicators of OHWM and video documentation were also used to identify the presence of surface water flow. Mainstem (MS): Surface water and flow was documented in each of the three (3) gauges over several periods during the monitoring event. The valley exhibits a very gradual slope (0.005 %) from the upper end (Carolina bay) to the lowest end (Little Caw Caw Canal). Gauge MS -1 was placed the furthest up- gradient (second stream meander from source) in order to capture bankfull events at the head of the restored stream reach. Guages MS -2 and MS -3 were spaced approximately 1000 -ft apart further down the stream. All three Stone Farm Regional Mitigation Bank 15 Phase Two and Three — Year 2 Annual Monitoring Report gauges were placed within the stream segment solely charged by the Carolina bay (Phase One). Refer to Figure 3 for the gauge locations. The amplitude of the surface water varied at each gauge. Gauge MS -1 exhibited seven (7) bankfull events during the monitoring period, while gauges MS -2 and MS -3 recorded sixteen (16) and eighteen (18) bankfull events, respectively (Table 8). The gauges exhibited a significant increase in the duration and amplitude of flow events during 2013 (Year 2). It should be noted that the duration of the bankfull events at all three gauges sometimes extended for several days, with the maximum duration being four (4) days for MS -1 and MS -2 and six (6) days for MS -3 (Table 8). Video evidence of flow was recorded following rainfall events during the spring and summer over multiple site visits. Flow can be readily seen at each gauge located within the stream valley. With increasing watershed size (downslope), the duration of surface flow increased within the valley. Observed physical indicators of an OHWM within the mainstem consisted of the following: (1) natural line impressed on the bank; (2) presence of litter and debris; (3) wracking; (4) vegetation matted down, bent, or absent; (5) sediment sorting; (6) scour; (7) deposition; (8) water staining; (9) and multiple observed flow events. Photographs of the mainstem are provided in Appendix A. OHWM photographs and physical indicators are provided in Appendix F. Video evidence of flow is provided on the attached CD with site hydrographs. Northern Tributary (NT): Surface water and flow was documented in each of the two (2) gauges over several periods during the monitoring event. Gauge NT -1 was placed the furthest up- gradient in order to capture bankfull events at the head of the restored stream reach. Gauge NT -2 was placed approximately 1000 -ft further down the stream. Refer to Figure 3 for the gauge locations. The amplitude of the surface water varied at each gauge. Gauge NT -1 exhibited twelve (12) bankfull events during the monitoring period, while gauge NT -2 exhibited twelve (12) bankfull events (Table 8). The gauges exhibited a significant increase in the duration and amplitude of flow events during 2013 (Year 2). It should be noted that the duration of the bankfull events at both gauges sometimes extended for several Stone Farm Regional Mitigation Bank 16 Phase Two and Three — Year 2 Annual Monitoring Report days, with the maximum duration being six (6) days (Table 8). Video evidence of flow was recorded following rainfall events during the spring and summer over multiple site visits. Flow can be readily seen at each gauge located within the stream valley. With increasing watershed size (downslope), the duration of surface flow increased within the valley. Observed physical indicators of an ordinary high water mark (OHWM) within the northern tributary consisted of the following: (1) natural line impressed on the bank; (2) presence of litter and debris; (3) wracking; (4) vegetation matted down, bent, or absent; (5) sediment sorting; (6) scour; (7) deposition; (8) water staining; (9) and multiple observed flow events. Photographs of the northern tributary are provided in Appendix A. Ordinary High Water Mark photographs and physical indicators are provided in Appendix F. Video evidence of flow is provided on the attached CD with site hydrographs. Southern Tributary (ST): Surface water and flow was documented in each of the two (2) gauges over several periods during the monitoring event. Gauge ST -1 was placed the furthest up- gradient in order to capture bankfull events at the head of the restored stream reach. Gauge ST -2 was placed approximately 1000 -ft further down the stream. Refer to Figure 3 for the gauge locations. The amplitude of the surface water varied at each gauge. Gauge ST -1 exhibited thirteen (13) bankfull events during the monitoring period, while gauge ST -2 exhibited ten (10) bankfull events (Table 8). Despite the drought conditions of the first half of 2012, the gauges exhibited a significant increase in the duration and amplitude of flow events during 2013 (Year 2). It should be noted that the duration of the bankfull events at both gauges sometimes extended for several days, with the maximum duration being eight (8) days for ST -1 and six (6) days for ST -2 (Table 8). Video evidence of flow was recorded following rainfall events during the spring and summer over multiple site visits. Flow can be readily seen at each gauge Stone Farm Regional Mitigation Bank 17 Phase Two and Three — Year 2 Annual Monitoring Report Table 8. Summary of 2013 Bankfull Event Monitoring (Phase Two) Gauge Number* Total Number of Bankfull Events Longest Number of Consecutive Days During Bankfull Event Dates of Bankfull Event(s) 3 -Day Antecedent Rainfall (Inches) (On -site Rain gauge) MS -1 7 4 February 26 -27 1.92 March 24 1.61 April 12 -13 1.44 April 29 -30 2.09 June 30 -July 4 6.19 (thru 7/3) July 13 -15 4.46 August 15 -18 3.59 (thru 8/17) MS -2 16 4 Feb 12 -13 Jun 29 1.56 1.90 Feb 26 -27 Jun 30 -Jul 4 1.92 6.19 (thru 7 /3) Mar 23 -25 Jul 13 -15 1.61 4.46 Apr 12 -13 Jul 17 1.44 0.60 Apr 15 Jul 29 0.49 1.71 Apr 29 -Mayl Aug 1 -2 2.10 (thru 5/1) 3.07 Jun 7 Aug 15 -19 2.38 3.69 (thru 8/19) Jun 24 Nov 27 1.85 2.32 MS -3 18 6 Feb 13 -14 Jun 24 1.56 1.85 Feb 26 -28 Jun 29 -Jul 5 1.92 6.63 (thru 7/3) Mar 24 -26 Jul 12 1.61 1.22 Apr 4 Jul 13 -16 0.92 4.46 Apr 12 -14 Jul 17 -18 1.44 0.60 Apr 15 -16 Jul 29 1.92 1.71 Apr 19 -21 Aug 1 -2 0.87 3.07 Apr 29 -May 2 Aug 15 -20 2.09 3.74 (thru 8/20) Jun 7 Nov 27 2.38 2.32 NT -1 12 6 Feb 13 Jun 29 -Jul 5 1.56 6.63 (thru 7/3) Feb 26 -27 Jul 13 -16 1.92 4.46 Mar 24 Jul 17 -18 1.61 0.60 Apr 12 Jul 29 1.44 1.71 Apr 29 -30 Aug 1 -2 2.09 3.07 Jun 7 Aug 15 -20 2.38 3.74 (thru 8/20) NT -2 12 6 Feb 13 Jun 29 -Jul 5 1.56 6.63 (thru 713) Feb 26 -27 Jul 13 -16 1.92 4.46 Mar 24 Jul 17 -18 1.61 0.60 Apr 12 Jul 29 1.44 1.71 Apr 29 -May 1 Aug 1 -2 2.09 3.07 Jun 7 Aug 15 -20 2.38 3.74 (thru 8120) ST -1 13 8 Feb 12 Jun 29 -Jul 7 1.07 6.63 (thru 713) Feb 25 -27 Jul 12 -20 2.10 (thru 2126) 5.06 (thru 7117) Mar 23 Jul 29 -31 1.61 1.97 (thru 7/31) Apr 12 -13 Aug 14 1.44 3.07 Apr 15 Aug 15 -22 1.92 3.75 (thru 8/22) Apr 29 -May 1 Nov 27 -28 2.09 2.32 Jun 7 _ 2.38 _ ST -2 10 6 Feb 26 Jul 12 -Jul 18 1.92 5.06 (thru 7/17) Apr 12 Jul 29 1.44 1.71 Apr 29 Aug 1 -Aug 3 2.09 3.07 Apr 30 -May 1 Aug 15- Aug 21 2.10 (thru 5/1) 3.74 (thru 8121) Jun 30 -Jul 6 Nov 27 6.19 (thru 7/3) 2.32 *- MS= Mainstem; NT= Northern Tributary; ST= Southern Tributary Stone Farm Regional Mitigation Bank 18 Phase Two and Three - Year 2 Annual Monitoring Report located within the stream valley. With increasing watershed size (downslope), the duration of surface flow increased within the valley. OHWM within the southern tributary consisted of the following: (1) natural line impressed on the bank; (2) presence of litter and debris; (3) wracking; (4) vegetation matted down, bent, or absent; (5) sediment sorting; (6) scour; (7) deposition; (8) water staining; (9) and multiple observed flow events. Photographs of the southern tributary are provided in Appendix A. OHWM photographs and physical indicators are provided in Appendix F. Video evidence of flow is provided on the attached CD with site hydrographs. 4. Contingency Measures Stream banks and in- stream structures (i.e. root wads, log vanes, etc.) were monitored for evidence of surface bank erosion (i.e. down - cutting) subsequent to above normal rainfall and high flow events. Some down - cutting of the floodplain was noted in areas where surface water in the floodplain flows back into the stream channel. However, these features have not resulted in any significant deposition within the channel and do not appear to adversely affect stream function. In fact, these features are common within natural, unimpaired streams and are evidence of the connectivity between the stream and its floodplain. Most of the areas in which this has been observed appear to have met a point of equilibrium and have become increasingly stable with the growth of stream bank vegetation. No re- grading or reinforcement of the stream banks are recommended at this time. Grading work conducted during initial project implementation resulted in a discernible increase in groundwater levels throughout the streams and adjacent small stream swamp and swamp forest communities. Restoration of the stream channels helped reduce surface water outflows. Upon further site assessments (including a November 2011 site meeting with the Corps of Engineers Wilmington Regulatory Branch), it was determined that certain meander bends of the stream needed to be reinforced with additional root wads in order to provide enhanced bank stability during high flow events. In January 2012, these additional root wads were installed and coir fiber matting was reinforced in the selected areas per the recommendation of the USACE. Stone Farm Regional Mitigation Bank 19 Phase Two and Three — Year 2 Annual Monitoring Report B. PHASE THREE Per review and approval by the USACE, a total of eight (8) shallow groundwater monitoring wells were installed throughout Phase Three. Subsequent to the earthwork, static water table depths gradually rose to within 12 inches of the soil surface, particularly in response to discrete rain events. Plugging of the main outlet ditch for this phase reduced the rate of groundwater discharge from the adjacent wetlands. The observed mean hydroperiod duration for the eight (8) wells was 73 days. Of the eight (8) wells within Phase Three, all eight (8) wells exhibited hydroperiods greater than 12% (corresponding to 32 consecutive days) of the growing season between March 7th and November 28th, 2013 (Table 8). It should be noted that six (6) out of the eight (8) wells observed hydroperiods of greater than 26% of the growing season. During Year 2 (2013), mid -range to very moist hydrologic conditions persisted throughout the entire growing season (refer to Appendix D). The headwater wetlands of the restoration area consist of very poorly drained soils and lie in a depressional landscape position. These wetlands typically receive hydrologic input primarily via precipitation. The mid -range to very moist conditions during the Year 2 monitoring period attributed to increased groundwater levels and duration throughout the growing season. The patterns of hydrologic response to normal and above - normal precipitation periods during the Year 2 monitoring period indicate that groundwater has been sufficiently recharged throughout the system. The majority of the wells observed hydroperiods of greater than 26% of the growing season, well above the 12% required for success. In addition, most of the wells observed longer hydroperiods than recorded by the reference wetland wells. A summary of the groundwater monitoring results for Year 2 is provided in Table 9. Complete hydrologic monitoring data are provided in Appendix C. NC Division of Water Resources Drought maps are provided in Appendix D. Stone Farm Regional Mitigation Bank 20 Phase Two and Three — Year 2 Annual Monitoring Report Table 9. Summary of 2013 Hydrologic Monitoring (Swamp Forest - Phase Three) 2013 Gr wing Season March 7 - November 28 * Well 2 malfunctioned Feb 4 -Apr 11 (no data recorded or included in totals) Well 4 malfunctioned Dec 4 -31 (no data recorded or included in totals) Well 5 malfunctioned Apr 12 -May 30 (no data recorded or included in totals) Well 6 malfunctioned Apr 12 -May 30 (no data recorded or included in totals) Well 7 malfunctioned Mar 31 -Apr 11 & Apr 23 -Jun 25 (no data recorded or included in totals) Stone Farm Regional Mitigation Bank 21 Phase Two and Three — Year 2 Annual Monitoring Report Total Number of Longest Number Of Dates of Longest Number of Percentage of 12% 12.5 Well Number days within 12" Consecutive Days Meeting Consecutive Days Meeting Growing Success >6- - 25 - >75% (Jan 1 thru Dec 31) Wetland Hydrology Criteria Wetland Hydrology Criteria Season Criterion 12.5% 0 25/0 75% (in growing season) (32 Days) 1 263 79 Mar 7 - May 24 29.6 Yes -- -- X -- 2 214* 92* Jun 25 - Sept 24 34.5 Yes -- -- X -- 3 274 81 Mar 7 - May 26 30.3 Yes -- -- X -- 4 241* 79 Mar 7 - May 24 29.6 Yes -- -- X -- 5 178* 36* Mar 7 — Apr 11 13.5 Yes -- X -- -- 6 230* 75* Jun 25 - Sept 7 28.1 Yes -- -- X -- 7 133* 70* Jun 30 - Sept 7 26.2 Yes -- -- X -- 8 169 51 Mar 23 — May 11 19.1 Yes -- X -- -- * Well 2 malfunctioned Feb 4 -Apr 11 (no data recorded or included in totals) Well 4 malfunctioned Dec 4 -31 (no data recorded or included in totals) Well 5 malfunctioned Apr 12 -May 30 (no data recorded or included in totals) Well 6 malfunctioned Apr 12 -May 30 (no data recorded or included in totals) Well 7 malfunctioned Mar 31 -Apr 11 & Apr 23 -Jun 25 (no data recorded or included in totals) Stone Farm Regional Mitigation Bank 21 Phase Two and Three — Year 2 Annual Monitoring Report Outlet channel banks and plugs of Phase 3 were monitored for evidence of surface bank erosion (i.e. down - cutting) subsequent to above normal rainfall and high flow events. During a November 2013 site inspection, minor down - cutting was noted around the downstream end of plug 1 in an area where surface water in the floodplain flows back into the main outlet ditch. However, the plug continues to function in blocking drainage from up- gradient portions of the site. This, in combination with the raised bed elevation of the stream (down - gradient), reduces discharge to downstream waters. As a result, there has been no discernable adverse effect to hydrologic function of the restored wetlands. The area will continue to be monitored in 2014 (and throughout the duration of the hydrologic monitoring) to determine if any contingency measures are needed at this location. 5.0 CONCLUSION The implementation of Phase Two and Three completed an integral component of the watershed restoration effort of the Stone Farm Regional Mitigation Bank. Removal of large outlet canals and the re- contouring of the stream valleys has resulted in the connection of vast headwater wetland areas to the upper first -order reaches of the Little Caw Caw Canal. There has been a discernible hydrologic response within the stream valleys and the adjacent riparian wetlands. Vegetation and hydrologic monitoring of the Phase Two and Three project areas indicate that the site is progressing well during the second year following a droughty first year post- construction. Overall, the site exhibited a diverse assemblage of characteristic trees and shrubs. Vegetation data document high rates of survivorship among the planted species (R stem density = 468 stems per acre). Due to normal to above normal rainfall, the restoration areas in the swamp forest and small stream swamp community of Phase Two and Phase Three met and exceeded the target hydrologic criteria. All of the wells met the success criteria, and overall, the site exhibited dramatically increased hydroperiods. It is anticipated that static water table elevations will remain steady across the site particularly during normal rainfall periods during the early growing season. Overall, Phase Two and Three appear to be progressing well toward the targeted wetland community types. No contingency measures are recommended at this time. The restoration site is already providing key wetland functions by reducing sediment /nutrient runoff; increasing floodwater storage; and re- Stone Farm Regional Mitigation Bank 22 Phase Two and Three — Year 2 Annual Monitoring Report establishing wildlife habitat. The site will be continued to be monitored over the next three years (through Year 5), and the findings of such will be provided in subsequent annual monitoring reports for agency review and concurrence. Stone Farm Regional Mitigation Bank 23 Phase Two and Three — Year 2 Annual Monitoring Report FIGURES Legend . o0 0 00000 0 0 Property Boundary 00000000 0 0 -� 000000000 ` 0 0 000 000: 404 Wetland Line 00 orthern Tributary 0 Stream Restoration (15,338 I.f. ) Riverine Small Stream Swamp Restoration (1 03 ac.) Non- Riverine Swamp 0 Forest Restoration (40 ac.) Southern Tributary Wetland Enhancement (66 ac.) % Riverine Preservation (2 (5 ac.) o 0 Non - Riverine Preservation (I 60 ac. ) Upland Buffer (2 1 ac. ) Main Stem 'q PARCEL D 232.52 AC � r A 1 -id 4 �.VL! 1VU �oVO Project: Date: Revision Date: NOT FOR CONSTRUCTION LMG 9 2/15/2013 Stone Farm Mltl anon Phase II Scale: .Job Number: LAND MANAGEMENT CROUP-. 1 "= 1000' 40-09-1905 Environmental Consultants Tale: Post office Box 2522 Restoration Plan (Drawn By: Figure: Wilmington, North Carolina 28402 LES 1 LAWETLAND5\2002 WETLANDS FILE5\01 -02 -240 - -- Stone Farm Mite ltt Site, DeCarol VAIllaen3arx'4NCAiJ\Pha= 2 FIM C«A5- boslt.dwg Telephone: 910 -452 -0001 300-ft 150 r ," �"Y,�'R� \.� �`•./:.. f 'r� 1,., l�E gf..��'` �_ • •,wyhr�l,�� P' K. _ "� .f • I '.. • ,�f � ,G\ � ,_ �t�4r a �'�.i��'SI /i.,,: ::k- _ S } �y r �k ` d •_� . �.i 1� J .Y'1 ,/ fy ®r 1,�.. +, i1 VV h. Legend N Preservation Areas = 85.0 Acres w E Enhancement Areas = 68.0 Acres S Restoration Areas (Non- Riparian) = 38.9 Acres Ditch Corridor - No Credits (6.16 Acres) L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Annual Monitoring\ Phase III - Upper South Trib \Maps \As -Built Map Source: NAPP 2010 Aerial Photography. ,,,,PLUG 2 �j T"), (� °�'�d •��.� R r l* PLUG 3 F X• • v � o I PLUG 4 4:.c • X!, 0 300 600 • rr .Z �� r a •4 IR .t •' {�t IJi .slid T'►yl_i��y{{.�,,��� /� i 1,200 1,800 P' 4 ! xt 4 � 1 s � 6n �+ 2,400 m Feet ,PLUG 1 Ah- �a+ ��;.a..,._ 300-ft 150 r ," �"Y,�'R� \.� �`•./:.. f 'r� 1,., l�E gf..��'` �_ • •,wyhr�l,�� P' K. _ "� .f • I '.. • ,�f � ,G\ � ,_ �t�4r a �'�.i��'SI /i.,,: ::k- _ S } �y r �k ` d •_� . �.i 1� J .Y'1 ,/ fy ®r 1,�.. +, i1 VV h. Legend N Preservation Areas = 85.0 Acres w E Enhancement Areas = 68.0 Acres S Restoration Areas (Non- Riparian) = 38.9 Acres Ditch Corridor - No Credits (6.16 Acres) L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Annual Monitoring\ Phase III - Upper South Trib \Maps \As -Built Map Source: NAPP 2010 Aerial Photography. ,,,,PLUG 2 �j T"), (� °�'�d •��.� R r l* PLUG 3 F X• • v � o I PLUG 4 4:.c • X!, 0 300 600 • rr .Z �� r a •4 IR .t •' {�t IJi .slid T'►yl_i��y{{.�,,��� /� i 1,200 1,800 P' 4 ! xt 4 � 1 s � 6n �+ 2,400 m Feet C �`� ..+^j � ��ds• � .�� �r�r��C, 3'rs<u IV- -�1 �y�t...4 � � tx :L W, c a PHASE 2 r _ a� ':.aw =•• _ f• f `k �,F,`et, r c�' t F @. r1 r� k, y' +r 1. r� ty.fd rflr ' r �A.. X P ell HA S .; 4 i rF a v . 'IX;:. '` l ry „,,,, a. rr... 4 n .r.. � , •�i..a .. r.,i�f..,� a e - <na...i rr f�ssr .• � �� z , - �t,s �t § t :F W7t' tee. f P F °,,' r%$� r !'_ r j '; •- IT � � ! 1 1 .•sue � ��°°°�� rF x u. a J , e r cr rrrr��f,j t,; A- li C{`.� y; C E � ,�• . ,Sys` [ IF1 _ r x f ` w pw I r .,f i , e NOTE: This is not a survey. All boundaries and distances are considered approximate. This represents portions of a Conservation Easment Map surveyed by Tompkins Land Surveying, P.A. AutoCAD layers have been overlaid onto an aerial photograph. Map Source: NAPP 2012 Aerial Photography. N W j E S 0 625 1,250 2,500 3,750 5,000 Fee Legend NOTE: This is not a survey. All boundaries and distances are considered gapproximate. This represents a preliminary sketch prepared from field notes. Rain Guage Wells Stream data provided by Steve Norris, PLS. Stream Guages Well / Plot Combination Permanent Cross Sections Plots Map Source: 2010 NAPP aerial photography SCALE 1" = 400' L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Well_Stream Data \Well_Plot_Map_2012 Stone Farm Regional Mitigation Bank - Phase II Brunswick County, NC February 2012 01 -02 -240 LMG inuli hl n�nc.GWNT GROUP Enwlt'onmrntol Consu7tanis www.LMGroup.net Phone: 910.452.0001 •1.866.LMG.1078 Fax: 910.452.0060 P.O. Box 2522, Wilmington, NC 28402 Figure 4 Aerial Photograph w/ Plot and Well Location Legena X X Permanent Cross Sections Longitudinal Profiles X As -Built Cross Sections NOTE: This is not a survey. All boundaries and distances are considered approximate. This represents a preliminary sketch prepared from field notes. Stream data provided by Steve Norris, PLS. Map Source: 2010 NAPP aerial photography SCALE 1" = 400' L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Well_Stream Data \Well_Plot_Map_2012 Stone Farm Regional www.LMGroup.net Figure 5 Mitigation Bank -Phase II Phone: 910.452.0001 •1.866.LMG.1078 Brunswick County NC LMG Aerial Photograph w/ February 2012 EiV NT GROUP Fax: 910.452.0060 Y Environmental Coasultants Cross Section Location 01 -02 -240 — P.O. Box 2522, Wilmington, NC 28402 APPENDIX A: SITE PHOTOGRAPHS View of Bay outlet supplying flow to Mainstem (MS) t �, View of gauge 1 along Mainstem (MS) during early growing season Stone Farm Regional Mitigation Bank LMG Appendix A. LAN[] MANAGF;M F,N'1' GROUP -. Phase II & III Fn�,,anmen�Q,CQnsuhams Site Photographs Year 2 AMR May 2014 View of gauge 1 during overbank flow event along Mainstem (MS) i`4t,p4lL; — y T 1 ; View of Mainstem in early growing season (MS) (looking upstream) Stone Farm Regional Mitigation Bank LMG Appendix A. LAN[] MANAGF;M F,N'1' GROUP iec. Phase II & III CQnsuhams Site Photographs Year 2 AMR May 2014 �E h View of guage 3 along Mainstem (MS) View of guage 3 during overbank flow event (MS) Stone Farm Regional Mitigation Bank LMG Appendix A. Phase II & III Site Photographs Envlron merttal Cnnsuhnnn Year 2 AMR May 2014 View of upper end of North Tributary (NT) mid - growing season View of Plot Nt2 at Year 02 monitoring along North Tributary (NT) Stone Farm Regional Mitigation Bank LMG Appendix A. Phase II & III Site Photographs Environ mental Cnnsuhnnr -. Year 2 AMR May 2014 � f r tir , View of flow at guage NT1 along North Tributary (NT) in mid growing season View of upper end of North Tributary (NT) near bankfull in early growing season Stone Farm Regional Mitigation Bank LMG Appendix A. Phase II & III R "" "A "A`'Hh °t; "' `'k" Site Photographs Envlron merttal Cnnsuhnx, Year 2 AMR May 2014 . ja ' I ' i. 4' s�3 A 7 _ - � r View of top end of Southern Tributary (ST) in early growing season p d r^ ni y !g L M rY Y Wi r +� View of Southern Tributary (ST) channel Stone Farm Regional Mitigation Bank LMG Appendix A. LAN[] MANAGF;M ENT GROUP-. Phase II & III Env;ron menra, Consuhams Site Photographs Year 2 AMR May 2014 rt; View of Southern Tributary (ST) near bankfull during mid growing season View of flow at gauge St2 along (ST) during mid growing season Stone Farm Regional Mitigation Bank LMG Appendix A. I.RN!) h7ANAGFMFIJ7' GROUP i „c. Phase 11 & III F „� „o „1 e„ ar�o „s�, a „,5 Site Photographs Year 2 AMR May 2014 View of bald cypress growth at Plot 5 (MS) View of river birch growth at Plot 7 (MS) Stone Farm Regional Mitigation Bank LMG Appendix A. LAND MANAGFMFNT GROUP - Phase 11 & III F „�„onmenta,Co„su,tan,s Site Photographs Year 2 AMR May 2014 View of black gum growth at Plot NT2 (NT) View of tulip poplar growth at Plot NT6 (NT) Stone Farm Regional Mitigation Bank LMG Appendix A. .A 11) MANAGF;MENT GROUP we Phase II & III Fn�,,anmen�Q,�Q�s�,�a��, Site Photographs Year 2 AMR May 2014 View of bald cypress growth at Plot ST1 (ST) x 'Tiff A i R R' !71A �.� -► View of tulip poplar growth at Plot ST4 (ST) Stone Farm Regional Mitigation Bank LMT ROUY Appendix A. LAN[]MANAGF;M F,N'1'Giec. Phase II & III En,tronmenrarConsuhams Site Photographs Year 2 AMR May 2014 View of plug 1 at lower end of Phase 3 with saturated floodplain View of saturated floodplain at plug 1 in mid growing season Stone Farm Regional Mitigation Bank LMG Appendix A. .AN[MANAGF;M Y,'NT GROUP we Phase II & III Fn�,,anmen�Q,�Q�s�,�a��, Site Photographs Year 2 AMR May 2014 View of plug 3 of Phase 3 inundated in mid - growing season View of inundated floodplain adjacent to plug 3 of Phase 3 in mid - growing season Stone Farm Regional Mitigation Bank LMG Appendix A. LAND MANAGF;MENT GROUP iec. Phase II & III EnvaanmentorConsuhams Site Photographs Year 2 AMR May 2014 View of partially inundated plug 4 of Phase 3 in mid - growing season View of water in channel behind plug 4 of Phase 3 at bankfull in mid - growing season Stone Farm Regional Mitigation Bank LMG Appendix A. LAND MANAGF;MENT GROUP iec. Phase II & III EnvtronmenrarConsuhanrs Site Photographs Year 2 AMR May 2014 OMMOM r:" IVllMolll_l9aEel a • Iti_1.9.1_a: I �� STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 1 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 4 1 ft Planted 4 Bald Cypress T 18 2ft Planted 18 Bald Cypress T 2 aft Planted 2 Black Gum T 10 1 It Planted 10 Black Gum T 2 2ft Planted 2 Tulip Poplar T 20 1 ft Planted 20 Tulip Poplar T 1 2ft Planted 1 Swamp Chestnut Oak T 3 1 ft Planted 3 Swamp Chestnut Oak T 5 2ft Planted 5 Water Oak T 1 5ft Volunteer 1 Water Oak T 1 6ft Volunteer 1 Water Oak T 1 8ft Volunteer 1 American Holly T 3 1 It Volunteer 3 Fetterbush SH 1 1 ft Volunteer 1 Fetterbush SH 1 2ft Volunteer 1 Inkberry SH 3 2ft Volunteer 3 Inkberry SH 3 6ft Volunteer 3 Red Bay SH 4 1 It Volunteer 4 Red Bay SH 2 2ft Volunteer 2 Red Bay SH 1 3ft Volunteer 1 Red Bay SH 3 4 ft Volunteer 3 Red Bay SH 3 5ft Volunteer 3 Red Bay SH 3 6ft Volunteer 3 Red Bay SH 1 7 ft Volunteer 1 Wax Myrtle SH 20 1 ft Volunteer 20 Wax Myrtle SH 4 2ft Volunteer 4 Wax Myrtle SH 7 3ft Volunteer 7 Wax Myrtle SH 5 4 ft Volunteer 5 Wax Myrtle SH 1 5ft Volunteer 1 Baccharis SH 3 1 ft Volunteer 3 Winged Sumac SH 17 1 ft Volunteer 17 Winged Sumac SH 1 2 It Volunteer 1 Persimmon T 1 2 ft Volunteer 1 Sweet Gum T 6 1 It Volunteer 6 Sweet Gum T 1 2 ft Volunteer 1 Sweet Gum T 1 3 ft Volunteer 1 Sweet Gum T 1 8 ft Volunteer 1 Sweet Gum T 1 15 ft Volunteer 1 Unidentified Pine T 2 1 ft Volunteer 2 Unidentified Pine T 9 2 ft Volunteer 9 Unidentified Pine T 1 3 ft Volunteer 1 Unidentified Pine T 1 loft Volunteer 1 TOTAL PLANTED SPECIES 65 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 650 PLOT NUMBER SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL ACCEPTABLE 68 (VOLUNTEER 680 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 45 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 178 1330 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 2 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 11 1 ft Planted 11 Bald Cypress T 10 2 ft Planted 10 Black Gum T 14 1 ft Planted 14 Black Gum T 3 2 ft Planted 3 River Birch T 14 1 ft Planted 14 River Birch T 1 2 ft Planted 1 River Birch T 1 3 ft Planted 1 Tulip Poplar T 9 1 ft Planted 9 Swamp Chestnut Oak T 1 1 ft Planted 1 Swamp Chestnut Oak T 1 2 ft Planted 1 Inkberry SH 1 1 ft Volunteer 1 Red Bay SH 5 1 ft Volunteer 5 Red Bay SH 3 2 ft Volunteer 3 Red Bay SH 1 3 ft Volunteer 1 Wax Myrtle SH 1 1 ft Volunteer 1 Wax Myrtle SH 2 2 ft Volunteer 2 Wax Myrtle SH 2 3 ft Volunteer 2 Water Oak T 1 1 ft Volunteer 1 Winged Sumac SH 1 1 ft Volunteer 1 Unidentified Pine T 45 1 ft Volunteer 45 Unidentified Pine T 29 2 ft Volunteer 29 Unidentified Pine T 3 3 ft Volunteer 3 Sweet Gum T 4 1 ft Volunteer 4 Sweet Gum T 1 2 ft Volunteer 1 Sweet Gum T 1 3 ft Volunteer 1 Sweet Gum T 3 4 ft Volunteer 3 TOTAL PLANTED SPECIES 65 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 650 PLOT NUMBER SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL ACCEPTABLE 16 (VOLUNTEER 160 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 87 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 168 810 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 3 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 5 1 ft Planted 5 Bald Cypress T 6 2ft Planted 6 Black Gum T 6 1 ft Planted 6 Black Gum T 1 2ft Planted 1 Atlantic White Cedar T 1 1 ft Planted 1 Atlantic White Cedar T 1 3ft Planted 1 Tulip Poplar T 10 1 ft Planted 10 Swamp Chestnut Oak T 2 1 ft Planted 2 Swamp Chestnut Oak T 1 2ft Planted 1 Pond Pine T 3 1 ft Planted 3 Pond Pine T 4 2ft Planted 4 Pond Pine T 1 3ft Planted 1 Pond Pine T 1 4 ft Planted 1 Red Bay T 150 3 ft - Avg. Volunteer 150 Inkberry SH 350 3 ft - Avg. Volunteer 350 Fetterbush SH 350 3 ft - Avg. Volunteer 350 Horse Sugar SH 30 4 ft - Avg. Volunteer 30 Sweet Gum T 25 3ft Volunteer 25 Sweet Gum T 25 6 ft Volunteer 25 Sweet Gum T 8 12 ft Volunteer 8 Unidentified Pine T 30 7 ft - Avg. Volunteer 30 TOTAL PLANTED SPECIES 42 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 420 PLOT NUMBER SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL ACCEPTABLE 850 (VOLUNTEER 8500 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 118 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 1010 8920 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 4 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 3 1 ft Planted 3 Bald Cypress T 19 2ft Planted 19 Bald Cypress T 1 3 ft Planted 1 Black Gum T 4 1 ft Planted 4 Black Gum T 5 2ft Planted 5 Atlantic White Cedar T 1 1 ft Planted 1 Swamp Chestnut Oak T 6 1 ft Planted 6 Wax Myrtle SH 5 2ft Volunteer 5 Baccharis SH 1 1 ft Volunteer 1 Sweet Gum T 1 2 ft Volunteer 1 Unidentified Pine T 1 1 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 39 (PLANTED SPECIES 390 SPECIES PER ACRE) TOTAL ACCEPTABLE OBSERVED DENSITY VOLUNTEERS 5 (VOLUNTEER 50 SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 3 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 47 440 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 5 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 5 1 ft Planted 5 Bald Cypress T 17 2ft Planted 17 Bald Cypress T 3 3ft Planted 3 Black Gum T 11 1 ft Planted 11 Black Gum T 8 2ft Planted 8 Tulip Poplar T 1 1 ft Planted 1 Swamp Chestnut Oak T 6 1 ft Planted 6 Swamp Chestnut Oak T 1 2ft Planted 1 Wax Myrtle SH 2 1 ft Volunteer 2 Wax Myrtle SH 10 2ft Volunteer 10 Wax Myrtle SH 5 3ft Volunteer 5 Wax Myrtle SH 1 4 ft Volunteer 1 Wax Myrtle SH 3 5 ft Volunteer 3 Sweet Gum T 2 2ft Volunteer 2 Unidentified Pine T 1 1 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 52 (PLANTED SPECIES 520 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 21 (VOLUNTEER 210 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 3 NO >50% OF TOTAL (YIN) VOLUNTEERS PLOT NUMBER SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL INDIVIDUALS 76 730 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 6 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 4 2ft Planted 4 Black Gum T 4 1 ft Planted 4 Black Gum T 2 2ft Planted 2 Atlantic White Cedar T 1 1 ft Planted 1 Atlantic White Cedar T 2 2ft Planted 2 Atlantic White Cedar T 1 3ft Planted 1 Tulip Poplar T 1 1 ft Planted 1 Pond Pine T 6 1 ft Planted 6 Pond Pine T 3 2ft Planted 3 Pond Pine T 1 3ft Planted 1 Water Oak T 4 1 ft Volunteer 4 Water Oak T 4 2ft Volunteer 4 Red Bay SH 60 2 ft - Avg. Volunteer 60 Fetterbush SH 300 3 ft - Avg. Volunteer 300 Sweet Gum T 50 3 ft - Avg. Volunteer 50 Unidentified Pine T 300 2 ft - Avg. Volunteer 300 OBSERVED DENSITY TOTAL PLANTED 26 (PLANTED SPECIES 260 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 368 (VOLUNTEER 3680 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 350 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 744 3940 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 7 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 18 2ft Planted 18 Black Gum T 6 1 ft Planted 6 Black Gum T 3 2ft Planted 3 River Birch T 7 1 ft Planted 7 River Birch T 5 2ft Planted 5 Swamp Chestnut Oak T 4 1 ft Planted 4 Wax Myrtle T 1 3 ft Volunteer 1 Unidentified Pine T 2 1 ft Volunteer 2 OBSERVED DENSITY TOTAL PLANTED 44 (PLANTED SPECIES 440 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 1 (VOLUNTEER 10 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 2 NO >50% OF TOTAL (YIN) VOLUNTEERS TOTAL INDIVIDUALS 47 OBSERVED DENSITY 450 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 8 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 8 1 ft Planted 8 Bald Cypress T 22 2 ft Planted 22 Bald Cypress T 8 3ft Planted 8 Bald Cypress T 2 4ft Planted 2 Tulip Poplar T 16 1 ft Planted 16 Wax Myrtle T 1 1 ft Volunteer 1 Wax Myrtle T 1 6ft Volunteer 1 Water Oak T 2 1 ft Volunteer 2 Red Bay SH 1 1 ft Volunteer 1 Red Bay SH 1 3ft Volunteer 1 Red Bay SH 1 6ft Volunteer 1 Winged Sumac SH 3 1 ft Volunteer 3 Sweet Gum T 6 1 ft Volunteer 6 Sweet Gum T 11 2 ft Volunteer 11 Sweet Gum T 8 3ft Volunteer 8 Sweet Gum T 3 4ft Volunteer 3 Sweet Gum T 2 6ft Volunteer 2 Sweet Gum T 1 7 ft Volunteer 1 Sweet Gum T 1 8 ft Volunteer 1 Sweet Gum T 1 loft Volunteer 1 Unidentified Pine T 30 1 ft Volunteer 30 Unidentified Pine T 4 2 ft Volunteer 4 Unidentified Pine T 1 3ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 56 (PLANTED SPECIES 560 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 7 (VOLUNTEER 70 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 71 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 134 630 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 9 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals Species Counted toward Success Criteria T, SA, or SH Bald Cypress T 6 1 ft Planted 6 Bald Cypress T 21 2ft Planted 21 Bald Cypress T 5 3ft Planted 5 Black Gum T 8 1 ft Planted 8 Black Gum T 4 2ft Planted 4 Black Gum T 2 3ft Planted 2 River Birch T 1 1 ft Planted 1 River Birch T 3 2ft Planted 3 Swamp Chestnut Oak T 3 1 ft Planted 3 Swamp Chestnut Oak T 3 2ft Planted 3 Wax Myrtle SH 1 2ft Volunteer 1 Wax Myrtle SH 3 3ft Volunteer 3 Wax Myrtle SH 1 8 ft Volunteer 1 Baccharis SH 3 2 ft Volunteer 3 Sweet Gum T 1 2 ft Volunteer 1 Sweet Gum T 1 3 ft Volunteer 1 Sweet Gum T 1 5 ft Volunteer 1 Sweet Gum T 1 6 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 56 (PLANTED SPECIES 560 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 5 (VOLUNTEER 50 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 7 NO >50% OF TOTAL (YIN) VOLUNTEERS TOTAL INDIVIDUALS I 68 I I OBS( EVR D DENSITY I 610 STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 10 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals Species Counted toward Success Criteria T, SA, or SH Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 10 2ft Planted 10 Bald Cypress T 1 3 ft Planted 1 Black Gum T 1 2ft Planted 1 Atlantic White Cedar T 2 1 ft Planted 2 Atlantic White Cedar T 3 2ft Planted 3 Swamp Chestnut Oak T 2 1 ft Planted 2 Swamp Chestnut Oak T 3 2ft Planted 3 Red Bay SH 3 7 ft Volunteer 3 Red Maple T 50 1 ft Volunteer 50 Sweet Gum T 25 2 ft - Avg. Volunteer 25 Sweet Gum T 2 6 ft - Avg. Volunteer 2 Sweet Gum T 1 10 ft - Avg. Volunteer 1 Unidentified Pine T 8 2 ft - Avg. Volunteer 8 Unidentified Pine T 1 6 ft - Avg. Volunteer 1 Unidentified Pine T 1 10 ft - Avg. Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 23 (PLANTED SPECIES 230 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 3 (VOLUNTEER 30 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 88 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 114 260 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 11 SPECIES STRATUM T, SA, or SH Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 13 2 ft Planted 13 Bald Cypress T 1 3 ft Planted 1 Black Gum T 2 1 ft Planted 2 Black Gum T 1 2ft Planted 1 Atlantic White Cedar T 1 1 ft Planted 1 Atlantic White Cedar T 5 2ft Planted 5 Atlantic White Cedar T 4 3 ft Planted 4 Tulip Poplar T 1 1 ft Planted 1 Swamp Chestnut Oak T 6 1 ft Planted 6 Swamp Chestnut Oak T 5 2ft Planted 5 Pond Pine T 1 1 ft Planted 1 Pond Pine T 2 2ft Planted 2 Pond Pine T 6 3 ft Planted 6 Pond Pine T 2 4 ft Planted 2 Red Maple T 10 1 ft Volunteer 10 Red Maple T 10 2ft Volunteer 10 Sweet Gum T 10 6 ft Volunteer 10 Sweet Gum T 10 8 ft Volunteer 10 Sweet Gum T 5 12 ft Volunteer 5 Unidentified Pine T 20 2 ft - Avg. Volunteer 20 Unidentified Pine T 5 5 ft- Avg. Volunteer 5 Unidentified Pine T 1 8 ft- Avg. Volunteer 1 TOTAL PLANTED SPECIES 50 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 500 TOTAL ACCEPTABLE VOLUNTEERS 0 OBSERVED DENSITY (VOLUNTEER SPECIES PER ACRE) 0 TOTAL UNACCEPTABLE VOLUNTEERS 71 SINGLE VOLUNTEER >50% OF TOTAL (YIN) NO TOTAL INDIVIDUALS 121 OBSERVED DENSITY (PER ACRE) 500 STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 12 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 3 1 ft Planted 3 Bald Cypress T 22 2ft Planted 22 Bald Cypress T 1 3ft Planted 1 Black Gum T 10 1 ft Planted 10 Black Gum T 2 2ft Planted 2 River Birch T 1 2ft Planted 1 Tulip Poplar T 2 1 ft Planted 2 Swamp Chestnut Oak T 5 1 ft Planted 5 Swamp Chestnut Oak T 3 2ft Planted 3 Wax Myrtle SH 3 2ft Volunteer 3 Wax Myrtle SH 3 3ft Volunteer 3 Wax Myrtle SH 2 4 ft Volunteer 2 Baccharis SH 1 1 ft Volunteer 1 Sweet Gum T 15 1 ft Volunteer 15 Unidentified Pine T 10 1 ft Volunteer 10 TOTAL PLANTED OBSERVED DENSITY SPECIES 49 (PLANTED SPECIES 490 PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 8 (VOLUNTEER 80 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 26 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 83 570 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 13 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 4 2ft Planted 4 Black Gum T 1 2ft Planted 1 Black Gum T 1 3ft Planted 1 Atlantic White Cedar T 5 1 ft Planted 5 Atlantic White Cedar T 4 2ft Planted 4 Atlantic White Cedar T 2 3ft Planted 2 River Birch T 2 1 ft Planted 2 River Birch T 2 2ft Planted 2 Tulip Poplar T 1 1 ft Planted 1 Swamp Chestnut Oak T 3 1 ft Planted 3 Wax Myrtle SH 8 3 ft - Avg. Volunteer 8 Wax Myrtle SH 6 6 ft - Avg. Volunteer 6 Wax Myrtle SH 4 8 ft - Avg. Volunteer 4 Red Bay SH 8 3 ft - Avg. Volunteer 8 Red Bay SH 8 6 ft - Avg. Volunteer 8 Red Bay SH 4 8 ft - Avg. Volunteer 4 Sweet Gum T 15 3 ft - Avg. Volunteer 15 Sweet Gum T 15 6 ft - Avg. Volunteer 15 Sweet Gum T 10 8 ft - Avg. Volunteer 10 Sweet Gum T 4 10 ft - Avg. Volunteer 4 Sweet Gum T 2 12+ ft - Avg. Volunteer 2 Unidentified Pine T 15 3 ft - Avg. Volunteer 15 Unidentified Pine T 8 6 ft - Avg. Volunteer 8 Unidentified Pine T 15 10 ft - Avg. Volunteer 15 Unidentified Pine T 8 12+ ft - Avg. Volunteer 8 TOTAL PLANTED SPECIES 25 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 250 PLOT NUMBER 13 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL ACCEPTABLE 38 (VOLUNTEER 380 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 92 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 155 630 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 14 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 2 1 ft Planted 2 Bald Cypress T 11 2ft Planted 11 Bald Cypress T 1 3ft Planted 1 Black Gum T 2 1 ft Planted 2 Black Gum T 1 2ft Planted 1 Atlantic White Cedar T 5 1 ft Planted 5 Atlantic White Cedar T 3 2ft Planted 3 Atlantic White Cedar T 2 3ft Planted 2 Tulip Poplar T 1 1 ft Planted 1 Swamp Chestnut Oak T 1 1 ft Planted 1 Swamp Chestnut Oak T 1 2ft Planted 1 Pond Pine T 4 1 ft Planted 4 Pond Pine T 5 2ft Planted 5 Pond Pine T 2 3ft Planted 2 Pond Pine T 1 4 ft Planted 1 Wax Myrtle SH 15 1 ft Volunteer 15 Wax Myrtle SH 18 3 ft - Avg. Volunteer 18 Wax Myrtle SH 1 3ft Volunteer 1 Red Maple T 30 1 ft Volunteer 30 Sweet Gum T 8 1 ft Volunteer 8 Sweet Gum T 8 3ft Volunteer 8 Sweet Gum T 12 6 ft Volunteer 12 Unidentified Pine T 20 1 ft Volunteer 20 Unidentified Pine T 8 3ft Volunteer 8 Unidentified Pine T 2 6 ft Volunteer 2 Unidentified Pine T 3 8 ft Volunteer 3 PLOT NUMBER 14 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward OBSERVED DENSITY Success Criteria TOTAL PLANTED 42 (PLANTED SPECIES 420 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 34 (VOLUNTEER 340 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 91 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 167 760 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 15 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 11 1 ft Planted 11 Bald Cypress T 20 2ft Planted 20 Black Gum T 2 1 ft Planted 2 Black Gum T 2 2ft Planted 2 River Birch T 5 1 ft Planted 5 River Birch T 2 2ft Planted 2 Swamp Chestnut Oak T 8 1 ft Planted 8 Wax Myrtle SH 5 3 ft Planted 5 Wax Myrtle SH 3 7 ft Volunteer 3 Baccharis SH 10 1 ft Volunteer 10 Sweet Gum T 10 2 ft - Avg. Volunteer 10 Sweet Gum T 4 5 ft- Avg. Volunteer 4 Sweet Gum T 3 8 ft- Avg Volunteer 3 Unidentified Pine T 6 2 ft- Avg. Volunteer 6 Unidentified Pine T 3 5 ft- Avg. Volunteer 3 Unidentified Pine T 3 8 ft- Avg Volunteer 3 Unidentified Pine T 1 12 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 50 (PLANTED SPECIES 500 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 8 (VOLUNTEER 80 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 40 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 98 580 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 16 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 16 1 ft Planted 16 Bald Cypress T 30 2ft Planted 30 Bald Cypress T 2 3 ft Planted 2 Black Gum T 2 1 ft Planted 2 Black Gum T 2 2ft Planted 2 Atlantic White Cedar T 1 1 ft Planted 1 Pond Pine T 3 1 ft Planted 3 Pond Pine T 2 2ft Planted 2 OBSERVED DENSITY TOTAL PLANTED 58 (PLANTED SPECIES 580 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 0 (VOLUNTEER 0 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 0 NO VOLUNTEERS >50% OF TOTAL (YIN) OBSERVED DENSITY TOTAL INDIVIDUALS 58 580 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 17 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 19 2ft Planted 19 Bald Cypress T 7 3 ft Planted 7 Black Gum T 2 1 ft Planted 2 Black Gum T 4 2ft Planted 4 River Birch T 2 1 ft Planted 2 Tulip Poplar T 1 1 ft Planted 1 Swamp Chestnut Oak T 2 1 ft Planted 2 Swamp Chestnut Oak T 2 2ft Planted 2 Baccharis T 16 2 ft - Avg. Planted 16 OBSERVED DENSITY TOTAL PLANTED 40 (PLANTED SPECIES 400 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 0 (VOLUNTEER 0 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 16 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 56 400 (PER ACRE) STONE FARM MITIGATION BANK - MAINSTEM ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER 18 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 5 1 ft Planted 5 Bald Cypress T 7 2ft Planted 7 Bald Cypress T 1 3ft Planted 1 Black Gum T 2 2ft Planted 2 Atlantic White Cedar T 2 1 ft Planted 2 Atlantic White Cedar T 3 2ft Planted 3 Atlantic White Cedar T 2 3ft Planted 2 Tulip Poplar T 5 1 ft Planted 5 Tulip Poplar T 1 2ft Planted 1 Swamp Chestnut Oak T 1 1 ft Planted 1 Swamp Chestnut Oak T 1 2ft Planted 1 Pond Pine T 1 2ft Planted 1 River Birch T 1 2ft Planted 1 American Holly T 8 3ft Volunteer 8 Fetterbush SH 120 3 ft - Avg. Volunteer 120 Red Bay SH 25 2 ft - Avg. Volunteer 25 Red Bay SH 15 6 ft - Avg. Volunteer 15 Red Bay SH 5 10 ft - Avg. Volunteer 5 Wax Myrtle SH 8 3 ft - Avg. Volunteer 8 Wax Myrtle SH 6 6 ft - Avg. Volunteer 6 Water Oak SH 9 2 ft - Avg. Volunteer 9 Blueberry SH 20 3ft Volunteer 20 Blue Huckleberry SH 40 3ft Volunteer 40 Red Chokeberry SH 15 2ft Volunteer 15 Sweet Gum SH 20 2 ft - Avg. Volunteer 20 Sweet Gum SH 10 6 ft - Avg. Volunteer 10 Sweet Gum SH 8 10 ft - Avg. Volunteer 8 Titi SH 5 3ft Volunteer 5 Live Oak T 3 3ft Volunteer 3 Unidentified Pine T 50 2 ft - Avg. Volunteer 50 Unidentified Pine T 30 6 ft - Avg. Volunteer 30 Unidentified Pine T 10 10 ft - Avg. Volunteer 10 PLOT NUMBER 18 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward OBSERVED DENSITY Success Criteria TOTAL PLANTED 32 (PLANTED SPECIES 320 SPECIES PER ACRE OBSERVED DENSITY TOTAL ACCEPTABLE 196 (VOLUNTEER 1960 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 211 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 439 2280 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 1 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 5 1 ft Planted 5 Bald Cypress T 13 2ft Planted 13 Bald Cypress T 7 3 ft Planted 7 Black Gum T 3 1 ft Planted 3 Black Gum T 4 2ft Planted 4 Tulip Poplar T 4 1 ft Planted 4 Swamp Chestnut Oak T 8 1 ft Planted 8 Swamp Chestnut Oak T 3 2ft Planted 3 Wax Myrtle SH 4 4 ft Volunteer 4 Red Bay SH 2 1 ft Volunteer 2 Red Bay SH 1 2ft Volunteer 1 Red Bay SH 1 5 ft Volunteer 1 Red Bay SH 1 6 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 47 (PLANTED SPECIES 470 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE VOLUNTEERS 9 (VOLUNTEER 90 SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 0 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 56 560 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 2 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 9 1 ft Planted 9 Bald Cypress T 24 2ft Planted 24 Bald Cypress T 3 3ft Planted 3 Black Gum T 3 1 ft Planted 3 Black Gum T 1 2ft Planted 1 River Birch T 4 1 ft Planted 4 Tulip Poplar T 5 1 ft Planted 5 Swamp Chestnut Oak T 5 1 ft Planted 5 Swamp Chestnut Oak T 1 2ft Planted 1 Wax Myrtle SH 1 4 ft Volunteer 1 Wax Myrtle SH 1 5 ft Volunteer 1 Wax Myrtle SH 1 7 ft Volunteer 1 Baccharis SH 8 2 ft Volunteer 8 Baccharis SH 4 3 ft Volunteer 4 Sweet Gum T 5 2 ft Volunteer 5 Sweet Gum T 1 3 ft Volunteer 1 Sweet Gum T 3 5 ft Volunteer 3 Sweet Gum T 5 7 ft Volunteer 5 OBSERVED DENSITY TOTAL PLANTED SPECIES 55 (PLANTED SPECIES 550 PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 3 (VOLUNTEER 30 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 26 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 84 580 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 3 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 4 1 ft Planted 4 Bald Cypress T 9 2ft Planted 9 Bald Cypress T 2 3ft Planted 2 Black Gum T 1 1 ft Planted 1 Black Gum T 1 2ft Planted 1 Atlantic White Cedar T 1 2ft Planted 1 Atlantic White Cedar T 4 3ft Planted 4 Atlantic White Cedar T 1 4ft Planted 1 Tulip Poplar T 3 1 ft Planted 3 Pond Pine T 4 2ft Planted 4 Red Bay SH 6 1 ft Volunteer 6 Red Bay SH 6 2ft Volunteer 6 Red Bay SH 9 3ft Volunteer 9 Red Bay SH 4 4ft Volunteer 4 Red Bay SH 1 5 ft Volunteer 1 Red Bay SH 1 6 ft Volunteer 1 Sweet Bay SH 2 1 ft Volunteer 2 Sweet Bay SH 1 3ft Volunteer 1 Wax Myrtle SH 4 2ft Volunteer 4 Wax Myrtle SH 6 3ft Volunteer 6 Wax Myrtle SH 1 6 ft Volunteer 1 Wax Myrtle SH 1 9 ft Volunteer 1 Water Oak T 4 3ft Volunteer 4 Blueberry SH 3 3ft Volunteer 3 Winged Sumac SH 1 3ft Volunteer 1 Sweet Gum T 2 2ft Volunteer 2 Sweet Gum T 2 3ft Volunteer 2 Sweet Gum T 1 4ft Volunteer 1 Sweet Gum T 2 5 ft Volunteer 2 Unidentified Pine T 5 1 ft Volunteer 5 PLOT NUMBER NT 3 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward T 11 Volunteer Success Criteria Unidentified Pine 2 ft 11 Unldentifed Pine T 9 3 ft Volunteer 9 Unldentifed Pine T 15 4 ft Volunteer 15 Unldentifed Pine T 12 5 ft Volunteer 12 Unidentified Pine T 9 6 ft Volunteer 9 OBSERVED DENSITY TOTAL PLANTED 30 (PLANTED SPECIES 300 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 49 (VOLUNTEER 490 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 69 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 148 790 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 4 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 4 1 ft Planted 4 Bald Cypress T 17 2ft Planted 17 Bald Cypress T 9 3ft Planted 9 Black Gum T 7 1 ft Planted 7 Black Gum T 2 2ft Planted 2 River Birch T 8 1 ft Planted 8 River Birch T 16 2ft Planted 16 River Birch T 2 4 ft Planted 2 River Birch T 1 5 ft Planted 1 Swamp Chestnut Oak T 2 1 ft Planted 2 Swamp Chestnut Oak T 1 2ft Planted 1 Wax Myrtle SH 1 3ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 69 (PLANTED SPECIES 690 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 1 (VOLUNTEER 10 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 0 NO VOLUNTEERS >50% OF TOTAL (YIN) TOTAL INDIVIDUALS 70 OBSERVED DENSITY 700 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 5 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 5 1 ft Planted 5 Bald Cypress T 17 2ft Planted 17 Bald Cypress T 4 3ft Planted 4 Black Gum T 14 1 ft Planted 14 Black Gum T 4 2ft Planted 4 American White Cedar T 2 1 ft Planted 2 Tulip Poplar T 8 1 ft Planted 8 Swamp Chestnut Oak T 4 1 ft Planted 4 Swamp Chestnut Oak T 1 2ft Planted 1 Pond Pine T 1 1 ft Planted 1 Sweet Gum T 8 1 ft Volunteer 8 Sweet Gum T 2 3ft Volunteer 2 Sweet Gum T 3 4 ft Volunteer 3 Sweet Gum T 1 7 ft Volunteer 1 TOTAL PLANTED 60 (PLANTED SPECIES 600 SPECIES PER ACREI OBSERVED DENSITY TOTAL ACCEPTABLE 0 (VOLUNTEER 0 VOLUNTEERS SPECIES PER ACRE) TOTAL UNACCEPTABLE 14 SINGLE VOLUNTEER NO VOLUNTEERS >50% OF TOTAL (YIN) TOTAL INDIVIDUALS 74 OBSERVED DENSITY 600 (PER ACRE) STONE FARM MITIGATION BANK - NORTH TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER NT 6 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 7 1 ft Planted 7 Bald Cypress T 25 2 ft Planted 25 Bald Cypress T 13 3 ft Planted 13 Bald Cypress T 2 4ft Planted 2 Tulip Poplar T 5 1 ft Planted 5 Tulip Poplar T 1 4ft Planted 1 Swamp Chestnut Oak T 7 1 ft Planted 7 Wax Myrtle SH 8 2 ft - Avg. Volunteer 8 Sweet Gum T 20 3 ft - Avg. Volunteer 20 Sweet Gum T 20 6 ft - Avg. Volunteer 20 Sweet Gum T 10 10 ft - Avg. Volunteer 10 TOTAL PLANTED OBSERVED DENSITY SPECIES 60 (PLANTED SPECIES 600 PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 8 (VOLUNTEER 80 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 30 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 108 680 (PER ACRE) STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER ST 1 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 15 2 ft Planted 15 Bald Cypress T 8 3 ft Planted 8 Bald Cypress T 3 4 ft Planted 3 Bald Cypress T 1 5 ft Planted 1 Green Ash T 5 1 ft Planted 5 Wax Myrtle SH 1 4 ft Volunteer 1 Red Bay SH 4 2 ft - Avg. Volunteer 4 Red Bay SH 5 5 ft Volunteer 5 Water Oak T 1 8 ft Volunteer 1 Fetterbush SH 6 2 ft Volunteer 6 Fetterbush SH 2 4 ft Volunteer 2 Red Maple T 40 1 ft Volunteer 40 Sweet Gum T 8 3 ft Volunteer 8 Sweet Gum T 1 12 ft Volunteer 1 Sweet Gum T 1 15 ft Volunteer 1 Unidentified Pine T 9 2 ft - Avg. Volunteer 9 Unidentified Pine T 1 7 ft Volunteer 1 OBSERVED DENSITY TOTAL PLANTED 33 (PLANTED SPECIES 330 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 19 (VOLUNTEER 190 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 60 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 112 520 (PER ACRE) STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER ST 2 SPECIES STRATUM (T, SA, SH) Number of Individuals HEIGHT Planted vs. Volunteer Species Number of Individuals Counted toward Success Criteria Bald Cypress T 2 1 ft Planted 2 Bald Cypress T 7 2 ft Planted 7 Bald Cypress T 7 3 ft Planted 7 Bald Cypress T 3 4 ft Planted 3 Black Gum T 9 1 ft Planted 9 Black Gum T 3 2 ft Planted 3 Pond Pine T 1 2 ft Planted 1 Pond Pine T 2 3 ft Planted 2 Pond Pine T 1 4 ft Planted 1 Pond Pine T 3 5 ft Planted 3 Pond Pine T 3 6 ft Planted 3 Pond Pine T 1 7 ft Planted 1 Red Bay SH 15 2 ft - Avg. Volunteer 15 Red Bay SH 12 5 ft - Avg. Volunteer 12 Red Bay SH 5 10 ft - Avg. Volunteer 5 Red Bay SH 2 12+ ft Volunteer 2 Wax Myrtle SH 10 2 ft - Avg. Volunteer 10 Wax Myrtle SH 5 5 ft - Avg. Volunteer 5 Wax Myrtle SH 2 10 ft - Avg. Volunteer 2 Sweet Gum T 15 2 ft - Avg. Volunteer 15 Sweet Gum T 25 5 ft - Avg. Volunteer 25 Sweet Gum T 6 10 ft - Avg. Volunteer 6 Sweet Gum T 1 12+ ft Volunteer 1 Unidentified Pine T 20 2 ft - Avg. Volunteer 20 Unidentified Pine T 10 5 ft - Avg. Volunteer 10 Unidentified Pine T 8 10 ft - Avg. Volunteer 8 Unidentified Pine T 1 12+ ft Volunteer 1 TOTAL PLANTED SPECIES 42 OBSERVED DENSITY (PLANTED SPECIES PER ACRE) 420 PLOT NUMBER ST 2 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria OBSERVED DENSITY TOTAL ACCEPTABLE 51 (VOLUNTEER 510 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 86 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 179 930 (PER ACRE) STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER ST 3 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 2 1 ft Planted 2 Bald Cypress T 12 2ft Planted 12 Bald Cypress T 3 3ft Planted 3 Bald Cypress T 4 4 ft Planted 4 Black Gum T 3 1 ft Planted 3 Green Ash T 4 1 ft Planted 4 Ironwood T 1 1 ft Planted 1 Ironwood T 1 2ft Planted 1 Red Bay SH 8 3ft Volunteer 8 Red Bay SH 4 5 ft Volunteer 4 Red Bay SH 1 8 ft Volunteer 1 Highbush Blueberry SH 10 3ft Volunteer 10 Highbush Blueberry SH 1 6 ft Volunteer 1 Red Maple T 30 1 ft Volunteer 30 Sweet Gum T 10 5 ft Volunteer 10 Unidentified Pine T 3 2 ft - Avg. Volunteer 3 Unidentified Pine T 3 5 ft - Avg. Volunteer 3 OBSERVED DENSITY TOTAL PLANTED 30 (PLANTED SPECIES 300 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 24 (VOLUNTEER 240 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 46 NO >50% OF TOTAL (YIN) VOLUNTEERS PLOT NUMBER ST 3 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria TOTAL INDIVIDUALS 100 OBSERVED DENSITY 540 (PER ACRE) STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER ST 4 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 1 1 ft Planted 1 Bald Cypress T 15 2ft Planted 15 Bald Cypress T 13 3 ft Planted 13 Bald Cypress T 4 4 ft Planted 4 Black Gum T 6 1 ft Planted 6 Black Gum T 5 2ft Planted 5 Green Ash T 17 1 ft Planted 17 Green Ash T 5 2ft Planted 5 Tulip Poplar T 15 1 -2 ft Volunteer 15 Tulip Poplar T 1 3 ft Volunteer 1 Wax Myrtle T 13 2 ft - Avg. Volunteer 13 Baccharis SH 10 2 ft - Avg. Volunteer 10 Winged Sumac SH 30 2 ft - Avg. Volunteer 30 Sweet Gum T 20 2 ft - Avg. Volunteer 20 Sweet Gum T 15 5 ft - Avg. Volunteer 15 Sweet Gum T 8 10 ft - Avg. Volunteer 8 Unidentified Pine T 10 2 ft - Avg. Volunteer 10 OBSERVED DENSITY TOTAL PLANTED 66 (PLANTED SPECIES 660 SPECIES PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 29 (VOLUNTEER 290 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 93 NO >50% OF TOTAL (YIN) VOLUNTEERS OBSERVED DENSITY TOTAL INDIVIDUALS 188 950 (PER ACRE) STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS 2013 PLOT NUMBER ST 5 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria Bald Cypress T 2 1 ft Planted 2 Bald Cypress T 7 2ft Planted 7 Bald Cypress T 13 3 ft Planted 13 Bald Cypress T 3 4 ft Planted 3 Bald Cypress T 1 5ft Planted 1 Black Gum T 11 1 ft Planted 11 Black Gum T 5 2ft Planted 5 Green Ash T 1 1 ft Planted 1 Green Ash T 1 2ft Planted 1 Ironwood T 1 1 ft Planted 1 Ironwood T 2 2ft Planted 2 Ironwood T 1 3 ft Planted 1 Swamp Chestnut Oak T 1 2ft Planted 1 Atlantic White Cedar T 1 1 ft Planted 1 Sweet Gum T 30 1 ft Volunteer 30 Sweet Gum T 2 5ft Volunteer 2 OBSERVED DENSITY TOTAL PLANTED SPECIES 50 (PLANTED SPECIES 500 PER ACRE) OBSERVED DENSITY TOTAL ACCEPTABLE 0 (VOLUNTEER 0 VOLUNTEERS SPECIES PER ACRE) TOTAL SINGLE VOLUNTEER UNACCEPTABLE 32 NO >50% OF TOTAL (YIN) VOLUNTEERS PLOT NUMBER ST 5 SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals (T, SA, SH) Species Counted toward Success Criteria TOTAL INDIVIDUALS gz OBSERVED DENSITY 500 (PER ACRE) ❑PL];%ZCl m, aAm i Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Tributary - Plot Wells 1, 3, 4 - Ecotone WM 20 and 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00 am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 �aK" �a� � �a� �a� � �a� 'o � �e� �' IQ( FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.lmgroup.net -42 - — _ — — — _ N N� Nb �3 �� Nb N'3 �� �3 �� ^3 �� �� �� �3 Nb Nb �3 lac �a� �a� �e� �e� yep NV l ^' 1� r �� t� gyp' `� �e� �eQ ��c �a�' lac ��c �aV lac 1O' rL l �' < NA 10; rOA --Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2) Plot 4 (13D4A988) 12in below surface IMOnsite Raingauge I Slide A -9 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Tributary - Plot Wells 1, 3, 4 - Ecotone WM 20 and 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00 am N d s 0 .Q m a` 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 N d t 0 v c d -6 d —1 -12 d -18 -24 N -30 c C -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 L ALA �3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N� a� a� aA a� �� wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge PQc' Pq -Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2) Plot 4 (13D4A988) 12in below surface �Onsite Raingauge Slide A -10 8 7 6 5 n rt 4 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Tributary - Plot Wells 1, 3, 4 - Ecotone WM 20 and 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 d t 0 v c d -6 d —1 -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment September 2013 �3 OJ� ,J� N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge -42 1 — — — — SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ --Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2) Plot 4 (13D4A988) 12in below surface IMOnsite Raingauge I Slide A -11 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Tributary - Plot Wells 1, 3, 4 - Ecotone WM 20 and 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe �� Qe Qe �e �e N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 �3 �3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N� J J J O O O O O O O �o �o �o K N� N� ��' ti� ��' h ^p N gyp' �4j I§y d G d h ^p NV 1p I Apr --Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2) Plot 4 (13D4A988) 12in below surface IMOnsite Raingauge I Slide A -12 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Tributary - Plot Wells 2, 3, 6 - Ecotone WM 20 and 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00 am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z � �Z �e� ���' <,Z FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 - - _ - - - _ N N� Nb �3 �� Nb N'3 �� �3 �� ^3 �� �� �� �3 Nb Nb �3 lac �a� �a� �e� �e� yep NV l ^' 1� r �� t� gyp' `� �e� �eQ ��c �a�' lac ��c �aV lac 1O' rL 1 �' < NA 10; rOA --Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F) Plot 6 (14E19549) 12in below surface IMOnsite Raingauge I Slide B -5 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Tributary - Plot Wells 2, 3, 6 - Ecotone WM 20 and 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00 am N d s 0 .Q m a` 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c C -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 L ALA �3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N� a� a� aA a� �� wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 n rt 4 rt 0 3 3 2 1 - 0 -Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F) Plot 6 (14E19549) 12in below surface MOnsite Raingauge Slide B -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Tributary - Plot Wells 2, 3, 6 - Ecotone WM 20 and 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 d t 0 v c d -6 d -1 -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment September 2013 �3 OJ� ,J� N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge -42 1 - - — - SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ --Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F) Plot 6 (14E19549) 12in below surface IMOnsite Raingauge I Slide B -7 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Tributary - Plot Wells 2, 3, 6 - Ecotone WM 20 and 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe �� Qe Qe �e �e N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 �3 �3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N� J J J O O O O O O O �o �o �o K N� N� ��' ti� ��' h ^p N gyp' �4j I§y d G d h ^p NV 1p I Apr --Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F) Plot 6 (14E19549) 12in below surface IMOnsite Raingauge I Slide B -8 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 1, 5, 7 - Ecotone WM 20 and 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00 am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z � �Z �e� ���' <,Z FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 - - _ - - - _ N N� Nb �3 �� Nb N'3 �� �3 �� ^3 �� �� �� �3 Nb Nb �3 lac �a� �a� �e� �e� yep NV l ^' 1� r �� t� gyp' `� �e� �eQ ��c �a�' lac ��c �aV lac 1O' rL l �' < NA 10; rOA --Plot 1 (14E1ABD3) --Plot 5 (14E1A330) Plot 7 (14E1 6007) 12in below surface IMOnsite Raingauge I Slide C -5 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 1, 5, 7 - Ecotone WM 20 and 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00 am N d s 0 .Q m a` 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c C -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 L ALA �3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N� a� a� aA a� �� wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 n rt 4 rt 0 3 3 2 1 - 0 -Plot 1 (14E1ABD3) --Plot 5 (14E1A330) Plot 7 (14E16007) 12in below surface MOnsite Raingauge Slide C -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 1, 5, 7 - Ecotone WM 20 and 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 d t 0 v c d -6 d -1 -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment September 2013 �3 OJ� ,J� N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge -42 1 - - — - SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ --Plot 1 (14E1ABD3) --Plot 5 (14E1A330) Plot 7 (14E16007) 12in below surface IMOnsite Raingauge I Slide C -7 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 1, 5, 7 - Ecotone WM 20 and 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe �� Qe Qe �e �e N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 �3 �3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N� J J J O O O O O O O �o �o �o K N� N� ��' ti� ��' h ^p N gyp' �4j I§y d G d h ^p NV 1p I Apr --Plot 1 (14E1ABD3) --Plot 5 (14E1A330) Plot 7 (14E16007) 12in below surface IMOnsite Raingauge I Slide C -8 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 8 and pairing - Ecotone WM 20 and 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00 am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z �Z �e� ��� <,�� h m nsite Raingauge —30 day total 30% —70% MShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD El V, <3 N �� Nb �� Nb �b �5 ^3 �� Nb �� NO �3 N3 N N3 Nb ��a° °��° ^�a° °��� �e� lea �e� ��� N L L 3 �° � i° 0°' t �' �t N\' Land Management Group, Inc. +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74) www.lmgroup.net 12in below surface MOnsite Raingauge Slide D -5 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 8 and pairing - Ecotone WM 20 and 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00 am N d s 0 .Q m a` 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 L ALA �3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N� a� a� aA a� �� FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 0 4 s O 3 2 1 -42 _ — — 1 0 N �� N3 �b ^3 �b <5 N'� �b N7 a ��a� ^ ^��� ^�a� a� ^�a1 I +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74) 1 2i below surface MOnsite Raingauge Slide D -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 8 and pairing - Ecotone WM 20 and 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00 am N d s c 0 .Q d (L Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 September 2013 �3 OJ� ,J� N Nv �. ti� �. �P NoP N "O rpO ��P �oP R5 �5 NV NC5 1�5 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L (D Land Management Group, Inc. www.imgroup.net -42 +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74) 12in below surface MOnsite Raingauge I Slide D -7 8 7 6 5 0 4 s O 3 2 1 0 N") �3 N1b 0R 0Q 0Q +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74) 12in below surface MOnsite Raingauge I Slide D -7 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 8 and pairing - Ecotone WM 20 and 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe N' �^ N" jN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD Land Management Group, Inc. www.lmgroup.net -42 ^� �3 'b '3 rt' <3 Nb Nb ^b N3 Nb 'b ^3 'b 6� G G� G` G� J' Al J' J' J' O O O O �o !o 10 'o ^' �o �� N" ��' ti� �.' h NZ N 'pr rye Al 'o Apr G G Ci Ci G G Oe Oo Oo Oo e Oo t� Np NV �p �� Ip' +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74) 12in below surface MOnsite Raingauge I Slide D -8 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 10, 12, 17 - Ecotone WM 20 and 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00 am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 �aK" �a� � �a� �a� � �a� 'o � �e� �' IQ( FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 N d t 0 v c d -6 d J -12 d -18 -24 N -30 c -36 'L^ V Land Management Group, Inc. www.lmgroup.net -42 - — _ — — — _ N N� Nb �3 �� Nb N'3 �� �3 �� ^3 �� �� �� �3 Nb Nb �3 lac �a� �a� �e� �e� yep NV l ^' 1� r �� t� gyp' `� �e� �eQ ��c �a�' lac ��c �aV lac 1O' rL l �' < NA 10; rOA --Plot 10 (EBD4EB3) 4 -Plot 12 (14E1 A282) Plot 17 (14E1 62C6) 12in below surface IMOnsite Raingauge I Slide E -5 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Pairing well at plot 12 added 6 -26 -13 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 10, 12, 12 pairing, 17 - Ecotone WM 20 and 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00 am N d s 0 .Q m a` 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 N d t 0 v c -6 d d J -12 d -18 -24 N -30 c -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 L ALA �3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N� a� a� aA a� �� FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 44 6W44 8 7 e 6 5 n rt 4 0 3 3 2 A 1 - 0 -Plot 10 (EBD4EB3) 4-Plot 12 (14E1A282) 4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6) MOnsite Raingauge —12in below surface Slide E -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 10, 12,12 pairing, 17 - Ecotone WM 20 and 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00 am N d s c 0 .Q d (L 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 d t 0 v c d -6 d -1 -12 d -18 -24 c) -30 c C -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment September 2013 �3 OJ� ,J� N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge -42 1 - - — - SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ --Plot 10 (EBD4EB3) --Plot 12 (14E1A282) 4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6) MOnsite Raingauge —12in below surface Slide E -7 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem - Plot Wells 10, 12,12 pairing, 17 - Ecotone WM 20 and 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00 am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 t 0 V � -6 J -12 d -18 -24 N -30 c -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net ...■Oil -!ifl 1 '.tea ■. �:� ,iii I: N3 �� N3 <5 N3 N� N'b �3 N� �3 Nb Nb Nb Nb Nb Nb J J J J' J' J' G G G d G d O O O O O O O �o �o �o �o �o �o Oe Qe �e Qe �e Oe K NN N� ��' ti� ��' h NZ N gyp' �4j lb � h ^p NV 1p I Apr --Plot 10 (EBD4EB3) --Plot 12 (14E1A282) 4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6) MOnsite Raingauge —12in below surface Slide E -8 8 7 6 5 �i 4 C 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 1, 2 - Ecotone WM 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z � �Z �e� � h FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD -42 Well 2 malfunction, replaced 4 -11 -13 N�a° °��° ^�a° °��� ^��� 6�a° ^��� Land Management Group, Inc. 4-Well 1 (14E19F68) -1-Well 2 (14E1AD78) www.lmgroup.net 12in below surface MOnsite Raingauge Slide A -5 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 1, 2 - Ecotone WM 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00am N a� s c 0 w d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 w t 0 _ -6 a� J -12 d r -18 a� -24 -30 O -36 L cD Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 <5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5 �a� �a� N 11,x' ti� NK', N r ^, �� �� h FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 0 4 s O 3 2 1 -42 _ — — 1 0 �3 0 N13 �b N13 �b N1b N1b ^1b ^3 3 N3 N1b N1b �b ^5 N13 N1b N3 aA' aK aA' aA' a� N �rcr 0, 4 . � ,�. �6 �. ti6 3� h ,moo ,�h �o ti� 30 4-Well 1 (14E19F68) -1-Well 2 (14E1AD78) 12in below surface MOnsite Raingauge Slide A -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 1, 2 - Ecotone WM 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00am N d s c 0 .Q d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 w t 0 _ -6 a� J -12 d r -18 a� -24 -30 O -36 L c� sy, Hydrology Assessment September 2013 �3 OJ� ,J� Land Management Group, Inc. 4-Well 1 (14E19F68) -1-Well 2 (14E1AD78) www.lmgroup.net 12in below surface MOnsite Raingauge Slide A -7 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 1, 2 - Ecotone WM 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe N' �^ N" jN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD Land Management Group, Inc. www.lmgroup.net -42 N N N N �� �3 �� Nb Nb �3 �� �� Nb �5 N''5 N5 �3 6� G G� G` G� J' Al J' J' J' O O O O �o !o 10 'o ^' �o �� N" ��' ti� �.' h NZ N 'pr rye Al 'o Apr G G Ci Ci G G Oe Oo Oo Oo e Oo t� Np NV �p �� Ip' 4-Well 1 (14E19F68) 4-Well 2 (14E1AD78) 12in below surface MOnsite Raingauge I Slide A -8 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 3,4 - Ecotone WM 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z � �Z �e� � h FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD -42 N�a° °��° ^�a° °��� ^��� 6�a° ^��� Land Management Group, Inc. +Well 3 (14E19E90) +Well 4 (14E141E8) www.lmgroup.net 12in below surface MOnsite Raingauge Slide B -5 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 3,4 - Ecotone WM 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00am N a� s c 0 w d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 w t 0 _ -6 a� J -12 d r -18 a� -24 -30 O -36 L cD Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 <5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5 �a� �a� N 11,x' ti� NK', N r ^, �� �� h FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 0 4 s O 3 2 1 -42 _ — — 1 0 �3 0 aA' aK aA' aA' a� N �rcr 0, 4 . � ,�. �6 �. ti6 3� h ,moo ,�h �o ti� 30 +Well 3 (14E19E90) +Well 4 (14E141 E8) 12in below surface MOnsite Raingauge Slide B -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 3,4 - Ecotone WM 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00am N d s c 0 .Q d (L Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 September 2013 �3 OJ� ,J� FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L (D Land Management Group, Inc. www.imgroup.net -42 +Well 3 (14E19E90) +Well 4 (14E141 E8) 12in below surface MOnsite Raingauge I Slide B -7 8 7 6 5 0 4 s O 3 2 1 0 N") �3 N1b yR pQ QQ +Well 3 (14E19E90) +Well 4 (14E141 E8) 12in below surface MOnsite Raingauge I Slide B -7 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 3,4 - Ecotone WM 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe N' �^ N" jN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 w t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD Land Management Group, Inc. www.lmgroup.net -42 Well 4 malfunction, data gap 12 -4 -13 to 2 -8 -14 ^� �3 <b '3 rt' '3 Nb Nb ^b N3 Nb 'b ^3 'b 6� G G� G` G� J' Al J' J' J' O O O O �o !o 10 'o ^' �o �� N� ��' ti� �.' h NZ N 'pr I Al 'o Apr G G Ci Ci G G Oe Oo Oo Oo e Oo t� Np NV �p �� Ip' +Well 3 (14E19E90) +Well 4 (14E141 E8) 12in below surface MOnsite Raingauge I Slide B -8 8 7 6 5 n 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 5, 6, 7 - Ecotone WM 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z �Z �e� ���' <,�� h FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge 6 N d t 0 v c d -6 d J -12 d -18 d -24 N -30 c C -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net 'b rt, 'b �3 0 Nb N3 0 0 0 0 0 Nb �� �3 Nb Nb �3 aV lac �a� �a� �e'or �e'or yep N l ^' ��6 �� t� gyp' `� �e� �eQ ��c �a�' lac ��c � lac �O' �� 1 < NA 10; -,A, --Well 5 (14E19EC9) Well 6 (14E1605A) Well 7 (14E1 603E) 12in below surface IMOnsite Raingauge I Slide C -5 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 5, 6, 7 - Ecotone WM 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00am N a� s c 0 w 'o. d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 N d t 0 v c d -6 d J -12 d -18 d -24 N -30 c C -36 'L^ V 42 Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 <5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5 �a� �a� N 11,x' ti� NK', N r ^, �� �� h FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge II 6 malfunction, data gap 4 -12 to 5 -30 *Wells 6 & 7 replaced 6 -25 -13 8 7 6 5 n 4 C 3 3 2 1 - 0 N N5 N'b �� �3 �� �� �3 N't, a� a� a� a� a� a� aA NP �P N'` Nb ��P ��P N, V4 NN, ��� ��� ��� ��� h� ^off �h� �o� �h� §o� -Well 5 (14E19EC9) Well 6 (14E1605A) Well 7 (14E1603E) 12in below surface MOnsite Raingauge Slide C -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 5, 6, 7 - Ecotone WM 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00am N d s c 0 .Q d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 d t 0 v c d -6 d -1 -12 d -18 d -24 N -30 c C -36 'L^ V Land Management Group, Inc. www.imgroup.net Hydrology Assessment September 2013 �3 OJ� ,J� FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge -42 1 - - — - J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ --Well 5 (14E19EC9) Well 6 (14E1605A) Well 7 (14E1 603E) 12in below surface IMOnsite Raingauge I Slide C -7 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Wells 5, 6, 7 - Ecotone WM 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G �o �o 'o 'o !o 'o Qe �� Qe Qe �e �e N' ��' N" LN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 d t 0 v c d -6 d J -12 d -18 d -24 N -30 c C -36 'L^ V Land Management Group, Inc. www.imgroup.net -42 �3 �3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N� J J J O O O O O O O �o �o �o K N� N� ��' ti� ��' h ^p N gyp' �4j I§y h ^p NV 1p I Apr --Well 5 (14E19EC9) Well 6 (14E1605A) We11 7 (14E1603E) 12in below surface IMOnsite Raingauge I Slide C -8 8 7 6 5 n rt 4 rt 0 3 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Well 8 - Ecotone WM 40 - January 1, 2013 to March 31, 2013 - One reading per day at 7:00am N d 0 .Q m a. Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 March 2013 15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb �aK" �a� � �a� �a� � �a� �z �Z �Z ��� <,�� h FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge 6 U) t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD -42 N�a° °��° ^�a° °��� ^��� 6�a° ^��� Land Management Group, Inc. 4-Well 8 (14E16DAD) —12in below surface www.lmgroup.net IMOnsite Raingauge Slide D -5 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Well 8 - Ecotone WM 40 - April 1, 2013 to June 30, 2013 - One reading per day at 7:00am N a� s c 0 w 'o. d a 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 6 U) t 0 _ -6 a� J -12 d r -18 a� -24 -30 O -36 L cD Land Management Group, Inc. www.imgroup.net Hydrology Assessment June 2013 <5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5 �a� �a� N 11,x' ti� NK', N r ^, �� �� h FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 8 7 6 5 0 4 s O 3 2 1 -42 _ — — 1 0 �3 0 aA' aK aA' aA' a� N �rcr 0, 4 . � ,�. �6 �� ti6 3� h ,moo ,�h �o ti� 30 4-Well 8 (14E16DAD) —12in below surface MOnsite Raingauge Slide D -6 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Well 8 - Ecotone WM 40 - July 1, 2013 to September 30, 2013 - One reading per day at 7:00am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 September 2013 �3 OJ� ,J� wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 U) t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L (D Land Management Group, Inc. www.imgroup.net -42 4-Well 8 (14E16DAD) —12in below surface IMOnsite Raingauge I Slide D -7 8 7 6 5 0 4 s O 3 2 1 0 N") �3 N1b yR pQ QQ 4-Well 8 (14E16DAD) —12in below surface IMOnsite Raingauge I Slide D -7 8 7 6 5 0 4 s O 3 2 1 0 Precipitation data obtained from: Onsite Raingauge and Shallotte Ag station Coop -TP 317813 (www.nc- cl!mate.ncsu.edu) 30% & 70% precipitation data obtained from the Longwood WETS Station NC5116 1978 -2009 (wcc.nres.usda.gov) Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Phase III - Well 8 - Ecotone WM 40 - October 1, 2013 to December 31, 2013 - One reading per day at 7:00am N d s c 0 .Q d a Hydrology Assessment 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 December 2013 �o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3 Al J' J' J' Al Al G OO ONO �o �''!o 'o QN " N' ' h moo �� G Qe C i Oo G �z G Oo G N IV 'h njo' h 0' NV rO -V �0 FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge 6 U) t 0 _ -6 a� J -12 d r -18 a� -24 U) -30 O -36 L cD Land Management Group, Inc. www.imgroup.net -42 ^� �3 'b '3 rt' <3 Nb Nb ^b N3 Nb 'b ^3 'b 6� G G� G` G� J' Al J' J' J' O O O O �o �o �o �o ^' �o �� N� ��' ti� �.' h NZ N 'pr �y� Al 'o Apr G G Ci Ci G G Oe Oo Oo Oo e Oo t� Np NV �p �� Ip' 4-Well 8 (14E16DAD) —12in below surface IMOnsite Raingauge I Slide D -8 8 7 6 5 0 4 s O 3 2 1 0 Stream Hydrology Assessment January 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM -30 WERM 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 yo yo o yo yo �3 yo �3 �3 �o ^ o �o < o <5 No ^o Nb �3 N3 ^o ^b o o No No ^� N� N N N No ro rp �o o ,o o V 10 �p 4o o o ro o o rp o o o -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -1 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d t = 0 d d J L -6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM -30 WERM 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 yo yo o yo yo �3 yo �3 �3 �o ^ o �o < o <5 No ^o Nb �3 N3 ^o ^b o o No No ^� N� N N N No ro rp �o o ,o o V 10 �p 4o o o ro o o rp o o o -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -1 Stream Hydrology Assessment February 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d t = 0 d d J 6 L U -12 R 3 -18 0 A dzM -30 WETIM <5 �� �� �� �� �3 �� �� �3 �� ^� �3 �3 �� �b �� �� �3 �3 �5 �� �� ^� \rp \P \yo :\p \yo \rp \�o \�o \rp \�o \,yo \p \�o \ro \�o \�o \�o \6yo \�o :\p \�o \rp \�o ti ti ti ti ti ti ti ti ti� tiV ti�V 'p tiT ti� 'p Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -2 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Stream Hydrology Assessment March 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM 190101111111111 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 N N N No �o �3 �3 �3 �� ^� <o <o �� ^o �b �3 �3 ^� ^b ^� ^� �� �� ^� N� rp yo yo yo yo rp e\ yo rp yo �o �o �o ,o V yo 1yo �o 4o p �o �o Vo �o rp 3 �� �p �p �p 5� �� 3,5 -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -3 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d t = 0 d d J L 6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM 190101111111111 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 N N N No �o �3 �3 �3 �� ^� <o <o �� ^o �b �3 �3 ^� ^b ^� ^� �� �� ^� N� rp yo yo yo yo rp e\ yo rp yo �o �o �o ,o V yo 1yo �o 4o p �o �o Vo �o rp 3 �� �p �p �p 5� �� 3,5 -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -3 Stream Hydrology Assessment April 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - April 1, 2013 to April 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 <3 No <5 �o No �o N3 �o 10 �� �3 N11b N13 �r5 N11b 10 1� No ^� Nlb -� N1b ^5 N11b ^\rp \11yo Grp \rp \ryo \rp P p Grp �V 4�o �V ��o Arlo P � \10 P V �p ��o pro �yo 4o 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d t = 0 d d J L 6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - April 1, 2013 to April 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 <3 No <5 �o No �o N3 �o 10 �� �3 N11b N13 �r5 N11b 10 1� No ^� Nlb -� N1b ^5 N11b ^\rp \11yo Grp \rp \ryo \rp P p Grp �V 4�o �V ��o Arlo P � \10 P V �p ��o pro �yo 4o 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4 1 0 Stream Hydrology Assessment May 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 -36 ' ^\�0 3 \�0 3 ^o \�0 ^3 ^ ^ ^ ^ ti 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d t = 0 d d J L 6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 -36 ' ^\�0 3 \�0 3 ^o \�0 ^3 ^ ^ ^ ^ ti 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5 0 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5 Stream Hydrology Assessment June 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 dz= -30 -36 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 N a� t = 0 d d J L 6 U R -12 Monitoring Well Record 3 -0 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 dz= -30 -36 <3 No <3 �� N15 �o N3 �5 �� �� �3 �� .13 �r5 .11b 1� 1� N1b ^� Nlb -� N1b ^5 N11b ^\yo 6yo 4yo �yo ��o Grp 4yo ayo Grp ��o ��o �V Grp pry' ��o � \10 P V �p ;�o Grp P 4o 9 8 7 6 io 0 5 al rF 0 4 3 0 CD Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6 3 2 1 0 Stream Hydrology Assessment July 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 N N N �o �o N3 N3 N'3 No ^o �o �o <o ^o <5 ,3 Nb ^o ^� ^o ^o �o No ^� yo yo yo yo yo yo yo yo yo yo ,o �o yo yo �o �o :o \o �o �o e �o Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 1z 6 d t = 0 d d J L 6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� dzM -30 N N N �o �o N3 N3 N'3 No ^o �o �o <o ^o <5 ,3 Nb ^o ^� ^o ^o �o No ^� yo yo yo yo yo yo yo yo yo yo ,o �o yo yo �o �o :o \o �o �o e �o Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Stream Hydrology Assessment August 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - August 1, 2013 to August 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM -30 WERM 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 3 yo 3 yo 3 yo o yo yo N3 yo N3 yo N'3 No ^ o <5 <5 No ^o Nb '3 N3 ^o Nb o o �o No No ^� N1b ����o ro rp o ,o V o 10 �p Po o o o o rp o o o rp -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -8 Precipitation data obtained from: Onsite Raingauge beginning September 2011 1z 6 d t = 0 d d J L 6 U R -12 Monitoring Well Record 3 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - August 1, 2013 to August 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 c� Land Management Group, Inc. www.lmgroup.net dzM -30 WERM 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 3 yo 3 yo 3 yo o yo yo N3 yo N3 yo N'3 No ^ o <5 <5 No ^o Nb '3 N3 ^o Nb o o �o No No ^� N1b ����o ro rp o ,o V o 10 �p Po o o o o rp o o o rp -1-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -8 Stream Hydrology Assessment September 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d t = 0 d d J 6 L U -12 R 3 -18 0 A dzM -30 -36 <3 No <5 �� N� �o N3 �5 �� �� �3 �� N13 �r5 N11b 1� 1� N1b ^� Nlb -� N1b ^5 N11b e �yo �yo :\p ��o \rp ��yo �,yo Grp ��p 4�o �V ��o pry' P � \10 P V �p ��o pro �yo 4o Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -9 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Stream Hydrology Assessment October 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 dzM -30 -36 o ^o ^ ^ ^ 9 8 7 6 io 0 5 al rF 0 4 3 0 CD 3 2 1 Precipitation data obtained 0 from: Onsite Raingauge beginning September 2011 12 6 N a� t = 0 d d J L 6 U R -12 Monitoring Well Record 3 -0 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am C 0 dzM -30 -36 o ^o ^ ^ ^ 9 8 7 6 io 0 5 al rF 0 4 3 0 CD 3 2 1 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 0 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 Stream Hydrology Assessment November 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - November 1, 2013 to November, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d t = 0 d d J 6 L U -12 R 3 -18 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 ^^\ �N\ �`�� ���b ���6 N\ \0 NN\�0 ^ \'� N�'� ^ \�� ^ \'6 ^��1 ^��� ^ � \L� `DLO � \L� `\L� ^ \l`� ^\�1 ^�l� ^\�0 1 N 4-Mainstem 1 (14E162B8) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Slide MS -11 Stream Hydrology Assessment December 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d t = 0 d d J 6 L U -12 R 3 -18 0 A dzM -30 -36 '3 'o '3 �3 �o yo Po yo �o yo �o �o ro rp rp O rp rp yo �o yo yo yo yo yo yo �o �o yo �o o\ 45 o\ 4\ 45 4 \' �` �\ �\ ��y \^^\,��y \^0\,�0 \^�\,�0 \^�\"'0 ' \,�ti \ ^� \" ' �ti \ ^� \" \0" 'q \0�y\'ry\0g \,pry \0"p \'rti \'p �y0� \'ry\0� \"10�\ 9 8 7 6 (DD 0 5 rF O 4 3 0 S <D N 3 2 1 0 Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am a� L) 0 d J -6 L d U -12 L D2 -18 0 L V -24 Land Management Group, Inc. www.lmgroup.net -30 -36 January 2013 �b ^b N3 �� <5 �b <5 <b �b <b ,� <5 �� �b �� �� �� �� �� �� <5 <5 <� <b <5 �o N\ \o\ N\ N\ N\ ' \o ', \,may \,'o\ ' ^° '^ \, \,' \� \� ^� \�� \�o� \T°� \Toy \��� \T�,� \T \,�`� +Mainstem 2 (14E160BC) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -1 9 8 6 CD 0 5 fl1 rh 0 4 0 S 3 2 1 0 �b ^b N3 �� <5 �b <5 <b �b <b ,� <5 �� �b �� �� �� �� �� �� <5 <5 <� <b <5 �o N\ \o\ N\ N\ N\ ' \o ', \,may \,'o\ ' ^° '^ \, \,' \� \� ^� \�� \�o� \T°� \Toy \��� \T�,� \T \,�`� +Mainstem 2 (14E160BC) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide MS -1 Stream Hydrology Assessment February 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am d t 0 d J -6 L d U -12 L D2 -18 0 L V -24 -30 -36 �5 �5 1�5 �3 �3 �5 �b �5 N5 ^b �5 �5 �5 �5 �5 �b �b ^3 �5 <5 <5 rp �o yo e e v 1, ti ti ti 1 ti 11� ti ti� 4V 16V 1P ti� 161 ti� Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -2 9 8 7 6 CD 0 5 fl1 rh 0 4 0 S 3 2 1 0 Stream Hydrology Assessment March 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d s c 0 m d J -6 L d fC v -12 ca Monitoring Well Record 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am c 0 c� -24 -30 -36 3 �3 �o � o �3 �3 o � 3 3 ^o �� ^o � �o o 3 �3 o � No .o o � .15 N No f, o V V V rp o P ro 5o o o o ro 0 0o �o V p P ro o Po rp Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -3 9 8 7 6 n 5 fl1 rt O 4 3 n cD N 3 2 1 0 Stream Hydrology Assessment April 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - April 1, 2013 to April 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 L d fC v -12 ca _ -18 0 -24 -30 -36 o N N \yo 0 o o o \yo No o 3 o N3 No 3 o o 3 o No 0 No 0 No ^ \ry' �\V \o \rp 4o \If, \V \o o \ro \rp 4o \o \10 \!o V \V \o \rp \P \�o 9 8 7 6 n 5 fl1 rt O 4 3 n cD N Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4 3 2 1 0 Stream Hydrology Assessment May 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 d s c 0 m d J -6 L d fC v -12 ca Monitoring Well Record -18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am c 0 c� -24 -30 -36 �3 N13 No <o N3 N3 �o -3 �3 ^o N11b ^o �� N10 �o N3 N3 �o �� �o No N10 �o �r5 N115 f, �o V V V rp �o �o Ifo �o �o �o �o ro 4yo �o �o �o V p P ro 4o Po rp _'\ <,\ h\ �� h\ �� h��� h�� h��� ���� ^ ^� 4'� 4'�� ���� ���� 4�' 4'�� ^�� � �� �� ��� � �� \�� � \p� ��� ';\5 �� 9 8 7 6 n 5 fl1 rt O 4 3 n cD N Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5 3 2 1 0 Stream Hydrology Assessment June 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am a� L) 0 d J -6 L d U -12 L D2 -18 0 L V -24 -30 -36 o rp �o �o yo o � o `o A\� \ro a :O o � 4V 4P �o AGrp e ^ti ^�^�� 000 o�4o o� �e s. � � 9 8 6 CD 0 5 fl1 rh 0 4 0 S 3 2 1 0 Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6 Stream Hydrology Assessment July 2013 IRM Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am M a� L) 0 d J -6 L d U -12 L D2 -18 0 L A -24 -30 -36 If, o � o o 'V o o rp o ,o o o rp 10 o V o ,yo ,-yo Po e\ r� 9 8 Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7 6 CD 0 5 fl1 rh 0 4 0 S 3 2 1 0 Stream Hydrology Assessment August 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - August 1, 2013 to August 31, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am a� L) 0 d J -6 L d U -12 L D2 -18 0 L V -24 -30 -36 ro f � 00 00 00 00 00 rp yo ,yo ,yo 00 ,po fyo e\ 0o yo e\ e\ ,yo yo e\ e\ r� Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -8 9 8 6 CD 0 5 fl1 rh 0 4 0 S 3 2 1 0 Stream Hydrology Assessment September 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s 0 N d J 6 L d R v -12 to _ -18 0 -24 -30 -36 N No 0 �o �� �o No �o �3 ^o N3 No �3 �o �o �3 �o No 0 Nb 0 No V 1P P ^\rp X00 X00 �� Xrp �yo X00 \1yo X00 �yo ��o X00 Grp X00 X00 0yo X00 X00 X00 Grp 4P Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -9 9 8 7 6 CD n 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment October 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 L d fC v -12 ca _ -18 0 -24 -30 -36 ' �3 N10 �3 No N3 �o <o <5 N10 �o �o N3 ^o� 11 o e 6 ^off o o ^o�,�I ,,ti ^o�,�o 9 8 7 6 n 5 fl1 rt O 4 3 n cD N 3 2 1 0 Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 Or ) 11 ,pop 11P IISP 'QP 'QP 141 111\`� 141 144 144 9 8 7 6 n 5 fl1 rt O 4 3 n cD N 3 2 1 0 Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 Stream Hydrology Assessment November 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - November 1, 2013 to November, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am 6 d s 0 N d J 6 L d R v -12 ca _ -18 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 ^�rp �yo ��o :\p apo Arlo ��o ��o \I�o ��p ��o �yo �yo Grp V ��yo ��o �yo ��o �p �yo pro 4yo ap +Mainstem 2 (14E160BC) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 CD n 5 fl1 rt O 4 3 n <D N 3 2 1 0 Slide MS -11 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 6 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am d t 0 d J -6 L d U -12 L D2 -18 0 L V -24 -30 lNT] December 2013 00 00 00 ,yo 00 00 p p p p 00 00 �o 'p o p p 00 p �o �o �o ,P Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12 9 8 7 6 CD n 5 fl1 rh 0 4 0 S 3 2 1 0 00 00 00 ,yo 00 00 p p p p 00 00 �o 'p o p p 00 p �o �o �o ,P Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12 Stream Hydrology Assessment January 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s U 0 N d J 6 L d R v -12 to _ -18 0 -24 -30 -36 — — �o �o �o yo yo yo �o yo yo 115P ro ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -1 9 8 7 6 CD n 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment February 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am d s c m d J d fC d v Cn c 0 6 M M -12 -18 -24 -30 -36 N3 N3 N115 N 3 N10 �o o �o No yo N3 N10 N10 o yo o �o N3 �o N13 �o N3 �o No o No 11\rP pro o 4o Grp Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -2 9 8 7 6 n 5 fl1 _rt O 4 3 n cD N 3 2 1 0 Stream Hydrology Assessment March 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s U 0 N d J 6 L d R v -12 to _ -18 0 -24 -30 -36 3 �3 �o �o �3 �3 o �3 3 o � ^o � �o o �3 �3 o � �o �o o � N15 N o Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -3 9 8 7 6 CD n 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment April 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - April 1, 2013 to April 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 L d fC v -12 ca _ -18 0 -24 -30 -36 o N N \yo 0 o o o \yo No o 3 o N3 No 3 o o 3 o No 0 No 0 No ^ \ry' �\V \o \rp 4o \If, \V \o o \ro \rp 4o \o \10 \!o V \V \o \rp \P \�o 9 8 7 6 n 5 fl1 rt O 4 3 n cD N Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4 3 2 1 0 Stream Hydrology Assessment May 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m J -6 L d fC v -12 to _ -18 0 -24 -30 -36 �3 N13 No <o N3 N3 �o -3 �3 ^o �r5 ^o �� N10 �o N3 N3 �o �� No No N10 �o �r5 N115 �o �yo �yo �yo �o �o �o �yo �o 9 8 7 6 c�D 0 5 rt C 4 3 0 cD N Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -5 3 2 1 0 Stream Hydrology Assessment June 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 d fC v -12 ca _ -18 0 -24 -30 -36 N No N �o �� �o No �o �3 ^o N3 No �3 �o �o �3 �o No 0 Nb 0 No 01 P ^\rp ��o �yo �V ��o Grp �yo \1yo �� 4Po ��o Grp ��o ��yo fro ��o �p ;�o Grp 9 8 7 6 5 rt O 4 3 n <D N Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6 3 2 1 0 Stream Hydrology Assessment July 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s U 0 N d J 6 L d R v -12 to _ -18 0 -24 -30 -36 0 0 �o �o �o yo yo yo �o yo yo 115P ro Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -7 9 8 7 6 CD n 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment August 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - August 1, 2013 to August 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m J -6 L d fC v -12 to _ -18 0 -24 -30 -36 �3 N13 No <o N3 N3 �o -3 �3 ^o �r5 ^o �� N10 �o N3 N3 �o �� �o No N10 �o �r5 N11b �o �o �o �yo �yo �yo �o �yo �yo �o �o �o �o �o �o �o Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -8 9 8 7 6 c�D 0 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment September 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m J -6 L d fC v -12 to _ -18 0 -24 -30 -36 N No 0 �o �� �o No �o �3 ^o N3 No �3 �o �o �3 �o No 0 Nb 0 No V 1P P P ^\rp ��o �Vo �� Grp �yo \1yo �� �yo ��o ��o Grp ��o \�o 0yo ��o �p ��o Grp Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -9 9 8 7 6 c�D 0 5 rt C 4 3 0 cD N 3 2 1 0 Stream Hydrology Assessment October 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 L d fC v -12 ca _ -18 0 -24 -30 -36 ' �3 N10 �3 No N3 �o <o <5 N10 �o �o N3 ^o� 11 o e 6 ^off o o ^o�,�I ,,ti ^o�,�o 9 8 7 6 n 5 fl1 rt O 4 3 n cD N 3 2 1 0 Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 Or ) 11 ,pop 11P IISP 'QP 'QP 141 111\`� 141 144 144 9 8 7 6 n 5 fl1 rt O 4 3 n cD N 3 2 1 0 Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - November 1, 2013 to November, 2013 - Readings four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 am d s C N d J d R d v Cn c 0 Land Management Group, Inc. www.lmgroup.net 6 [S7 M -12 -18 -24 -30 November 2013 9 8 7 6 CD n 5 0) rt — 4 + <D v 3 2 1 -36 ^�rp �yo ��o :\p apo Arlo ��o ��o \I�o ��p ��o �yo �yo Grp V ��yo ��o �yo ��o �p �yo pro 4yo ap +Mainstem 3 (14E188B1) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 0 Slide MS -11 Stream Hydrology Assessment December 2013 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Mainstem Stream - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Readings four times per day at 1:00 am, 7:00 am X1:00 pm, 7:00 am 6 d s c 0 m d J -6 L d fC v -12 ca _ -18 0 -24 -30 -36 N11b .11 �� .11 ^ \�0N3 \�0�3 \�0�3 \�0 ^3 \�0N30 \�0 ^3 \�0 ^3 \�0N3 \�0 3 ro N3 N11b .11 �� .11 �r5 <5 �� .1b .1 �� �r �r" .115 �o yo yo 1yo �yo yo 10 �o �o yo �o rp yo rp 4yo 9 8 7 6 n 5 fl1 rt O 4 3 n Q N 3 2 1 0 Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am X1:00 pm, 7:00 pm t 6 v C d d J 0 L M d v -6 td c 0 -12 Land Management Group, Inc. www.lmgroup.net i� January 2013 -24 — 7 N N N N N N N N N -� N'b N� N� NO) N3 ^3 ^'b N3 N N N N N N N,b �o 'o �o yo yo yo rp yo �o �o yo rp �o yo rp yo rp 110 6 5 n 4 -p rt rt O 3 3 0 cD N 2 1 -24 — — N N N N N N N N N -� N'b N� N� NO) N3 ^3 ^'b N3 N N N N N N N,b �o 'o �o yo yo yo rp yo �o �o yo rp �o yo rp yo rp 110 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -1 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm y d 6 t v _ d d J 0 L fC m v -6 m U) p -12 0 Land Management Group, Inc. www.lmgroup.net -18 February 2013 -24 7 6 5 'yp ��ti� TO (DD n 4 -p rt rt O 7 O 3 n cD N -24 'yp ��ti� TO 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -2 0 Stream Hydrology Assessment March 2013 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O -12 c� Land Management Group, Inc. www.lmgroup.net 24 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -3 7 6 5 CD n O 7 3 O n 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 N m 6 t v C N O J 0 L R d v -6 O L CO Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O -12 c� Land Management Group, Inc. www.lmgroup.net 24 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -3 7 6 5 CD n O 7 3 O n 2 1 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record �- Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm ql d 6 t v _ m m J 0 L a+ f6 U -6 ca L p -12 c� Land Management Group, Inc. www.lmgroup.net -18 April 2013 7 6 5 3 O n W -24 N N� �3 �� �3 �� �� �� N11b e do �o yo �o ,yo ro ,yo (DD o\ 46 N ^o� ^o� �� �� t.\ �\ti N\ t-N 4 NK ago\ \ n 4 rt rt O 7 3 O n W -24 N N� �3 �� �3 �� �� �� N11b e do �o yo �o ,yo ro ,yo �o rlo ryo rp yo rp ,p yo yo �o yo Io 4yo P o\ 46 N ^o� ^o� �� �� t.\ �\ti N\ t-N 4 NK ago\ \ '�' \ \� \o� \ \o� \�� \�� \o� '�� \" '� \' \ \ 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -4 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record �- Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 -May 1, 2013 to May 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm t 6 v C d d J 0 L M v -6 c 0 -12 Land Management Group, Inc. www.lmgroup.net i� May 2013 7 6 5 -24 ' N N N N N N N N N -� N'bN� N� NO)N3 ^3 ^'bN3 N N N N N N N,b 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -5 0 4 M rt pl rh O 3 3 no C's fD N ►; 1 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record �- Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm ql d 6 t v _ m m J 0 L a+ f6 m U -6 ca L p -12 c� Land Management Group, Inc. www.lmgroup.net -18 -24 7 o O N^0 0 ^O ^1b ti e � \11O 0 O o6OOo60O\ ^\� \HO O ^o OHO OHO O ^o Oho O ^o OHO O ^o O ^O OHO \ ^o�ti \���0 \�O�ti �'��0 �'��ti \ ^O�ti \ \ \ O�0 \ 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation June 2013 Slide NS -6 7 6 5 (DD n 4 rt rt O 7 O 3 n 2 1 0 Slide NS -6 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 -July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm t 6 v C d d J 0 L M G1 v -6 c p -12 L Land Management Group, Inc. www.lmgroup.net i� -24 July 2013 7 6 5 N N N N N N N N N <� Nb N'�' No) Nb N3 ^3 ^b N3 N3 Nb N11b N1b N13 NO) N1b ro �o yo �o yo �o yo �o rp �o �o �o A\ A\ A \ti A\ AN A \p\ \cam\ \�\ ���\ ��g\ A \''�\ Al ' A \fig\ A \� A'^ A\^ A\^ A''<� A\`l,'�� A\`l A\`l A\lp� �\lc�� �\1�� �\lg� �\l°�� �\g�� 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -7 n 4 -p rt rt O 3 3 no C's (D (0 ►; 1 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm t 6 v C d d J 0 L M d v -6 td c p -12 L Land Management Group, Inc. www.lmgroup.net i� August 2013 -24 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -8 0 7 6 5 n 4 -p rt rt O 3 3 0 cD N 2 1 -24 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -8 0 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -8 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm ql d 6 t v C m m J 0 L a+ f6 v -6 O c p -12 L O Land Management Group, Inc. www.lmgroup.net -18 September 2013 7 6 5 -24 ' N N� �3 �� �3 �� �� �� N11b e do �o yo �o yo �o yo �o rlo �yo yo yo �o yo �o yo yo yo �o yo �o yo yo 4 o\ ti e�`�\ "'N ono\ a��\ "'P ago\ \ N \�� \ ^o� \��� \�o� \�1� \�' \ \ \� p \ J \�� \�� p o e o 0 0 o e o o�' o� o� o`l' oti o� o� o� (DD n 4 rt rt O 7 O 3 n fD N 2 1 -24 ' N N� �3 �� �3 �� �� �� N11b e do �o yo �o yo �o yo �o rlo �yo yo yo �o yo �o yo yo yo �o yo �o yo yo 4 o\ ti e�`�\ "'N ono\ a��\ "'P ago\ \ N \�� \ ^o� \��� \�o� \�1� \�' \ \ \� p \ J \�� \�� p o e o 0 0 o e o o�' o� o� o`l' oti o� o� o� 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -9 0 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm t 6 v C d d J 0 L M d v -6 td c 0 -12 Land Management Group, Inc. www.lmgroup.net i� October 2013 -24 ' 7 6 N N N N N N N N N 1� Nb N3 <� NO) N3 �3 N� <3 Nb Nb Nb ^O) N3 �3 ^1b yo 11 �o �o yo r �o �o ro �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o �o .o� ^\ �o�� .ono\ .o��\ �0�6\ o\ "Z\; "Z \o ^o�`' ^\ ^o���\,�o� 'S\'\�k\ o�\ �\ ^o��o,\ ^\ 'o��� ^o\�o\ ^o���\ ^o�tio\ 5 n 4 -p rt rt O 3 3 0 (D N 2 1 -24 ' N N N N N N N N N 1� Nb N3 <� NO) N3 �3 N� <3 Nb Nb Nb ^O) N3 �3 ^1b yo 11 �o �o yo r �o �o ro �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o �o .o� ^\ �o�� .ono\ .o��\ �0�6\ o\ "Z\; "Z \o ^o�`' ^\ ^o���\,�o� 'S\'\�k\ o�\ �\ ^o��o,\ ^\ 'o��� ^o\�o\ ^o���\ ^o�tio\ 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 0 Slide NS -10 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm y d 6 t v _ d d J 0 L d fC d v -6 U) p -12 L 0 Land Management Group, Inc. www.lmgroup.net -24 November 2013 7 6 5 (DD n eo �o �o �o �o ro yo �o �o �o yo yo yo rp �o �o 10 yo 4o eo eo yo yo yo �. \ ^\ �. \� �. \o\ �. \°\ �. \`O\ �. \�\ �. \�'\ \°'\ ��\ `��\ �o\ �°\ �`O\ ��\ �`�\ ��'\ tip\ ti`s tio\ ti°\ ti`s\ tip\ ti`s\ tip'\ , ^ ^ ^ ^ NN ^ ^\ ^ ^\ '^ ^^\ ^ ^\ ^^\ ^N\ ^^\ ^1 ^ ^\ ^^\ ^\ � ^ ^\ ^\ ^\ 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -11 4 -p rt rt O 7 O 3 n fD N 2 1 0 eo �o �o �o �o ro yo �o �o �o yo yo yo rp �o �o 10 yo 4o eo eo yo yo yo �. \ ^\ �. \� �. \o\ �. \°\ �. \`O\ �. \�\ �. \�'\ \°'\ ��\ `��\ �o\ �°\ �`O\ ��\ �`�\ ��'\ tip\ ti`s tio\ ti°\ ti`s\ tip\ ti`s\ tip'\ , ^ ^ ^ ^ NN ^ ^\ ^ ^\ '^ ^^\ ^ ^\ ^^\ ^N\ ^^\ ^1 ^ ^\ ^^\ ^\ � ^ ^\ ^\ ^\ 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -11 Stream Hydrology Assessment 18 Precipitation data obtained from: Onsite Raingauge beginning September 2011 12 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm ql d 6 t v C m m J 0 L a+ f6 v -6 O c p -12 L O Land Management Group, Inc. www.lmgroup.net -18 -24 December 2013 7 6 5 (DD n yo �� yo ON \ \ro ro rp r k 10 o �\ rp op ^\ ro o \ o oo \\ rp '\�p oo o oP "\ rp o o o'\ p 'P r '0 �� � ^ti\^ti��^ti ti ^ti\^ti��^ ; ^ti\^ti ti^ ���ti\^ti\^�;�^ti��ti 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -12 4 rt rt O 7 O 3 n /%+41. cD N 2 1 0 yo �� yo ON \ \ro ro rp r k 10 o �\ rp op ^\ ro o \ o oo \\ rp '\�p oo o oP "\ rp o o o'\ p 'P r '0 �� � ^ti\^ti��^ti ti ^ti\^ti��^ ; ^ti\^ti ti^ ���ti\^ti\^�;�^ti��ti 4- North Stream 1 (A278C2A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -12 Stream Hydrology Assessment January 2013 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net Blom -36 — — Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 N t v 0 N d J L -6 d R v -12 ca 3 N Monitoring Well Record -18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net Blom -36 — — N N N No No N N No N No No No No No No N) N <o No <o No No No No O �� 4P 4 o � o 1 � 3 � o \ e o '1 ti ti ti ti ti ti ti � 1\ 1 1\ NN ^�N\ �' N�' 1�' N'� 1'� 1�' N�1'^ 1\ N\ N\ N\ N\ N\ N\ N\ 1\ +North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -1 9 8 7 6 0 5 v rt 0 7 4 3 0 CD N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L. 0 Land Management Group, Inc. www.imgroup.net -24 -30 February 2013 -36 N N ^� ^� ^1b ^3 N13 N115 N15 NO) ^O) N11b ^3 ^O) N� N15 ^O) ^1b N3 N3 N� ^� N1b 0 ^BOO BOO �yo �yo BOO �ro BOO �Oo �Oo �Oo �yo �Oo ��o �Oo �Oo �Oo BOO ��o ��o �Oo Grp �Oo N � ti 00 do �° ��o �� do do ti^ ti, r^o r $^ ti, ti ti, ti�� ��ti �V3 �0° �10 q �-0 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -2 9 8 7 6 n 5 R rt O 7 4 n <D N 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 ME 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L 0 Land Management Group, Inc. www.imgroup.net -24 -30 -36 March 2013 �yo �yo �yo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo Oo Oo Oo Oo Oo Oo Oo �yo Oo 314 �\ cD\ \ g\ o�\ ^^\ ^ry\ ^�\ ^�\ ^`O\ ^ "\ ^g\ � ^o�\ ^\ 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -3 9 8 7 6 n 5 R rt O 7 4 n <D N v 3 2 1 0 �yo �yo �yo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo Oo Oo Oo Oo Oo Oo Oo �yo Oo 314 �\ cD\ \ g\ o�\ ^^\ ^ry\ ^�\ ^�\ ^`O\ ^ "\ ^g\ � ^o�\ ^\ 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -3 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment 18 12 6 0 -6 -12 -18 -24 -30 April 2013 -36 Precipitation data obtained from: Onsite Raingauge beginning September 2011 N d t v C m m J L d f� d v O O Cn Monitoring Well Record 3 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment 18 12 6 0 -6 -12 -18 -24 -30 April 2013 -36 ro rp � 10 ti rp o o o y �o o o �o o o �o o o �o o o e o \ �G ^\ o o � o o o o o \�o 3 o � �\t�N t tN�' \^ \ ^^ 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -4 9 8 7 6 n 5 R rt O 7 4 n <D N 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 -May 1, 2013 to May 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 ME 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L 0 Land Management Group, Inc. www.imgroup.net -24 -30 -36 May 2013 9 8 7 6 n 5 R rt O 7 4 n <D N v 3 2 1 0 �yo �yo Oo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo �yo Oo Oo Oo Oo Oo Oo �yo Oo 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -5 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 0 N a� t v � 0 Z J L -6 .r R U -12 L U) 'a -18 0 c� Land Management Group, Inc. www.lmgroup.net -24 -30 -36 o\ 4 o\o o\� o \o 4 o \Io \Io \�o \ro \�o \�o \�o \�o \�o \�o \�o \�o \�o \�o \� 0 R\"' o \�ti � \moo o \,'a q \, R \, 4, � \moo '.o \'ti o \"C o \�a 4- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation June 2013 Slide NS -6 9 8 7 6 CD 0 - 5 ., 0 7 4 3 0 CD N 3 2 1 0 Slide NS -6 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 -July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L 0 Land Management Group, Inc. www.imgroup.net -24 -30 -36 July 2013 9 8 7 6 n 5 R rt O 7 4 n <D N v 3 2 1 0 yo yo yo Oo Oo yo ,yo yo yo yo Oo ,yo Oo Oo Oo yo Oo Oo Oo Oo Oo Oo Oo yo Oo A0 A\' � A\'o A0 "\'Vo� 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -7 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L 0 Land Management Group, Inc. www.imgroup.net -24 -30 -36 August 2013 yo yo Oo \ Oo � y o \ yo \ yo ^ � y o y o Oo yo Oo Oo yo Oo � O o � O o � O o Oo yo 4o ti "\,P o �� 'p (b\ (b � � \ \ \ \ ' \ \^ \ \ \ \ \ Oo \ o� \ o� \ ^� 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -8 9 8 7 6 n 5 R rt O 7 4 n <D N v 3 2 1 0 yo yo Oo \ Oo � y o \ yo \ yo ^ � y o y o Oo yo Oo Oo yo Oo � O o � O o � O o Oo yo 4o ti "\,P o �� 'p (b\ (b � � \ \ \ \ ' \ \^ \ \ \ \ \ Oo \ o� \ o� \ ^� 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -8 Stream Hydrology Assessment September 2013 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net Blom -36 ' Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 N t v 0 N d J L -6 d R v -12 ca 3 N Monitoring Well Record -18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net Blom -36 ' N No N3 �o do �o yo �o �o rp �o ro rp �o ryo 0yo rp yo �o �p p yo �o p rp 4yo P o\�� o \ ti ego\ "'N ago\ 4 o\'6 ono\ \'N \ ^oe \"' \�o� \ \' �� \ \ �� \� p \ �� J p \�� \o� 0 ','r, 0 o a o e o off' o� off' o�' o� o�' o� ar' +North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -9 9 8 7 0 5 v rt 0 7 4 3 0 CD N 3 2 1 0 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment October 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 9 Precipitation data obtained — from: Onsite Raingauge beginning September 2011 ro fo Po yo 3�^ k�^ 0� �o yo �o �o ^� N 1 �� °�� t v o�^ ��^ 0�^ o�^ o�^ C ^o�ti� ^ o�ti��^ o�ti�� ^o��yo� ^o�y10 ^o�� N d J L d 0 R d v ca 5 3 co Monitoring Well Record fl1 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment October 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 9 — 8 ^3 ^o ^3 ^� ^o ^� ^o ^t yo �o �o yo �o ro fyo \yo ^� ro fo Po yo 3�^ k�^ 0� �o yo �o �o ^� �p p P �o P 1 �� °�� ^o� ^o�� ^0�3� ^o��� ^o�o� ^o�\ ^o��� ^ o�° ��^ o�^^^ o�^ ��^ 0�^ o�^ o�^ ^0� ^1� ^0� ^�� ^o� ^°�� ^o�ti� ^ o�ti��^ o�ti�� ^o��yo� ^o�y10 ^o�� +North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -10 9 — 8 7 6 .O 0 5 fl1 rt O 7 4 3 0 CD N �. — 3 2 1 0 ^ Slide NS -10 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 ME 6 N d t v _= 0 m m L -6 m f� v -12 O -18 c 0 L 0 Land Management Group, Inc. www.imgroup.net -24 -30 -36 November 2013 Oo �o yo Oo yo rp yo Oo Oo yo Oo Oo �o Oo Oo �o Oo �o Oo do yo rp Oo yo N\ti N\�\ N\ �\ ���\ N��\ ' ^tip ' ^�\ ^6\ ^�\ "�\ ' ti ^\ ti� ti�� ti�� tip\ tip\ tip\ tip\ 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -11 9 8 7 6 n 5 R rt O 7 4 n <D N v 3 2 1 0 Oo �o yo Oo yo rp yo Oo Oo yo Oo Oo �o Oo Oo �o Oo �o Oo do yo rp Oo yo N\ti N\�\ N\ �\ ���\ N��\ ' ^tip ' ^�\ ^6\ ^�\ "�\ ' ti ^\ ti� ti�� ti�� tip\ tip\ tip\ tip\ 4�- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -11 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Northern Stream Tributary - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment N a� t v � 0 Z J L -6 .r R U -12 L U) 'a -18 0 L 0 Land Management Group, Inc. www.lmgroup.net -24 -30 W December 2013 00 �0 00 00 �o �o �o �o �o �o yo �p �o �o �o ��� �ti �o� ��� \ o� �� o� �o� ��� �ti ^o� ��� ^o� ��� ��� ^o� �� � o� �� o� �� �� o� N N N\ L 4- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -12 9 8 7 6 CD 0 5 ., 0 7 4 3 0 CD N 3 2 1 0 00 �0 00 00 �o �o �o �o �o �o yo �p �o �o �o ��� �ti �o� ��� \ o� �� o� �o� ��� �ti ^o� ��� ^o� ��� ��� ^o� �� � o� �� o� �� �� o� N N N\ L 4- North Stream 2 (A3BFE3A) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide NS -12 Stream Hydrology Assessment January 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.lmgroup.net -30 WARM N N N N N N N <5 ^3 Nb N� Nb ^b N3 N3 ^b ^b N� N3 N3 N1b N1b N3 N� NO) �o �o �o yo �o �o yo �o yo �o yo yo yo yo �o �o �o yo yo yo �o yo �o yo �o �\�� ��� �\o� '\�\ '�o\ '\\ '��\ '�o\ ^�� \�� \��\ \��\ ��o\ \��\ \��\ ��o\ �ti ^\ �titi \�o\ \ti�\ \tio\ \ti1 \ \ti�\ \�o\ \o^\ 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -1 9 8 7 6 cue 0 5 R 0 4 0 <D 3 2 1 0 Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 a� t v 0 N d J L -6 d r cC v -12 t3 Monitoring Well Record 'D 3 -18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.lmgroup.net -30 WARM N N N N N N N <5 ^3 Nb N� Nb ^b N3 N3 ^b ^b N� N3 N3 N1b N1b N3 N� NO) �o �o �o yo �o �o yo �o yo �o yo yo yo yo �o �o �o yo yo yo �o yo �o yo �o �\�� ��� �\o� '\�\ '�o\ '\\ '��\ '�o\ ^�� \�� \��\ \��\ ��o\ \��\ \��\ ��o\ �ti ^\ �titi \�o\ \ti�\ \tio\ \ti1 \ \ti�\ \�o\ \o^\ 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -1 9 8 7 6 cue 0 5 R 0 4 0 <D 3 2 1 0 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment February 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ' — ti ti� do IN do ti� r 4 41 1 �' �' 1 '^ �^ 1 4P 1\1P 4\1 �l ��3 1 �rl X47 �6l 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -2 9 8 7 6 cue n 5 O 4 n <D 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 a� t v C N d J L r d v t3 O Monitoring Well Record 3 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment February 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ' — ti ti� do IN do ti� r 4 41 1 �' �' 1 '^ �^ 1 4P 1\1P 4\1 �l ��3 1 �rl X47 �6l 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -2 9 8 7 6 cue n 5 O 4 n <D 3 v 2 1 0 Stream Hydrology Assessment March 2013 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net -30 -36 Precipitation data obtained ^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^� �yo �yo 0 0 0 0 3 0 0 3 01, or' or� or' '1\T 4_" ',\'V 30 from: Onsite Raingauge 12 beginning September 2011 6 N d t V 0 m m J � -6 d ca v -12 ca 7 CO Monitoring Well Record 'a -18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.imgroup.net -30 -36 ^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^� �yo �yo 0 0 0 0 3 0 0 3 01, or' or� or' '1\T 4_" ',\'V 30 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 M CD 0 5 PF v 0 4 C'> S M N 3 W Slide SS -3 1 0 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment April 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 Precipitation data obtained 1�b <5 �� N� �� N� �� ^3 NO) ^3 �3 ^3 ^r �� Nl3 NO) ^3 �3 ^1 �3 ^3 �3 NO) �yo �yo ��o �yo ��o \rp ��o ��o 3 \ o \rl � o from: Onsite Raingauge beginning September 2011 a� t v C N d J L r d v t3 O Monitoring Well Record 3 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment April 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 1�b <5 �� N� �� N� �� ^3 NO) ^3 �3 ^3 ^r �� Nl3 NO) ^3 �3 ^1 �3 ^3 �3 NO) �yo �yo ��o �yo ��o \rp ��o ��o 3 \ o \rl � o 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -4 9 8 7 6 cue n 5 O 4 n <D 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record �- Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 (A d t V = 0 Z d J 6 L d a+ f0 v -12 O -18 3 O Land Management Group, Inc. www.lmgroup.net -24 -30 -36 ONE O`�� O`�O ON O ^O O ^O �\^�ti h��� May 2013 �3 ^3 <5 NO) -� �5 �3 1� N3 ^15 <5 <5 -� ^O) NO �3 Nrb ^5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 \ ^�ti \ ^o�ti \ ^��ti \ ^o�ti \ ^��ti \ ^��ti \ ^o�ti \1 \��ti \�o�ti \���ti \�6�ti \���ti \���ti \�o�ti \o h�<< 4 e e h 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -5 9 8 6 CD 0 5 R rt O 7 4 0 M 3 v 2 1 0 Stream Hydrology Assessment June 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.lmgroup.net -30 -36 N10 �o No �o N10 ^o No No N13 �o N115 No No �o ^o �o �o N13 No Nr5 pro Grp ��yo �,yo Grp 5�o P ��o Grp \If f ��o \10 P f ��yo ;�o pro �Io P o� o�ti o�3 0N0 '00 0& o;\ ono ��^ � ^ti ��� ��° � ^o ' ' �< � � \v \ro \T bp \� �w \o 0 0 0 0 0 0 0 0 0� o� o� o� o� o� o� or� 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -6 9 8 7 6 n 5 rt O 3 4 3 0 CD 3 2 1 0 Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 N d t v 0 O J L, -6 d co tOi -12 m 3 CO Monitoring Well Record -0 -18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.lmgroup.net -30 -36 N10 �o No �o N10 ^o No No N13 �o N115 No No �o ^o �o �o N13 No Nr5 pro Grp ��yo �,yo Grp 5�o P ��o Grp \If f ��o \10 P f ��yo ;�o pro �Io P o� o�ti o�3 0N0 '00 0& o;\ ono ��^ � ^ti ��� ��° � ^o ' ' �< � � \v \ro \T bp \� �w \o 0 0 0 0 0 0 0 0 0� o� o� o� o� o� o� or� 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -6 9 8 7 6 n 5 rt O 3 4 3 0 CD 3 2 1 0 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment July 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 Precipitation data obtained ^3 ^b ^3 ^3 ^3 ^" ^n' ^3 ^3 ^r5 ^" ^3 ^b ^r' ^t ^3 ^t ^`b ^r5 ^O �yo �o �yo �yo ,yo yo ,yo from: Onsite Raingauge beginning September 2011 d t V C N m J L r d v IC 7 Cn Monitoring Well Record r_ - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment July 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ^3 ^b ^3 ^3 ^3 ^" ^n' ^3 ^3 ^r5 ^" ^3 ^b ^r' ^t ^3 ^t ^`b ^r5 ^O �yo �o �yo �yo ,yo yo ,yo 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation ^� O ^O O ^� O ^� O0 :\11P O-I\r ti4 00�L �^\� ,,\ A\ -,\ �\ Slide SS -7 9 8 7 6 m n 5 R r_F O 4 3 n CD 3 v 2 1 0 Stream Hydrology Assessment August 2013 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 Precipitation data obtained ^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^� yo yo �o ,yo �o yo ,yo ,yo yo yo �o yo yo do %N from: Onsite Raingauge 12 beginning September 2011 6 N d t V 0 d d J L -6 d fC v -12 ca 7 CO Monitoring Well Record 'a 3 -18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 ^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^� yo yo �o ,yo �o yo ,yo ,yo yo yo �o yo yo do %N 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 M CD 0 5 m rt_ 0 4 0 S M N 3 W Slide SS -8 1 0 Stream Hydrology Assessment September 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 a� t v 0 m d J L -6 d r cC v -12 t3 Monitoring Well Record 3 -18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 c� -24 Land Management Group, Inc. www.lmgroup.net -30 -36 N� �� N� �� ^3 NO) ^3 N3 ^3 ^1b N15 Nl3 NO) ^3 N3 ^1b N3 ^3 N3 NO) ��o �yo Grp 0 0 pro 60o �yo :\o ��o Grp V ��yo pro �yo ��o �yo ��o Grp ��o �p o� o�ti o\ 3 0�� ono o,\ q\� oho p p p \^ ' ^o � ^� ^o ^o p \ \ 3 \ \ o p� \ � o 0 o a o 0 o a o o� o� o� a� o� o� o� oT 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -9 9 8 7 6 0 5 0 4 0 <D 3 2 1 0 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment October 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ' Precipitation data obtained from: Onsite Raingauge beginning September 2011 N d t V C m m J d a+ IC d v 7 co Monitoring Well Record 3 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment October 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ' �3 �o �o �'b No No No No �o �o �o �o �o �o �o �o �o �o �3 �o �o No �� �o �'b �yo ��o ��o ��o �yo �yo �yo �yo ��o �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o ��o ��o ��o ��o "P '41 ^0�3 '0" 'ono ^'Z\, ^o�; ^ova o��� o� o� ^o o��� o��o o��A o��� o��o o��N o�"C sO ZO ZO o�� sO ZO on' 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 M 0 5 m rt_ O 4 C'> S M N 3 .... 2 1 0 Slide SS -10 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment November 2013 18 12 6 — — — — — — — — — — — — — — — k- 0 -6 - -12 - -18 -24 -30 -36 r6' �o yo do ,yo 'yo �o NO) Nr5 �o 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 cue n 5 O 4 n <D 3 v 2 1 0 Slide SS -11 Precipitation data obtained from: Onsite Raingauge beginning September 2011 a� t v C N d J L r d v t3 O Monitoring Well Record 3 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.lmgroup.net Stream Hydrology Assessment November 2013 18 12 6 — — — — — — — — — — — — — — — k- 0 -6 - -12 - -18 -24 -30 -36 r6' �o yo do ,yo 'yo �o NO) Nr5 �o 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 cue n 5 O 4 n <D 3 v 2 1 0 Slide SS -11 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment December 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 Precipitation data obtained from: Onsite Raingauge N No No N No No No �o �o �o �o �o �o �o �o �o �o �o �3 �o �o No �yo �yo �'yo �yo �yo �ro �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o 0�o P 0 0 1', 1' o 0 Nti N N \�� N\ �� ^tip ^o 1ti�� Nl��o Nl��� N\ �� N\ �o ^'��� �ti� N �� N �� �tio 1'1\ ^ti\�V ^ti\� 1'\ beginning September 2011 N d t V C m m J d ca d v 7 CO Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment December 2013 18 12 6 0 -6 -12 -18 -24 -30 -36 N No No N No No No �o �o �o �o �o �o �o �o �o �o �o �3 �o �o No �yo �yo �'yo �yo �yo �ro �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o 0�o P 0 0 1', 1' o 0 Nti N N \�� N\ �� ^tip ^o 1ti�� Nl��o Nl��� N\ �� N\ �o ^'��� �ti� N �� N �� �tio 1'1\ ^ti\�V ^ti\� 1'\ 4- South Stream 1 (13D491A2) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation 9 8 7 6 M 0 5 PF v O 4 C'> S M N 3 .... 2 1 0 Slide SS -12 Stream Hydrology Assessment January 2013 18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.imgroup.net -30 -36 ' — — NKyo 6yo �yo �o yo rp �yo P ro fo e\ po �o ryo fo �o 1yo �o e\ p �o ,yo N1b rb r5 1b �o �o do ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ +South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -1 9 8 7 6 n 5 O rt O 7 4 n fD N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge 12 beginning September 2011 6 d t v 0 d a� J L -6 d a+ M v -12 m 3 N Monitoring Well Record C -18 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm 0 0 -24 Land Management Group, Inc. www.imgroup.net -30 -36 ' — — NKyo 6yo �yo �o yo rp �yo P ro fo e\ po �o ryo fo �o 1yo �o e\ p �o ,yo N1b rb r5 1b �o �o do ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ +South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -1 9 8 7 6 n 5 O rt O 7 4 n fD N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 ql d t V C 0 d m J -6 L d v -12 -18 0 L. 0 Land Management Group, Inc. www.imgroup.net -24 -30 February 2013 -36 ^It, <3 ^3 ^3 NO) ^3 NO) NO) ^1b ^3 NO) ^O, NO) N3 ^1b ^3 ^3 NO) �5 N3 �o yo �o yo yo Iyo yo �o �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -2 9 8 7 6 n 5 rh 0 4 n s c� N 3 v 2 1 0 Stream Hydrology Assessment March 2013 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O L. 0 -24 Land Management Group, Inc. www.imgroup.net -30 -36 Precipitation data obtained N N �3 N3 <5 �� �� <3 ^3 �3 �� �3 ^b �3 <3 ^� ^b �� �� �3 �3 �3 �3 <3 N� rp yo yo yo yo �o yo yo rp yo �o �o �o rp �o �o rp �o �o yo �o rp �o �o rp 3 '!� '!� 3 r5 3� 'tp �p' 'p 5T '�� �'V j 3-.) from: Onsite Raingauge 12 beginning September 2011 6 ql d t V C 0 d m J L -6 d v -12 Monitoring Well Record 18 Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O L. 0 -24 Land Management Group, Inc. www.imgroup.net -30 -36 N N �3 N3 <5 �� �� <3 ^3 �3 �� �3 ^b �3 <3 ^� ^b �� �� �3 �3 �3 �3 <3 N� rp yo yo yo yo �o yo yo rp yo �o �o �o rp �o �o rp �o �o yo �o rp �o �o rp 3 '!� '!� 3 r5 3� 'tp �p' 'p 5T '�� �'V j 3-.) 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -3 9 8 7 6 n 5 rh O 4 n s c� N 3 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - April, 1, 2013 to April 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 ql d t V C 0 d m J -6 L d v -12 -18 0 L. 0 Land Management Group, Inc. www.imgroup.net -24 -30 April 2013 -36 ^5 <5 <5 Nb �� ^b N3 ^3 N3 ^3 ^b N� N'3 NO) ^3 N3 ^1b N3 ^3 N3 NO) rp �o �o rlo P rp �o 0 ro �o yo �o �o rp V yo ro p �o yo �o rp �o �o �� ^� ��� ��o� �N' t�\ ��' ���� N�o� \' \ ^ti \ ^3� \^ \^ \' \^o� \^ \ ^� \ \ o� \ �� \ o� \' � \ p� \ o� 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -4 9 8 7 6 n 5 rh 0 4 n s c� N 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record �- Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 m E 0 m m J L -6 d f6 U —12 cC L 'a -18 0 c� Land Management Group, Inc. www.lmgroup.net 24 —30 —36 ONO ONO ONO ONO ONO NO 10 11\ May 2013 9 8 6 CD 0 5 'a. -' rt_ 0 7 4 3 0 CD N v 3 2 1 0 1O <O ^O <O NO <O <5 �O <O NO NO <O <O <O <O <O <O <O <3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4\o�ti \� ^�ti \ \ ^o�ti \ \ ^o�ti \ \ ^o�ti \�o�ti \� \��ti \�o�ti \���ti \�o�ti \���ti \���ti \�o�ti \o^\ti h h h h h h h h h h h h h h 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -5 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 W 6 ql d t V C 0 d m J -6 L d v -12 -18 0 L O Land Management Group, Inc. www.imgroup.net -24 -30 June 2013 -36 ^5 <� <5 Nb �� ^b N3 ^3 N3 ^3 ^b N� N'3 NO) ^3 N3 ^b N3 ^3 N3 N� ^�yo ��o ��o ��o �yo Grp ��o 0 �ro �yo ��o �yo Grp �yo ��o �yo P Grp Grp o\ o�ti 4 bN ono o�� o;\ oho o� ^' Q\' b\' "� o' ^o b�' o�^o o�^o o\-� bo, bo, 0\T o\T o\'� o& -p o\p 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -6 9 8 7 6 n 5 rh 0 4 n s c� N 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 d t v � 0 m m d f0 v -12 ca to -18 0 c� Land Management Group, Inc. www.imgroup.net -24 -30 July 2013 -36 9 — e e e e e � e e 7 +South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -7 9 — 8 7 6 T (DD n 5 rt 0 — 4 3 0 CD v 3 2 — 1 0 101 Slide SS -7 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment August2013 18 12 6 0 -6 -12 -18 -24 -30 -36 Precipitation data obtained from: Onsite Raingauge beginning September 2011 ql d t V C d m J L d d v Monitoring Well Record 3 - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - August 1, 2013 to August 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm O c� Land Management Group, Inc. www.imgroup.net Stream Hydrology Assessment August2013 18 12 6 0 -6 -12 -18 -24 -30 -36 ^3 ^3 ^3 ^3 �� N N'b <5 ^3 NO) N") N3 ^b ^3 <3 ^'b ^'b ^b Nb ^3 N3 N3 N3 <5 N'5 �o yo yo yo yo �o yo yo yo yo �o �o �o �o �o �o yo �o �o yo �o �o �o �o �o rb ��^� ��� r \ t:\ ��o\ ��� ��'� ego\ \ ' Z\ ^ \ ^r \ ^3� \ ^�� \ ^o� \ ^�� \ ^'� \ ^o� \ ^� \ ti \ 3� \ �� \ 6; \�� \ �� \ 1� \ ^� � � � � �� �� �� �� �ti �ti �� IJ �_') 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -8 9 8 7 6 n 5 rh O 4 n s c� N 3 v 2 1 0 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 m E 0 m m J L -6 d f6 U —12 cC L 'a -18 0 L (D Land Management Group, Inc. www.lmgroup.net 24 —30 —36 o\ o\� ono C� September 2013 <t) '� <5 <5 <5 Nrb <5 ^1b <� ^� N11b <3 N� <5 ^1b <� ^`ID <5 ^3 <5 <� X00 ;00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 ono o\� o\w o8o � \ p ^o ^� p � ': ^� � O ti \ o � a \ o \� e o e a a e a a o 0 0� a� o� a`� o� o� eP CP 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -9 9 8 6 CD 0 'a. 5 -' rt_ 0 7 4 3 0 CD N v 3 2 1 0 <t) '� <5 <5 <5 Nrb <5 ^1b <� ^� N11b <3 N� <5 ^1b <� ^`ID <5 ^3 <5 <� X00 ;00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 ono o\� o\w o8o � \ p ^o ^� p � ': ^� � O ti \ o � a \ o \� e o e a a e a a o 0 0� a� o� a`� o� o� eP CP 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -9 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 m E 0 m m J L -6 d f6 U -12 cC L _ -18 0 L cD Land Management Group, Inc. www.lmgroup.net 24 -30 -36 October 2013 00 00 00 00 00 rp 00 p < rp 00 P 00 N1b q f< rp 00 00 00 00 00 00 00 rp 00 00 00 ^O \I\ ^�\� r�j� �O \k� ^O \�\ '\O�� �O \�� ^O�p���o\ ^ ^� ^o\ ^r� ^o\�r�j��o\ ^��N' \' N' \' \1o\' �o\' IS \�r�\^o\�r� ^o\�r�j�^o\����o\��\^o\�.,\^o\ NQ \�p��^o\�I\ 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -10 9 8 6 CD 0 'a. 5 -' rt_ 0 7 4 3 0 CD N v 3 2 1 0 00 00 00 00 00 rp 00 p < rp 00 P 00 N1b q f< rp 00 00 00 00 00 00 00 rp 00 00 00 ^O \I\ ^�\� r�j� �O \k� ^O \�\ '\O�� �O \�� ^O�p���o\ ^ ^� ^o\ ^r� ^o\�r�j��o\ ^��N' \' N' \' \1o\' �o\' IS \�r�\^o\�r� ^o\�r�j�^o\����o\��\^o\�.,\^o\ NQ \�p��^o\�I\ 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -10 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 ql d t V C 0 d m J -6 L d v -12 -18 0 L O Land Management Group, Inc. www.imgroup.net -24 -30 -36 November 2013 N5 N5 rp 6o o o P �o 4o V rp 4o o po o o o o o 4o o d,o rp o e 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -11 9 8 7 6 n — 5 rh 0 4 0 s cD N v 3 2 1 0 N5 N5 rp 6o o o P �o 4o V rp 4o o po o o o o o 4o o d,o rp o e 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -11 Precipitation data obtained from: Onsite Raingauge beginning September 2011 Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Southern Stream Tributary - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment 18 12 6 ql d t V C 0 d m J -6 L d v -12 -18 0 L O Land Management Group, Inc. www.imgroup.net -24 -30 -36 December 2013 ^3 '5 �� N3 Nb �� N3 N3 N3 N3 Nb N3 ^3 N3 N3 N� N3 Nb N� ^3 N3 ^15 N3 N3 N� �o yo yo yo �o yo �o yo �o yo yo �o �o yo �o yo �o yo yo L \N\ L \0 L \g\ Lp\ L6\ y�\ L \q�\ L \o�\ \�I\ \�' \erg\ \�R\ \�c;\ \��\ \�g\ \�o�\ \L�\ \Ll \L g\ \L p\ \Lca\ \L1\ \Lq\ \L0\ \�N\ 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -12 9 8 7 6 0 5 rh 0 4 0 s cD N v 3 2 1 0 ^3 '5 �� N3 Nb �� N3 N3 N3 N3 Nb N3 ^3 N3 N3 N� N3 Nb N� ^3 N3 ^15 N3 N3 N� �o yo yo yo �o yo �o yo �o yo yo �o �o yo �o yo �o yo yo L \N\ L \0 L \g\ Lp\ L6\ y�\ L \q�\ L \o�\ \�I\ \�' \erg\ \�R\ \�c;\ \��\ \�g\ \�o�\ \L�\ \Ll \L g\ \L p\ \Lca\ \L1\ \Lq\ \L0\ \�N\ 4- South Stream 2 (13D4AA06) MOnsite Raingauge — Ground Surface (0 ") —Bed Elevation Slide SS -12 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - January 1, 2013 to January 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 M y d t V S 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net MIN January 2013 -24 N N N N N N N <b N3 Nb Nb N3 <5 N't' NO) ^b N3 N� Nb N N� N N N 1P yo �o p Po 1yo P p 1yo yo ,yo ,yo Vyo 10 ,yo yo ,yo ,yo ,yo p �o ,yo p �o ^� ^� ^�� 4 NN N� ^\�\ ^fig\ ^fig\ \' \' \' \� \ z \^ \' \^ \' 1\1P \ -r \ -C \T \T \ -� \'P \ -g \ - -) 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -1 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - February 1, 2013 to February 28, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V S 0 d d J I- M -6 d v to N _ -12 0 c� Land Management Group, Inc. www.lmgroup.net MM February 2013 -24 e � yo ,yo e 1 �o yo do yo yo 0 e\ yo p 0 ,yo p do do e\ yo 0 ti ti ti ti ti ti ti ti ti� ti� ti� ti� ti� ti� ti� 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -2 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - March 1, 2013 to March 31, 2013 - Reading four times per day at 1:00 am, 7:00 am \ 1:00 pm, 7:00 pm Stream Hydrology Assessment W, M y d t V 0 d J L Q% -6 d U Cl) _ -12 0 0 Land Management Group, Inc. www.lmgroup.net MR -24 March 2013 ro yo rp e 0 4o �o e rp 3 '� 3 3 3 3 �� 3p 't\p 'j\ 'j\p 'j\ 3� 3� 4 -Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) MBF Onsite Raingauge Slide BF -3 6 5 4 cD n rh 3 0 n 3 CD 2 1 0 ro yo rp e 0 4o �o e rp 3 '� 3 3 3 3 �� 3p 't\p 'j\ 'j\p 'j\ 3� 3� 4 -Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) MBF Onsite Raingauge Slide BF -3 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - April 1, 2013 to April 30, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V S 0 d d J I- M -6 d v to N _ -12 0 c� Land Management Group, Inc. www.lmgroup.net SUM April 2013 -24 <3 N5 <b Nb <5 N� N3 �� Nb <3 Nb N� N3 N3 <5 Nb <� Nb Nb Nb N� Nb -� <5 p yo P ,yo \yo ,yo yo ,yo rp ,yo �o ,yo \o �o do 4o �\ p\ \r�\ \v \\ \p\ \\ \1\ \�\ ^3\ ^�\ ^p�\ t t N t N t\ \' � \gyp\ \ \' \ \" \' \ \ \ '\'V \ � � D� � R`L b`L �`L �`L \'P \'V \ �`L �`L �`L D`L 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -4 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - May 1, 2013 to May 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V S 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net MIN May 2013 -24 — - N N N N N N N <b N3 Nb Nb N3 <5 N't' � NO) yo ^ b yo N 3 yo N '� Nb N �o N yo N 4 4 4 4 4 h h h4' 4' � 4' ������ � 4' P � � p ��'o � 'o �� � ��� 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -5 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - June 1, 2013 to June 30, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 N d t V = 0 d d J I- M -6 d v to N _ -12 0 Land Management Group, Inc. www.lmgroup.net -18 June 2013 -24 ' <3 N) <b Nb <5 N15 N3 �� N� <3 N3 N15 N3 N3 <5 N1b <� N1b N1b N1b N15 N11b -� <5 Kyo v 4yo ,yo �yo �yo p � 1 �o �o ,yo \o rp ,yo �o ,yo Po �o do �o do \n�\ \p\ \11\1p j ^�\ ^p�\ �\ raj\ p\ ca\ \ �\ o�\ 0\r�\ I& Ib Ib 10 6 q ;\ 'b\ \ 0 \ \^3\ \gyp\ ,^ ,^' ,^' \ \ \ \ \ 0 0 0 0 0 0 0 0� 0� 0� 0� \ \' \ \ 0� 6� 0� 0� 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -6 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - July 1, 2013 to July 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V 0 d d J L d -6 d v N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net MIN -24 July 2013 6 5 4 N N N N N N3 N <b N3 Nb N' <3 <5 N' <5 ^b N3 N� Nb Nb -� Nb Nb <3 <5 10 10 o �o �o CO o �o o o o o o o o o o o o o o �o 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -7 cD n p1 rh 3 0 ►: 1 0 n 3 CD Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - August 1, 2013 to August 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V S 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net Mt-11 August 2013 -24 N N N N N N3 N <b N3 Nb N'5 <3 <5 N'5 <5 ^b N3 N'� Nb Nb -�5 Nb Nb <3 <5 'P P 'yo yo �o yo yo yo yo yo 'o yo yo yo yo yo yo yo �o yo yo �o 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -8 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - September 1, 2013 to September 30, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 y d t V S 0 d d J I- M -6 d v to N _ -12 0 c� Land Management Group, Inc. www.lmgroup.net SUM September 2013 -24 ' <3 N) <b Nb <5 N5 N3 �� N� <3 Nb N� N3 N3 <5 Nb <� Nb Nb Nb N� Nb -� <5 p yo P ,yo \yo ,yo �yo p �o �o �o ,yo \o rp �o �o �o ,yo Po �o do \�\ \v � \n�\ (),N �\cD\ c'\1\ 4 \�\ 4 \�j\ p p p p\ \ p \^'\ p�\ \ '\P \ \ �j\ '\T '\T p \ 0 0 0 'p 0 0 0 'p 0� 0� 0� 0� 0� 0� 0'V 0� 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -9 6 5 4 fD C'1 rt fl1 rt 3 0 n 3 CD 2 1 0 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - October 1, 2013 to October 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 N d t V = 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net -18 -24 October 2013 N N N N N N N <3 Nb N� Nb N3 �� <b <b N3 Nb N3 Nb Nb Nb N'b N3 N15 N11b ryo P �o yo �o ryo yo �o �o �o �o �o �o ro �o �o �o �o yo yo e\ rp �o yo �o 'o& �o�� '0& "Z� �. \ 'off\ ^o��� Ns\\ N6�' ^o�`' ', S'o\,�o��k\No��o\�o���\'( �' "'S' \^o�`��\'� �`�� ^o�` 'o �`��\^o�`� NQ�`��'Qo�\No\\ \ �\ 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -10 6 5 4 0 rt fl1 rt 3 O n 3 CD 2 1 0 N N N N N N N <3 Nb N� Nb N3 �� <b <b N3 Nb N3 Nb Nb Nb N'b N3 N15 N11b ryo P �o yo �o ryo yo �o �o �o �o �o �o ro �o �o �o �o yo yo e\ rp �o yo �o 'o& �o�� '0& "Z� �. \ 'off\ ^o��� Ns\\ N6�' ^o�`' ', S'o\,�o��k\No��o\�o���\'( �' "'S' \^o�`��\'� �`�� ^o�` 'o �`��\^o�`� NQ�`��'Qo�\No\\ \ �\ 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -10 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - November 1, 2013 to November 30, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 N d t V = 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net WIN -24 November 2013 6 5 4 yo �o yo �o yo yo yo yo �o �o yo yo yo "\ r p �4V 4P tip\ o DLO o 4V tip\ o 4P tip\ ' p tip\ � o tio�\ ro 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -11 0 rt fl1 rt 3 O n 3 CD 2 1 0 yo �o yo �o yo yo yo yo �o �o yo yo yo "\ r p �4V 4P tip\ o DLO o 4V tip\ o 4P tip\ ' p tip\ � o tio�\ ro 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -11 Precipitation data obtained from: Onsite Raingauge @ Brunswick Forest Monitoring Well Record - Stone Farm Mitigation - Brunswick County, NC -01-02-240 - Stream Reference Wells @ Brunswick Forest - Ecotone WM 40 - December 1, 2013 to December 31, 2013 - Reading four times per day at 1:00 am, 7:00 am 1:00 pm, 7:00 pm Stream Hydrology Assessment 12 6 N d t V = 0 d d J I- M -6 d v to N _ -12 0 0 Land Management Group, Inc. www.lmgroup.net -18 -24 December 2013 6 5 4 yo ryo �o yo e\ 'yo yo yo �o �o �o �o e\ ro �o �o �o �o yo yo �o rp �o yo �o 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -12 fD C'1 rt fl1 rt 3 O n 3 CD 2 1 0 yo ryo �o yo e\ 'yo yo yo �o �o �o �o e\ ro �o �o �o �o yo yo �o rp �o yo �o 4- Upper Stream Ref (A287224) 4- Lower Stream Ref (EBD23B5) WBF Onsite Raingauge Slide BF -12 V L • 11 �� •1 � l� l ; Y � ��i L •I l l t t • 1:1 I i L�l ��i G\ �� North Carolina Drought Status Flap 01/01/2013 1WRISARS Drought Monitoring Layers Legend l` State Boundary of HC Basins State Boundaries TVA States Counties W, 04 - Exceptional Drought E B3 - Extrene Drought 02 - Seyere Drought 01 - First Leuel drought Ufa - Rbnornally Org North Carolina. Drought hlt Status Map p � I �+ � �J 0 � az)ros/zai s - +k,► 'Ri Drought Monitoring Layers Legend /V Mate Boundary of MC Basins State Boundarie TVR States Al Counties B4 - Exceptional Brought 03 - Extreme Draught 02 - Severe Drought Di - First Level Draught. DO - Abnornarlly Ury North Carolina Drought Status Map �l I 'WTUSARS Drought Monitoring Layers Legend State Boundary of HE Basins Mate Boundaries TVA States Counties 04 - Exceptional Drought DS - EMtrene Drought 02 - Severe Drought D1 - First Level Drought DD - Abnornally Dry North Carolina Drought Status Map + jr-k I I - "13 1 &� <--, 1 04/02/2013 1�-] QI WRISARS Draught Monitoriu Layers Legend State Boundary of ND IV Basins State Boundaries A/ TVA States Counties M- N - Exceptional Drought D3 - Extreue drought D2 - Severe Brought D1 - First Level Drought Bo - Abnormally Dry North Carolina Drought Status Map 05f07I2013 WRISARS Droudit Monitoring Layers Legend ,J' State Boundary of HC Basins State Boundaries TVA States A counties M D4 - Exceptional Drought E D3 - Extren+e Brought 02 Seyere Drought DI - First Level Drought Do - Abnornallq Dry North Carolina Drought Status Map 0610412013 - 1AFRISARS Drought Monitorin Layers Legend A/ state Boundary of HC Al Basins Mate Boundaries TVR States N counties N - Exceptional Drought D3 - Extrene Brought 02 - Severe Brought Di - First Level Drought DD - Abnormally Dry North Carolina Drought ou ht Status Map El (�j (-z4l +� ;:Z� J-, " do <�O� 07/02,/2013 v 4 )ATdSAR,S Drought Monitoriu Layers Legend ,/ State Boundary of BC ,, Basins State Boundaries V TYR States ,/ Counties DI - Exceptional Drought D3 - Extrene Drought 02 - Severe Drought Di - First Level Drought 00 - Abnornallq Dry North Carolina ➢ rou ht Status Map !� (i� Q ± � 10 � 08/06/2013 ' g INTdSARS Drought Monitoring Layers Legend At state Boundary of HC IV Basins State Boundaries `OVA States Countie W N - Exceptional Brought H3 - Extrene Brought 02 - Severe Brought H1 - First Level drought Be - R norma.119 Dry North Carolina Drought Status leap Q_ � � � � � � 09l0312013 WRiSARS Drought Monitoring Layers Legend State Boundary of HC Basins State Boundaries iv 1 VA 'States / Counties 04 - Exceptional Brought 03 - Extrene Drought D2 - Severe Drought D1 - First Level Drought DO Abnormally Dry North Carolina Drought h Status Map r', 10!01/2013 WRISARS Drou it Monitorin Layers Legend A/ State Boundary of HC ,V Basins State Boundaries TVR States Counties M 04 - Exceptional drought M' D3 - Extrene drought DP - Severe Drought Di - First Level drought DO - Rbnornally Ivry North Carolina Drought Status Map Q QJ � � � � � 1110512073 � '� WRISARS Droudit Monitorin Layers Legend IV state Boundary of HNC Basins State Boundaries TVA States as - 0 a3 - U2 - U1 - no - (ties Exceptional drought • Extreme Drought ° Severe Brought • First Lewel Drought Abnornally Dr q North Carolina Drought Status Map 12/0,312013 � "� WRISARS DTought Monitoring Layers Legend State Boundary of He Basins State Boundaries TVA States Counties 04 Exceptional Droutht. 03 - Extrene Drought D2 - Severe Drought XI - First Level Drought DD - Abnormally Dry LONGITUDINAL SURVEYS /CROSS SECTION SURVEYS CROSS SECTION PHOTOS 34 33.5 33 w 32.5 0 32 31.5 W 31 W 30.5 30 29.5 0 As -Built c Sta. #: + 0 34 33.5 33 32.5 0 32 5 31.5 w w 31 30.5 30 29.5 50 MAINSTEM: LONGITUDINAL PROFILE (MS -1) —m--bed water srf t bankfull a x- section o riffle crest o pool ■ run glide 100 slope ( %) reach 0.12 riffle 3 (2.3-3.5) pool 0 glide - -- SECTION (MS -1) 150 200 Channel Distance (ft) slope ratio 25 (19.2 - 29.2) 0 250 318.0 57.0 (50.9 - 69.4) 14.9 (11 - 17.9) 7.6 (6.6-8.7) CROSS SECTION (MS -1 - pool) AS -BUILT STATION NUMBER: 8 +51.05 300 0 N Cl) C) co 0 10 20 30 40 50 60 Width (ft) Bankfull Dimensions 51.2 "x-section area (ft.sq.) 47.5 width (ft) 1.1 mean depth (ft) 3.5 max depth (ft) 49.8 "wetted perimeter (ft) 1.0 hyd radi (ft) 44.0 ' width -depth ratio View of MS -1 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey View of MS -1 Cross Section (looking upstream) 350 www. LMGrou p. net MS -1 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section MAINSTEM: LONGITUDINAL PROFILE (MS -2) --m— bed water srf --9—bankfull o x- section o riffle crest O pool ■ run A glide 35 34.5 --- - - - -- - --------- -------- ------ -- - - - - -- 34 -- - - - -- - - - --- — _ ZE 33.5 0 33 32.5 _j 32 w 31.5 31 30.5 0— CROSS SECTION (MS -2) 30 0 50 100 150 200 250 300 350 M Channel Distance (ft) �t As -Built ri o Sta. #: + o M N N slope ( %) slope ratio length (ft) reach 0.5 - -- 306.2 riffle 3.2 (2.4-3.7) 6.4 (4.8-7.4) 52.2 (43.3 - 62.7) pool 0 (0-0.096) 0 (0-0.2) 22.4 (7.5-43.1) glide - -- - -- 6.9 (4.9-8) CROSS SECTION (MS -2 - pool) AS -BUILT STATION NUMBER: 21 +45.78 34 33.5 33 32.5 0 32 31.5 w Li 31 30.5 30 29.5 0 10 20 30 40 50 60 Width (ft) Bankfull Dimensions 93.2 x section area (ft.sq.) 50.1 ' width (ft) 1.9 ' mean depth (ft) 4.4 ' max depth (ft) 52.4 "wetted pari meter (ft) 1.8 ' hyd radi (ft) 26.9 ' width -depth ratio /," _4F Y e§ 1:' c. s la �: 0 � 1 View of MS -2 Cross Section View of MS -2 Cross Section (looking upstream) www.LMGroup.net MS -2 Stone Farm Mitigation Bank LMG Phone: 910.452.0001 •1.866.LMG.1078 Year 02 Annual Monitoring LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060 Longitudinal Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 34 33.5 33 z 32.5 0 32 31.5 W W 31 30.5 30 29.5 0 As -Built ui Sta. #: + M 35.5 35 34.5 $ 34 z 0 33.5 > 33 w J uw 32.5 32 31.5 31 50 MAINSTEM: LONGITUDINAL PROFILE (MS -3) —m-- bed water srf --*-- ba n kfu I I o x- section o riffle crest o pool ■ run o glide 100 CROSS SECTION (MS -3) 150 200 Channel Distance (ft) 250 CROSS SECTION (MS -3 - pool) AS -BUILT STATION NUMBER: 34 +06.47 0 10 20 slope % slope ratio length ft reach 0.12 - -- 318.0 20.1 riffle 3 (2.3-3.5) 25 (19.2 - 29.2) 57.0 (50.9 - 69.4) pool 0 0 14.9 (11 -17.9) glide - -- - -- 7.6 (6.6-8.7) CROSS SECTION (MS -3 - pool) AS -BUILT STATION NUMBER: 34 +06.47 0 10 20 30 Width (ft) Bankfull Dimensions 30.2 x- section area (ft.sq.) 20.1 width (ft) 1.5 mean depth (ft) 2.1 max depth (ft) 21.1 wetted parimeter (ft) 1.4 hyd radi (ft) 13.3 width -depth ratio View of MS -3 Cross Section 40 50 300 �� +t t` C IV N M e View of MS -3 Cross Section (looking downstream) 350 Stone Farm Mitigation Bank www.LMGroup.net MS -3 LMG Phone: 910.452.0001 •1.866.LMG.1078 Year 02 Annual Monitoring LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060 Longitudinal Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 35.5 35 34.5 34 z 0 33.5 33 w 32.5 32 31.5 31 0 N As -Built �► Sta. M + Cl) 1* 50 35.5 35 z 34.5 0 a W 34 33 MAINSTEM: LONGITUDINAL PROFILE (MS -4) --n—bed water srf f bankfull o x- section o riffle crest o pool ■ run v glide 100 slope ( %) reach 0.061 riffle 3.4 (2.8-3.9) pool 0 (0 - 0.51) glide - -- — CROSS SECTION (MS -4) 150 200 Channel Distance (ft) slope ratio 55.7 (45.9 - 63.9) 0 (0-8.4) 250 (ft) 319.9 (7.7 channel widths) 47.4 (39.8 - 60.7) 11.0 (1.4-21.6) 5.6 (3.6-7) CROSS SECTION (MS -4 - riffle) AS -BUILT STATION NUMBER: 41 +67.22 0 5 10 15 20 25 30 Width (ft) Bankfull Dimensions 28.8 x section area (ft.sq.) 41.3 width (ft) 0.7 mean depth (ft) 1.7 max depth (ft) 41.8 "wetted perimeter (ft) 0.7 hyd radi (ft) 59.4 width -depth ratio View of MS -4 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey 300 0 w LO 0 35 40 45 50 �y "by , W. View of MS -4 Cross Section (looking upstream) 350 www.LMGroup.net MS -4 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 36.5 36 35.5 0 35 5 34.5 w 34 33.5 33 32.5 0 As -Built Sta. #: ° LO 36.5 36 z 35.5 w J W 35 34.5 MAINSTEM: LONGITUDINAL PROFILE (MS -5) --m— bed -water srf f bankfull A x- section o riffle crest o pool ■ run A glide t 50 100 150 200 Channel Distance (ft) slope ( %) slope ratio length reach 0.067 - -- riffle 4.6 (3.7-5.5) 68.7 (55.2 - 82.1) pool 0 0 glide - -- - -- 250 300 M N tC LO 282.8 (11.4 channel widths) 32.0 (26-42.7) 6.5 (4.6-9.3) 3.8 (2.4-4.9) CROSS SECTION (MS -5 - riffle) AS -BUILT STATION NUMBER: 55 +63.72 0 5 10 15 20 25 30 35 Width (ft) Bankfull Dimensions 7.9 x section area (ft.sq.) 24.9 width (ft) 0.3 mean depth (ft) 1.1 max depth (ft) 25.4 'wetted parimeter (ft) 0.3 hyd radi (ft) 78.8 width -depth ratio View of MS -5 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey rr+ View of MS -5 Cross Section (looking upstream) www. LMGrou p. net MS -5 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 37.5 37 36.5 z 36 O Q 35.5 J 35 W 34.5 34 33.5 I�I� 0 et As-Built N Sta. #: + LO tp 37.5 37 S z ° 36.5 Q w J w 36 35.5 50 MAINSTEM: LONGITUDINAL PROFILE (MS -6) gybed water srf f bankfuII o x- section o riffle crest ® pool ■ run o glide 100 slope reach 0.11 riffle 4.8 (1.9-6.6) pool 0 glide - -- lsl�� I —CROSS SECTION (MS -6) 150 Channel Distance (ft) slope ratio 43.6 (17.3-60) 0 CROSS SECTION (MS -6 - riffle) AS -BUILT STATION NUMBER: 63 +71.47 0 5 10 15 20 Width (ft) Bankfull Dimensions 5.8 'x-section area (ft.sq.) 25.2 width (ft) 0.2 mean depth (ft) 1.0 max depth (ft) 25.7 wetted parimeter (ft) 0.2 hyd radi (ft) 110.0 width -depth ratio View of MS -6 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey 200 250 296.3 (11.7 channel widths) 30.0 (22.6-37) 7.4 (2 - 16.7) 4.9 (3.5-7.6) 25 30 35 View of MS -6 Cross Section (looking upstream) 0 C N to www. LMGrou p. net MS -6 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 38.5 38 _ 37.5 Z 37 O 36.5 36 w 35.5 35 34.5 0 co M As -Built a°, Sta. #. + N N 38.5 38 37.5 z O 37 a J 36.5 w 36 35.5 35 50 MAINSTEM: LONGITUDINAL PROFILE (MS -7) —t bed water srf --o— bankfull a x- section o riffle crest 0 pool ■ run a glide 100 slope reach 0.31 riffle 4.4 (2.4-5.5) pool 0 (0- 1.6) glide - -- —CROSS SECTION (MS -7) 150 Channel Distance (ft) ratio 14.2 (7.7-17.7) 0 (0-5.2) CROSS SECTION (MS -7 - pool) AS -BUILT STATION NUMBER: 71 +51.83 200 286.9 33.7 (27.8 - 44.9) 7.1 (4.5 - 10.8) 4.9 (4.3-5.9) 250 0 vs N o� co 0 5 10 15 20 25 30 35 Width (ft) Bankfull Dimensions 11.9 x section area (ft.sq.) 13.2 'width (ft) 0.9 mean depth (ft) 2.5 max depth (ft) 14.8 wetted perimeter (ft) 0.8 hyd radi (ft) 14.6 width -depth ratio View of MS -7 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey Close -up View of MS -7 Cross Section www. LMGrou p. net MS -7 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 41 40.5 40 Z 39.5 0 39 > 38.5 w w 38 37.5 37 36.5 0 00 AS -Built N 00 Sta. #: °p 00 41 40.5 40 39.5 0 39 w 38.5 J w 38 37.5 37 36.5 MAINSTEM: LONGITUDINAL PROFILE (MS -8) -a--bed I water sr' tbankfull o x- section o riffle crest o pool ■ run 0 glide x a + b - c -CROSS SECTION (MS -8) 50 100 150 200 250 300 350 Channel Distance (ft) N1t Cl) u� slope ( %) slope ratio length (ft) co reach 0.51 - -- riffle 6.3 (4.4 - 8.1) 12.4 (8.6-15.9) pool 0 0 glide - -- - -- CROSS SECTION (MS -8 - pool) AS -BUILT STATION NUMBER: 83 +28.70 0 5 10 15 20 25 Width (ft) Bankfull Dimensions 15.7 x- section area (ft.sq.) 17.3 'width (ft) 0.9 " mean depth (ft) 3.0 max depth (ft) 19.0 wetted parimeter (ft) 0.8 hyd radi (ft) 19.0 width -depth ratio View of MS -8 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey 319.5 29.9 (24.3 - 40.7) 6.4 (3.2 - 9.9) 4.4 (3.3-6.2) 30 35 40 45 Close -up View of MS -8 Cross Section www. LMGrou p. net MS -8 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 39 38.5 38 37.5 z 37 Q 36.5 J 36 W 35.5 35 34.5 NORTH TRIBUTARY: LONGITUDINAL PROFILE (NT -1) -a--bed water srf --*--bankfull A x- section o riffle crest O pool ■ run glide -CROSS SECTION (NT -1) 0 50 100 150 200 250 M 300 00 Channel Distance (ft) As- Built `" 00 Sta. #: M °n°, slope ( %) slope ratio length (ft) 081, 0* S z 0 37.5 w J W 37 36.5 reach 0.29 - -- 278.6 (9.6 channel widths) riffle 5.5 (3.9-6.9) 19 (13.4 - 23.8) 27.5 (19.3-34) pool 0 (0- 1.3) 0 (0-4.5) 5.3 (2.6- 13.5) glide - -- - -- 5.1 (2.1 -8.1) CROSS SECTION (NT -1 - riffle) AS -BUILT STATION NUMBER: 30 +56.52 0 5 10 15 20 25 30 Width (ft) Bankfull Dimensions 10.3 x section area (ft.sq.) 28.9 ' width (ft) 0.4 mean depth (ft) 1.2 max depth (ft) 29.1 wetted perimeter (ft) 0.4 hyd radi (ft) 80.9 width -depth ratio View of NT -1 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey View of NT -1 Cross Section www. LMGrou p. net NT -1 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 37.5 37 36.5 36 z O 35.5 w 35 w 34.5 34 33.5 NORTHERN TRIBUTARY: LONGITUDINAL PROFILE (NT -2) -a-- bed water srf tbankfull A x- section O riffle crest o pool ■ run glide 111111 �� 41111'­. 111111krz:11 In - - -- - --- -- --- - - ---- Q - CROSS SECTION (NT -2) 0 50 100 150 200 250 300 14.5 width (ft) 0.9 Channel Distance (ft) 2.5 max depth (ft) 15.7 LO N 0.8 hyd radi (ft) 16.3 width -depth ratio `p N As-Built Sta. #: N N o slope /o) slope ratio length ft reach 0.13 - -- 287.7 riffle 5.6 (4.1 -8) 43.1 (31.5 - 61.5) 22.3 (12.9 - 30.3) pool 0 0 5.4 (2.9-9.9) glide - -- - -- 4.9 (3.1 -6.4) CROSS SECTION (NT -2 - pool) AS -BUILT STATION NUMBER: 24 +38.17 37.5 37 36.5 0 36 c W 35.5 J W 35 34.5 34 0 5 10 15 20 Width (ft) Bankfull Dimensions 12.9 "x-section area (ft.sq.) 14.5 width (ft) 0.9 mean depth (ft) 2.5 max depth (ft) 15.7 wetted parimeter (ft) 0.8 hyd radi (ft) 16.3 width -depth ratio View of NT -2 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey 25 30 35 40 View of NT -2 Cross Section (looking downstream) www. LMGrou p. net NT -2 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 35.5 35 34.5 ZE 34 z 33.5 Q 33 W 32.5 w 32 31.5 31 30.5 0 M As -Built N Sta. #: + 35 34.5 z 34 0 a 33.5 W 33 NORTHERN TRIBUTARY: LONGITUDINAL PROFILE (NT -3) --m­ bed water srf f bankfull a x- section O riffle crest O pool ■ run _,� glide x a + b - c I_ CROSS SECTION 50 100 150 Channel Distance (ft) ratio reach 0.069 - -- riffle 7 (5.4-9.5) 101.4 (78.3 - 137.7) pool 0 0 glide - -- - -- CROSS SECTION (NT -3 - riffle) AS -BUILT STATION NUMBER: 5 +24.07 200 length (ft) 250 293.2 (10.3 channel widths) 26.4 (20.2 - 31.3) 4.4 (3.3-6) 5.0 (2.8-7.1) 0 5 10 15 20 25 30 Width (ft) Bankfull Dimensions 12.7 'x-section area (ft.sq.) 28.5 ' width (ft) 0.4 ' mean depth (ft) 1.5 ' max depth (ft) 29.0 "wetted perimeter (ft) 0.4 ' hyd radi (ft) 64.1 ' width -depth ratio Z.. View of NT -3 Cross Section Close -up View of NT -3 Cross Section LO cy co cc Stone Farm Mitigation Bank www.LMGroup.net NT -3 LMG Phone: 910.452.0001 •1.866.LMG.1078 Year 02 Annual Monitoring LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060 Longitudinal Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 40 39.5 39 _ 38.5 z 38 O Q 37.5 w 37 w 36.5 36 35.5 35 0 o> AS -BuHt ri Sta. #: + LO N 39.5 39 38.5 38 z 37.5 w J 7 3 W 36.5 36 35.5 50 SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -1) --m-bed - water sr' f bankfull A x- section o riffle crest o pool ■ run L glide x a + b - c 100 slope ( %) reach 0.068 riffle 6.2 (4.4-8) pool 0 (0-0.15) glide - -- L -CROSS SECTION (ST -1) 150 Channel Distance (ft) slope ratio 91.2 (64.7 - 117.6) 0 (0-2.2) CROSS SECTION (ST -1 - pool) AS -BUILT STATION NUMBER: 26 +83.26 200 293.1 26.3 (20.9 - 30.9) 10.2 (3.6 - 14.6) 5.6 (2.9 - 10.1) 250 0 5 10 15 20 25 30 35 40 Width (ft) Bankfull Dimensions 28.9 x- section area (ft.sq.) 22.9 width (ft) 1.3 mean depth (ft) 3.0 max depth (ft) 24.3 "wetted pari meter (ft) 1.2 hyd radi (ft) 18.1 width -depth ratio r, yid 5 `l View of ST -1 Cross Section View of ST -1 Cross Section (looking downstream) 300 co N w N Stone Farm Mitigation Bank www.LMGroup.net ST -1 LMG Phone: 910.452.0001 •1.866.LMG.1078 Year 02 Annual Monitoring L wD nn1 acErnetvTCROUP- Fax: 910.452.0060 Longitudinal Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 38.5 38 37.5 x Z 37 O Q 36.5 w 36 J W 35.5 35 34.5 0 00 AS -Built Sta. #: + co 38.5 38 0 37.5 a J 37 W 36.5 36 SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -2) --n— bed water srf —*— bankfuII A x- section O riffle crest 0 pool ■ run a glide Q CROSS SECTION (ST -2) 50 100 150 200 250 300 Channel Distance (ft) o M Os co slope ( %) slope ratio length (ft) reach 0.25 - -- 279.2 (24.7 channel widths) riffle 3.7 (2.9-4.4) 14.8 (11.6 - 17.6) 37.8 (33.2 - 47.3) pool 0 0 7.9 (4.8-12.5) glide - -- - -- 5.3 (4.1 -6.8) CROSS SECTION (ST -2 - riffle) AS -BUILT STATION NUMBER: 17 +73.63 0 5 10 15 20 25 Width (ft) Bankfull Dimensions 11.8 x- section area (ft.sq.) 11.2 width (ft) 1.1 mean depth (ft) 1.6 max depth (ft) 12.1 "wetted pari meter (ft) 1.0 hyd radi (ft) 10.7 width -depth ratio View of ST -2 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey View of ST -2 Cross Section (looking upstream) www. LMGrou p. net ST -2 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section 37 36.5 36 35.5 z 35 Q 34.5 w 34 w 33.5 33 32.5 SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -3) —m-- bed water srf f bankfull o x- section O riffle crest o pool ■ run L glide —CROSS 0 50 100 150 200 250 300 Channel Distance (ft) to As -Built er ri Sta. #: V_ °+° c+o slope ( %) slope ratio length (ft) °p 37 36.5 36 35.5 z 35 0 34.5 w w 34 33.5 33 32.5 reach 0.3 - -- riffle 4.6 (1.9 - 11) 15.3 (6.3-36.7) pool 0 0 glide - -- - -- 254.2 31.2 (7.4 -44.7) 7.3 (2- 16.9) 4.9 (3.2-7.7) CROSS SECTION (ST -3 - pool) AS -BUILT STATION NUMBER: 7 +38.92 0 5 10 15 20 Width (ft) Bankfull Dimensions 25.0 x- section area (ft.sq.) 16.8 width (ft) 1.5 mean depth (ft) 3.1 max depth (ft) 18.7 "wetted pari meter (ft) 1.3 hyd radi (ft) 11.3 width -depth ratio View of ST -3 Cross Section Stone Farm Mitigation Bank Year 02 Annual Monitoring Stream Survey 25 30 35 �t View of ST -3 Cross Section (looking downstream) www. LMGrou p. net ST -3 LMG Phone: 910.452.0001.1.866.LMG.1078 LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section [GRUB 1 i I; I : �' :1 L l ; \ ►�► /_ t 13 ►�i l _ I �� : \ l 11 [ I st / ] ;9 :.i ;a /d �� ,s- . a"s w•,l, I L 7I.,'�,r �' `A ' i OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 - Presence of Litter & Debris 3 - Vegetation matted, bent, Or absent 4 - Water Staining 5 - Sediment Sorting (1) View of OHWM along Mainstem (early growing season) I &:A"#vWW OHWM INDICATORS ry �Ak 1 - Natural Line Impressed On Bank ,. 2 - Presence of Litter & T Debris 3 - Vegetation matted, bent, Or absent 4 - Water Staining 5 - Sediment Sorting (2) View of OHWM on (early growing season) Stone Farm Regional Mitigation Bank LMG Appendix F: LAND MANAGEMENT GROUP Phase II OHWM Indicators in Year 2 AMR Stream Valleys OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 - Wracking 3 - Presence of Litter & Debris 4 - Sediment Sorting I i a 5 - Water Staining MY _ (3) View of OHWM on Mainstem (early growing season) OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 - Wracking 3 - Vegetation matted, bent, Or absent 4 - Water Staining 5 - Multiple Observed Flow Events (4) View of OHWM along Mainstem (early growing season) Stone Farm Regional Mitigation Bank LMG Appendix F: LAND MANAGEMENT GROUP me Phase II ��me ,a �an,�,an, OHWM Indicators in Year 2 AMR Stream Valleys OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 - Wracking 3 - Vegetation matted, bent, Or absent 4 - Water Staining (5) View of OHWM along North Tributary (mid growing season) OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 -Wracking 3 - Vegetation matted, bent, Or absent 4 - Water Staining (6) View of OHWM along South Tributary (early growing season) Stone Farm Regional Mitigation Bank LMG Appendix F: LAND MANAGEMENT GROUP Phase II OHWM Indicators in Year 2 AMR Stream Valleys OHWM INDICATORS 1 - Natural Line Impressed On Bank 2 - Wracking 3 - Vegetation matted, bent, Or absent 4 - Water Staining 5 - Presence of Litter & Debris (7) View of OHWM along South Tributary (early growing season) (8) View of overbank flow (flooded valley) along upper reach of Mainstem (mid growing season) Stone Farm Regional Mitigation Bank LMG Appendix F: LAND MANAGHUENT GROUP Phase II OHWM Indicators in � E��;.o�meR"a��on,� "�onE, Year 2 AMR Stream Valleys (9) View of overbank flow at guage 2 along Mainstem (MS) (mid growing season) (10) View of overbank flow (flooded valley) along mid -reach of Mainstem (mid growing season) Stone Farm gional Mitigation Bank LMG Appendix F: Re L" °h,A�A�T�R °uP,ut OHWM Indicators in Phase II � E��;.o�meR"a��on,� "�onE, Year 2 AMR Stream Valleys (11) View of overbank flow (flooded valley) along lower -reach of Mainstem (mid growing season) (12) VView of overbank flow (flooded valley) along lower -reach of Mainstem (mid growing season) Stone Farm Regional Mitigation Bank LMG Appendix F: NnMANAGEMENT GROUP ,ut Phase II OHWM Indicators in � E��;.o�me��a��on,���onE, Year 2 AMR Stream Valleys