HomeMy WebLinkAbout20071843 Ver 1_Year 2 Monitoring Report Ph 2-3 Year 2_20140529Stone Farm Regional Mitigation Bank
Annual Monitoring Report — Year 2
(Phase Two and Three)
Brunswick County, NC
Lumber River Basin
(Cataloging Unit #03040207)
Prepared on behalf of-
Stone Farm Mitigation Bank, LLC
(Sponsor)
Prepared by.,
LMG
LAND MANAGEMENT GROUP iNc.
Environmental Consultants
Wilmington, N.C.
May 2014
TABLE OF CONTENTS
1.0. EXECUTIVE SUMMARY
2.0.
3.0
4.0
5.0
PROJECTOVERVIEW ................................................................................. ..............................2
A. INTRODUCTION ............................................................................................ ..............................2
B. MITIGATION GOALS AND OBJECTIVES .................................................... ..............................2
C. PROJECT IMPLEMENTATION ..................................................................... ..............................2
MONITORING REQUIREMENTS .............................................................. ..............................6
A. WETLAND RESTORATION SUCCESS CRITERIA ....................................... ..............................6
MONITORING RESULTS (YEAR 2) .....
A. PHASE II ...................... ...............................
1. VEGETATION MONITORING ..................
2. HYDROLOGIC MONITORING .................
3. STREAM MONITORING ..........................
(a) Photo Documentation .........................
(b) Ecological Function ............................
(c) Channel Stability /Survey Procedures
(1.) Cross - Sections ...........................
(2.) Longitudinal Profiles ..................
(3.) Pebble Counts .............................
(4.) Stream Flow Monitoring .............
4. CONTINGENCY MEASURES .................
B. PHASE III ..................... ...............................
11
13
13
13
14
14
14
15
15
19
20
CONCLUSION................................................................................................ .............................22
Figure 1...
Figure 2 ..
Figure 3. .
Figure 4...
Figure 5...
LIST OF FIGURES, TABLES, AND APPENDICES
... Phase II Restoration Plan /As -Built
..Phase III Restoration Plan /As -Built
.......Phase Boundary Overview Map
Phase II Plot and Well Location Map
............ Cross Section Location Map
Table 1 ............................................. ............................... Phase II Planting List (March 2011 /February 2012)
Table 2 ................................................. ............................... Summary of Tasks Completed — Phase II and III
Table 3 ................................................. ............................... Vegetation Plots and Wells by Community Type
Table 4 ................................. ............................... Annual Monitoring Data Sheets, Year 2 — Planted Species
Table 4A .... ............................... .........................Annual Monitoring Data Sheets, Year 2 — Volunteer Species
Table 413 ............................. .........................Annual Monitoring Data Sheets, Year 2 — Unidentified Volunteer
Table 4C ........................................................ ............................... Stem Counts By Year (Phase 11— Planted)
Table 5 . ............................... ........................Summary of Year 2 Hydrologic Monitoring (Phase 11— Streams)
Table 6 ............................... ............................... .........................Stream Lengths and Cross Section Stations
Table 7 ................................................................ ............................... Longitudinal Profiles by Stream Reach
Table 8 ................... ............................... Summary of Year 2 Bankfull Event Monitoring (Phase 11— Streams)
Table 9 ........................................ ............................... Summary of Year 2 Hydrologic Monitoring — Phase III
AppendixA .......................................................................................... ............................... Site Photographs
Appendix B ................................. ............................... Individual Plot Data Sheets (Year 2 Monitoring — 2013)
Appendix C .......................................... ............................... Hydrographs (January 2013 — December 2013)
Appendix D .......................................... ............................... NC Division of Water Resources Drought Maps
Appendix E ................ ............................... Longitudinal /Cross- Section Surveys, Cross - Section Photographs
Appendix F ............................................................ ............................... Ordinary High Water Mark Indicators
1.0 EXECUTIVE SUMMARY
On behalf of the Bank Sponsor (Stone Farm Bank, LLC), Land Management Group (LMG) has completed
Year 2 annual monitoring of Phase Two and Phase Three of the Stone Farm Regional Mitigation Bank.
Phase Two consists of 418 acres of the total 968 -acre mitigation bank site and includes 15,338 linear feet
of stream restoration, 103 acres of Riparian (Non - Riverine) Wetland Restoration (i.e. small stream swamp);
28 acres of Riparian (Non - Riverine) Wetland Preservation; 40 acres of Riparian (Non - Riverine) Wetland
Restoration (i.e. headwater swamp forest); 66 acres of Non - Riparian Wetland Enhancement; 160 acres of
Non - Riparian Wetland Preservation; and 21 acres of upland buffer (Figure 1). Phase Three consists of 192
acres and includes 7.40 acres of Riparian (Non - Riverine) Wetland Restoration; 31.5 acres of Non - Riparian
Wetland Restoration; 68 acres of Non - Riparian Wetland Enhancement; and 85 acres of Non - Riparian
Wetland Preservation (Figure 2).
The Phase Two project area connects the 145 -acre Carolina bay on the southern portion of the tract to the
Little Caw Caw Canal (a third -order tributary of the Waccamaw River) on the north boundary of the Bank
site. The Phase Three project area comprises the entire headwater wetlands of the South Tributary. As
was documented in the Mitigation Plan, the streams and wetlands of these watersheds had been
historically impaired by agricultural and silvicultural practices for over a hundred years. The wetlands of the
Main Stem and its tributaries (North Tributary and South Tributary) had been cleared and drained for rice
production. A network of dirt roads and canals dissected the site and resulted in the disconnection of first -
order tributaries from adjacent, former floodplain wetlands. Restoration work in Phase Two and Phase
Three involved the removal of over two miles of dirt roads, backfilling of four miles of canals, plugging of an
approximate 5,000 -If section of canal, 15,388 -If of Priority I stream restoration, restoration of valley grades,
and planting of approximately 96 acres of restored wetlands. Construction of the South Tributary of Phase
2 was completed in October 2011. The remaining areas of Phase Two and Phase Three were completed
in February 2012.
The following Annual Monitoring Report (AMR) presents the findings of the second year of monitoring for
both Phase Two and Phase Three.
Stone Farm Regional Mitigation Bank 1
Phase Two and Three — Year 2 Annual Monitoring Report
2.0 PROJECT OVERVIEW
A. Introduction
As approved by the Mitigation Bank Review Team (MBRT), the bank Sponsor began implementation of
Phase Two of the restoration project in September 2010. Figure 3 depicts the location and extent of the
three phases of the project. One remaining phase (Phase 4) consists of stream restoration within an
independent watershed (Hunters Creek) on the western portion of the site. Implementation of Phase Three
of the restoration project began in January of 2012. Placement of fill material within existing ditches (Figure
2) was authorized under Nationwide Permit 27 issued by the US Army Corps of Engineers (USACE) on
January 25, 2008 (Action ID# 2003 - 00682) and the corresponding 401 Water Quality Certification issued on
January 2, 2008 (DWQ Project #20071843).
B. Mitigation Goals and Objectives
The larger Bank restoration project is intended to provide suitable, high - quality wetland and stream
restoration to mitigate for authorized impacts within the Lumber River Basin (USGS 8 -digit Hydrologic Unit
03040207; DWQ Subbasin 03- 07 -57). The objective of the project is to restore natural vegetative and
hydrologic conditions throughout the nonriparian, riparian, and Coastal Plain stream habitat that have been
compromised by previous land use activities. The primary functions to be restored or enhanced as a result
of the restoration project include: surface water storage (i.e. flood attenuation); sediment /nutrient retention;
organic carbon transport to downstream food -webs; and wildlife habitat. The project provides an invaluable
opportunity to restore an entire watershed within a region currently experiencing acute development
pressures.
C. Project Implementation
Earthwork initially included the construction of a dry Priority I stream channel. The first stream channel
restored was the South Tributary. As construction progressed downstream, existing ditches and canals
were filled. Clay plugs were used at prescribed intervals to reduce potential subsurface drainage within
backfilled ditches. Soil removed for the construction of the Priority 1 channel was used to fill in the existing
channels. Existing roadbeds and adjacent spoil piles were removed, and the material was used to backfill
the road -side canals. Construction of the Main Stem and North Tributary was implemented in a similar
manner. Stream valleys were restored through converted agricultural fields to re- establish the natural
hydrologic connection of small stream swamp and headwater bay forest (Carolina bay) and swamp forest
Stone Farm Regional Mitigation Bank 2
Phase Two and Three — Year 2 Annual Monitoring Report
wetlands to the first -order reach of Little Caw Caw Canal. Restored wetlands were planted with
characteristic wetland trees corresponding to the targeted community type (headwater swamp forest and
small stream swamp).
Approximately 63,250 hardwood tree seedlings were planted throughout the restored small stream swamp
and swamp forest communities between March 2011 and February 2012. Seedlings were planted on
approximate 9 -ft centers, corresponding to an average density of 659 seedlings per acre. Planting was
supervised by LMG personnel to ensure proper spacing and planting depths. Swamp black gum (Nyssa
sylvatica) and bald cypress (Taxodium distichum) comprised a majority of the seedlings planted, totaling
approximately 30,400. Species such as swamp chestnut oak (Quercus michauxii), tulip poplar
(Liriodendron tulipifera), Atlantic white cedar (Chamaecyparis thyoides), pond pine (Pinus serotina), and
river birch (Betula nigra) were also planted (See Table 1 for seedling quantities by species). Tulip poplar,
Atlantic white cedar, and pond pine were planted in slightly higher landscape positions in the swamp forest
communities, while the remaining species were planted in the small stream swamp communities that will
likely experience longer flooding durations. The transition between the small stream swamp community
and the swamp forest community in the outer Coastal Plain represents subtle shifts in composition rather
than distinct breaks between wetland types. An overlap of planted species occurs along the boundaries
between the two wetland communities. In addition, live stakes were planted on approximate 4 -ft centers
and interspersed along the top of bank and side bank of the stream channels to provide for enhanced bank
stabilization and vegetative cover.
Restoration work for Phase Three consisted of the installation of four (4) armored earthen clay plugs at
prescribed locations and backfilling 200 -ft upstream of each plug along a channelized ditch upstream of the
Southern Tributary. Given the limited amount of earthwork required for the hydrologic restoration and the
existing forested condition, there were no additional planting requirements for Phase Three.
Refer to Table 2 for a list of tasks and associated completion dates for the implementation of Phase 2 and
Phase 3.
Stone Farm Regional Mitigation Bank 3
Phase Two and Three — Year 2 Annual Monitoring Report
Table 1. Phase Two Planting List (March 2011/February 2012)
Non - Riverine Restoration
2011 Southern Tributary
Swamp Forest
6 -ac
Common Name
Scientific Name
# Planted
Yellow Poplar
Liriodendron tulipifera
1,000
Pond Pine
Pinus serotina
1,350
Green Ash
Fraxinus pennsylvanica
1,200
Bald Cypress
Taxodium distichum
2,000
Swamp Black Gum
Nyssa sylvatica
2,000
Total
7,550
Riverine Restoration (2011)
Southern Tributary
Small Stream Swamp
14 -ac
Common Name
Scientific Name
Ironwood
Carpinus caroliniana
1,000
Green Ash
Fraxinus pennsylvanica
800
Bald Cypress
Taxodium distichum
1,000
Swamp Black Gum
Nyssa sylvatica
1,000
Elderberry
Sambucus canadensis
2,000
Buttonbush
Cephalanthus occidentalis
2,000
Total
7,800
Non - Riverine Restoration
2012 Mainstem /North Trib.
Swamp Forest
20 -ac
Common Name
Scientific Name
Yellow Poplar
Liriodendron tulipifera
4,300
Bald Cypress
Taxodium distichum
6,000
Swamp Chestnut Oak
Quercus michauxii
3,000
Swamp Black Gum
Nyssa sylvatica
3,500
Pond Pine
Pinus serotina
2,400
Atlantic White Cedar
Chamaecyparis thyoides
2,000
Total
21,200
Riverine Restoration (2012)
Mainstem /North Trib.
Small Stream Swamp
56 -ac
Common Name
Scientific Name
Bald Cypress
Taxodium distichum
10,000
River Birch
Betula nigra
2,000
Swamp Black Gum
Nyssa sylvatica
4,900
Swamp Chestnut Oak
Quercus michauxii
2,000
Yellow Poplar
Liriodendron tulipifera
2,000
Silky Dogwood
Corpus amomum
500
Elderberry
Sambucus canadensis
2,300
Buttonbush
Cephalanthus occidentalis
500
Black Willow
Salix nigra
1,500
Silky Willow
Salix sericea
1,000
Total
26,700
Grand Total
63,250
Stone Farm Regional Mitigation Bank
Phase Two and Three — Year 2 Annual Monitoring Report
Table 2. Summary of Tasks Completed on Phases Two and Three
Description of Task
Date
Logging within Limits of Clearing
September 2009
Completion of Earthwork (Southern Tributary)
October 2010
Site Planting (Southern Tributary)
March 2011
Completion of Earthwork (Mainstem & Northern Tributary)
October 2011
On -site Meeting with COE Staff - Construction Review
November 2011
Site Planting (Mainstem & Northern Tributary)
February 2012
Completion of Earthwork Phase III
February 2012
On -Site Meeting with COE Staff
March 2012
Year 1 Monitoring
November 2012
Year 1 Monitoring Report Submitted
March 2013
Year 2 Monitoring
September 2013
On -Site Meeting with COE Staff - Phase II & III Review
November 2013
Year 2 Monitoring Report Submitted
May 2014
Per the approved restoration plan, monitoring of Phase Two includes the assessment of both hydrologic
and vegetative conditions over the course of a five year monitoring period. Following the completion of the
earthwork, a total of twenty -nine (29) permanent 0.10 acre plots were established throughout the planted
and restored (i.e. former) small stream swamp and swamp forest communities (Table 3). A total of fourteen
(14) automated shallow groundwater monitoring wells were installed within the Phase Two project area
(Table 3). In addition, a total of seven (7) automated water level gauges have been installed within the
stream banks to document bankfull and normal flow events (Table 3). Wells and gauges have collected
data from January 2012 through the present.
Table 3. Vegetation Plots and Wells by Community Type
Community Type
Acreage
Vegetation Plots
Monitoring Wells
Stream Gauges
Phase II - Swamp Forest
315
15
6
0
Phase II - Small Stream
103
14
8
7
Phase III - Swamp Forest
190
0
8
0
TOTAL
608
29
22
7
Monitoring of Phase Three includes the assessment of hydrologic conditions over a five year monitoring
period. Following the completion of earthwork, a total of eight (8) automated shallow groundwater
Stone Farm Regional Mitigation Bank 5
Phase Two and Three - Year 2 Annual Monitoring Report
monitoring wells were installed within the project area (Table 3). Wells have collected data from mid -March
2012 through the present.
3.0 MONITORING REQUIREMENTS
Annual monitoring is being conducted near the end of each growing season for a period of five years. The
monitoring includes both a vegetative and hydrologic component per the approved mitigation banking
instrument. The specific success criteria for the bank are listed below.
A. Wetland Restoration Success Criteria
(1) Demonstrated density of planted species to meet or exceed 320 trees per acre at the end of 3
years (post - planting) and 260 trees per acres at the end of 5 years (post - planting). 1
(2) No single volunteer species (most notably, red maple, loblolly pine, and sweet gum) will comprise
more than 50% of the total composition at year 2 or 3. If this occurs, remedial procedures will be
implemented. During years 4 and 5, no single volunteer species, comprising over 50% of the total
composition, may be more than two times the height of the planted trees. If this occurs, remedial
procedures will be implemented.
(3) Hydrology during the growing season must be sufficient to at least meet the guidelines set forth
within the 1987 Corps of Engineers Wetlands Delineation Manual (Technical Report Y- 87 -1).
Therefore, the hydrologic criterion will be the establishment of a static water table at, or within, 12"
of the soil surface for 12% of the growing season2 (equivalent to 32 days based upon SCS-
established growing season March 7th through November 28th) during periods of normal rainfall.
The vegetative component for Phase Two includes an assessment of the conditions within each of the
twenty -nine (29) permanent monitoring plots that have been established throughout the project area (Figure
4). Hydrologic monitoring is being conducted via fourteen (14) automated shallow groundwater monitoring
1 Volunteer species may be counted toward meeting the success criteria upon evaluation of site - specific conditions and
concurrence by IRT members.
2 As defined by the Soil Conservation Service, the growing season for Brunswick County is 266 days.
Stone Farm Regional Mitigation Bank 6
Phase Two and Three — Year 2 Annual Monitoring Report
wells for Phase Two and eight (8) for Phase Three recording on daily intervals (refer to Figure 4 for location
of the monitoring wells). Data from the wells are downloaded on approximate three -month intervals and
imported into graphing software for analysis. Phase Three monitoring consists of collection of groundwater
level data (once daily) over the course of the five -year monitoring period through the use of eight (8)
automated wells.
Monitoring reports are being submitted annually to the USACE and the IRT. These reports include results
of vegetative and hydrologic monitoring and photographic documentation of site conditions. Monitoring
reports also identify any contingency measures that may need to be employed to remedy any site
deficiencies (e.g. major stream design failures).
4.0 MONITORING RESULTS (YEAR 2)
A. PHASE TWO
1. Vegetation Monitoring
Year 2 monitoring data were collected in September and November 2013 over a four -day period
(September 24th -26th, November 8th). A total of 4,912 stems were counted throughout the twenty -nine (29)
plots (Table 4). Inclusive within this total were 1,356 stems of planted species (correlating to a mean
density of 468 stems per acre) (refer to Table 4). Bald cypress (Taxodium distichum) and swamp black
gum (Nyssa sylvatica) were the most abundant woody species, with a total of 695 and 212 individuals,
respectively. Swamp chestnut oak (Quercus michauxii) and tulip poplar (Liriodendron tulipifera) were also
prevalent within certain plots. In review of Year 2 monitoring data it appears that the site is progressing well
towards the required planted vegetative densities.
In addition to the planted species, numerous volunteers were observed within swamp forest plots (Table
4A). A majority of these individuals, such as fetterbush (Lyonia lucida), redbay (Persea palustris), wax
myrtle (Morella cerifera), and gallberry (Ilex glabra) are considered desirable volunteers since these plants
are representative of the target wetland community type. It should be noted that a majority of pines were
undistinguishable between loblolly pine and pond pine due to the relatively young age of the seedlings and
Stone Farm Regional Mitigation Bank 7
Phase Two and Three — Year 2 Annual Monitoring Report
lack of identifiable pine characteristics (resinous buds, needle bundles, rounded cone, stem foliage
sprouts). Unidentified Pinus spp. have not been counted toward the success criterion (Table 4B).
The mean stem density observed for both planted and characteristic (desirable) wetland species for the
project area is 1,121 stems /acre. Note that this observed density excludes individuals of the following
species: (1) red maple (Acer rubrum); (2) sweet gum (Liquidambar styraciflua); (3) horse sugar (Symplocos
tinctoria); (4) baccharis ( Baccharis halimifolia); and (5) unidentified Pinus spp.. Please refer to Table 4C for
Planted Stem Counts by Year. Individual plot data sheets are provided in Appendix B.
The most abundant volunteer species identified within the restored small stream swamp and swamp forest
communities are (in order of abundance): (1) fetterbush (780 total stems); (2) sweet gum (591 total stems);
(3) red bay (395 total stems); (4) gallberry (357 total stems); and (5) wax myrtle (217 total stems). Refer to
Table 4A for volunteer species identified by plot. In general, the observed volunteer species are
considered characteristic of the target wetland community type (small stream swamp and swamp forest).
The most prevalent non - target species observed during Year 2 monitoring was unidentified Pinus spp. and
sweet gum. While considered non - desirable (due to their potential to out - compete planted species), both
loblolly pine and sweet gum are commonly occurring as early successional species in the Outer Coastal
Plain. Based upon the data, Plot 3 and Plot 6 both contain volunteer species that comprise more than 50%
of total plot composition. However, Plot 3 contains an abundance of gallberry and fetterbush stems, both
desirable species, while Plot 6 contains and abundance of fetterbush and unidentified pine. These
predominant volunteers (e.g. fetterbush, red bay, gallberry, etc.) are desirable and consistent with the
restoration goals of the project (i.e. characteristic of the target vegetative community). While certain
Stone Farm Regional Mitigation Bank 8
Phase Two and Three — Year 2 Annual Monitoring Report
TABLE 4. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - PLANTED
SPECIES
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT9
PLOT10
PLOT11
PLOT12
PLOT13
PLOT14
PLOT15
PLOT16
PLOT17
PLOT18
PLOT
NT1
PLOT
NT2
PLOT
NT3
PLOT
NT4
PLOT
NT5
PLOT
NT6
PLOT
ST1
PLOT
ST2
PLOT
ST3
PLOT
ST4
PLOT
ST5
TOTAL
Bald Cypress
24
21
11
23
25
5
19
40
32
12
14
26
4
14
31
48
27
13
25
36
15
30
26
47
28
19
21
33
26
695
Black Gum
12
17
7
9
19
6
9
0
14
1
3
12
2
3
4
4
6
2
7
4
2
9
18
0
0
12
3
11
16
212
Atlantic White
Cedar
0
0
2
1
0
4
0
0
0
5
10
0
11
10
0
1
0
7
0
0
6
0
2
0
0
0
0
0
1
60
Pond Pine
0
0
9
0
0
10
0
0
0
0
11
0
0
12
0
5
0
1
0
0
4
0
1
0
0
11
0
0
0
64
Tulip Poplar
21
9
10
0
1
1
0
16
0
0
1
2
1
1
0
0
1
6
4
5
3
0
8
6
0
0
0
0
0
96
Swamp
Chestnut Oak
8
2
3
6
7
0
4
0
6
5
11
8
3
2
8
0
4
2
11
6
0
3
5
7
0
0
0
0
1
112
River Birch
0
16
0
0
0
0
12
0
4
0
0
1
4
0
7
0
2
1
0
4
0
27
0
0
0
0
0
0
0
78
Green Ash
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
0
4
22
2
33
Ironwood
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
4
6
TOTAL
65
65
42
39
52
26
44
56
56
23
50
49
25
42
50
58
40
32
47
55
30
69
60
60
33
42
30
66
50
1356
TABLE 4A. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - VOLUNTEERS
SPECIES
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT9
PLOT10
PLOT11
PLOT12
PLOT13
PLOT14
PLOT15
PLOT16
PLOT17
PLOT18
PLOT
NT1
PLOT
NT2
PLOT
NT3
PLOT
NT4
PLOT
NT5
PLOT
NT6
PLOT
ST1
PLOT
ST2
PLOT
ST3
PLOT
ST4
PLOT
ST5
TOTAL
Water Oak
3
1
0
0
0
8
0
2
0
0
0
0
0
0
0
0
0
9
0
0
4
0
0
0
1
0
0
0
0
28
Tulip Poplar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16
0
16
Gallberry
6
1
350
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
357
Sweetbay
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
3
Red Bay
17
9
150
0
0
60
0
3
0
3
0
0
20
0
0
0
0
45
5
0
27
0
0
0
9
34
13
0
0
395
Wax Myrtle
37
5
0
5
21
0
1
2
5
0
0
8
18
34
8
0
0
14
4
3
12
1
0
8
1
17
0
13
0
217
American Holly
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8
0
0
0
0
0
0
0
0
0
0
0
11
Fetterbush
2
0
350
0
0
300
0
0
0
0
0
0
0
0
0
0
0
120
0
0
0
0
0
0
8
0
0
0
0
780
Highbush Blue
Berry
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
0
0
3
0
0
0
0
0
11
0
0
34
Horse Sugar
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30
Blue
Huckleberry
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
40
0
0
0
0
0
0
0
0
0
0
0
40
Red
Chokeberry
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15
0
0
0
0
0
0
0
0
0
0
0
15
Baccharis
3
0
0
1
0
0
0
0
3
0
0
1
0
0
10
0
16
0
0
12
0
0
0
0
0
0
0
10
0
56
Sweet Gum
10
9
58
1
2
50
0
33
4
28
25
15
46
28
17
0
0
38
0
14
7
0
14
50
10
47
10
43
32
591
Red Maple
0
0
0
0
0
0
0
0
0
50
20
0
0
30
0
0
0
0
0
0
0
0
0
0
40
0
30
0
0
170
TOTAL
81
25
938
7
23
418
1
40
12
81
45
24
84
92
35
0
16
309
9
29
56
1
14
58
69
98
64
82
32
2743
TABLE 4B. YEAR 2 STEM COUNTS (PHASE TWO - STREAM) - UNIDENTIFIED VOLUNTEERS
Stone Farm Regional Mitigation Bank
Phase Two and Three — Year 2 Annual Monitoring Report
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
SPECIES
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT
PLOT9
PLOT10
PLOT11
PLOT12
PLOT13
PLOT14
PLOT15
PLOT16
PLOT17
PLOT18
TOTAL
NT1
NT2
NT3
NT4
NT5
NT6
ST1
ST2
ST3
ST4
ST5
Unidentified
13
77
30
1
1
300
2
35
0
10
26
10
46
33
13
0
0
90
0
0
61
0
0
0
10
39
6
10
0
813
Pine
1
TOTAL
13
77
30
1
1
300
2
35
0
10
26
10
46
33
13
0
0
90
0
0
61
0
0
0
10
39
6
10
0
813
Stone Farm Regional Mitigation Bank
Phase Two and Three — Year 2 Annual Monitoring Report
TABLE 4C. STEM COUNTS BY YEAR (Stone Farm Phase II) - PLANTED
SPECIES
YEAR
PLOT 1
PLOT 2
PLOT 3
PLOT 4
PLOT 5
PLOT 6
PLOT 7
PLOT 8
PLOT 9
PLOT 10
PLOT 11
PLOT 12
PLOT 13
PLOT 14
PLOT 15
PLOT 16
PLOT 17
PLOT 18
PLOT NTt
PLOT NT2
PLOT NT3
PLOT NT4
PLOT NT5
PLOT NT6
PLOT STi
PLOT ST2
PLOT ST3
PLOT ST4
PLOT ST5
TOTAL
Survivorship Rate
(by year)
0
24
19
12
25
25
6
18
43
31
18
16
27
4
14
31
58
35
15
24
40
18
29
31
49
33
18
25
34
32
754
N/A
Bald Cypress
1
23
20
12
27
26
5
20
40
32
17
16
26
4
14
33
56
33
15
25
37
16
33
28
54
28
19
24
34
32
749
99
2
24
21
11
23
25
5
19
40
32
12
14
26
4
14
31
48
27
13
25
36
15
30
26
47
28
19
21
33
26
695
92
0
13
22
12
8
20
11
'11
0
17
2
3
13
4
3
5
5
10
5
15
6
5
12
21
3
0
42
26
7
29
330
N/A
Black Gum
1
12
20
8
7
20
8
11
0
12
2
3
13
3
3
4
4
8
4
11
6
4
9
22
3
0
9
7
8
20
241
73
2
12
17
7
9
19
6
9
0
14
1
3
12
2
3
4
4
6
2
7
4
2
9
18
0
0
12
3
11
16
212
64
0
0
0
2
1
0
5
0
0
0
9
12
0
20
14
0
4
0
7
0
0
8
0
1
0
0
0
0
0
0
83
N/A
Atlantic White
Cedar
1
0
0
2
1
0
5
0
0
0
8
11
0
18
13
0
4
0
7
0
0
8
0
2
0
0
0
0
0
1
80
96
2
0
0
2
1
0
4
0
0
0
5
10
0
11
10
0
1
0
7
0
0
6
0
2
0
0
0
0
0
1
60
72
0
0
0
14
0
0
18
0
0
0
0
19
0
0
17
0
8
0
10
0
0
12
0
1
0
0
11
1
0
6
117
N/A
Pond Pine
1
0
0
11
0
0
12
0
0
0
0
12
0
0
15
0
6
0
4
0
0
4
0
1
0
0
8
0
0
0
73
62
2
0
0
9
0
0
10
0
0
0
0
11
0
0
12
0
5
0
1
0
0
4
0
1
0
0
11
0
0
0
64
55
0
8
1
23
0
5
8
0
33
0
5
2
5
8
8
7
0
7
14
12
18
5
0
10
2
0
4
0
3
4
192
N/A
Tulip Poplar
1
20
6
17
0
4
3
0
25
0
1
1
4
4
2
5
0
2
10
5
8
3
0
8
4
0
0
2
0
0
134
70
2
21
9
10
0
1
1
0
16
0
0
1
2
1
1
0
0
1
6
4
5
3
0
8
6
0
0
0
0
0
96
50
0
9
7
4
8
11
0
3
0
8
10
12
8
5
4
12
0
9
4
11
7
0
4
5
12
0
0
0
0
0
153
N/A
Swamp Chestnut
Oak
1
8
6
5
7
10
0
3
0
8
7
10
7
4
2
9
0
8
3
11
7
0
5
5
11
0
0
0
0
2
138
90
2
8
2
3
6
7
0
4
0
6
5
11
8
3
2
8
0
4
2
11
6
0
3
5
7
0
0
0
0
1
112
73
0
0
16
0
0
0
0
15
0
3
0
0
1
3
0
7
0
3
0
0
4
0
26
0
0
0
0
0
0
0
78
N/A
River Birch
1
0
23
0
0
0
0
14
0
3
0
0
1
4
0
7
0
2
1
0
4
0
23
0
0
0
0
0
0
0
82
105
2
0
16
0
0
0
0
12
0
4
0
0
1
4
0
7
0
2
1
0
4
0
27
0
0
0
0
0
0
0
78
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
22
4
15
38
21
100
N/A
Green Ash
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7
3
7
22
1
40
40
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
0
4
22
2
33
33
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
N/A
Ironwood
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
5
6
150
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
4
6
150
Stone Farm Regional Mitigation Bank
10
Phase Two and Three — Year 2 Annual Monitoring Report
volunteer species can potentially out - compete planted species, the overall composition of the species
observed is characteristic of small stream swamp and swamp forest wetlands of the outer Coastal Plain
and appear to be well- adapted to the restored wetland hydrology. The unidentified pine growth recorded in
Plot 6 will continue to be monitored, but remedial action is not recommended at this time.
2. Hydrologic Monitoring (Wetlands)
Per the approved mitigation plan, a total of fourteen (14) shallow groundwater monitoring wells were
installed throughout Phase Two. Following the completion of stream construction, discharge rates
decreased throughout the site, and static water table depths have remained within 12" of the surface for
extended periods. Of the fourteen (14) wells within Phase Two, all fourteen (14) wells exhibited
hydroperiods greater than 12% (corresponding to 32 consecutive days) of the growing season between
March 7th and November 28th, 2013 (Table 5). The observed mean hydroperiod duration for these wells
was 100 days. During Year 2 (2013), normal to very moist hydrologic conditions persisted throughout the
entire growing season. January through May exhibited normal moisture, June was moderately moist, July
and August were very moist, September was moderately moist, and October through December exhibited
normal moisture. During Year 1 (2012), moderate to extreme drought conditions caused one (Well #12) of
the fourteen wells to not meet the 12% success criterion. It was believed that readings were being
influenced by the material of the former road bed which may have been influencing lateral groundwater
movement. An additional well (Well #12B) was installed outside of the former roadbed as a comparison for
Well #12 (now labeled Well #12A). Both Well #12A and Well #12B exhibited hydroperiods greater than 12%
of the Year 2 growing season. Well #12B was not installed until June 26th, 2013, yet still exhibited longer
hydroperiods than Well #12A. These results suggest that underlying road bed material is affecting
groundwater movement in the vicinity of Well #12A.
A summary of these results are provided in Table 5. Complete hydrologic monitoring data are provided in
Appendix C. NC Division of Water Resources Drought maps are provided in Appendix D.
Stone Farm Regional Mitigation Bank 11
Phase Two and Three — Year 2 Annual Monitoring Report
Table 5. Summary of 2013 Hydrologic Monitoring (Phase 2)
2013 Growing Season March 7 - November 28
Well Number
Community
y
Type
Total Number
f days within
12"
(Jan 1 thru Dec
31)
Longest Number Of
Consecutive Days
Meeting Wetland
Hydrology Criteria (in
growing season)
Dates of Longest Number
of Consecutive Days
Meeting Wetland
Hydrology Criteria
Percentage of
Growing
Season
12%
Success
Criteria (32
Days)
>6
0
12.5 /°
12.5
-
25%
25
°'
75 /°
>75%
MS -1
SS
308
100
Jun 4—Sept 11
37.5
Yes
--
--
X
--
MS-5
SS
288
72
Mar 7 — May 17
27.0
Yes
--
--
X
--
MS-7
SF
282
97
Jun 4 — Sept 8
36.3
Yes
--
--
X
--
MS-8A
SF
267
73
Mar 7 — May 18
27.3
Yes
--
--
X
--
MS -813
SF
365
267
Mar 7 - Nov 28
100.0
Yes
--
--
--
X
MS -10
SF
293
99
Jun 4 — Sept 10
37.1
Yes
--
--
X
--
MS-12A
SS
216
64
Mar 7 — May 9
24.0
Yes
--
X
--
--
MS-12B
SS
108*
70
Jun 26 — Sept 3
26.2
Yes
--
--
X
--
MS-17
SS
307
195
Mar 7 — Sept 17
73.0
Yes
--
--
X
--
NT-2
SS
268
72
Mar 7 — May 17
27.0
Yes
--
--
X
--
NT-3
SF
271
92
Jun 4 — Sept 3
34.5
Yes
--
--
X
--
NT-6
SS
225
67
Mar 7 — May 12
25.1
Yes
--
--
X
--
ST-1
SS
282
95
Jun 4 - Sep 6
35.6
Yes
--
--
X
--
ST-3
SS
228
71
Mar 7 — May 16
26.6
Yes
--
--
X
--
ST-4
SF
244
69
Mar 7 — May 14
25.8
Yes
--
--
X
--
MS = Mainstem * - Well MS -12B was installed on June 26, 2013.
NT = Northern Tributary
ST = Southern Tributary
SS = Small Stream
SF = Swamp Forest
Stone Farm Regional Mitigation Bank 12
Phase Two and Three — Year 2 Annual Monitoring Report
3. Stream Monitoring
The primary success criterion for the stream portion of the mitigation bank is identified below:
No less than two bankfull flow events must be documented through the monitoring period. These
events will be documented through the use of well monitoring data and on -site photo
documentation. If less than two bankfull events occur during the first 5 years, monitoring will
continue until the second bankfull event is documented. The bankfull events must occur during
separate monitoring years. In the event that the required bankfull events do not occur during the
five -year monitoring period, the MBRT may determine that further monitoring is not required.
Level 1 Monitoring was implemented for the stream portion of the Stone Farm Regional Mitigation Bank as
detailed in the Stream Mitigation Guidelines, April 2003. Monitoring will occur every year for the five year
monitoring period.
Level 1 Monitoring includes Sections (a), (b), and (c) listed below.
(a) Photo - Documentation
Extensive photo documentation was implemented during Year 2 for the stream monitoring phase of this
project. Site visits were conducted and photographs were taken within 24 hours of a 0.5, 1.0, and 2.0 inch
rain event at each gauge location during Year 2 monitoring. Photographic and video evidence of Ordinary
High Water Mark indicators (OHWM) and flow evidence were also collected. Photos were taken at all
permanent cross - sections and are provided in Appendix E. OHWM indicators are provided in Appendix F.
Please refer to the enclosed CD for video evidence of flow.
(b) Ecological Function
The health of the riparian vegetation was documented as part of the wetland restoration monitoring efforts.
Multiple 0.10 ac. permanent monitoring plots were established throughout the riverine wetland restoration
including areas directly adjacent to the restored channel. Reference the vegetation monitoring section for
monitoring results.
Stone Farm Regional Mitigation Bank 13
Phase Two and Three — Year 2 Annual Monitoring Report
Subsequent to communication with the Corps of Engineers Wilmington Regulatory Branch in February
2012, macroinvertebrate sampling will no longer be required as part of the Phase Two monitoring
requirements.
(c) Channel Stability /Survey Procedures
1. Cross - Sections
The Stone Farm Phase Two area has restored 15,338 If of Coastal Plain stream. The restored channels
mimick low gradient, low velocity stream reaches characteristic of the outer Coastal Plain. No hardened
materials (i.e. rock structures) were used. Rather, natural materials (such as root wads and log vanes)
have assisted with channel stabilization and grade control. Given the size, uniform design, and gentle
slope (0.005) of the project, cross - sections were established every 1,000 feet of stream length (totaling 14
permanent stations). Placement of these stations was designed to assess the performance of potential
problem areas (i.e. severe erosion, structural failure). These stations were also evenly distributed between
riffles and pools throughout the project. Refer to Table 6 for the number of cross - sections and Figure 5 for
the locations of the cross - section monitoring stations. Year 2 cross - section surveys are provided in
Appendix E.
Table 6. Stream Lengths and Number of Cross - Section Stations
2. Longitudinal Profiles
Guidelines regarding longitudinal profiles for projects totaling over 3,000 If suggest that 30% of the area be
surveyed on an annual basis. Based on this guideline, a total of 4,200 If of profile is required for the Stone
Farm project. The 4,200 If of survey was divided throughout the individual reaches and includes the
permanent cross - sections (Table 7). Reference the longitudinal surveys in Appendix E in comparison to
as -built conditions.
Stone Farm Regional Mitigation Bank 14
Phase Two and Three — Year 2 Annual Monitoring Report
Proposed (If)
Final Design
Reach Name
Mitigation
Length
As -Built Length
Cross - sections
Plan
Mainstem
8,073
8,609
8,613
8
Northern Tributary
2,668
3,473
3,474
3
Southern Tributary
2,641
3,288
3,251
3
Total Length
13,382
15,370
15,338
14
2. Longitudinal Profiles
Guidelines regarding longitudinal profiles for projects totaling over 3,000 If suggest that 30% of the area be
surveyed on an annual basis. Based on this guideline, a total of 4,200 If of profile is required for the Stone
Farm project. The 4,200 If of survey was divided throughout the individual reaches and includes the
permanent cross - sections (Table 7). Reference the longitudinal surveys in Appendix E in comparison to
as -built conditions.
Stone Farm Regional Mitigation Bank 14
Phase Two and Three — Year 2 Annual Monitoring Report
Table 7. Longitudinal Profiles by Stream Reach
Reach Name
Proposed (If)
Final Design Length
As -Built Length
% of Project
Profile (If)
Mainstem
8,073
8,609
8,613
35.6
2,400
Northern Tributary
2,668
3,473
3,474
14.4
900
Southern Tributary
2,641
3,288
3,251
13.4
900
Total Length
13,382
15,370
15,338
63.4
4,200
3. Pebble Counts
Streams in the Stone Farm Phase Two project area are composed of sandy substrates typical in the outer
Coastal plain. Since all sediment falls into the sand category, gravelometer readings were not conducted.
All sediment in the constructed stream beds is less than 2mm and would be placed in the <2mm category
for Wolman pebble count analysis.
4. Stream Flow Monitoring
As indicated above, the 1 st -order streams of Phase Two occur within three distinct valleys that connect the
145 -acre Carolina bay on the southern portion of the tract to the Little Caw Caw Canal on the north side (a
third order tributary of the Waccamaw River). The three valleys are identified as the mainstem, the
northern tributary, and the southern tributary. A total of 5 gauges were installed in the stream beds to
document the elevations of surface water in the channels on a daily basis. These gauges capture the
upper end of each stream reach (3 gauges in the mainstem, 2 gauges in the northern tributary, and 2
gauges in the southern tributary). Refer to Figure 3 for a map depicting the location of 1st -order gauges.
Indicators of OHWM and video documentation were also used to identify the presence of surface water
flow.
Mainstem (MS):
Surface water and flow was documented in each of the three (3) gauges over several periods during the
monitoring event. The valley exhibits a very gradual slope (0.005 %) from the upper end (Carolina bay) to
the lowest end (Little Caw Caw Canal). Gauge MS -1 was placed the furthest up- gradient (second stream
meander from source) in order to capture bankfull events at the head of the restored stream reach.
Guages MS -2 and MS -3 were spaced approximately 1000 -ft apart further down the stream. All three
Stone Farm Regional Mitigation Bank 15
Phase Two and Three — Year 2 Annual Monitoring Report
gauges were placed within the stream segment solely charged by the Carolina bay (Phase One). Refer to
Figure 3 for the gauge locations.
The amplitude of the surface water varied at each gauge. Gauge MS -1 exhibited seven (7) bankfull events
during the monitoring period, while gauges MS -2 and MS -3 recorded sixteen (16) and eighteen (18)
bankfull events, respectively (Table 8). The gauges exhibited a significant increase in the duration and
amplitude of flow events during 2013 (Year 2). It should be noted that the duration of the bankfull events at
all three gauges sometimes extended for several days, with the maximum duration being four (4) days for
MS -1 and MS -2 and six (6) days for MS -3 (Table 8). Video evidence of flow was recorded following rainfall
events during the spring and summer over multiple site visits. Flow can be readily seen at each gauge
located within the stream valley. With increasing watershed size (downslope), the duration of surface flow
increased within the valley.
Observed physical indicators of an OHWM within the mainstem consisted of the following: (1) natural line
impressed on the bank; (2) presence of litter and debris; (3) wracking; (4) vegetation matted down, bent, or
absent; (5) sediment sorting; (6) scour; (7) deposition; (8) water staining; (9) and multiple observed flow
events. Photographs of the mainstem are provided in Appendix A. OHWM photographs and physical
indicators are provided in Appendix F. Video evidence of flow is provided on the attached CD with site
hydrographs.
Northern Tributary (NT):
Surface water and flow was documented in each of the two (2) gauges over several periods during the
monitoring event. Gauge NT -1 was placed the furthest up- gradient in order to capture bankfull events at
the head of the restored stream reach. Gauge NT -2 was placed approximately 1000 -ft further down the
stream. Refer to Figure 3 for the gauge locations.
The amplitude of the surface water varied at each gauge. Gauge NT -1 exhibited twelve (12) bankfull
events during the monitoring period, while gauge NT -2 exhibited twelve (12) bankfull events (Table 8). The
gauges exhibited a significant increase in the duration and amplitude of flow events during 2013 (Year 2).
It should be noted that the duration of the bankfull events at both gauges sometimes extended for several
Stone Farm Regional Mitigation Bank 16
Phase Two and Three — Year 2 Annual Monitoring Report
days, with the maximum duration being six (6) days (Table 8). Video evidence of flow was recorded
following rainfall events during the spring and summer over multiple site visits. Flow can be readily seen at
each gauge located within the stream valley. With increasing watershed size (downslope), the duration of
surface flow increased within the valley.
Observed physical indicators of an ordinary high water mark (OHWM) within the northern tributary
consisted of the following: (1) natural line impressed on the bank; (2) presence of litter and debris; (3)
wracking; (4) vegetation matted down, bent, or absent; (5) sediment sorting; (6) scour; (7) deposition; (8)
water staining; (9) and multiple observed flow events. Photographs of the northern tributary are provided in
Appendix A. Ordinary High Water Mark photographs and physical indicators are provided in Appendix F.
Video evidence of flow is provided on the attached CD with site hydrographs.
Southern Tributary (ST):
Surface water and flow was documented in each of the two (2) gauges over several periods during the
monitoring event. Gauge ST -1 was placed the furthest up- gradient in order to capture bankfull events at
the head of the restored stream reach. Gauge ST -2 was placed approximately 1000 -ft further down the
stream. Refer to Figure 3 for the gauge locations.
The amplitude of the surface water varied at each gauge. Gauge ST -1 exhibited thirteen (13) bankfull
events during the monitoring period, while gauge ST -2 exhibited ten (10) bankfull events (Table 8). Despite
the drought conditions of the first half of 2012, the gauges exhibited a significant increase in the duration
and amplitude of flow events during 2013 (Year 2). It should be noted that the duration of the bankfull
events at both gauges sometimes extended for several days, with the maximum duration being eight (8)
days for ST -1 and six (6) days for ST -2 (Table 8). Video evidence of flow was recorded following rainfall
events during the spring and summer over multiple site visits. Flow can be readily seen at each gauge
Stone Farm Regional Mitigation Bank 17
Phase Two and Three — Year 2 Annual Monitoring Report
Table 8. Summary of 2013 Bankfull Event Monitoring (Phase Two)
Gauge Number*
Total Number of Bankfull Events
Longest Number of Consecutive Days
During Bankfull Event
Dates of Bankfull Event(s)
3 -Day Antecedent
Rainfall (Inches)
(On -site Rain gauge)
MS -1
7
4
February 26 -27
1.92
March 24
1.61
April 12 -13
1.44
April 29 -30
2.09
June 30 -July 4
6.19 (thru 7/3)
July 13 -15
4.46
August 15 -18
3.59 (thru 8/17)
MS -2
16
4
Feb 12 -13
Jun 29
1.56
1.90
Feb 26 -27
Jun 30 -Jul 4
1.92
6.19 (thru 7 /3)
Mar 23 -25
Jul 13 -15
1.61
4.46
Apr 12 -13
Jul 17
1.44
0.60
Apr 15
Jul 29
0.49
1.71
Apr 29 -Mayl
Aug 1 -2
2.10 (thru 5/1)
3.07
Jun 7
Aug 15 -19
2.38
3.69 (thru 8/19)
Jun 24
Nov 27
1.85
2.32
MS -3
18
6
Feb 13 -14
Jun 24
1.56
1.85
Feb 26 -28
Jun 29 -Jul 5
1.92
6.63 (thru 7/3)
Mar 24 -26
Jul 12
1.61
1.22
Apr 4
Jul 13 -16
0.92
4.46
Apr 12 -14
Jul 17 -18
1.44
0.60
Apr 15 -16
Jul 29
1.92
1.71
Apr 19 -21
Aug 1 -2
0.87
3.07
Apr 29 -May 2
Aug 15 -20
2.09
3.74 (thru 8/20)
Jun 7
Nov 27
2.38
2.32
NT -1
12
6
Feb 13
Jun 29 -Jul 5
1.56
6.63 (thru 7/3)
Feb 26 -27
Jul 13 -16
1.92
4.46
Mar 24
Jul 17 -18
1.61
0.60
Apr 12
Jul 29
1.44
1.71
Apr 29 -30
Aug 1 -2
2.09
3.07
Jun 7
Aug 15 -20
2.38
3.74 (thru 8/20)
NT -2
12
6
Feb 13
Jun 29 -Jul 5
1.56
6.63 (thru 713)
Feb 26 -27
Jul 13 -16
1.92
4.46
Mar 24
Jul 17 -18
1.61
0.60
Apr 12
Jul 29
1.44
1.71
Apr 29 -May 1
Aug 1 -2
2.09
3.07
Jun 7
Aug 15 -20
2.38
3.74 (thru 8120)
ST -1
13
8
Feb 12
Jun 29 -Jul 7
1.07
6.63 (thru 713)
Feb 25 -27
Jul 12 -20
2.10 (thru 2126)
5.06 (thru 7117)
Mar 23
Jul 29 -31
1.61
1.97 (thru 7/31)
Apr 12 -13
Aug 14
1.44
3.07
Apr 15
Aug 15 -22
1.92
3.75 (thru 8/22)
Apr 29 -May 1
Nov 27 -28
2.09
2.32
Jun 7
_
2.38
_
ST -2
10
6
Feb 26
Jul 12 -Jul 18
1.92
5.06 (thru 7/17)
Apr 12
Jul 29
1.44
1.71
Apr 29
Aug 1 -Aug 3
2.09
3.07
Apr 30 -May 1
Aug 15- Aug 21
2.10 (thru 5/1)
3.74 (thru 8121)
Jun 30 -Jul 6
Nov 27
6.19 (thru 7/3)
2.32
*- MS= Mainstem; NT= Northern Tributary; ST= Southern Tributary
Stone Farm Regional Mitigation Bank 18
Phase Two and Three - Year 2 Annual Monitoring Report
located within the stream valley. With increasing watershed size (downslope), the duration of surface flow
increased within the valley.
OHWM within the southern tributary consisted of the following: (1) natural line impressed on the bank; (2)
presence of litter and debris; (3) wracking; (4) vegetation matted down, bent, or absent; (5) sediment
sorting; (6) scour; (7) deposition; (8) water staining; (9) and multiple observed flow events. Photographs of
the southern tributary are provided in Appendix A. OHWM photographs and physical indicators are
provided in Appendix F. Video evidence of flow is provided on the attached CD with site hydrographs.
4. Contingency Measures
Stream banks and in- stream structures (i.e. root wads, log vanes, etc.) were monitored for evidence of
surface bank erosion (i.e. down - cutting) subsequent to above normal rainfall and high flow events. Some
down - cutting of the floodplain was noted in areas where surface water in the floodplain flows back into the
stream channel. However, these features have not resulted in any significant deposition within the channel
and do not appear to adversely affect stream function. In fact, these features are common within natural,
unimpaired streams and are evidence of the connectivity between the stream and its floodplain. Most of
the areas in which this has been observed appear to have met a point of equilibrium and have become
increasingly stable with the growth of stream bank vegetation. No re- grading or reinforcement of the
stream banks are recommended at this time.
Grading work conducted during initial project implementation resulted in a discernible increase in
groundwater levels throughout the streams and adjacent small stream swamp and swamp forest
communities. Restoration of the stream channels helped reduce surface water outflows. Upon further site
assessments (including a November 2011 site meeting with the Corps of Engineers Wilmington Regulatory
Branch), it was determined that certain meander bends of the stream needed to be reinforced with
additional root wads in order to provide enhanced bank stability during high flow events. In January 2012,
these additional root wads were installed and coir fiber matting was reinforced in the selected areas per the
recommendation of the USACE.
Stone Farm Regional Mitigation Bank 19
Phase Two and Three — Year 2 Annual Monitoring Report
B. PHASE THREE
Per review and approval by the USACE, a total of eight (8) shallow groundwater monitoring wells were
installed throughout Phase Three. Subsequent to the earthwork, static water table depths gradually rose to
within 12 inches of the soil surface, particularly in response to discrete rain events. Plugging of the main
outlet ditch for this phase reduced the rate of groundwater discharge from the adjacent wetlands. The
observed mean hydroperiod duration for the eight (8) wells was 73 days. Of the eight (8) wells within
Phase Three, all eight (8) wells exhibited hydroperiods greater than 12% (corresponding to 32 consecutive
days) of the growing season between March 7th and November 28th, 2013 (Table 8). It should be noted
that six (6) out of the eight (8) wells observed hydroperiods of greater than 26% of the growing season.
During Year 2 (2013), mid -range to very moist hydrologic conditions persisted throughout the entire
growing season (refer to Appendix D). The headwater wetlands of the restoration area consist of very
poorly drained soils and lie in a depressional landscape position. These wetlands typically receive
hydrologic input primarily via precipitation. The mid -range to very moist conditions during the Year 2
monitoring period attributed to increased groundwater levels and duration throughout the growing season.
The patterns of hydrologic response to normal and above - normal precipitation periods during the Year 2
monitoring period indicate that groundwater has been sufficiently recharged throughout the system. The
majority of the wells observed hydroperiods of greater than 26% of the growing season, well above the
12% required for success. In addition, most of the wells observed longer hydroperiods than recorded by
the reference wetland wells. A summary of the groundwater monitoring results for Year 2 is provided in
Table 9. Complete hydrologic monitoring data are provided in Appendix C. NC Division of Water
Resources Drought maps are provided in Appendix D.
Stone Farm Regional Mitigation Bank 20
Phase Two and Three — Year 2 Annual Monitoring Report
Table 9. Summary of 2013 Hydrologic Monitoring (Swamp Forest - Phase Three)
2013 Gr wing Season March 7 - November 28
* Well 2 malfunctioned Feb 4 -Apr 11 (no data recorded or included in totals)
Well 4 malfunctioned Dec 4 -31 (no data recorded or included in totals)
Well 5 malfunctioned Apr 12 -May 30 (no data recorded or included in totals)
Well 6 malfunctioned Apr 12 -May 30 (no data recorded or included in totals)
Well 7 malfunctioned Mar 31 -Apr 11 & Apr 23 -Jun 25 (no data recorded or included in totals)
Stone Farm Regional Mitigation Bank 21
Phase Two and Three — Year 2 Annual Monitoring Report
Total Number of
Longest Number Of
Dates of Longest Number of
Percentage of
12%
12.5
Well Number
days within 12"
Consecutive Days Meeting
Consecutive Days Meeting
Growing
Success
>6-
-
25 -
>75%
(Jan 1 thru Dec 31)
Wetland Hydrology Criteria
Wetland Hydrology Criteria
Season
Criterion
12.5%
0
25/0
75%
(in growing season)
(32 Days)
1
263
79
Mar 7 - May 24
29.6
Yes
--
--
X
--
2
214*
92*
Jun 25 - Sept 24
34.5
Yes
--
--
X
--
3
274
81
Mar 7 - May 26
30.3
Yes
--
--
X
--
4
241*
79
Mar 7 - May 24
29.6
Yes
--
--
X
--
5
178*
36*
Mar 7 — Apr 11
13.5
Yes
--
X
--
--
6
230*
75*
Jun 25 - Sept 7
28.1
Yes
--
--
X
--
7
133*
70*
Jun 30 - Sept 7
26.2
Yes
--
--
X
--
8
169
51
Mar 23 — May 11
19.1
Yes
--
X
--
--
* Well 2 malfunctioned Feb 4 -Apr 11 (no data recorded or included in totals)
Well 4 malfunctioned Dec 4 -31 (no data recorded or included in totals)
Well 5 malfunctioned Apr 12 -May 30 (no data recorded or included in totals)
Well 6 malfunctioned Apr 12 -May 30 (no data recorded or included in totals)
Well 7 malfunctioned Mar 31 -Apr 11 & Apr 23 -Jun 25 (no data recorded or included in totals)
Stone Farm Regional Mitigation Bank 21
Phase Two and Three — Year 2 Annual Monitoring Report
Outlet channel banks and plugs of Phase 3 were monitored for evidence of surface bank erosion (i.e.
down - cutting) subsequent to above normal rainfall and high flow events. During a November 2013 site
inspection, minor down - cutting was noted around the downstream end of plug 1 in an area where surface
water in the floodplain flows back into the main outlet ditch. However, the plug continues to function in
blocking drainage from up- gradient portions of the site. This, in combination with the raised bed elevation
of the stream (down - gradient), reduces discharge to downstream waters. As a result, there has been no
discernable adverse effect to hydrologic function of the restored wetlands. The area will continue to be
monitored in 2014 (and throughout the duration of the hydrologic monitoring) to determine if any
contingency measures are needed at this location.
5.0 CONCLUSION
The implementation of Phase Two and Three completed an integral component of the watershed
restoration effort of the Stone Farm Regional Mitigation Bank. Removal of large outlet canals and the re-
contouring of the stream valleys has resulted in the connection of vast headwater wetland areas to the
upper first -order reaches of the Little Caw Caw Canal. There has been a discernible hydrologic response
within the stream valleys and the adjacent riparian wetlands. Vegetation and hydrologic monitoring of the
Phase Two and Three project areas indicate that the site is progressing well during the second year
following a droughty first year post- construction. Overall, the site exhibited a diverse assemblage of
characteristic trees and shrubs. Vegetation data document high rates of survivorship among the planted
species (R stem density = 468 stems per acre). Due to normal to above normal rainfall, the restoration
areas in the swamp forest and small stream swamp community of Phase Two and Phase Three met and
exceeded the target hydrologic criteria. All of the wells met the success criteria, and overall, the site
exhibited dramatically increased hydroperiods. It is anticipated that static water table elevations will remain
steady across the site particularly during normal rainfall periods during the early growing season.
Overall, Phase Two and Three appear to be progressing well toward the targeted wetland community
types. No contingency measures are recommended at this time. The restoration site is already providing
key wetland functions by reducing sediment /nutrient runoff; increasing floodwater storage; and re-
Stone Farm Regional Mitigation Bank 22
Phase Two and Three — Year 2 Annual Monitoring Report
establishing wildlife habitat. The site will be continued to be monitored over the next three years (through
Year 5), and the findings of such will be provided in subsequent annual monitoring reports for agency
review and concurrence.
Stone Farm Regional Mitigation Bank 23
Phase Two and Three — Year 2 Annual Monitoring Report
FIGURES
Legend
. o0
0
00000 0 0 Property Boundary
00000000 0 0 -�
000000000 ` 0 0 000
000: 404 Wetland Line
00 orthern Tributary
0 Stream Restoration (15,338 I.f. )
Riverine Small Stream
Swamp Restoration (1 03 ac.)
Non- Riverine Swamp 0
Forest Restoration (40 ac.)
Southern Tributary
Wetland Enhancement (66 ac.) %
Riverine Preservation (2 (5 ac.) o 0
Non - Riverine Preservation (I 60 ac. )
Upland Buffer (2 1 ac. )
Main Stem
'q
PARCEL D
232.52 AC
� r
A
1
-id
4
�.VL! 1VU �oVO
Project: Date: Revision Date:
NOT FOR CONSTRUCTION LMG 9
2/15/2013
Stone Farm Mltl anon Phase II
Scale: .Job Number:
LAND MANAGEMENT CROUP-. 1 "= 1000' 40-09-1905
Environmental Consultants Tale:
Post office Box 2522 Restoration Plan (Drawn By: Figure:
Wilmington, North Carolina 28402 LES 1
LAWETLAND5\2002 WETLANDS FILE5\01 -02 -240 - -- Stone Farm Mite ltt Site, DeCarol VAIllaen3arx'4NCAiJ\Pha= 2 FIM C«A5- boslt.dwg Telephone: 910 -452 -0001
300-ft
150
r
," �"Y,�'R� \.� �`•./:.. f 'r� 1,., l�E gf..��'` �_ • •,wyhr�l,�� P' K. _ "� .f
• I '.. • ,�f � ,G\ � ,_ �t�4r a �'�.i��'SI /i.,,: ::k- _
S } �y
r �k ` d •_� . �.i 1� J .Y'1 ,/ fy ®r 1,�.. +, i1 VV
h.
Legend N
Preservation Areas = 85.0 Acres w E
Enhancement Areas = 68.0 Acres S
Restoration Areas (Non- Riparian) = 38.9 Acres
Ditch Corridor - No Credits (6.16 Acres)
L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm
Mitigation Site, DeCarol Williamson \Annual Monitoring\
Phase III - Upper South Trib \Maps \As -Built
Map Source: NAPP 2010 Aerial Photography.
,,,,PLUG 2
�j
T"),
(� °�'�d •��.�
R r l*
PLUG 3
F X•
• v
� o
I
PLUG 4
4:.c •
X!,
0 300 600
• rr .Z ��
r a
•4
IR
.t
•'
{�t
IJi .slid T'►yl_i��y{{.�,,��� /� i
1,200 1,800
P'
4 ! xt 4
� 1
s �
6n �+
2,400
m Feet
,PLUG 1
Ah-
�a+
��;.a..,._
300-ft
150
r
," �"Y,�'R� \.� �`•./:.. f 'r� 1,., l�E gf..��'` �_ • •,wyhr�l,�� P' K. _ "� .f
• I '.. • ,�f � ,G\ � ,_ �t�4r a �'�.i��'SI /i.,,: ::k- _
S } �y
r �k ` d •_� . �.i 1� J .Y'1 ,/ fy ®r 1,�.. +, i1 VV
h.
Legend N
Preservation Areas = 85.0 Acres w E
Enhancement Areas = 68.0 Acres S
Restoration Areas (Non- Riparian) = 38.9 Acres
Ditch Corridor - No Credits (6.16 Acres)
L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm
Mitigation Site, DeCarol Williamson \Annual Monitoring\
Phase III - Upper South Trib \Maps \As -Built
Map Source: NAPP 2010 Aerial Photography.
,,,,PLUG 2
�j
T"),
(� °�'�d •��.�
R r l*
PLUG 3
F X•
• v
� o
I
PLUG 4
4:.c •
X!,
0 300 600
• rr .Z ��
r a
•4
IR
.t
•'
{�t
IJi .slid T'►yl_i��y{{.�,,��� /� i
1,200 1,800
P'
4 ! xt 4
� 1
s �
6n �+
2,400
m Feet
C �`� ..+^j � ��ds• � .�� �r�r��C, 3'rs<u IV-
-�1 �y�t...4 � � tx
:L
W,
c a
PHASE
2
r _
a� ':.aw =•• _ f• f `k �,F,`et, r c�' t F @. r1 r� k, y' +r 1.
r� ty.fd rflr
' r
�A.. X
P
ell
HA S
.; 4 i
rF
a v
. 'IX;:. '` l ry „,,,, a. rr... 4 n .r.. � , •�i..a .. r.,i�f..,� a e - <na...i
rr f�ssr .• � �� z ,
-
�t,s
�t § t :F W7t' tee. f P F °,,' r%$� r !'_ r j '; •-
IT
� � ! 1 1 .•sue � ��°°°�� rF
x
u. a
J
, e
r cr rrrr��f,j t,;
A-
li
C{`.� y; C E � ,�• . ,Sys` [ IF1
_ r
x
f
` w
pw I
r
.,f
i
,
e
NOTE: This is not a survey. All boundaries and distances are considered approximate.
This represents portions of a Conservation Easment Map surveyed by Tompkins Land Surveying,
P.A. AutoCAD layers have been overlaid onto an aerial photograph.
Map Source: NAPP 2012 Aerial Photography.
N
W j E
S
0 625 1,250 2,500 3,750 5,000
Fee
Legend NOTE: This is not a survey. All boundaries and distances are considered
gapproximate. This represents a preliminary sketch prepared from field notes.
Rain Guage Wells Stream data provided by Steve Norris, PLS.
Stream Guages Well / Plot Combination
Permanent Cross Sections Plots
Map Source: 2010 NAPP aerial photography SCALE 1" = 400'
L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Well_Stream Data \Well_Plot_Map_2012
Stone Farm Regional
Mitigation Bank - Phase II
Brunswick County, NC
February 2012
01 -02 -240
LMG
inuli hl n�nc.GWNT GROUP
Enwlt'onmrntol Consu7tanis
www.LMGroup.net
Phone: 910.452.0001 •1.866.LMG.1078
Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 28402
Figure 4
Aerial Photograph w/
Plot and Well Location
Legena
X X Permanent Cross Sections
Longitudinal Profiles
X As -Built Cross Sections
NOTE: This is not a survey. All boundaries and distances are considered
approximate. This represents a preliminary sketch prepared from field notes.
Stream data provided by Steve Norris, PLS.
Map Source: 2010 NAPP aerial photography SCALE 1" = 400'
L: \WETLANDS \2002 WETLANDS FILES \01 -02 -240 - -- Stone Farm Mitigation Site, DeCarol Williamson \Well_Stream Data \Well_Plot_Map_2012
Stone Farm Regional www.LMGroup.net
Figure 5
Mitigation Bank -Phase II Phone: 910.452.0001 •1.866.LMG.1078
Brunswick County NC LMG Aerial Photograph w/
February 2012 EiV NT GROUP Fax: 910.452.0060
Y Environmental Coasultants Cross Section Location
01 -02 -240 — P.O. Box 2522, Wilmington, NC 28402
APPENDIX A:
SITE PHOTOGRAPHS
View of Bay outlet supplying flow to Mainstem (MS)
t �,
View of gauge 1 along Mainstem (MS) during early growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAN[] MANAGF;M F,N'1' GROUP -.
Phase II & III Fn�,,anmen�Q,CQnsuhams Site Photographs
Year 2 AMR May 2014
View of gauge 1 during overbank flow event along Mainstem (MS)
i`4t,p4lL; —
y T
1 ;
View of Mainstem in early growing season (MS) (looking upstream)
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAN[] MANAGF;M F,N'1' GROUP iec.
Phase II & III CQnsuhams Site Photographs
Year 2 AMR May 2014
�E
h
View of guage 3 along Mainstem (MS)
View of guage 3 during overbank flow event (MS)
Stone Farm
Regional Mitigation Bank LMG Appendix A.
Phase II & III Site Photographs
Envlron merttal Cnnsuhnnn
Year 2 AMR May 2014
View of upper end of North Tributary (NT) mid - growing season
View of Plot Nt2 at Year 02 monitoring along North Tributary (NT)
Stone Farm
Regional Mitigation Bank LMG Appendix A.
Phase II & III Site Photographs
Environ mental Cnnsuhnnr -.
Year 2 AMR May 2014
� f
r tir ,
View of flow at guage NT1 along North Tributary (NT) in mid growing season
View of upper end of North Tributary (NT) near bankfull in early growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
Phase II & III R "" "A "A`'Hh °t; "' `'k" Site Photographs
Envlron merttal Cnnsuhnx,
Year 2 AMR May 2014
. ja
' I '
i.
4'
s�3 A 7
_
- � r
View of top end of Southern Tributary (ST) in early growing season
p d r^ ni
y !g L
M
rY Y
Wi
r +�
View of Southern Tributary (ST) channel
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAN[] MANAGF;M ENT GROUP-.
Phase II & III Env;ron menra, Consuhams Site Photographs
Year 2 AMR May 2014
rt;
View of Southern Tributary (ST) near bankfull during mid growing season
View of flow at gauge St2 along (ST) during mid growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
I.RN!) h7ANAGFMFIJ7' GROUP i „c.
Phase 11 & III F „� „o „1 e„ ar�o „s�, a „,5 Site Photographs
Year 2 AMR May 2014
View of bald cypress growth at Plot 5 (MS)
View of river birch growth at Plot 7 (MS)
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAND MANAGFMFNT GROUP -
Phase 11 & III F „�„onmenta,Co„su,tan,s Site Photographs
Year 2 AMR May 2014
View of black gum growth at Plot NT2 (NT)
View of tulip poplar growth at Plot NT6 (NT)
Stone Farm
Regional Mitigation Bank LMG Appendix A.
.A 11) MANAGF;MENT GROUP we
Phase II & III Fn�,,anmen�Q,�Q�s�,�a��, Site Photographs
Year 2 AMR May 2014
View of bald cypress growth at Plot ST1 (ST)
x 'Tiff
A i
R R'
!71A
�.� -►
View of tulip poplar growth at Plot ST4 (ST)
Stone Farm
Regional Mitigation Bank LMT ROUY Appendix A.
LAN[]MANAGF;M F,N'1'Giec.
Phase II & III En,tronmenrarConsuhams Site Photographs
Year 2 AMR May 2014
View of plug 1 at lower end of Phase 3 with saturated floodplain
View of saturated floodplain at plug 1 in mid growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
.AN[MANAGF;M Y,'NT GROUP we
Phase II & III Fn�,,anmen�Q,�Q�s�,�a��, Site Photographs
Year 2 AMR May 2014
View of plug 3 of Phase 3 inundated in mid - growing season
View of inundated floodplain adjacent to plug 3 of Phase 3
in mid - growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAND MANAGF;MENT GROUP iec.
Phase II & III EnvaanmentorConsuhams Site Photographs
Year 2 AMR May 2014
View of partially inundated plug 4 of Phase 3 in mid - growing season
View of water in channel behind plug 4 of Phase 3 at bankfull
in mid - growing season
Stone Farm
Regional Mitigation Bank LMG Appendix A.
LAND MANAGF;MENT GROUP iec.
Phase II & III EnvtronmenrarConsuhanrs Site Photographs
Year 2 AMR May 2014
OMMOM r:"
IVllMolll_l9aEel a • Iti_1.9.1_a: I ��
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 1
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
4
1 ft
Planted
4
Bald Cypress
T
18
2ft
Planted
18
Bald Cypress
T
2
aft
Planted
2
Black Gum
T
10
1 It
Planted
10
Black Gum
T
2
2ft
Planted
2
Tulip Poplar
T
20
1 ft
Planted
20
Tulip Poplar
T
1
2ft
Planted
1
Swamp Chestnut Oak
T
3
1 ft
Planted
3
Swamp Chestnut Oak
T
5
2ft
Planted
5
Water Oak
T
1
5ft
Volunteer
1
Water Oak
T
1
6ft
Volunteer
1
Water Oak
T
1
8ft
Volunteer
1
American Holly
T
3
1 It
Volunteer
3
Fetterbush
SH
1
1 ft
Volunteer
1
Fetterbush
SH
1
2ft
Volunteer
1
Inkberry
SH
3
2ft
Volunteer
3
Inkberry
SH
3
6ft
Volunteer
3
Red Bay
SH
4
1 It
Volunteer
4
Red Bay
SH
2
2ft
Volunteer
2
Red Bay
SH
1
3ft
Volunteer
1
Red Bay
SH
3
4 ft
Volunteer
3
Red Bay
SH
3
5ft
Volunteer
3
Red Bay
SH
3
6ft
Volunteer
3
Red Bay
SH
1
7 ft
Volunteer
1
Wax Myrtle
SH
20
1 ft
Volunteer
20
Wax Myrtle
SH
4
2ft
Volunteer
4
Wax Myrtle
SH
7
3ft
Volunteer
7
Wax Myrtle
SH
5
4 ft
Volunteer
5
Wax Myrtle
SH
1
5ft
Volunteer
1
Baccharis
SH
3
1 ft
Volunteer
3
Winged Sumac
SH
17
1 ft
Volunteer
17
Winged Sumac
SH
1
2 It
Volunteer
1
Persimmon
T
1
2 ft
Volunteer
1
Sweet Gum
T
6
1 It
Volunteer
6
Sweet Gum
T
1
2 ft
Volunteer
1
Sweet Gum
T
1
3 ft
Volunteer
1
Sweet Gum
T
1
8 ft
Volunteer
1
Sweet Gum
T
1
15 ft
Volunteer
1
Unidentified Pine
T
2
1 ft
Volunteer
2
Unidentified Pine
T
9
2 ft
Volunteer
9
Unidentified Pine
T
1
3 ft
Volunteer
1
Unidentified Pine
T
1
loft
Volunteer
1
TOTAL PLANTED
SPECIES
65
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
650
PLOT NUMBER
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL ACCEPTABLE
68
(VOLUNTEER
680
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
45
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
178
1330
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 2
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
11
1 ft
Planted
11
Bald Cypress
T
10
2 ft
Planted
10
Black Gum
T
14
1 ft
Planted
14
Black Gum
T
3
2 ft
Planted
3
River Birch
T
14
1 ft
Planted
14
River Birch
T
1
2 ft
Planted
1
River Birch
T
1
3 ft
Planted
1
Tulip Poplar
T
9
1 ft
Planted
9
Swamp Chestnut Oak
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
1
2 ft
Planted
1
Inkberry
SH
1
1 ft
Volunteer
1
Red Bay
SH
5
1 ft
Volunteer
5
Red Bay
SH
3
2 ft
Volunteer
3
Red Bay
SH
1
3 ft
Volunteer
1
Wax Myrtle
SH
1
1 ft
Volunteer
1
Wax Myrtle
SH
2
2 ft
Volunteer
2
Wax Myrtle
SH
2
3 ft
Volunteer
2
Water Oak
T
1
1 ft
Volunteer
1
Winged Sumac
SH
1
1 ft
Volunteer
1
Unidentified Pine
T
45
1 ft
Volunteer
45
Unidentified Pine
T
29
2 ft
Volunteer
29
Unidentified Pine
T
3
3 ft
Volunteer
3
Sweet Gum
T
4
1 ft
Volunteer
4
Sweet Gum
T
1
2 ft
Volunteer
1
Sweet Gum
T
1
3 ft
Volunteer
1
Sweet Gum
T
3
4 ft
Volunteer
3
TOTAL PLANTED
SPECIES
65
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
650
PLOT NUMBER
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL ACCEPTABLE
16
(VOLUNTEER
160
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
87
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
168
810
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 3
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
5
1 ft
Planted
5
Bald Cypress
T
6
2ft
Planted
6
Black Gum
T
6
1 ft
Planted
6
Black Gum
T
1
2ft
Planted
1
Atlantic White Cedar
T
1
1 ft
Planted
1
Atlantic White Cedar
T
1
3ft
Planted
1
Tulip Poplar
T
10
1 ft
Planted
10
Swamp Chestnut Oak
T
2
1 ft
Planted
2
Swamp Chestnut Oak
T
1
2ft
Planted
1
Pond Pine
T
3
1 ft
Planted
3
Pond Pine
T
4
2ft
Planted
4
Pond Pine
T
1
3ft
Planted
1
Pond Pine
T
1
4 ft
Planted
1
Red Bay
T
150
3 ft - Avg.
Volunteer
150
Inkberry
SH
350
3 ft - Avg.
Volunteer
350
Fetterbush
SH
350
3 ft - Avg.
Volunteer
350
Horse Sugar
SH
30
4 ft - Avg.
Volunteer
30
Sweet Gum
T
25
3ft
Volunteer
25
Sweet Gum
T
25
6 ft
Volunteer
25
Sweet Gum
T
8
12 ft
Volunteer
8
Unidentified Pine
T
30
7 ft - Avg.
Volunteer
30
TOTAL PLANTED
SPECIES
42
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
420
PLOT NUMBER
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL ACCEPTABLE
850
(VOLUNTEER
8500
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
118
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
1010
8920
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 4
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
3
1 ft
Planted
3
Bald Cypress
T
19
2ft
Planted
19
Bald Cypress
T
1
3 ft
Planted
1
Black Gum
T
4
1 ft
Planted
4
Black Gum
T
5
2ft
Planted
5
Atlantic White Cedar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
6
1 ft
Planted
6
Wax Myrtle
SH
5
2ft
Volunteer
5
Baccharis
SH
1
1 ft
Volunteer
1
Sweet Gum
T
1
2 ft
Volunteer
1
Unidentified Pine
T
1
1 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
39
(PLANTED SPECIES
390
SPECIES
PER ACRE)
TOTAL ACCEPTABLE
OBSERVED DENSITY
VOLUNTEERS
5
(VOLUNTEER
50
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
3
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
47
440
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 5
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
5
1 ft
Planted
5
Bald Cypress
T
17
2ft
Planted
17
Bald Cypress
T
3
3ft
Planted
3
Black Gum
T
11
1 ft
Planted
11
Black Gum
T
8
2ft
Planted
8
Tulip Poplar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
6
1 ft
Planted
6
Swamp Chestnut Oak
T
1
2ft
Planted
1
Wax Myrtle
SH
2
1 ft
Volunteer
2
Wax Myrtle
SH
10
2ft
Volunteer
10
Wax Myrtle
SH
5
3ft
Volunteer
5
Wax Myrtle
SH
1
4 ft
Volunteer
1
Wax Myrtle
SH
3
5 ft
Volunteer
3
Sweet Gum
T
2
2ft
Volunteer
2
Unidentified Pine
T
1
1 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
52
(PLANTED SPECIES
520
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
21
(VOLUNTEER
210
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
3
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
PLOT NUMBER
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL INDIVIDUALS
76
730
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 6
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
4
2ft
Planted
4
Black Gum
T
4
1 ft
Planted
4
Black Gum
T
2
2ft
Planted
2
Atlantic White Cedar
T
1
1 ft
Planted
1
Atlantic White Cedar
T
2
2ft
Planted
2
Atlantic White Cedar
T
1
3ft
Planted
1
Tulip Poplar
T
1
1 ft
Planted
1
Pond Pine
T
6
1 ft
Planted
6
Pond Pine
T
3
2ft
Planted
3
Pond Pine
T
1
3ft
Planted
1
Water Oak
T
4
1 ft
Volunteer
4
Water Oak
T
4
2ft
Volunteer
4
Red Bay
SH
60
2 ft - Avg.
Volunteer
60
Fetterbush
SH
300
3 ft - Avg.
Volunteer
300
Sweet Gum
T
50
3 ft - Avg.
Volunteer
50
Unidentified Pine
T
300
2 ft - Avg.
Volunteer
300
OBSERVED DENSITY
TOTAL PLANTED
26
(PLANTED SPECIES
260
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
368
(VOLUNTEER
3680
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
350
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
744
3940
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 7
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
18
2ft
Planted
18
Black Gum
T
6
1 ft
Planted
6
Black Gum
T
3
2ft
Planted
3
River Birch
T
7
1 ft
Planted
7
River Birch
T
5
2ft
Planted
5
Swamp Chestnut Oak
T
4
1 ft
Planted
4
Wax Myrtle
T
1
3 ft
Volunteer
1
Unidentified Pine
T
2
1 ft
Volunteer
2
OBSERVED DENSITY
TOTAL PLANTED
44
(PLANTED SPECIES
440
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
1
(VOLUNTEER
10
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
2
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
TOTAL INDIVIDUALS
47
OBSERVED DENSITY
450
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 8
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
8
1 ft
Planted
8
Bald Cypress
T
22
2 ft
Planted
22
Bald Cypress
T
8
3ft
Planted
8
Bald Cypress
T
2
4ft
Planted
2
Tulip Poplar
T
16
1 ft
Planted
16
Wax Myrtle
T
1
1 ft
Volunteer
1
Wax Myrtle
T
1
6ft
Volunteer
1
Water Oak
T
2
1 ft
Volunteer
2
Red Bay
SH
1
1 ft
Volunteer
1
Red Bay
SH
1
3ft
Volunteer
1
Red Bay
SH
1
6ft
Volunteer
1
Winged Sumac
SH
3
1 ft
Volunteer
3
Sweet Gum
T
6
1 ft
Volunteer
6
Sweet Gum
T
11
2 ft
Volunteer
11
Sweet Gum
T
8
3ft
Volunteer
8
Sweet Gum
T
3
4ft
Volunteer
3
Sweet Gum
T
2
6ft
Volunteer
2
Sweet Gum
T
1
7 ft
Volunteer
1
Sweet Gum
T
1
8 ft
Volunteer
1
Sweet Gum
T
1
loft
Volunteer
1
Unidentified Pine
T
30
1 ft
Volunteer
30
Unidentified Pine
T
4
2 ft
Volunteer
4
Unidentified Pine
T
1
3ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
56
(PLANTED SPECIES
560
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
7
(VOLUNTEER
70
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
71
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
134
630
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 9
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
Species
Counted toward
Success Criteria
T, SA, or SH
Bald Cypress
T
6
1 ft
Planted
6
Bald Cypress
T
21
2ft
Planted
21
Bald Cypress
T
5
3ft
Planted
5
Black Gum
T
8
1 ft
Planted
8
Black Gum
T
4
2ft
Planted
4
Black Gum
T
2
3ft
Planted
2
River Birch
T
1
1 ft
Planted
1
River Birch
T
3
2ft
Planted
3
Swamp Chestnut Oak
T
3
1 ft
Planted
3
Swamp Chestnut Oak
T
3
2ft
Planted
3
Wax Myrtle
SH
1
2ft
Volunteer
1
Wax Myrtle
SH
3
3ft
Volunteer
3
Wax Myrtle
SH
1
8 ft
Volunteer
1
Baccharis
SH
3
2 ft
Volunteer
3
Sweet Gum
T
1
2 ft
Volunteer
1
Sweet Gum
T
1
3 ft
Volunteer
1
Sweet Gum
T
1
5 ft
Volunteer
1
Sweet Gum
T
1
6 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
56
(PLANTED SPECIES
560
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
5
(VOLUNTEER
50
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
7
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
TOTAL INDIVIDUALS I 68 I I OBS( EVR D DENSITY I 610
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 10
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
Species
Counted toward
Success Criteria
T, SA, or SH
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
10
2ft
Planted
10
Bald Cypress
T
1
3 ft
Planted
1
Black Gum
T
1
2ft
Planted
1
Atlantic White Cedar
T
2
1 ft
Planted
2
Atlantic White Cedar
T
3
2ft
Planted
3
Swamp Chestnut Oak
T
2
1 ft
Planted
2
Swamp Chestnut Oak
T
3
2ft
Planted
3
Red Bay
SH
3
7 ft
Volunteer
3
Red Maple
T
50
1 ft
Volunteer
50
Sweet Gum
T
25
2 ft - Avg.
Volunteer
25
Sweet Gum
T
2
6 ft - Avg.
Volunteer
2
Sweet Gum
T
1
10 ft - Avg.
Volunteer
1
Unidentified Pine
T
8
2 ft - Avg.
Volunteer
8
Unidentified Pine
T
1
6 ft - Avg.
Volunteer
1
Unidentified Pine
T
1
10 ft - Avg.
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
23
(PLANTED SPECIES
230
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
3
(VOLUNTEER
30
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
88
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
114
260
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 11
SPECIES
STRATUM
T, SA, or SH
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
13
2 ft
Planted
13
Bald Cypress
T
1
3 ft
Planted
1
Black Gum
T
2
1 ft
Planted
2
Black Gum
T
1
2ft
Planted
1
Atlantic White Cedar
T
1
1 ft
Planted
1
Atlantic White Cedar
T
5
2ft
Planted
5
Atlantic White Cedar
T
4
3 ft
Planted
4
Tulip Poplar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
6
1 ft
Planted
6
Swamp Chestnut Oak
T
5
2ft
Planted
5
Pond Pine
T
1
1 ft
Planted
1
Pond Pine
T
2
2ft
Planted
2
Pond Pine
T
6
3 ft
Planted
6
Pond Pine
T
2
4 ft
Planted
2
Red Maple
T
10
1 ft
Volunteer
10
Red Maple
T
10
2ft
Volunteer
10
Sweet Gum
T
10
6 ft
Volunteer
10
Sweet Gum
T
10
8 ft
Volunteer
10
Sweet Gum
T
5
12 ft
Volunteer
5
Unidentified Pine
T
20
2 ft - Avg.
Volunteer
20
Unidentified Pine
T
5
5 ft- Avg.
Volunteer
5
Unidentified Pine
T
1
8 ft- Avg.
Volunteer
1
TOTAL PLANTED
SPECIES
50
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
500
TOTAL ACCEPTABLE
VOLUNTEERS
0
OBSERVED DENSITY
(VOLUNTEER
SPECIES PER ACRE)
0
TOTAL
UNACCEPTABLE
VOLUNTEERS
71
SINGLE VOLUNTEER
>50% OF TOTAL (YIN)
NO
TOTAL INDIVIDUALS
121
OBSERVED DENSITY
(PER ACRE)
500
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 12
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
3
1 ft
Planted
3
Bald Cypress
T
22
2ft
Planted
22
Bald Cypress
T
1
3ft
Planted
1
Black Gum
T
10
1 ft
Planted
10
Black Gum
T
2
2ft
Planted
2
River Birch
T
1
2ft
Planted
1
Tulip Poplar
T
2
1 ft
Planted
2
Swamp Chestnut Oak
T
5
1 ft
Planted
5
Swamp Chestnut Oak
T
3
2ft
Planted
3
Wax Myrtle
SH
3
2ft
Volunteer
3
Wax Myrtle
SH
3
3ft
Volunteer
3
Wax Myrtle
SH
2
4 ft
Volunteer
2
Baccharis
SH
1
1 ft
Volunteer
1
Sweet Gum
T
15
1 ft
Volunteer
15
Unidentified Pine
T
10
1 ft
Volunteer
10
TOTAL PLANTED
OBSERVED DENSITY
SPECIES
49
(PLANTED SPECIES
490
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
8
(VOLUNTEER
80
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
26
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
83
570
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 13
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
4
2ft
Planted
4
Black Gum
T
1
2ft
Planted
1
Black Gum
T
1
3ft
Planted
1
Atlantic White Cedar
T
5
1 ft
Planted
5
Atlantic White Cedar
T
4
2ft
Planted
4
Atlantic White Cedar
T
2
3ft
Planted
2
River Birch
T
2
1 ft
Planted
2
River Birch
T
2
2ft
Planted
2
Tulip Poplar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
3
1 ft
Planted
3
Wax Myrtle
SH
8
3 ft - Avg.
Volunteer
8
Wax Myrtle
SH
6
6 ft - Avg.
Volunteer
6
Wax Myrtle
SH
4
8 ft - Avg.
Volunteer
4
Red Bay
SH
8
3 ft - Avg.
Volunteer
8
Red Bay
SH
8
6 ft - Avg.
Volunteer
8
Red Bay
SH
4
8 ft - Avg.
Volunteer
4
Sweet Gum
T
15
3 ft - Avg.
Volunteer
15
Sweet Gum
T
15
6 ft - Avg.
Volunteer
15
Sweet Gum
T
10
8 ft - Avg.
Volunteer
10
Sweet Gum
T
4
10 ft - Avg.
Volunteer
4
Sweet Gum
T
2
12+ ft - Avg.
Volunteer
2
Unidentified Pine
T
15
3 ft - Avg.
Volunteer
15
Unidentified Pine
T
8
6 ft - Avg.
Volunteer
8
Unidentified Pine
T
15
10 ft - Avg.
Volunteer
15
Unidentified Pine
T
8
12+ ft - Avg.
Volunteer
8
TOTAL PLANTED
SPECIES
25
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
250
PLOT NUMBER 13
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL ACCEPTABLE
38
(VOLUNTEER
380
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
92
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
155
630
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 14
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
2
1 ft
Planted
2
Bald Cypress
T
11
2ft
Planted
11
Bald Cypress
T
1
3ft
Planted
1
Black Gum
T
2
1 ft
Planted
2
Black Gum
T
1
2ft
Planted
1
Atlantic White Cedar
T
5
1 ft
Planted
5
Atlantic White Cedar
T
3
2ft
Planted
3
Atlantic White Cedar
T
2
3ft
Planted
2
Tulip Poplar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
1
2ft
Planted
1
Pond Pine
T
4
1 ft
Planted
4
Pond Pine
T
5
2ft
Planted
5
Pond Pine
T
2
3ft
Planted
2
Pond Pine
T
1
4 ft
Planted
1
Wax Myrtle
SH
15
1 ft
Volunteer
15
Wax Myrtle
SH
18
3 ft - Avg.
Volunteer
18
Wax Myrtle
SH
1
3ft
Volunteer
1
Red Maple
T
30
1 ft
Volunteer
30
Sweet Gum
T
8
1 ft
Volunteer
8
Sweet Gum
T
8
3ft
Volunteer
8
Sweet Gum
T
12
6 ft
Volunteer
12
Unidentified Pine
T
20
1 ft
Volunteer
20
Unidentified Pine
T
8
3ft
Volunteer
8
Unidentified Pine
T
2
6 ft
Volunteer
2
Unidentified Pine
T
3
8 ft
Volunteer
3
PLOT NUMBER 14
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
OBSERVED DENSITY
Success Criteria
TOTAL PLANTED
42
(PLANTED SPECIES
420
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
34
(VOLUNTEER
340
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
91
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
167
760
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 15
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
11
1 ft
Planted
11
Bald Cypress
T
20
2ft
Planted
20
Black Gum
T
2
1 ft
Planted
2
Black Gum
T
2
2ft
Planted
2
River Birch
T
5
1 ft
Planted
5
River Birch
T
2
2ft
Planted
2
Swamp Chestnut Oak
T
8
1 ft
Planted
8
Wax Myrtle
SH
5
3 ft
Planted
5
Wax Myrtle
SH
3
7 ft
Volunteer
3
Baccharis
SH
10
1 ft
Volunteer
10
Sweet Gum
T
10
2 ft - Avg.
Volunteer
10
Sweet Gum
T
4
5 ft- Avg.
Volunteer
4
Sweet Gum
T
3
8 ft- Avg
Volunteer
3
Unidentified Pine
T
6
2 ft- Avg.
Volunteer
6
Unidentified Pine
T
3
5 ft- Avg.
Volunteer
3
Unidentified Pine
T
3
8 ft- Avg
Volunteer
3
Unidentified Pine
T
1
12 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
50
(PLANTED SPECIES
500
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
8
(VOLUNTEER
80
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
40
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
98
580
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 16
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
16
1 ft
Planted
16
Bald Cypress
T
30
2ft
Planted
30
Bald Cypress
T
2
3 ft
Planted
2
Black Gum
T
2
1 ft
Planted
2
Black Gum
T
2
2ft
Planted
2
Atlantic White Cedar
T
1
1 ft
Planted
1
Pond Pine
T
3
1 ft
Planted
3
Pond Pine
T
2
2ft
Planted
2
OBSERVED DENSITY
TOTAL PLANTED
58
(PLANTED SPECIES
580
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
0
(VOLUNTEER
0
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
0
NO
VOLUNTEERS
>50% OF TOTAL (YIN)
OBSERVED DENSITY
TOTAL INDIVIDUALS
58
580
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 17
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
19
2ft
Planted
19
Bald Cypress
T
7
3 ft
Planted
7
Black Gum
T
2
1 ft
Planted
2
Black Gum
T
4
2ft
Planted
4
River Birch
T
2
1 ft
Planted
2
Tulip Poplar
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
2
1 ft
Planted
2
Swamp Chestnut Oak
T
2
2ft
Planted
2
Baccharis
T
16
2 ft - Avg.
Planted
16
OBSERVED DENSITY
TOTAL PLANTED
40
(PLANTED SPECIES
400
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
0
(VOLUNTEER
0
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
16
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
56
400
(PER ACRE)
STONE FARM MITIGATION BANK - MAINSTEM
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER 18
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
5
1 ft
Planted
5
Bald Cypress
T
7
2ft
Planted
7
Bald Cypress
T
1
3ft
Planted
1
Black Gum
T
2
2ft
Planted
2
Atlantic White Cedar
T
2
1 ft
Planted
2
Atlantic White Cedar
T
3
2ft
Planted
3
Atlantic White Cedar
T
2
3ft
Planted
2
Tulip Poplar
T
5
1 ft
Planted
5
Tulip Poplar
T
1
2ft
Planted
1
Swamp Chestnut Oak
T
1
1 ft
Planted
1
Swamp Chestnut Oak
T
1
2ft
Planted
1
Pond Pine
T
1
2ft
Planted
1
River Birch
T
1
2ft
Planted
1
American Holly
T
8
3ft
Volunteer
8
Fetterbush
SH
120
3 ft - Avg.
Volunteer
120
Red Bay
SH
25
2 ft - Avg.
Volunteer
25
Red Bay
SH
15
6 ft - Avg.
Volunteer
15
Red Bay
SH
5
10 ft - Avg.
Volunteer
5
Wax Myrtle
SH
8
3 ft - Avg.
Volunteer
8
Wax Myrtle
SH
6
6 ft - Avg.
Volunteer
6
Water Oak
SH
9
2 ft - Avg.
Volunteer
9
Blueberry
SH
20
3ft
Volunteer
20
Blue Huckleberry
SH
40
3ft
Volunteer
40
Red Chokeberry
SH
15
2ft
Volunteer
15
Sweet Gum
SH
20
2 ft - Avg.
Volunteer
20
Sweet Gum
SH
10
6 ft - Avg.
Volunteer
10
Sweet Gum
SH
8
10 ft - Avg.
Volunteer
8
Titi
SH
5
3ft
Volunteer
5
Live Oak
T
3
3ft
Volunteer
3
Unidentified Pine
T
50
2 ft - Avg.
Volunteer
50
Unidentified Pine
T
30
6 ft - Avg.
Volunteer
30
Unidentified Pine
T
10
10 ft - Avg.
Volunteer
10
PLOT NUMBER 18
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
OBSERVED DENSITY
Success Criteria
TOTAL PLANTED
32
(PLANTED SPECIES
320
SPECIES
PER ACRE
OBSERVED DENSITY
TOTAL ACCEPTABLE
196
(VOLUNTEER
1960
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
211
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
439
2280
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 1
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
5
1 ft
Planted
5
Bald Cypress
T
13
2ft
Planted
13
Bald Cypress
T
7
3 ft
Planted
7
Black Gum
T
3
1 ft
Planted
3
Black Gum
T
4
2ft
Planted
4
Tulip Poplar
T
4
1 ft
Planted
4
Swamp Chestnut Oak
T
8
1 ft
Planted
8
Swamp Chestnut Oak
T
3
2ft
Planted
3
Wax Myrtle
SH
4
4 ft
Volunteer
4
Red Bay
SH
2
1 ft
Volunteer
2
Red Bay
SH
1
2ft
Volunteer
1
Red Bay
SH
1
5 ft
Volunteer
1
Red Bay
SH
1
6 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
47
(PLANTED SPECIES
470
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
VOLUNTEERS
9
(VOLUNTEER
90
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
0
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
56
560
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 2
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
9
1 ft
Planted
9
Bald Cypress
T
24
2ft
Planted
24
Bald Cypress
T
3
3ft
Planted
3
Black Gum
T
3
1 ft
Planted
3
Black Gum
T
1
2ft
Planted
1
River Birch
T
4
1 ft
Planted
4
Tulip Poplar
T
5
1 ft
Planted
5
Swamp Chestnut Oak
T
5
1 ft
Planted
5
Swamp Chestnut Oak
T
1
2ft
Planted
1
Wax Myrtle
SH
1
4 ft
Volunteer
1
Wax Myrtle
SH
1
5 ft
Volunteer
1
Wax Myrtle
SH
1
7 ft
Volunteer
1
Baccharis
SH
8
2 ft
Volunteer
8
Baccharis
SH
4
3 ft
Volunteer
4
Sweet Gum
T
5
2 ft
Volunteer
5
Sweet Gum
T
1
3 ft
Volunteer
1
Sweet Gum
T
3
5 ft
Volunteer
3
Sweet Gum
T
5
7 ft
Volunteer
5
OBSERVED DENSITY
TOTAL PLANTED
SPECIES
55
(PLANTED SPECIES
550
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
3
(VOLUNTEER
30
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
26
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
84
580
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 3
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
4
1 ft
Planted
4
Bald Cypress
T
9
2ft
Planted
9
Bald Cypress
T
2
3ft
Planted
2
Black Gum
T
1
1 ft
Planted
1
Black Gum
T
1
2ft
Planted
1
Atlantic White Cedar
T
1
2ft
Planted
1
Atlantic White Cedar
T
4
3ft
Planted
4
Atlantic White Cedar
T
1
4ft
Planted
1
Tulip Poplar
T
3
1 ft
Planted
3
Pond Pine
T
4
2ft
Planted
4
Red Bay
SH
6
1 ft
Volunteer
6
Red Bay
SH
6
2ft
Volunteer
6
Red Bay
SH
9
3ft
Volunteer
9
Red Bay
SH
4
4ft
Volunteer
4
Red Bay
SH
1
5 ft
Volunteer
1
Red Bay
SH
1
6 ft
Volunteer
1
Sweet Bay
SH
2
1 ft
Volunteer
2
Sweet Bay
SH
1
3ft
Volunteer
1
Wax Myrtle
SH
4
2ft
Volunteer
4
Wax Myrtle
SH
6
3ft
Volunteer
6
Wax Myrtle
SH
1
6 ft
Volunteer
1
Wax Myrtle
SH
1
9 ft
Volunteer
1
Water Oak
T
4
3ft
Volunteer
4
Blueberry
SH
3
3ft
Volunteer
3
Winged Sumac
SH
1
3ft
Volunteer
1
Sweet Gum
T
2
2ft
Volunteer
2
Sweet Gum
T
2
3ft
Volunteer
2
Sweet Gum
T
1
4ft
Volunteer
1
Sweet Gum
T
2
5 ft
Volunteer
2
Unidentified Pine
T
5
1 ft
Volunteer
5
PLOT NUMBER NT 3
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
T
11
Volunteer
Success Criteria
Unidentified Pine
2 ft
11
Unldentifed Pine
T
9
3 ft
Volunteer
9
Unldentifed Pine
T
15
4 ft
Volunteer
15
Unldentifed Pine
T
12
5 ft
Volunteer
12
Unidentified Pine
T
9
6 ft
Volunteer
9
OBSERVED DENSITY
TOTAL PLANTED
30
(PLANTED SPECIES
300
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
49
(VOLUNTEER
490
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
69
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
148
790
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 4
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
4
1 ft
Planted
4
Bald Cypress
T
17
2ft
Planted
17
Bald Cypress
T
9
3ft
Planted
9
Black Gum
T
7
1 ft
Planted
7
Black Gum
T
2
2ft
Planted
2
River Birch
T
8
1 ft
Planted
8
River Birch
T
16
2ft
Planted
16
River Birch
T
2
4 ft
Planted
2
River Birch
T
1
5 ft
Planted
1
Swamp Chestnut Oak
T
2
1 ft
Planted
2
Swamp Chestnut Oak
T
1
2ft
Planted
1
Wax Myrtle
SH
1
3ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
69
(PLANTED SPECIES
690
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
1
(VOLUNTEER
10
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
0
NO
VOLUNTEERS
>50% OF TOTAL (YIN)
TOTAL INDIVIDUALS
70
OBSERVED DENSITY
700
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 5
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
5
1 ft
Planted
5
Bald Cypress
T
17
2ft
Planted
17
Bald Cypress
T
4
3ft
Planted
4
Black Gum
T
14
1 ft
Planted
14
Black Gum
T
4
2ft
Planted
4
American White Cedar
T
2
1 ft
Planted
2
Tulip Poplar
T
8
1 ft
Planted
8
Swamp Chestnut Oak
T
4
1 ft
Planted
4
Swamp Chestnut Oak
T
1
2ft
Planted
1
Pond Pine
T
1
1 ft
Planted
1
Sweet Gum
T
8
1 ft
Volunteer
8
Sweet Gum
T
2
3ft
Volunteer
2
Sweet Gum
T
3
4 ft
Volunteer
3
Sweet Gum
T
1
7 ft
Volunteer
1
TOTAL PLANTED
60
(PLANTED SPECIES
600
SPECIES
PER ACREI
OBSERVED DENSITY
TOTAL ACCEPTABLE
0
(VOLUNTEER
0
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
UNACCEPTABLE
14
SINGLE VOLUNTEER
NO
VOLUNTEERS
>50% OF TOTAL (YIN)
TOTAL INDIVIDUALS
74
OBSERVED DENSITY
600
(PER ACRE)
STONE FARM MITIGATION BANK - NORTH TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER NT 6
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
7
1 ft
Planted
7
Bald Cypress
T
25
2 ft
Planted
25
Bald Cypress
T
13
3 ft
Planted
13
Bald Cypress
T
2
4ft
Planted
2
Tulip Poplar
T
5
1 ft
Planted
5
Tulip Poplar
T
1
4ft
Planted
1
Swamp Chestnut Oak
T
7
1 ft
Planted
7
Wax Myrtle
SH
8
2 ft - Avg.
Volunteer
8
Sweet Gum
T
20
3 ft - Avg.
Volunteer
20
Sweet Gum
T
20
6 ft - Avg.
Volunteer
20
Sweet Gum
T
10
10 ft - Avg.
Volunteer
10
TOTAL PLANTED
OBSERVED DENSITY
SPECIES
60
(PLANTED SPECIES
600
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
8
(VOLUNTEER
80
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
30
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
108
680
(PER ACRE)
STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER ST 1
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
15
2 ft
Planted
15
Bald Cypress
T
8
3 ft
Planted
8
Bald Cypress
T
3
4 ft
Planted
3
Bald Cypress
T
1
5 ft
Planted
1
Green Ash
T
5
1 ft
Planted
5
Wax Myrtle
SH
1
4 ft
Volunteer
1
Red Bay
SH
4
2 ft - Avg.
Volunteer
4
Red Bay
SH
5
5 ft
Volunteer
5
Water Oak
T
1
8 ft
Volunteer
1
Fetterbush
SH
6
2 ft
Volunteer
6
Fetterbush
SH
2
4 ft
Volunteer
2
Red Maple
T
40
1 ft
Volunteer
40
Sweet Gum
T
8
3 ft
Volunteer
8
Sweet Gum
T
1
12 ft
Volunteer
1
Sweet Gum
T
1
15 ft
Volunteer
1
Unidentified Pine
T
9
2 ft - Avg.
Volunteer
9
Unidentified Pine
T
1
7 ft
Volunteer
1
OBSERVED DENSITY
TOTAL PLANTED
33
(PLANTED SPECIES
330
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
19
(VOLUNTEER
190
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
60
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
112
520
(PER ACRE)
STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER ST 2
SPECIES
STRATUM
(T, SA, SH)
Number of Individuals
HEIGHT
Planted vs. Volunteer
Species
Number of Individuals
Counted toward
Success Criteria
Bald Cypress
T
2
1 ft
Planted
2
Bald Cypress
T
7
2 ft
Planted
7
Bald Cypress
T
7
3 ft
Planted
7
Bald Cypress
T
3
4 ft
Planted
3
Black Gum
T
9
1 ft
Planted
9
Black Gum
T
3
2 ft
Planted
3
Pond Pine
T
1
2 ft
Planted
1
Pond Pine
T
2
3 ft
Planted
2
Pond Pine
T
1
4 ft
Planted
1
Pond Pine
T
3
5 ft
Planted
3
Pond Pine
T
3
6 ft
Planted
3
Pond Pine
T
1
7 ft
Planted
1
Red Bay
SH
15
2 ft - Avg.
Volunteer
15
Red Bay
SH
12
5 ft - Avg.
Volunteer
12
Red Bay
SH
5
10 ft - Avg.
Volunteer
5
Red Bay
SH
2
12+ ft
Volunteer
2
Wax Myrtle
SH
10
2 ft - Avg.
Volunteer
10
Wax Myrtle
SH
5
5 ft - Avg.
Volunteer
5
Wax Myrtle
SH
2
10 ft - Avg.
Volunteer
2
Sweet Gum
T
15
2 ft - Avg.
Volunteer
15
Sweet Gum
T
25
5 ft - Avg.
Volunteer
25
Sweet Gum
T
6
10 ft - Avg.
Volunteer
6
Sweet Gum
T
1
12+ ft
Volunteer
1
Unidentified Pine
T
20
2 ft - Avg.
Volunteer
20
Unidentified Pine
T
10
5 ft - Avg.
Volunteer
10
Unidentified Pine
T
8
10 ft - Avg.
Volunteer
8
Unidentified Pine
T
1
12+ ft
Volunteer
1
TOTAL PLANTED
SPECIES
42
OBSERVED DENSITY
(PLANTED SPECIES
PER ACRE)
420
PLOT NUMBER ST 2
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
OBSERVED DENSITY
TOTAL ACCEPTABLE
51
(VOLUNTEER
510
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
86
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
179
930
(PER ACRE)
STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER ST 3
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
2
1 ft
Planted
2
Bald Cypress
T
12
2ft
Planted
12
Bald Cypress
T
3
3ft
Planted
3
Bald Cypress
T
4
4 ft
Planted
4
Black Gum
T
3
1 ft
Planted
3
Green Ash
T
4
1 ft
Planted
4
Ironwood
T
1
1 ft
Planted
1
Ironwood
T
1
2ft
Planted
1
Red Bay
SH
8
3ft
Volunteer
8
Red Bay
SH
4
5 ft
Volunteer
4
Red Bay
SH
1
8 ft
Volunteer
1
Highbush Blueberry
SH
10
3ft
Volunteer
10
Highbush Blueberry
SH
1
6 ft
Volunteer
1
Red Maple
T
30
1 ft
Volunteer
30
Sweet Gum
T
10
5 ft
Volunteer
10
Unidentified Pine
T
3
2 ft - Avg.
Volunteer
3
Unidentified Pine
T
3
5 ft - Avg.
Volunteer
3
OBSERVED DENSITY
TOTAL PLANTED
30
(PLANTED SPECIES
300
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
24
(VOLUNTEER
240
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
46
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
PLOT NUMBER ST 3
SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals
(T, SA, SH) Species Counted toward
Success Criteria
TOTAL INDIVIDUALS 100 OBSERVED DENSITY 540
(PER ACRE)
STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER ST 4
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
1
1 ft
Planted
1
Bald Cypress
T
15
2ft
Planted
15
Bald Cypress
T
13
3 ft
Planted
13
Bald Cypress
T
4
4 ft
Planted
4
Black Gum
T
6
1 ft
Planted
6
Black Gum
T
5
2ft
Planted
5
Green Ash
T
17
1 ft
Planted
17
Green Ash
T
5
2ft
Planted
5
Tulip Poplar
T
15
1 -2 ft
Volunteer
15
Tulip Poplar
T
1
3 ft
Volunteer
1
Wax Myrtle
T
13
2 ft - Avg.
Volunteer
13
Baccharis
SH
10
2 ft - Avg.
Volunteer
10
Winged Sumac
SH
30
2 ft - Avg.
Volunteer
30
Sweet Gum
T
20
2 ft - Avg.
Volunteer
20
Sweet Gum
T
15
5 ft - Avg.
Volunteer
15
Sweet Gum
T
8
10 ft - Avg.
Volunteer
8
Unidentified Pine
T
10
2 ft - Avg.
Volunteer
10
OBSERVED DENSITY
TOTAL PLANTED
66
(PLANTED SPECIES
660
SPECIES
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
29
(VOLUNTEER
290
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
93
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
OBSERVED DENSITY
TOTAL INDIVIDUALS
188
950
(PER ACRE)
STONE FARM MITIGATION BANK - SOUTHERN TRIBUTARY
ANNUAL MONITORING DATA SHEET - VEGETATION PLOTS
2013
PLOT NUMBER ST 5
SPECIES
STRATUM
Number of Individuals
HEIGHT
Planted vs. Volunteer
Number of Individuals
(T, SA, SH)
Species
Counted toward
Success Criteria
Bald Cypress
T
2
1 ft
Planted
2
Bald Cypress
T
7
2ft
Planted
7
Bald Cypress
T
13
3 ft
Planted
13
Bald Cypress
T
3
4 ft
Planted
3
Bald Cypress
T
1
5ft
Planted
1
Black Gum
T
11
1 ft
Planted
11
Black Gum
T
5
2ft
Planted
5
Green Ash
T
1
1 ft
Planted
1
Green Ash
T
1
2ft
Planted
1
Ironwood
T
1
1 ft
Planted
1
Ironwood
T
2
2ft
Planted
2
Ironwood
T
1
3 ft
Planted
1
Swamp Chestnut Oak
T
1
2ft
Planted
1
Atlantic White Cedar
T
1
1 ft
Planted
1
Sweet Gum
T
30
1 ft
Volunteer
30
Sweet Gum
T
2
5ft
Volunteer
2
OBSERVED DENSITY
TOTAL PLANTED
SPECIES
50
(PLANTED SPECIES
500
PER ACRE)
OBSERVED DENSITY
TOTAL ACCEPTABLE
0
(VOLUNTEER
0
VOLUNTEERS
SPECIES PER ACRE)
TOTAL
SINGLE VOLUNTEER
UNACCEPTABLE
32
NO
>50% OF TOTAL (YIN)
VOLUNTEERS
PLOT NUMBER ST 5
SPECIES STRATUM Number of Individuals HEIGHT Planted vs. Volunteer Number of Individuals
(T, SA, SH) Species Counted toward
Success Criteria
TOTAL INDIVIDUALS gz OBSERVED DENSITY 500
(PER ACRE)
❑PL];%ZCl m, aAm i
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Tributary
- Plot Wells 1, 3, 4
- Ecotone WM 20 and 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00 am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
�aK" �a� � �a� �a� � �a� 'o � �e� �' IQ(
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.lmgroup.net
-42 - — _ — — —
_
N N� Nb �3 �� Nb N'3 �� �3
�� ^3 �� �� �� �3 Nb Nb �3
lac �a� �a� �e� �e� yep
NV l ^' 1� r �� t� gyp' `�
�e� �eQ ��c �a�' lac ��c �aV lac
1O' rL l �' < NA 10; rOA
--Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2)
Plot 4 (13D4A988) 12in below surface
IMOnsite Raingauge I Slide A -9
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Tributary
- Plot Wells 1, 3, 4
- Ecotone WM 20 and 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00 am
N
d
s
0
.Q
m
a`
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
N
d
t 0
v
c
d
-6
d
—1 -12
d
-18
-24
N -30
c
C -36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
L ALA
�3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N�
a� a� aA a� ��
wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
PQc' Pq
-Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2)
Plot 4 (13D4A988) 12in below surface
�Onsite Raingauge Slide A -10
8
7
6
5
n
rt
4
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Tributary
- Plot Wells 1, 3, 4
- Ecotone WM 20 and 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
d
t 0
v
c
d
-6
d
—1 -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
September 2013
�3
OJ� ,J�
N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
-42 1 — — — —
SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ
--Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2)
Plot 4 (13D4A988) 12in below surface
IMOnsite Raingauge I Slide A -11
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Tributary
- Plot Wells 1, 3, 4
- Ecotone WM 20 and 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe �� Qe Qe �e �e
N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42
�3
�3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N�
J J J
O O O O O O O �o �o �o
K N� N� ��' ti� ��' h ^p N gyp' �4j I§y
d G d
h ^p NV 1p I Apr
--Plot 1 (13D4C94F) 4 -Plot 3 (13D4ACD2)
Plot 4 (13D4A988) 12in below surface
IMOnsite Raingauge I Slide A -12
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Tributary
- Plot Wells 2, 3, 6
- Ecotone WM 20 and 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00 am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �
�Z �e� ���' <,Z
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42 - - _ - - -
_
N N� Nb �3 �� Nb N'3 �� �3
�� ^3 �� �� �� �3 Nb Nb �3
lac �a� �a� �e� �e� yep
NV l ^' 1� r �� t� gyp' `�
�e� �eQ ��c �a�' lac ��c �aV lac
1O' rL 1 �' < NA 10; rOA
--Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F)
Plot 6 (14E19549) 12in below surface
IMOnsite Raingauge I Slide B -5
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Tributary
- Plot Wells 2, 3, 6
- Ecotone WM 20 and 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00 am
N
d
s
0
.Q
m
a`
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
C -36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
L ALA
�3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N�
a� a� aA a� ��
wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
n
rt
4 rt
0
3 3
2
1
- 0
-Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F)
Plot 6 (14E19549) 12in below surface
MOnsite Raingauge Slide B -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Tributary
- Plot Wells 2, 3, 6
- Ecotone WM 20 and 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
d
t 0
v
c
d
-6
d
-1 -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
September 2013
�3
OJ� ,J�
N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
-42 1 - - — -
SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ
--Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F)
Plot 6 (14E19549) 12in below surface
IMOnsite Raingauge I Slide B -7
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Tributary
- Plot Wells 2, 3, 6
- Ecotone WM 20 and 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe �� Qe Qe �e �e
N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42
�3
�3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N�
J J J
O O O O O O O �o �o �o
K N� N� ��' ti� ��' h ^p N gyp' �4j I§y
d G d
h ^p NV 1p I Apr
--Plot 2 (14E19DE1) 4 -Plot 3 (14E1951F)
Plot 6 (14E19549) 12in below surface
IMOnsite Raingauge I Slide B -8
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 1, 5, 7
- Ecotone WM 20 and 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00 am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �
�Z �e� ���' <,Z
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42 - - _ - - -
_
N N� Nb �3 �� Nb N'3 �� �3
�� ^3 �� �� �� �3 Nb Nb �3
lac �a� �a� �e� �e� yep
NV l ^' 1� r �� t� gyp' `�
�e� �eQ ��c �a�' lac ��c �aV lac
1O' rL l �' < NA 10; rOA
--Plot 1 (14E1ABD3) --Plot 5 (14E1A330)
Plot 7 (14E1 6007) 12in below surface
IMOnsite Raingauge I Slide C -5
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 1, 5, 7
- Ecotone WM 20 and 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00 am
N
d
s
0
.Q
m
a`
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
C -36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
L ALA
�3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N�
a� a� aA a� ��
wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
n
rt
4 rt
0
3 3
2
1
- 0
-Plot 1 (14E1ABD3) --Plot 5 (14E1A330)
Plot 7 (14E16007) 12in below surface
MOnsite Raingauge Slide C -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 1, 5, 7
- Ecotone WM 20 and 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
d
t 0
v
c
d
-6
d
-1 -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
September 2013
�3
OJ� ,J�
N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
-42 1 - - — -
SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ
--Plot 1 (14E1ABD3) --Plot 5 (14E1A330)
Plot 7 (14E16007) 12in below surface
IMOnsite Raingauge I Slide C -7
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 1, 5, 7
- Ecotone WM 20 and 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe �� Qe Qe �e �e
N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42
�3
�3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N�
J J J
O O O O O O O �o �o �o
K N� N� ��' ti� ��' h ^p N gyp' �4j I§y
d G d
h ^p NV 1p I Apr
--Plot 1 (14E1ABD3) --Plot 5 (14E1A330)
Plot 7 (14E16007) 12in below surface
IMOnsite Raingauge I Slide C -8
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 8 and pairing
- Ecotone WM 20 and 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00 am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �Z �e� ��� <,��
h
m nsite Raingauge —30 day total 30% —70% MShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
El V,
<3 N �� Nb �� Nb �b �5 ^3 �� Nb �� NO �3 N3 N N3 Nb
��a° °��° ^�a° °��� �e� lea �e� ���
N L L 3 �° � i° 0°' t �' �t N\'
Land Management Group, Inc. +Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74)
www.lmgroup.net 12in below surface MOnsite Raingauge Slide D -5
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 8 and pairing
- Ecotone WM 20 and 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00 am
N
d
s
0
.Q
m
a`
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
L ALA
�3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N�
a� a� aA a� ��
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
0
4 s
O
3
2
1
-42 _ — — 1 0
N �� N3 �b ^3 �b <5 N'� �b
N7 a ��a�
^ ^��� ^�a� a� ^�a1 I
+Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74)
1 2i below surface MOnsite Raingauge Slide D -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 8 and pairing
- Ecotone WM 20 and 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
(L
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
September 2013
�3
OJ� ,J�
N Nv �. ti� �. �P NoP N "O rpO ��P �oP R5 �5 NV NC5 1�5
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
(D
Land Management Group, Inc.
www.imgroup.net
-42
+Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74)
12in below surface MOnsite Raingauge I Slide D -7
8
7
6
5
0
4 s
O
3
2
1
0
N") �3 N1b
0R 0Q 0Q
+Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74)
12in below surface MOnsite Raingauge I Slide D -7
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 8 and pairing
- Ecotone WM 20 and 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe
N' �^ N" jN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
Land Management Group, Inc.
www.lmgroup.net
-42
^� �3 'b '3 rt' <3 Nb Nb ^b N3 Nb 'b ^3 'b
6� G G� G` G� J' Al J' J' J'
O O O O �o !o 10 'o
^' �o �� N" ��' ti� �.' h NZ N 'pr rye
Al
'o
Apr
G G Ci Ci G G
Oe Oo Oo Oo e Oo
t� Np NV �p �� Ip'
+Plot 8 (14E19528) 4- Plot 8 pair (EBD7B74)
12in below surface MOnsite Raingauge I Slide D -8
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 10, 12, 17
- Ecotone WM 20 and 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00 am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
�aK" �a� � �a� �a� � �a� 'o � �e� �' IQ(
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
Land Management Group, Inc.
www.lmgroup.net
-42 - — _ — — —
_
N N� Nb �3 �� Nb N'3 �� �3
�� ^3 �� �� �� �3 Nb Nb �3
lac �a� �a� �e� �e� yep
NV l ^' 1� r �� t� gyp' `�
�e� �eQ ��c �a�' lac ��c �aV lac
1O' rL l �' < NA 10; rOA
--Plot 10 (EBD4EB3) 4 -Plot 12 (14E1 A282)
Plot 17 (14E1 62C6) 12in below surface
IMOnsite Raingauge I Slide E -5
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Pairing well at plot 12
added 6 -26 -13
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 10, 12, 12
pairing, 17
- Ecotone WM 20 and 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00 am
N
d
s
0
.Q
m
a`
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
N
d
t 0
v
c
-6
d
d
J -12
d
-18
-24
N -30
c
-36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
L ALA
�3 �3 1b lb lb 1b 3 1b 3 3 3 3 N N N N�
a� a� aA a� ��
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
44 6W44
8
7
e
6
5
n
rt
4
0
3 3
2
A 1
- 0
-Plot 10 (EBD4EB3) 4-Plot 12 (14E1A282)
4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6)
MOnsite Raingauge —12in below surface Slide E -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 10, 12,12
pairing, 17
- Ecotone WM 20 and 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
(L
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
d
t 0
v
c
d
-6
d
-1 -12
d
-18
-24
c) -30
c
C -36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
September 2013
�3
OJ� ,J�
N Nv �. ti� �. �P NoP N "O rpO � P 'oP v 5 NV NC5 1�5
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
-42 1 - - — -
SJ' �'J� Sy *'J� J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ
--Plot 10 (EBD4EB3) --Plot 12 (14E1A282)
4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6)
MOnsite Raingauge —12in below surface Slide E -7
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem
- Plot Wells 10, 12,12
pairing, 17
- Ecotone WM 20 and 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00 am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe
N' ��' N" LN' �� ltd' h ,moo' N IV 'h r§!' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
t 0
V
� -6
J -12
d
-18
-24
N -30
c
-36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
...■Oil -!ifl
1 '.tea ■. �:� ,iii
I:
N3 �� N3 <5 N3 N� N'b �3 N� �3 Nb Nb Nb Nb Nb Nb
J J J J' J' J' G G G d G d
O O O O O O O �o �o �o �o �o �o Oe Qe �e Qe �e Oe
K NN N� ��' ti� ��' h NZ N gyp' �4j lb � h ^p NV 1p I Apr
--Plot 10 (EBD4EB3) --Plot 12 (14E1A282)
4-Plot 12 Pairing (A3BFE3A) Plot 17 (14E162C6)
MOnsite Raingauge —12in below surface Slide E -8
8
7
6
5
�i
4 C
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 1, 2
- Ecotone WM 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �
�Z �e� �
h
FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
-42
Well 2 malfunction, replaced 4 -11 -13
N�a° °��° ^�a° °��� ^��� 6�a° ^���
Land Management Group, Inc. 4-Well 1 (14E19F68) -1-Well 2 (14E1AD78)
www.lmgroup.net 12in below surface MOnsite Raingauge Slide A -5
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 1, 2
- Ecotone WM 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00am
N
a�
s
c
0
w
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
-30
O -36
L
cD
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
<5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5
�a� �a�
N 11,x' ti� NK', N r ^, �� �� h
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
0
4 s
O
3
2
1
-42 _ — — 1 0
�3 0 N13 �b N13 �b N1b N1b ^1b ^3 3 N3 N1b N1b �b ^5 N13 N1b N3
aA' aK aA' aA' a�
N �rcr 0, 4 . � ,�. �6 �. ti6 3� h ,moo ,�h �o ti� 30
4-Well 1 (14E19F68) -1-Well 2 (14E1AD78)
12in below surface MOnsite Raingauge Slide A -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 1, 2
- Ecotone WM 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
-30
O -36
L
c�
sy,
Hydrology Assessment
September 2013
�3
OJ� ,J�
Land Management Group, Inc. 4-Well 1 (14E19F68) -1-Well 2 (14E1AD78)
www.lmgroup.net 12in below surface MOnsite Raingauge Slide A -7
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 1, 2
- Ecotone WM 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe
N' �^ N" jN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
Land Management Group, Inc.
www.lmgroup.net
-42
N N N N �� �3 �� Nb Nb �3 �� �� Nb �5 N''5 N5 �3
6� G G� G` G� J' Al J' J' J'
O O O O �o !o 10 'o
^' �o �� N" ��' ti� �.' h NZ N 'pr rye
Al
'o
Apr
G G Ci Ci G G
Oe Oo Oo Oo e Oo
t� Np NV �p �� Ip'
4-Well 1 (14E19F68) 4-Well 2 (14E1AD78)
12in below surface MOnsite Raingauge I Slide A -8
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 3,4
- Ecotone WM 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �
�Z �e� �
h
FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
-42
N�a° °��° ^�a° °��� ^��� 6�a° ^���
Land Management Group, Inc. +Well 3 (14E19E90) +Well 4 (14E141E8)
www.lmgroup.net 12in below surface MOnsite Raingauge Slide B -5
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 3,4
- Ecotone WM 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00am
N
a�
s
c
0
w
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
-30
O -36
L
cD
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
<5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5
�a� �a�
N 11,x' ti� NK', N r ^, �� �� h
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
0
4 s
O
3
2
1
-42 _ — — 1 0
�3 0
aA' aK aA' aA' a�
N �rcr 0, 4 . � ,�. �6 �. ti6 3� h ,moo ,�h �o ti� 30
+Well 3 (14E19E90) +Well 4 (14E141 E8)
12in below surface MOnsite Raingauge Slide B -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 3,4
- Ecotone WM 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
(L
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
September 2013
�3
OJ� ,J�
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
(D
Land Management Group, Inc.
www.imgroup.net
-42
+Well 3 (14E19E90) +Well 4 (14E141 E8)
12in below surface MOnsite Raingauge I Slide B -7
8
7
6
5
0
4 s
O
3
2
1
0
N") �3 N1b
yR pQ QQ
+Well 3 (14E19E90) +Well 4 (14E141 E8)
12in below surface MOnsite Raingauge I Slide B -7
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 3,4
- Ecotone WM 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG\: OG\: OG OG\' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe
N' �^ N" jN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
w
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
Land Management Group, Inc.
www.lmgroup.net
-42
Well 4 malfunction, data gap 12 -4 -13 to 2 -8 -14
^� �3 <b '3 rt' '3 Nb Nb ^b N3 Nb 'b ^3 'b
6� G G� G` G� J' Al J' J' J'
O O O O �o !o 10 'o
^' �o �� N� ��' ti� �.' h NZ N 'pr I
Al
'o
Apr
G G Ci Ci G G
Oe Oo Oo Oo e Oo
t� Np NV �p �� Ip'
+Well 3 (14E19E90) +Well 4 (14E141 E8)
12in below surface MOnsite Raingauge I Slide B -8
8
7
6
5
n
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 5, 6, 7
- Ecotone WM 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �Z �e� ���' <,��
h
FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
d
-24
N -30
c
C -36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
'b rt, 'b �3 0 Nb N3 0 0
0 0 0 Nb �� �3 Nb Nb �3
aV
lac �a� �a� �e'or �e'or yep
N l ^' ��6 �� t� gyp' `�
�e� �eQ ��c �a�' lac ��c � lac
�O' �� 1 < NA 10; -,A,
--Well 5 (14E19EC9) Well 6 (14E1605A)
Well 7 (14E1 603E) 12in below surface
IMOnsite Raingauge I Slide C -5
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 5, 6, 7
- Ecotone WM 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00am
N
a�
s
c
0
w
'o.
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
N
d
t 0
v
c
d
-6
d
J -12
d
-18
d
-24
N -30
c
C -36
'L^
V
42
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
<5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5
�a� �a�
N 11,x' ti� NK', N r ^, �� �� h
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
II 6 malfunction, data gap 4 -12 to 5 -30
*Wells 6 & 7 replaced 6 -25 -13
8
7
6
5
n
4 C
3 3
2
1
- 0
N N5 N'b �� �3 �� �� �3 N't,
a� a� a� a� a� a� aA
NP �P N'` Nb ��P ��P N, V4 NN, ��� ��� ��� ��� h� ^off �h� �o� �h� §o�
-Well 5 (14E19EC9) Well 6 (14E1605A)
Well 7 (14E1603E) 12in below surface
MOnsite Raingauge Slide C -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 5, 6, 7
- Ecotone WM 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
d
t 0
v
c
d
-6
d
-1 -12
d
-18
d
-24
N -30
c
C -36
'L^
V
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
September 2013
�3
OJ� ,J�
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
-42 1 - - — -
J� JA J� JJ' JJ' JJ' �0Q �0Q �ZQ 50Q �0Q �ZQ
--Well 5 (14E19EC9) Well 6 (14E1605A)
Well 7 (14E1 603E) 12in below surface
IMOnsite Raingauge I Slide C -7
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Wells 5, 6, 7
- Ecotone WM 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
OG'�: OG'l: OG�' OG'�' J' Al Al Al Al Al G G Ci G G G
�o �o 'o 'o !o 'o Qe �� Qe Qe �e �e
N' ��' N" LN' �� nj�' h ,moo' N IV 'h njo' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
d
t 0
v
c
d
-6
d
J -12
d
-18
d
-24
N -30
c
C -36
'L^
V
Land Management Group, Inc.
www.imgroup.net
-42
�3 �3 <5 ^3 NO? N'3 <5 N3 ^� N'b N3 ^O) ^3 N Nb Nrb N� Nb N�
J J J
O O O O O O O �o �o �o
K N� N� ��' ti� ��' h ^p N gyp' �4j I§y h ^p NV 1p I Apr
--Well 5 (14E19EC9) Well 6 (14E1605A)
We11 7 (14E1603E) 12in below surface
IMOnsite Raingauge I Slide C -8
8
7
6
5
n
rt
4 rt
0
3 3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Well 8
- Ecotone WM 40
- January 1, 2013 to
March 31, 2013
- One reading per day
at 7:00am
N
d
0
.Q
m
a.
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
March 2013
15 1b 15 1b 15 1b lb It, 1b 15 1b 1b 15 lb rb lb
�aK" �a� � �a� �a� � �a� �z �Z �Z ��� <,��
h
FOnsite Raingauge —30 day total 30% —70% OShallotte Ag Raingauge
6
U)
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
-42
N�a° °��° ^�a° °��� ^��� 6�a° ^���
Land Management Group, Inc. 4-Well 8 (14E16DAD) —12in below surface
www.lmgroup.net IMOnsite Raingauge Slide D -5
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Well 8
- Ecotone WM 40
- April 1, 2013 to
June 30, 2013
- One reading per day
at 7:00am
N
a�
s
c
0
w
'o.
d
a
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
6
U)
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
-30
O -36
L
cD
Land Management Group, Inc.
www.imgroup.net
Hydrology Assessment
June 2013
<5 Nb N't, N3 Nb N'b Nb Nb Nb N3 Nb Nb Nb N'b <5 <5 <5 <5
�a� �a�
N 11,x' ti� NK', N r ^, �� �� h
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
8
7
6
5
0
4 s
O
3
2
1
-42 _ — — 1 0
�3 0
aA' aK aA' aA' a�
N �rcr 0, 4 . � ,�. �6 �� ti6 3� h ,moo ,�h �o ti� 30
4-Well 8 (14E16DAD) —12in below surface
MOnsite Raingauge Slide D -6
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Well 8
- Ecotone WM 40
- July 1, 2013 to
September 30, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
September 2013
�3
OJ� ,J�
wOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
U)
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
(D
Land Management Group, Inc.
www.imgroup.net
-42
4-Well 8 (14E16DAD) —12in below surface
IMOnsite Raingauge I Slide D -7
8
7
6
5
0
4 s
O
3
2
1
0
N") �3 N1b
yR pQ QQ
4-Well 8 (14E16DAD) —12in below surface
IMOnsite Raingauge I Slide D -7
8
7
6
5
0
4 s
O
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge and
Shallotte Ag station Coop -TP
317813
(www.nc- cl!mate.ncsu.edu)
30% & 70% precipitation data
obtained from the Longwood
WETS Station NC5116
1978 -2009
(wcc.nres.usda.gov)
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Phase III
- Well 8
- Ecotone WM 40
- October 1, 2013 to
December 31, 2013
- One reading per day
at 7:00am
N
d
s
c
0
.Q
d
a
Hydrology Assessment
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
December 2013
�o <o N3 N3 No N3 N3 N3 N3 <5 �3 No N3 N3 No N3
Al J' J' J' Al Al G
OO ONO �o �''!o 'o QN " N' ' h moo �� G Qe C i Oo G �z G Oo G
N IV 'h njo' h 0' NV rO -V �0
FOnsite Raingauge —30 day total 30% —70% WShallotte Ag Raingauge
6
U)
t
0
_
-6
a�
J -12
d
r
-18
a�
-24
U) -30
O -36
L
cD
Land Management Group, Inc.
www.imgroup.net
-42
^� �3 'b '3 rt' <3 Nb Nb ^b N3 Nb 'b ^3 'b
6� G G� G` G� J' Al J' J' J'
O O O O �o �o �o �o
^' �o �� N� ��' ti� �.' h NZ N 'pr �y�
Al
'o
Apr
G G Ci Ci G G
Oe Oo Oo Oo e Oo
t� Np NV �p �� Ip'
4-Well 8 (14E16DAD) —12in below surface
IMOnsite Raingauge I Slide D -8
8
7
6
5
0
4 s
O
3
2
1
0
Stream Hydrology Assessment January 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
-30
WERM
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
yo yo o yo yo �3 yo �3 �3 �o ^ o �o < o <5 No ^o Nb �3 N3 ^o ^b o o No No ^� N� N N N No
ro rp �o o ,o o V 10 �p 4o o o ro o o rp o o o
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -1
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
6
d
t
=
0
d
d
J
L
-6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
-30
WERM
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
yo yo o yo yo �3 yo �3 �3 �o ^ o �o < o <5 No ^o Nb �3 N3 ^o ^b o o No No ^� N� N N N No
ro rp �o o ,o o V 10 �p 4o o o ro o o rp o o o
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -1
Stream Hydrology Assessment February 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
t
= 0
d
d
J 6
L
U -12
R
3
-18
0
A
dzM
-30
WETIM
<5 �� �� �� �� �3 �� �� �3 �� ^� �3 �3 �� �b �� �� �3 �3 �5 �� �� ^�
\rp \P \yo :\p \yo \rp \�o \�o \rp \�o \,yo \p \�o \ro \�o \�o \�o \6yo \�o :\p \�o \rp \�o
ti ti ti ti ti ti ti ti ti� tiV ti�V 'p tiT ti� 'p
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -2
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Stream Hydrology Assessment March 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
190101111111111
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
N N N No �o �3 �3 �3 �� ^� <o <o �� ^o �b �3 �3 ^� ^b ^� ^� �� �� ^� N�
rp yo yo yo yo rp e\ yo rp yo �o �o �o ,o V yo 1yo �o 4o p �o �o Vo �o rp
3 �� �p �p �p 5� �� 3,5
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -3
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
6
d
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
190101111111111
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
N N N No �o �3 �3 �3 �� ^� <o <o �� ^o �b �3 �3 ^� ^b ^� ^� �� �� ^� N�
rp yo yo yo yo rp e\ yo rp yo �o �o �o ,o V yo 1yo �o 4o p �o �o Vo �o rp
3 �� �p �p �p 5� �� 3,5
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -3
Stream Hydrology Assessment April 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- April 1, 2013 to
April 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
<3 No <5 �o No �o N3 �o 10 �� �3 N11b N13 �r5 N11b 10 1� No ^� Nlb -� N1b ^5 N11b
^\rp \11yo Grp \rp \ryo \rp P p Grp �V 4�o �V ��o Arlo P � \10 P V �p ��o pro �yo 4o
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
6
d
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- April 1, 2013 to
April 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
<3 No <5 �o No �o N3 �o 10 �� �3 N11b N13 �r5 N11b 10 1� No ^� Nlb -� N1b ^5 N11b
^\rp \11yo Grp \rp \ryo \rp P p Grp �V 4�o �V ��o Arlo P � \10 P V �p ��o pro �yo 4o
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4
1
0
Stream Hydrology Assessment May 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
-36 '
^\�0 3 \�0 3 ^o \�0 ^3
^ ^ ^ ^
ti
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
6
d
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
-36 '
^\�0 3 \�0 3 ^o \�0 ^3
^ ^ ^ ^
ti
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5
0
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5
Stream Hydrology Assessment June 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
dz=
-30
-36
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
6
N
a�
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
-0
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
dz=
-30
-36
<3 No <3 �� N15 �o N3 �5 �� �� �3 �� .13 �r5 .11b 1� 1� N1b ^� Nlb -� N1b ^5 N11b
^\yo 6yo 4yo �yo ��o Grp 4yo ayo Grp ��o ��o �V Grp pry' ��o � \10 P V �p ;�o Grp P 4o
9
8
7
6
io
0
5
al
rF
0
4 3
0
CD
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6
3
2
1
0
Stream Hydrology Assessment July 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
N N N �o �o N3 N3 N'3 No ^o �o �o <o ^o <5 ,3 Nb ^o ^� ^o ^o �o No ^�
yo yo yo yo yo yo yo yo yo yo ,o �o yo yo �o �o :o \o �o �o e �o
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
1z
6
d
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
dzM
-30
N N N �o �o N3 N3 N'3 No ^o �o �o <o ^o <5 ,3 Nb ^o ^� ^o ^o �o No ^�
yo yo yo yo yo yo yo yo yo yo ,o �o yo yo �o �o :o \o �o �o e �o
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Stream Hydrology Assessment August 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- August 1, 2013 to
August 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
-30
WERM
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
3 yo 3 yo 3 yo o yo yo N3 yo N3 yo N'3 No ^ o <5 <5 No ^o Nb '3 N3 ^o Nb o o �o No No ^� N1b ����o
ro rp o ,o V o 10 �p Po o o o o rp o o o
rp
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -8
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
1z
6
d
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- August 1, 2013 to
August 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
c�
Land Management Group, Inc.
www.lmgroup.net
dzM
-30
WERM
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
3 yo 3 yo 3 yo o yo yo N3 yo N3 yo N'3 No ^ o <5 <5 No ^o Nb '3 N3 ^o Nb o o �o No No ^� N1b ����o
ro rp o ,o V o 10 �p Po o o o o rp o o o
rp
-1-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -8
Stream Hydrology Assessment September 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
t
= 0
d
d
J 6
L
U -12
R
3
-18
0
A
dzM
-30
-36
<3 No <5 �� N� �o N3 �5 �� �� �3 �� N13 �r5 N11b 1� 1� N1b ^� Nlb -� N1b ^5 N11b
e �yo �yo :\p ��o \rp ��yo �,yo Grp ��p 4�o �V ��o pry' P � \10 P V �p ��o pro �yo 4o
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -9
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Stream Hydrology Assessment October 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
dzM
-30
-36
o ^o
^ ^ ^
9
8
7
6
io
0
5
al
rF
0
4 3
0
CD
3
2
1
Precipitation data obtained
0
from: Onsite Raingauge
beginning September 2011
12
6
N
a�
t
=
0
d
d
J
L
6
U
R
-12
Monitoring Well Record
3
-0
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
C
0
dzM
-30
-36
o ^o
^ ^ ^
9
8
7
6
io
0
5
al
rF
0
4 3
0
CD
3
2
1
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
0
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
Stream Hydrology Assessment November 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- November 1, 2013 to
November, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
t
= 0
d
d
J 6
L
U -12
R
3
-18
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
^^\ �N\ �`�� ���b ���6 N\ \0 NN\�0 ^ \'� N�'� ^ \�� ^ \'6 ^��1 ^��� ^ � \L� `DLO � \L� `\L� ^ \l`� ^\�1 ^�l� ^\�0
1 N
4-Mainstem 1 (14E162B8) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Slide MS -11
Stream Hydrology Assessment December 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
t
= 0
d
d
J 6
L
U -12
R
3
-18
0
A
dzM
-30
-36
'3 'o '3 �3 �o
yo Po yo �o yo �o �o ro rp rp O rp rp yo �o yo yo yo yo yo yo �o �o yo �o
o\ 45 o\ 4\ 45 4 \' �` �\ �\ ��y \^^\,��y \^0\,�0 \^�\,�0 \^�\"'0 ' \,�ti \ ^� \" ' �ti \ ^� \" \0" 'q \0�y\'ry\0g \,pry \0"p \'rti \'p �y0� \'ry\0� \"10�\
9
8
7
6
(DD
0
5
rF
O
4 3
0
S
<D
N
3
2
1
0
Land Management Group, Inc. 4-Mainstem 1 (14E162B8) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
a�
L) 0
d
J -6
L
d
U -12
L
D2
-18
0
L
V
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
January 2013
�b ^b N3 �� <5 �b <5 <b �b <b ,� <5 �� �b �� �� �� �� �� �� <5 <5 <� <b <5
�o
N\ \o\ N\ N\ N\ ' \o ', \,may \,'o\ ' ^° '^ \, \,' \� \� ^� \�� \�o� \T°� \Toy \��� \T�,� \T \,�`�
+Mainstem 2 (14E160BC) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -1
9
8
6
CD
0
5
fl1
rh
0
4
0
S
3
2
1
0
�b ^b N3 �� <5 �b <5 <b �b <b ,� <5 �� �b �� �� �� �� �� �� <5 <5 <� <b <5
�o
N\ \o\ N\ N\ N\ ' \o ', \,may \,'o\ ' ^° '^ \, \,' \� \� ^� \�� \�o� \T°� \Toy \��� \T�,� \T \,�`�
+Mainstem 2 (14E160BC) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation Slide MS -1
Stream Hydrology Assessment February 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
6
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
d
t
0
d
J -6
L
d
U -12
L
D2
-18
0
L
V
-24
-30
-36
�5 �5 1�5 �3 �3 �5 �b �5 N5 ^b �5 �5 �5 �5 �5 �b �b ^3 �5 <5 <5
rp �o yo e e
v 1, ti ti ti 1 ti 11� ti ti� 4V 16V 1P ti� 161 ti�
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -2
9
8
7
6
CD
0
5
fl1
rh
0
4
0
S
3
2
1
0
Stream Hydrology Assessment March 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
Monitoring Well Record
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
c
0
c�
-24
-30
-36
3 �3 �o � o �3 �3 o � 3 3 ^o �� ^o � �o o 3 �3 o � No .o o � .15 N No
f, o V V V rp o P ro 5o o o o ro 0 0o �o V p P ro
o Po rp
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -3
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
3
2
1
0
Stream Hydrology Assessment April 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- April 1, 2013 to
April 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
_ -18
0
-24
-30
-36
o N N \yo 0 o o o \yo No o 3 o N3 No 3 o o 3 o No 0 No 0 No
^ \ry' �\V \o \rp 4o \If, \V \o o \ro \rp 4o \o \10 \!o V \V \o \rp \P \�o
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4
3
2
1
0
Stream Hydrology Assessment May 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
Monitoring Well Record
-18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
c
0
c�
-24
-30
-36
�3 N13 No <o N3 N3 �o -3 �3 ^o N11b ^o �� N10 �o N3 N3 �o �� �o No N10 �o �r5 N115
f, �o V V V rp �o �o Ifo �o �o �o �o ro 4yo �o �o �o V p P ro 4o Po rp
_'\ <,\ h\ �� h\ �� h��� h�� h��� ���� ^ ^� 4'� 4'�� ���� ���� 4�' 4'�� ^�� � �� �� ��� � �� \�� � \p� ��� ';\5 ��
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -5
3
2
1
0
Stream Hydrology Assessment June 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
a�
L) 0
d
J -6
L
d
U -12
L
D2
-18
0
L
V
-24
-30
-36
o
rp �o
�o yo o
� o `o A\� \ro a :O o � 4V 4P �o AGrp
e
^ti ^�^��
000 o�4o o� �e s.
�
�
9
8
6
CD
0
5
fl1
rh
0
4
0
S
3
2
1
0
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6
Stream Hydrology Assessment July 2013
IRM
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
M
a�
L) 0
d
J -6
L
d
U -12
L
D2
-18
0
L
A
-24
-30
-36
If, o � o o 'V o o rp o ,o o o rp 10 o V o ,yo ,-yo Po e\ r�
9
8
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -7
6
CD
0
5
fl1
rh
0
4
0
S
3
2
1
0
Stream Hydrology Assessment August 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- August 1, 2013 to
August 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
a�
L) 0
d
J -6
L
d
U -12
L
D2
-18
0
L
V
-24
-30
-36
ro f � 00 00 00 00 00
rp yo ,yo ,yo 00 ,po fyo e\
0o yo
e\ e\ ,yo yo e\
e\ r�
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -8
9
8
6
CD
0
5
fl1
rh
0
4
0
S
3
2
1
0
Stream Hydrology Assessment September 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
0
N
d
J 6
L
d
R
v -12
to
_ -18
0
-24
-30
-36
N No 0 �o �� �o No �o
�3 ^o N3 No �3 �o �o �3 �o No 0
Nb 0 No
V
1P
P
^\rp X00 X00 �� Xrp �yo X00 \1yo X00 �yo ��o X00 Grp X00 X00 0yo X00 X00 X00 Grp 4P
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -9
9
8
7
6
CD
n
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment October 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
_ -18
0
-24
-30
-36 '
�3 N10 �3 No N3 �o <o <5 N10 �o �o N3
^o� 11 o e 6 ^off o o ^o�,�I ,,ti ^o�,�o
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
3
2
1
0
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
Or
)
11 ,pop 11P IISP
'QP 'QP 141 111\`� 141 144
144
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
3
2
1
0
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
Stream Hydrology Assessment November 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- November 1, 2013 to
November, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
6
d
s
0
N
d
J 6
L
d
R
v -12
ca
_ -18
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
^�rp �yo ��o :\p apo Arlo ��o ��o \I�o ��p ��o �yo �yo Grp V ��yo ��o �yo ��o �p �yo pro 4yo ap
+Mainstem 2 (14E160BC) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation
9
8
7
6
CD
n
5
fl1
rt
O
4 3
n
<D
N
3
2
1
0
Slide MS -11
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
6
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
d
t
0
d
J -6
L
d
U -12
L
D2
-18
0
L
V
-24
-30
lNT]
December 2013
00 00 00 ,yo 00 00 p p p p 00 00 �o 'p o p p 00 p �o �o �o ,P
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12
9
8
7
6
CD
n
5
fl1
rh
0
4
0
S
3
2
1
0
00 00 00 ,yo 00 00 p p p p 00 00 �o 'p o p p 00 p �o �o �o ,P
Land Management Group, Inc. +Mainstem 2 (14E160BC) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12
Stream Hydrology Assessment January 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
U 0
N
d
J 6
L
d
R
v -12
to
_ -18
0
-24
-30
-36 — —
�o �o �o yo yo yo �o yo yo 115P ro
^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -1
9
8
7
6
CD
n
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment February 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
d
s
c
m
d
J
d
fC
d
v
Cn
c
0
6
M
M
-12
-18
-24
-30
-36
N3 N3 N115 N 3 N10 �o o �o No yo N3 N10 N10 o yo o �o N3 �o N13 �o N3 �o No o No
11\rP pro o 4o
Grp
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -2
9
8
7
6
n
5
fl1
_rt
O
4 3
n
cD
N
3
2
1
0
Stream Hydrology Assessment March 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
U 0
N
d
J 6
L
d
R
v -12
to
_ -18
0
-24
-30
-36
3 �3 �o �o �3 �3 o �3 3 o � ^o � �o o �3 �3 o � �o �o o � N15 N o
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -3
9
8
7
6
CD
n
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment April 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- April 1, 2013 to
April 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
_ -18
0
-24
-30
-36
o N N \yo 0 o o o \yo No o 3 o N3 No 3 o o 3 o No 0 No 0 No
^ \ry' �\V \o \rp 4o \If, \V \o o \ro \rp 4o \o \10 \!o V \V \o \rp \P \�o
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -4
3
2
1
0
Stream Hydrology Assessment May 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
J -6
L
d
fC
v -12
to
_ -18
0
-24
-30
-36
�3 N13 No <o N3 N3 �o -3 �3 ^o �r5 ^o �� N10 �o N3 N3 �o �� No No N10 �o �r5 N115
�o �yo �yo �yo �o �o �o �yo �o
9
8
7
6
c�D
0
5
rt
C
4 3
0
cD
N
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -5
3
2
1
0
Stream Hydrology Assessment June 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
d
fC
v -12
ca
_ -18
0
-24
-30
-36
N No N �o �� �o No �o
�3 ^o N3 No �3 �o �o �3 �o No 0
Nb 0 No
01
P
^\rp ��o �yo �V ��o Grp �yo \1yo �� 4Po ��o Grp ��o ��yo fro ��o �p ;�o Grp
9
8
7
6
5
rt
O
4 3
n
<D
N
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -6
3
2
1
0
Stream Hydrology Assessment July 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
U 0
N
d
J 6
L
d
R
v -12
to
_ -18
0
-24
-30
-36
0 0
�o �o �o yo yo yo �o yo yo
115P ro
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -7
9
8
7
6
CD
n
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment August 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- August 1, 2013 to
August 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
J -6
L
d
fC
v -12
to
_ -18
0
-24
-30
-36
�3 N13 No <o N3 N3 �o -3
�3 ^o �r5 ^o �� N10 �o N3
N3 �o �� �o No N10 �o
�r5 N11b
�o �o �o �yo �yo �yo �o �yo
�yo �o �o �o �o �o
�o �o
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -8
9
8
7
6
c�D
0
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment September 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
J -6
L
d
fC
v -12
to
_ -18
0
-24
-30
-36
N No 0 �o �� �o No �o
�3 ^o N3 No �3 �o �o �3 �o No 0
Nb 0 No
V
1P
P P
^\rp ��o �Vo �� Grp �yo \1yo �� �yo ��o ��o Grp ��o \�o 0yo ��o �p ��o Grp
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net — Ground Surface (0 ") —Bed Elevation Slide MS -9
9
8
7
6
c�D
0
5
rt
C
4 3
0
cD
N
3
2
1
0
Stream Hydrology Assessment October 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
_ -18
0
-24
-30
-36 '
�3 N10 �3 No N3 �o <o <5 N10 �o �o N3
^o� 11 o e 6 ^off o o ^o�,�I ,,ti ^o�,�o
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
3
2
1
0
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
Or
)
11 ,pop 11P IISP
'QP 'QP 141 111\`� 141 144
144
9
8
7
6
n
5
fl1
rt
O
4 3
n
cD
N
3
2
1
0
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -10
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- November 1, 2013 to
November, 2013
- Readings four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 am
d
s
C
N
d
J
d
R
d
v
Cn
c
0
Land Management Group, Inc.
www.lmgroup.net
6
[S7
M
-12
-18
-24
-30
November 2013
9
8
7
6
CD
n
5
0)
rt
— 4
+ <D
v
3
2
1
-36
^�rp �yo ��o :\p apo Arlo ��o ��o \I�o ��p ��o �yo �yo Grp V ��yo ��o �yo ��o �p �yo pro 4yo ap
+Mainstem 3 (14E188B1) MOnsite Raingauge
— Ground Surface (0 ") —Bed Elevation
0
Slide MS -11
Stream Hydrology Assessment December 2013
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Mainstem Stream
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Readings four times per
day at 1:00 am, 7:00 am
X1:00 pm, 7:00 am
6
d
s
c 0
m
d
J -6
L
d
fC
v -12
ca
_ -18
0
-24
-30
-36
N11b .11 �� .11
^ \�0N3 \�0�3 \�0�3 \�0 ^3 \�0N30 \�0 ^3 \�0 ^3 \�0N3 \�0 3
ro N3
N11b .11 �� .11
�r5 <5 �� .1b .1 �� �r �r" .115
�o yo
yo 1yo �yo yo 10 �o �o yo �o rp yo rp
4yo
9
8
7
6
n
5
fl1
rt
O
4 3
n
Q
N
3
2
1
0
Land Management Group, Inc. +Mainstem 3 (14E188B1) MOnsite Raingauge
www.lmgroup.net Ground Surface (0 ") —Bed Elevation Slide MS -12
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
X1:00 pm, 7:00 pm
t
6
v
C
d
d
J 0
L
M
d
v -6
td
c
0 -12
Land Management Group, Inc.
www.lmgroup.net
i�
January 2013
-24 —
7
N N N N N N N N N -� N'b N� N� NO) N3 ^3 ^'b N3 N N N N N N N,b
�o 'o �o yo yo yo rp yo �o �o yo rp �o yo rp yo rp 110
6
5
n
4
-p
rt
rt
O
3
3
0
cD
N
2
1
-24 —
—
N N N N N N N N N -� N'b N� N� NO) N3 ^3 ^'b N3 N N N N N N N,b
�o 'o �o yo yo yo rp yo �o �o yo rp �o yo rp yo rp 110
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -1
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
y
d 6
t
v
_
d
d
J 0
L
fC
m
v -6
m
U)
p -12
0
Land Management Group, Inc.
www.lmgroup.net
-18
February 2013
-24
7
6
5
'yp ��ti� TO
(DD
n
4
-p
rt
rt
O
7
O
3
n
cD
N
-24
'yp ��ti� TO
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -2
0
Stream Hydrology Assessment March 2013
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O -12
c�
Land Management Group, Inc.
www.lmgroup.net
24
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -3
7
6
5
CD
n
O
7
3 O
n
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
12
N
m 6
t
v
C
N
O
J 0
L
R
d
v -6
O
L
CO
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O -12
c�
Land Management Group, Inc.
www.lmgroup.net
24
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -3
7
6
5
CD
n
O
7
3 O
n
2
1
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
�- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
ql
d 6
t
v
_
m
m
J 0
L
a+
f6
U -6
ca
L
p -12
c�
Land Management Group, Inc.
www.lmgroup.net
-18
April 2013
7
6
5
3 O
n
W
-24
N N� �3 �� �3 �� �� ��
N11b
e do �o yo �o ,yo ro ,yo
(DD
o\ 46 N ^o� ^o� �� ��
t.\ �\ti N\ t-N 4 NK ago\ \
n
4
rt
rt
O
7
3 O
n
W
-24
N N� �3 �� �3 �� �� ��
N11b
e do �o yo �o ,yo ro ,yo
�o rlo ryo rp yo rp ,p yo yo �o yo Io 4yo P
o\ 46 N ^o� ^o� �� ��
t.\ �\ti N\ t-N 4 NK ago\ \
'�' \ \� \o� \ \o� \�� \�� \o�
'�� \" '� \' \ \
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -4
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
�- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
-May 1, 2013 to
May 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
t
6
v
C
d
d
J 0
L
M
v -6
c
0 -12
Land Management Group, Inc.
www.lmgroup.net
i�
May 2013
7
6
5
-24 '
N N N N N N N N N -� N'bN� N� NO)N3 ^3 ^'bN3 N N N N N N N,b
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -5
0
4 M
rt
pl
rh
O
3
3 no
C's
fD
N
►;
1
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
�- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
ql
d 6
t
v
_
m
m
J 0
L
a+
f6
m
U -6
ca
L
p -12
c�
Land Management Group, Inc.
www.lmgroup.net
-18
-24
7
o O N^0 0 ^O ^1b
ti e � \11O 0 O
o6OOo60O\ ^\� \HO O ^o OHO OHO O ^o Oho O ^o OHO O ^o O ^O OHO
\ ^o�ti \���0 \�O�ti �'��0 �'��ti \ ^O�ti \ \ \ O�0 \
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
June 2013
Slide NS -6
7
6
5
(DD
n
4
rt
rt
O
7
O
3
n
2
1
0
Slide NS -6
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
-July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
t
6
v
C
d
d
J 0
L
M
G1
v -6
c
p -12
L
Land Management Group, Inc.
www.lmgroup.net
i�
-24
July 2013
7
6
5
N N N N N N N N N <� Nb N'�' No) Nb N3 ^3 ^b N3 N3 Nb N11b N1b N13 NO) N1b
ro �o yo �o yo �o yo �o rp �o �o �o
A\ A\ A \ti A\ AN A \p\ \cam\ \�\ ���\ ��g\ A \''�\ Al ' A \fig\ A \� A'^ A\^ A\^ A''<� A\`l,'�� A\`l A\`l A\lp� �\lc�� �\1�� �\lg� �\l°�� �\g��
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -7
n
4 -p
rt
rt
O
3
3 no
C's
(D
(0
►;
1
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
t
6
v
C
d
d
J 0
L
M
d
v -6
td
c
p -12
L
Land Management Group, Inc.
www.lmgroup.net
i�
August 2013
-24
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -8
0
7
6
5
n
4
-p
rt
rt
O
3
3
0
cD
N
2
1
-24
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -8
0
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -8
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
ql
d 6
t
v
C
m
m
J 0
L
a+
f6
v -6
O
c
p -12
L
O
Land Management Group, Inc.
www.lmgroup.net
-18
September 2013
7
6
5
-24 '
N N� �3 �� �3 �� �� �� N11b
e do �o yo �o yo �o yo �o rlo �yo yo yo �o yo �o yo yo yo �o yo �o yo yo
4 o\ ti e�`�\ "'N ono\ a��\ "'P ago\ \ N \�� \ ^o� \��� \�o� \�1� \�' \ \ \� p \ J \�� \�� p
o e o 0 0 o e o o�' o� o� o`l' oti o� o� o�
(DD
n
4
rt
rt
O
7
O
3
n
fD
N
2
1
-24 '
N N� �3 �� �3 �� �� �� N11b
e do �o yo �o yo �o yo �o rlo �yo yo yo �o yo �o yo yo yo �o yo �o yo yo
4 o\ ti e�`�\ "'N ono\ a��\ "'P ago\ \ N \�� \ ^o� \��� \�o� \�1� \�' \ \ \� p \ J \�� \�� p
o e o 0 0 o e o o�' o� o� o`l' oti o� o� o�
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -9
0
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
t
6
v
C
d
d
J 0
L
M
d
v -6
td
c
0 -12
Land Management Group, Inc.
www.lmgroup.net
i�
October 2013
-24 '
7
6
N N N N N N N N N 1� Nb N3 <� NO) N3 �3 N� <3 Nb Nb Nb ^O) N3 �3 ^1b
yo 11 �o �o yo r �o �o ro �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o �o
.o� ^\ �o�� .ono\ .o��\ �0�6\ o\ "Z\; "Z \o ^o�`' ^\ ^o���\,�o� 'S\'\�k\ o�\ �\ ^o��o,\ ^\ 'o��� ^o\�o\ ^o���\ ^o�tio\
5
n
4
-p
rt
rt
O
3
3
0
(D
N
2
1
-24 '
N N N N N N N N N 1� Nb N3 <� NO) N3 �3 N� <3 Nb Nb Nb ^O) N3 �3 ^1b
yo 11 �o �o yo r �o �o ro �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o �o
.o� ^\ �o�� .ono\ .o��\ �0�6\ o\ "Z\; "Z \o ^o�`' ^\ ^o���\,�o� 'S\'\�k\ o�\ �\ ^o��o,\ ^\ 'o��� ^o\�o\ ^o���\ ^o�tio\
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
0
Slide NS -10
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
y
d 6
t
v
_
d
d
J 0
L
d
fC
d
v -6
U)
p -12
L
0
Land Management Group, Inc.
www.lmgroup.net
-24
November 2013
7
6
5
(DD
n
eo �o �o �o �o ro yo �o �o �o yo yo yo rp �o �o 10 yo 4o eo eo yo yo yo
�. \ ^\ �. \� �. \o\ �. \°\ �. \`O\ �. \�\ �. \�'\ \°'\ ��\ `��\ �o\ �°\ �`O\ ��\ �`�\ ��'\ tip\ ti`s tio\ ti°\ ti`s\ tip\ ti`s\ tip'\
, ^ ^ ^ ^ NN ^ ^\ ^ ^\ '^ ^^\ ^ ^\ ^^\ ^N\ ^^\ ^1 ^ ^\ ^^\ ^\ � ^ ^\ ^\ ^\
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -11
4
-p
rt
rt
O
7
O
3
n
fD
N
2
1
0
eo �o �o �o �o ro yo �o �o �o yo yo yo rp �o �o 10 yo 4o eo eo yo yo yo
�. \ ^\ �. \� �. \o\ �. \°\ �. \`O\ �. \�\ �. \�'\ \°'\ ��\ `��\ �o\ �°\ �`O\ ��\ �`�\ ��'\ tip\ ti`s tio\ ti°\ ti`s\ tip\ ti`s\ tip'\
, ^ ^ ^ ^ NN ^ ^\ ^ ^\ '^ ^^\ ^ ^\ ^^\ ^N\ ^^\ ^1 ^ ^\ ^^\ ^\ � ^ ^\ ^\ ^\
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -11
Stream Hydrology Assessment
18
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011 12
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
ql
d 6
t
v
C
m
m
J 0
L
a+
f6
v -6
O
c
p -12
L
O
Land Management Group, Inc.
www.lmgroup.net
-18
-24
December 2013
7
6
5
(DD
n
yo �� yo ON
\ \ro ro rp r k 10 o �\ rp op ^\ ro o \ o oo \\ rp '\�p oo o oP "\ rp o o o'\ p
'P r '0 �� � ^ti\^ti��^ti ti ^ti\^ti��^ ; ^ti\^ti ti^ ���ti\^ti\^�;�^ti��ti
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -12
4
rt
rt
O
7
O
3
n
/%+41.
cD
N
2
1
0
yo �� yo ON
\ \ro ro rp r k 10 o �\ rp op ^\ ro o \ o oo \\ rp '\�p oo o oP "\ rp o o o'\ p
'P r '0 �� � ^ti\^ti��^ti ti ^ti\^ti��^ ; ^ti\^ti ti^ ���ti\^ti\^�;�^ti��ti
4- North Stream 1 (A278C2A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -12
Stream Hydrology Assessment January 2013
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
Blom
-36 — —
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
N
t
v
0
N
d
J
L
-6
d
R
v
-12
ca
3
N
Monitoring Well Record
-18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
Blom
-36 — —
N N N No No N N No N No No No No No No N) N <o No <o No No No No O
�� 4P 4 o � o 1 � 3 � o \ e o '1 ti ti ti ti ti ti ti � 1\ 1 1\ NN ^�N\ �' N�' 1�' N'� 1'� 1�' N�1'^ 1\ N\ N\ N\ N\ N\ N\ N\ 1\
+North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -1
9
8
7
6
0
5
v
rt
0
7
4 3
0
CD
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L.
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
February 2013
-36
N N ^� ^� ^1b ^3 N13 N115 N15 NO) ^O) N11b ^3 ^O) N� N15
^O) ^1b N3 N3 N� ^� N1b
0
^BOO BOO �yo �yo BOO �ro BOO �Oo �Oo �Oo �yo �Oo ��o �Oo �Oo �Oo BOO ��o ��o �Oo Grp �Oo
N �
ti 00 do �° ��o �� do do ti^ ti, r^o r $^ ti, ti ti, ti��
��ti �V3 �0° �10 q �-0
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -2
9
8
7
6
n
5 R
rt
O
7
4
n
<D
N
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
ME
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
March 2013
�yo �yo �yo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo Oo Oo Oo Oo Oo Oo Oo �yo Oo
314 �\ cD\ \ g\ o�\ ^^\ ^ry\ ^�\ ^�\ ^`O\ ^ "\ ^g\ � ^o�\ ^\
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -3
9
8
7
6
n
5
R
rt
O
7
4
n
<D
N
v
3
2
1
0
�yo �yo �yo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo Oo Oo Oo Oo Oo Oo Oo �yo Oo
314 �\ cD\ \ g\ o�\ ^^\ ^ry\ ^�\ ^�\ ^`O\ ^ "\ ^g\ � ^o�\ ^\
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -3
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment
18
12
6
0
-6
-12
-18
-24
-30
April 2013
-36
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
N
d
t
v
C
m
m
J
L
d
f�
d
v
O
O
Cn
Monitoring Well Record
3
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment
18
12
6
0
-6
-12
-18
-24
-30
April 2013
-36
ro rp � 10 ti rp o o o y �o o o �o o o �o o o �o o o e o
\ �G
^\ o o � o o o o o \�o 3 o �
�\t�N t tN�' \^ \ ^^
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -4
9
8
7
6
n
5 R
rt
O
7
4
n
<D
N
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
-May 1, 2013 to
May 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
ME
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
May 2013
9
8
7
6
n
5
R
rt
O
7
4
n
<D
N
v
3
2
1
0
�yo �yo Oo Oo Oo �yo ,yo �yo �yo �yo Oo ,yo Oo Oo Oo �yo �yo Oo Oo Oo Oo Oo Oo �yo Oo
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -5
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
0
N
a�
t
v
� 0
Z
J
L -6
.r
R
U -12
L
U)
'a -18
0
c�
Land Management Group, Inc.
www.lmgroup.net
-24
-30
-36
o\ 4 o\o o\� o \o 4 o
\Io \Io \�o \ro \�o \�o \�o \�o \�o \�o \�o \�o \�o \�o
\� 0 R\"' o \�ti � \moo o \,'a q \, R \, 4, � \moo '.o \'ti o \"C o \�a
4- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
June 2013
Slide NS -6
9
8
7
6
CD
0
-
5
.,
0
7
4
3
0
CD
N
3
2
1
0
Slide NS -6
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
-July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
July 2013
9
8
7
6
n
5
R
rt
O
7
4
n
<D
N
v
3
2
1
0
yo yo yo Oo Oo yo ,yo yo yo yo Oo ,yo Oo Oo Oo yo Oo Oo Oo Oo Oo Oo Oo yo Oo
A0 A\' � A\'o A0 "\'Vo�
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -7
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
August 2013
yo yo
Oo \ Oo � y o \ yo \ yo ^ � y o y o Oo yo Oo Oo yo Oo � O o � O o � O o Oo yo
4o ti "\,P o �� 'p
(b\ (b � � \ \ \ \ ' \ \^ \ \ \ \ \ Oo
\ o� \ o� \ ^�
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -8
9
8
7
6
n
5
R
rt
O
7
4
n
<D
N
v
3
2
1
0
yo yo
Oo \ Oo � y o \ yo \ yo ^ � y o y o Oo yo Oo Oo yo Oo � O o � O o � O o Oo yo
4o ti "\,P o �� 'p
(b\ (b � � \ \ \ \ ' \ \^ \ \ \ \ \ Oo
\ o� \ o� \ ^�
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -8
Stream Hydrology Assessment September 2013
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
Blom
-36 '
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
N
t
v
0
N
d
J
L
-6
d
R
v
-12
ca
3
N
Monitoring Well Record
-18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
Blom
-36 '
N No N3
�o do �o yo �o �o rp �o ro rp �o ryo 0yo rp yo �o �p p yo �o p rp 4yo P
o\�� o \ ti ego\ "'N ago\ 4 o\'6 ono\ \'N \ ^oe \"' \�o� \ \' �� \ \ �� \� p \ �� J p \�� \o�
0 ','r, 0 o a o e o off' o� off' o�' o� o�' o� ar'
+North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -9
9
8
7
0
5
v
rt
0
7
4 3
0
CD
N
3
2
1
0
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment October 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
9
Precipitation data obtained
—
from: Onsite Raingauge
beginning September 2011
ro fo Po yo
3�^ k�^ 0�
�o yo �o �o
^�
N
1
�� °��
t
v
o�^ ��^ 0�^ o�^ o�^
C
^o�ti� ^ o�ti��^ o�ti�� ^o��yo� ^o�y10 ^o��
N
d
J
L
d
0
R
d
v
ca
5
3
co
Monitoring Well Record
fl1
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment October 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
9
—
8
^3 ^o ^3 ^� ^o ^� ^o ^t
yo �o �o yo �o ro fyo \yo
^�
ro fo Po yo
3�^ k�^ 0�
�o yo �o �o
^�
�p p P �o P
1
�� °��
^o� ^o�� ^0�3� ^o��� ^o�o� ^o�\ ^o��� ^ o�° ��^ o�^^^
o�^ ��^ 0�^ o�^ o�^
^0� ^1� ^0� ^�� ^o� ^°��
^o�ti� ^ o�ti��^ o�ti�� ^o��yo� ^o�y10 ^o��
+North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -10
9
—
8
7
6
.O
0
5
fl1
rt
O
7
4
3
0
CD
N
�.
—
3
2
1
0
^
Slide NS -10
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
ME
6
N
d
t
v
_= 0
m
m
L -6
m
f�
v -12
O
-18
c
0
L
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
November 2013
Oo �o yo Oo yo rp yo Oo Oo yo Oo Oo �o Oo Oo �o Oo �o Oo do yo rp Oo yo
N\ti N\�\ N\ �\ ���\ N��\ ' ^tip ' ^�\ ^6\ ^�\ "�\ ' ti ^\ ti� ti�� ti�� tip\ tip\ tip\ tip\
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -11
9
8
7
6
n
5
R
rt
O
7
4
n
<D
N
v
3
2
1
0
Oo �o yo Oo yo rp yo Oo Oo yo Oo Oo �o Oo Oo �o Oo �o Oo do yo rp Oo yo
N\ti N\�\ N\ �\ ���\ N��\ ' ^tip ' ^�\ ^6\ ^�\ "�\ ' ti ^\ ti� ti�� ti�� tip\ tip\ tip\ tip\
4�- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -11
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Northern Stream Tributary
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
N
a�
t
v
� 0
Z
J
L -6
.r
R
U -12
L
U)
'a -18
0
L
0
Land Management Group, Inc.
www.lmgroup.net
-24
-30
W
December 2013
00 �0 00 00 �o �o �o �o �o �o yo �p �o �o �o
��� �ti �o� ��� \ o� �� o� �o� ��� �ti ^o� ��� ^o� ��� ��� ^o� �� � o� �� o� �� �� o�
N N N\ L
4- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -12
9
8
7
6
CD
0
5
.,
0
7
4
3
0
CD
N
3
2
1
0
00 �0 00 00 �o �o �o �o �o �o yo �p �o �o �o
��� �ti �o� ��� \ o� �� o� �o� ��� �ti ^o� ��� ^o� ��� ��� ^o� �� � o� �� o� �� �� o�
N N N\ L
4- North Stream 2 (A3BFE3A)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide NS -12
Stream Hydrology Assessment January 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.lmgroup.net
-30
WARM
N N N N N N N <5 ^3 Nb N� Nb ^b N3 N3 ^b ^b N� N3 N3 N1b N1b N3 N� NO)
�o �o �o yo �o �o yo �o yo �o yo yo yo yo �o �o �o yo yo yo �o yo �o yo �o
�\�� ��� �\o� '\�\ '�o\ '\\ '��\ '�o\ ^�� \�� \��\ \��\ ��o\ \��\ \��\ ��o\ �ti ^\ �titi \�o\ \ti�\ \tio\ \ti1 \ \ti�\ \�o\ \o^\
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -1
9
8
7
6
cue
0
5 R
0
4
0
<D
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
a�
t
v
0
N
d
J
L
-6
d
r
cC
v
-12
t3
Monitoring Well Record
'D
3
-18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.lmgroup.net
-30
WARM
N N N N N N N <5 ^3 Nb N� Nb ^b N3 N3 ^b ^b N� N3 N3 N1b N1b N3 N� NO)
�o �o �o yo �o �o yo �o yo �o yo yo yo yo �o �o �o yo yo yo �o yo �o yo �o
�\�� ��� �\o� '\�\ '�o\ '\\ '��\ '�o\ ^�� \�� \��\ \��\ ��o\ \��\ \��\ ��o\ �ti ^\ �titi \�o\ \ti�\ \tio\ \ti1 \ \ti�\ \�o\ \o^\
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -1
9
8
7
6
cue
0
5 R
0
4
0
<D
3
2
1
0
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment February 2013
18
12
6
0
-6
-12
-18
-24
-30
-36 ' —
ti ti� do IN do ti�
r 4 41 1 �' �' 1 '^ �^ 1 4P 1\1P 4\1 �l ��3 1 �rl X47 �6l
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -2
9
8
7
6
cue
n
5
O
4
n
<D
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
a�
t
v
C
N
d
J
L
r
d
v
t3
O
Monitoring Well Record
3
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment February 2013
18
12
6
0
-6
-12
-18
-24
-30
-36 ' —
ti ti� do IN do ti�
r 4 41 1 �' �' 1 '^ �^ 1 4P 1\1P 4\1 �l ��3 1 �rl X47 �6l
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -2
9
8
7
6
cue
n
5
O
4
n
<D
3 v
2
1
0
Stream Hydrology Assessment March 2013
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36
Precipitation data obtained
^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^�
�yo �yo
0 0 0 0 3 0 0 3 01, or' or� or' '1\T 4_" ',\'V 30
from: Onsite Raingauge
12
beginning September 2011
6
N
d
t
V
0
m
m
J
�
-6
d
ca
v
-12
ca
7
CO
Monitoring Well Record
'a
-18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36
^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^�
�yo �yo
0 0 0 0 3 0 0 3 01, or' or� or' '1\T 4_" ',\'V 30
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
M
CD
0
5 PF
v
0
4
C'>
S
M
N
3
W
Slide SS -3
1
0
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment April 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
Precipitation data obtained
1�b <5 �� N� �� N� �� ^3 NO) ^3 �3 ^3 ^r �� Nl3 NO) ^3 �3 ^1 �3 ^3 �3 NO)
�yo �yo ��o �yo ��o \rp ��o ��o
3 \ o \rl � o
from: Onsite Raingauge
beginning September 2011
a�
t
v
C
N
d
J
L
r
d
v
t3
O
Monitoring Well Record
3
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment April 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
1�b <5 �� N� �� N� �� ^3 NO) ^3 �3 ^3 ^r �� Nl3 NO) ^3 �3 ^1 �3 ^3 �3 NO)
�yo �yo ��o �yo ��o \rp ��o ��o
3 \ o \rl � o
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -4
9
8
7
6
cue
n
5
O
4
n
<D
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
�- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
(A
d
t
V
= 0
Z
d
J 6
L
d
a+
f0
v -12
O
-18
3
O
Land Management Group, Inc.
www.lmgroup.net
-24
-30
-36
ONE O`�� O`�O ON O ^O O ^O
�\^�ti h���
May 2013
�3 ^3 <5 NO) -� �5 �3 1� N3 ^15 <5 <5 -� ^O) NO �3 Nrb ^5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
\ ^�ti \ ^o�ti \ ^��ti \ ^o�ti \ ^��ti \ ^��ti \ ^o�ti \1 \��ti \�o�ti \���ti \�6�ti \���ti \���ti \�o�ti \o
h�<< 4 e e h
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -5
9
8
6
CD
0
5 R
rt
O
7
4
0
M
3 v
2
1
0
Stream Hydrology Assessment June 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
N10 �o No �o N10 ^o No No N13 �o N115 No No �o ^o �o �o N13 No Nr5
pro Grp ��yo �,yo Grp 5�o P ��o Grp \If f ��o \10 P f ��yo ;�o pro �Io P
o� o�ti o�3 0N0 '00 0& o;\ ono ��^ � ^ti ��� ��° � ^o ' ' �< � � \v \ro \T bp \� �w \o
0 0 0 0 0 0 0 0 0� o� o� o� o� o� o� or�
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -6
9
8
7
6
n
5
rt
O
3
4 3
0
CD
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
N
d
t
v
0
O
J
L,
-6
d
co
tOi
-12
m
3
CO
Monitoring Well Record
-0
-18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
N10 �o No �o N10 ^o No No N13 �o N115 No No �o ^o �o �o N13 No Nr5
pro Grp ��yo �,yo Grp 5�o P ��o Grp \If f ��o \10 P f ��yo ;�o pro �Io P
o� o�ti o�3 0N0 '00 0& o;\ ono ��^ � ^ti ��� ��° � ^o ' ' �< � � \v \ro \T bp \� �w \o
0 0 0 0 0 0 0 0 0� o� o� o� o� o� o� or�
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -6
9
8
7
6
n
5
rt
O
3
4 3
0
CD
3
2
1
0
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment July 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
Precipitation data obtained
^3 ^b ^3 ^3 ^3 ^" ^n' ^3 ^3 ^r5 ^" ^3 ^b ^r' ^t ^3 ^t ^`b ^r5 ^O
�yo �o �yo �yo ,yo yo ,yo
from: Onsite Raingauge
beginning September 2011
d
t
V
C
N
m
J
L
r
d
v
IC
7
Cn
Monitoring Well Record
r_
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment July 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
^3 ^b ^3 ^3 ^3 ^" ^n' ^3 ^3 ^r5 ^" ^3 ^b ^r' ^t ^3 ^t ^`b ^r5 ^O
�yo �o �yo �yo ,yo yo ,yo
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
^� O ^O O ^� O ^� O0
:\11P O-I\r ti4 00�L �^\�
,,\ A\ -,\ �\
Slide SS -7
9
8
7
6
m
n
5 R
r_F
O
4 3
n
CD
3 v
2
1
0
Stream Hydrology Assessment August 2013
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
Precipitation data obtained
^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^�
yo yo �o ,yo �o yo ,yo ,yo yo yo �o yo yo do
%N
from: Onsite Raingauge
12
beginning September 2011
6
N
d
t
V
0
d
d
J
L
-6
d
fC
v
-12
ca
7
CO
Monitoring Well Record
'a
3
-18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
^� ^3 ^3 ^o ^o ^o ^o ^o ^o ^o ^3 ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^o ^�
yo yo �o ,yo �o yo ,yo ,yo yo yo �o yo yo do
%N
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
M
CD
0
5
m
rt_
0
4
0
S
M
N
3
W
Slide SS -8
1
0
Stream Hydrology Assessment September 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
a�
t
v
0
m
d
J
L
-6
d
r
cC
v
-12
t3
Monitoring Well Record
3
-18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
c�
-24
Land Management Group, Inc.
www.lmgroup.net
-30
-36
N� �� N� �� ^3 NO) ^3 N3 ^3 ^1b N15 Nl3 NO) ^3 N3 ^1b N3 ^3 N3 NO)
��o �yo Grp 0 0 pro 60o �yo :\o ��o Grp V ��yo pro �yo ��o �yo ��o Grp ��o �p
o� o�ti o\ 3 0�� ono o,\ q\� oho p p p \^ ' ^o � ^� ^o ^o p \ \ 3 \ \ o p� \ � o
0 o a o 0 o a o o� o� o� a� o� o� o� oT
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -9
9
8
7
6
0
5
0
4
0
<D
3
2
1
0
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment October 2013
18
12
6
0
-6
-12
-18
-24
-30
-36 '
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
N
d
t
V
C
m
m
J
d
a+
IC
d
v
7
co
Monitoring Well Record
3
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment October 2013
18
12
6
0
-6
-12
-18
-24
-30
-36 '
�3 �o �o �'b No No No No �o �o �o �o �o �o �o �o �o �o �3 �o �o No �� �o �'b
�yo ��o ��o ��o �yo �yo �yo �yo ��o �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o ��o ��o ��o ��o
"P '41 ^0�3 '0" 'ono ^'Z\, ^o�; ^ova o��� o� o� ^o o��� o��o o��A o��� o��o o��N o�"C sO ZO ZO o�� sO ZO on'
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
M
0
5
m
rt_
O
4
C'>
S
M
N
3 ....
2
1
0
Slide SS -10
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment November 2013
18
12
6 — — — — — — — — — — — — — — — k-
0
-6 -
-12 -
-18
-24
-30
-36
r6' �o yo do ,yo 'yo �o NO) Nr5
�o
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
cue
n
5
O
4
n
<D
3 v
2
1
0
Slide SS -11
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
a�
t
v
C
N
d
J
L
r
d
v
t3
O
Monitoring Well Record
3
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.lmgroup.net
Stream Hydrology Assessment November 2013
18
12
6 — — — — — — — — — — — — — — — k-
0
-6 -
-12 -
-18
-24
-30
-36
r6' �o yo do ,yo 'yo �o NO) Nr5
�o
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
cue
n
5
O
4
n
<D
3 v
2
1
0
Slide SS -11
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment December 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
Precipitation data obtained
from: Onsite Raingauge
N No No N No No No �o �o �o �o �o �o �o �o �o �o �o �3 �o �o No
�yo �yo �'yo �yo �yo �ro �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o 0�o P
0 0 1', 1' o 0 Nti N N \�� N\ �� ^tip ^o 1ti�� Nl��o Nl��� N\ �� N\ �o ^'��� �ti� N �� N �� �tio 1'1\ ^ti\�V ^ti\� 1'\
beginning September 2011
N
d
t
V
C
m
m
J
d
ca
d
v
7
CO
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment December 2013
18
12
6
0
-6
-12
-18
-24
-30
-36
N No No N No No No �o �o �o �o �o �o �o �o �o �o �o �3 �o �o No
�yo �yo �'yo �yo �yo �ro �yo �yo �yo ��o ��o ��o ��o ��o �yo �yo �yo ��o 0�o P
0 0 1', 1' o 0 Nti N N \�� N\ �� ^tip ^o 1ti�� Nl��o Nl��� N\ �� N\ �o ^'��� �ti� N �� N �� �tio 1'1\ ^ti\�V ^ti\� 1'\
4- South Stream 1 (13D491A2)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
9
8
7
6
M
0
5 PF
v
O
4
C'>
S
M
N
3 ....
2
1
0
Slide SS -12
Stream Hydrology Assessment January 2013
18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36 ' — —
NKyo 6yo �yo �o yo rp �yo P ro fo e\ po �o ryo fo �o 1yo �o e\ p �o ,yo N1b rb r5 1b
�o �o do
^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^
+South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -1
9
8
7
6
n
5
O
rt
O
7
4
n
fD
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
12
beginning September 2011
6
d
t
v
0
d
a�
J
L
-6
d
a+
M
v
-12
m
3
N
Monitoring Well Record
C
-18
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
0
0
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36 ' — —
NKyo 6yo �yo �o yo rp �yo P ro fo e\ po �o ryo fo �o 1yo �o e\ p �o ,yo N1b rb r5 1b
�o �o do
^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^
+South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -1
9
8
7
6
n
5
O
rt
O
7
4
n
fD
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
ql
d
t
V
C 0
d
m
J -6
L
d
v -12
-18
0
L.
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
February 2013
-36
^It, <3 ^3 ^3 NO) ^3 NO) NO) ^1b ^3 NO) ^O, NO) N3 ^1b ^3 ^3 NO) �5 N3
�o yo �o yo yo Iyo yo �o �o �o �o �o �o �o �o �o �o yo �o �o �o �o �o
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -2
9
8
7
6
n
5
rh
0
4
n
s
c�
N
3 v
2
1
0
Stream Hydrology Assessment March 2013
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
L.
0
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36
Precipitation data obtained
N N �3 N3 <5 �� �� <3 ^3 �3 �� �3 ^b �3 <3 ^� ^b �� �� �3 �3 �3 �3 <3 N�
rp yo yo yo yo �o yo yo rp yo �o �o �o rp �o �o rp �o �o yo �o rp �o �o rp
3 '!� '!� 3 r5 3� 'tp �p' 'p 5T '�� �'V j 3-.)
from: Onsite Raingauge
12
beginning September 2011
6
ql
d
t
V
C
0
d
m
J
L
-6
d
v
-12
Monitoring Well Record
18
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
L.
0
-24
Land Management Group, Inc.
www.imgroup.net
-30
-36
N N �3 N3 <5 �� �� <3 ^3 �3 �� �3 ^b �3 <3 ^� ^b �� �� �3 �3 �3 �3 <3 N�
rp yo yo yo yo �o yo yo rp yo �o �o �o rp �o �o rp �o �o yo �o rp �o �o rp
3 '!� '!� 3 r5 3� 'tp �p' 'p 5T '�� �'V j 3-.)
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -3
9
8
7
6
n
5
rh
O
4
n
s
c�
N
3
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- April, 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
ql
d
t
V
C 0
d
m
J -6
L
d
v -12
-18
0
L.
0
Land Management Group, Inc.
www.imgroup.net
-24
-30
April 2013
-36
^5 <5 <5 Nb �� ^b N3 ^3 N3 ^3 ^b N� N'3 NO) ^3 N3 ^1b N3 ^3 N3 NO)
rp �o �o rlo P rp �o 0 ro �o yo �o �o rp V yo ro p �o yo �o rp �o �o
�� ^� ��� ��o� �N' t�\ ��' ���� N�o� \' \ ^ti \ ^3� \^ \^ \' \^o� \^ \ ^� \ \ o� \ �� \ o� \' � \ p� \ o�
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -4
9
8
7
6
n
5
rh
0
4
n
s
c�
N
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
�- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
m
E 0
m
m
J
L -6
d
f6
U —12
cC
L
'a -18
0
c�
Land Management Group, Inc.
www.lmgroup.net
24
—30
—36
ONO ONO ONO ONO ONO NO
10 11\
May 2013
9
8
6
CD
0
5
'a.
-'
rt_
0
7
4
3
0
CD
N
v
3
2
1
0
1O <O ^O <O NO <O <5 �O <O NO NO <O <O <O <O <O <O <O <3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4\o�ti \� ^�ti \ \ ^o�ti \ \ ^o�ti \ \ ^o�ti \�o�ti \� \��ti \�o�ti \���ti \�o�ti \���ti \���ti \�o�ti \o^\ti
h h h h h h h h h h h h h h
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -5
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
W
6
ql
d
t
V
C 0
d
m
J -6
L
d
v -12
-18
0
L
O
Land Management Group, Inc.
www.imgroup.net
-24
-30
June 2013
-36
^5 <� <5 Nb �� ^b N3 ^3 N3 ^3 ^b N� N'3 NO) ^3 N3 ^b N3 ^3 N3 N�
^�yo ��o ��o ��o �yo Grp ��o 0 �ro �yo ��o �yo Grp �yo ��o �yo P Grp Grp
o\ o�ti 4 bN ono o�� o;\ oho o� ^' Q\' b\' "� o' ^o b�' o�^o o�^o o\-� bo, bo, 0\T o\T o\'� o& -p o\p
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -6
9
8
7
6
n
5
rh
0
4
n
s
c�
N
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
d
t
v
� 0
m
m
d
f0
v -12
ca
to
-18
0
c�
Land Management Group, Inc.
www.imgroup.net
-24
-30
July 2013
-36
9
—
e e e e e � e e
7
+South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -7
9
—
8
7
6
T
(DD
n
5
rt
0
—
4
3
0
CD
v
3
2
—
1
0
101
Slide SS -7
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment August2013
18
12
6
0
-6
-12
-18
-24
-30
-36
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
ql
d
t
V
C
d
m
J
L
d
d
v
Monitoring Well Record
3
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- August 1, 2013 to
August 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
O
c�
Land Management Group, Inc.
www.imgroup.net
Stream Hydrology Assessment August2013
18
12
6
0
-6
-12
-18
-24
-30
-36
^3 ^3 ^3 ^3 �� N N'b <5 ^3 NO) N") N3 ^b ^3 <3 ^'b ^'b ^b Nb ^3 N3 N3 N3 <5 N'5
�o yo yo yo yo �o yo yo yo yo �o �o �o �o �o �o yo �o �o yo �o �o �o �o �o rb
��^� ��� r \ t:\ ��o\ ��� ��'� ego\ \ ' Z\ ^ \ ^r \ ^3� \ ^�� \ ^o� \ ^�� \ ^'� \ ^o� \ ^� \ ti \ 3� \ �� \ 6; \�� \ �� \ 1� \ ^�
� � � � �� �� �� �� �ti �ti �� IJ �_')
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -8
9
8
7
6
n
5
rh
O
4
n
s
c�
N
3 v
2
1
0
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
m
E 0
m
m
J
L -6
d
f6
U —12
cC
L
'a -18
0
L
(D
Land Management Group, Inc.
www.lmgroup.net
24
—30
—36
o\ o\� ono C�
September 2013
<t) '� <5 <5 <5 Nrb <5 ^1b <� ^� N11b <3 N� <5 ^1b <� ^`ID <5 ^3 <5 <�
X00 ;00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00
ono o\� o\w o8o � \ p ^o ^� p � ': ^� � O ti \ o � a \ o \� e o
e a a e a a o 0 0� a� o� a`� o� o� eP CP
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -9
9
8
6
CD
0
'a.
5
-'
rt_
0
7
4
3
0
CD
N
v
3
2
1
0
<t) '� <5 <5 <5 Nrb <5 ^1b <� ^� N11b <3 N� <5 ^1b <� ^`ID <5 ^3 <5 <�
X00 ;00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00 X00
ono o\� o\w o8o � \ p ^o ^� p � ': ^� � O ti \ o � a \ o \� e o
e a a e a a o 0 0� a� o� a`� o� o� eP CP
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -9
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
m
E 0
m
m
J
L -6
d
f6
U -12
cC
L
_ -18
0
L
cD
Land Management Group, Inc.
www.lmgroup.net
24
-30
-36
October 2013
00 00 00 00 00 rp 00 p < rp 00 P 00 N1b q f< rp 00 00 00 00 00 00 00 rp 00 00 00
^O \I\ ^�\� r�j� �O \k� ^O \�\ '\O�� �O \�� ^O�p���o\ ^ ^� ^o\ ^r� ^o\�r�j��o\ ^��N' \' N' \' \1o\' �o\' IS \�r�\^o\�r� ^o\�r�j�^o\����o\��\^o\�.,\^o\ NQ \�p��^o\�I\
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -10
9
8
6
CD
0
'a.
5
-'
rt_
0
7
4
3
0
CD
N
v
3
2
1
0
00 00 00 00 00 rp 00 p < rp 00 P 00 N1b q f< rp 00 00 00 00 00 00 00 rp 00 00 00
^O \I\ ^�\� r�j� �O \k� ^O \�\ '\O�� �O \�� ^O�p���o\ ^ ^� ^o\ ^r� ^o\�r�j��o\ ^��N' \' N' \' \1o\' �o\' IS \�r�\^o\�r� ^o\�r�j�^o\����o\��\^o\�.,\^o\ NQ \�p��^o\�I\
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -10
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
ql
d
t
V
C 0
d
m
J -6
L
d
v -12
-18
0
L
O
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
November 2013
N5 N5 rp 6o o o P �o 4o V rp 4o o po o o o o o 4o o d,o rp o e
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -11
9
8
7
6
n
—
5
rh
0
4
0
s
cD
N
v
3
2
1
0
N5 N5 rp 6o o o P �o 4o V rp 4o o po o o o o o 4o o d,o rp o e
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -11
Precipitation data obtained
from: Onsite Raingauge
beginning September 2011
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Southern Stream Tributary
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
18
12
6
ql
d
t
V
C 0
d
m
J -6
L
d
v -12
-18
0
L
O
Land Management Group, Inc.
www.imgroup.net
-24
-30
-36
December 2013
^3 '5 �� N3 Nb �� N3 N3 N3 N3 Nb N3 ^3 N3 N3 N� N3 Nb N� ^3 N3 ^15 N3 N3 N�
�o yo yo yo �o yo �o yo �o yo yo �o �o yo �o yo �o yo yo
L \N\ L \0 L \g\ Lp\ L6\ y�\ L \q�\ L \o�\ \�I\ \�' \erg\ \�R\ \�c;\ \��\ \�g\ \�o�\ \L�\ \Ll \L g\ \L p\ \Lca\ \L1\ \Lq\ \L0\ \�N\
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -12
9
8
7
6
0
5
rh
0
4
0
s
cD
N
v
3
2
1
0
^3 '5 �� N3 Nb �� N3 N3 N3 N3 Nb N3 ^3 N3 N3 N� N3 Nb N� ^3 N3 ^15 N3 N3 N�
�o yo yo yo �o yo �o yo �o yo yo �o �o yo �o yo �o yo yo
L \N\ L \0 L \g\ Lp\ L6\ y�\ L \q�\ L \o�\ \�I\ \�' \erg\ \�R\ \�c;\ \��\ \�g\ \�o�\ \L�\ \Ll \L g\ \L p\ \Lca\ \L1\ \Lq\ \L0\ \�N\
4- South Stream 2 (13D4AA06)
MOnsite Raingauge
— Ground Surface (0 ")
—Bed Elevation
Slide SS -12
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- January 1, 2013 to
January 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
M
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
MIN
January 2013
-24
N N N N N N N <b N3 Nb Nb N3 <5 N't' NO) ^b N3 N� Nb N N� N N N
1P yo �o p Po 1yo P p 1yo yo ,yo ,yo Vyo 10 ,yo yo ,yo ,yo ,yo p �o ,yo p �o
^� ^� ^�� 4 NN N� ^\�\ ^fig\ ^fig\ \' \' \' \� \ z \^ \' \^ \' 1\1P \ -r \ -C \T \T \ -� \'P \ -g \ - -)
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -1
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- February 1, 2013 to
February 28, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
c�
Land Management Group, Inc.
www.lmgroup.net
MM
February 2013
-24
e � yo ,yo e 1 �o yo do yo yo 0 e\ yo p 0 ,yo p do do e\ yo 0
ti ti ti ti ti ti ti ti ti� ti� ti� ti� ti� ti� ti�
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -2
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- March 1, 2013 to
March 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
\ 1:00 pm, 7:00 pm
Stream Hydrology Assessment
W,
M
y
d
t
V
0
d
J
L
Q%
-6
d
U
Cl)
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
MR
-24
March 2013
ro yo rp e 0 4o �o e rp
3 '� 3 3 3 3 �� 3p 't\p 'j\ 'j\p 'j\
3� 3�
4 -Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
MBF Onsite Raingauge
Slide BF -3
6
5
4
cD
n
rh
3
0
n
3
CD
2
1
0
ro yo rp e 0 4o �o e rp
3 '� 3 3 3 3 �� 3p 't\p 'j\ 'j\p 'j\
3� 3�
4 -Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
MBF Onsite Raingauge
Slide BF -3
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- April 1, 2013 to
April 30, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
c�
Land Management Group, Inc.
www.lmgroup.net
SUM
April 2013
-24
<3 N5 <b Nb <5 N� N3 ��
Nb <3 Nb N� N3 N3 <5 Nb <� Nb Nb
Nb N� Nb -� <5
p yo P ,yo \yo ,yo yo ,yo
rp ,yo �o ,yo
\o �o do
4o �\ p\
\r�\ \v \\ \p\ \\ \1\ \�\ ^3\ ^�\ ^p�\
t t N t N t\ \'
�
\gyp\ \
\' \ \" \' \ \ \ '\'V \
� � D� � R`L b`L �`L �`L
\'P \'V \
�`L �`L �`L D`L
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -4
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- May 1, 2013 to
May 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
MIN
May 2013
-24 —
-
N N N N N N N <b N3 Nb Nb N3 <5 N't' �
NO) yo ^ b yo N 3 yo N '� Nb N �o N yo N
4 4 4 4 4 h h h4' 4' � 4' ������ � 4' P � � p
��'o � 'o �� � ���
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -5
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- June 1, 2013 to
June 30, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
N
d
t
V
= 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
Land Management Group, Inc.
www.lmgroup.net
-18
June 2013
-24 '
<3 N) <b Nb <5 N15 N3 ��
N� <3 N3 N15 N3 N3 <5 N1b <� N1b N1b
N1b N15 N11b -� <5
Kyo v 4yo ,yo �yo �yo p
� 1 �o �o ,yo \o rp ,yo �o ,yo
Po �o do �o do
\n�\ \p\ \11\1p j ^�\ ^p�\ �\ raj\ p\ ca\ \ �\ o�\
0\r�\ I& Ib Ib 10 6 q ;\ 'b\ \
0
\ \^3\ \gyp\ ,^ ,^' ,^' \ \ \ \ \
0 0 0 0 0 0 0 0� 0� 0� 0�
\ \' \ \
0� 6� 0� 0�
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -6
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- July 1, 2013 to
July 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
0
d
d
J
L
d
-6
d
v
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
MIN
-24
July 2013
6
5
4
N N N N N N3 N <b N3 Nb N' <3 <5 N' <5 ^b N3 N� Nb Nb -� Nb Nb <3 <5
10 10 o �o �o CO o �o o o o o o o o o o o o o o �o
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -7
cD
n
p1
rh
3 0
►:
1
0
n
3
CD
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- August 1, 2013 to
August 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
Mt-11
August 2013
-24
N N N N N N3 N <b N3 Nb N'5 <3 <5 N'5 <5 ^b N3 N'� Nb Nb -�5 Nb Nb <3 <5
'P P 'yo yo �o yo yo yo yo yo 'o yo yo yo yo yo yo yo �o yo yo �o
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -8
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- September 1, 2013 to
September 30, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
y
d
t
V
S 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
c�
Land Management Group, Inc.
www.lmgroup.net
SUM
September 2013
-24 '
<3 N) <b Nb <5 N5 N3 �� N� <3 Nb N� N3 N3 <5 Nb <� Nb Nb Nb N� Nb -� <5
p yo P ,yo \yo ,yo �yo p �o �o �o ,yo \o rp �o �o �o ,yo Po �o do
\�\ \v � \n�\ (),N �\cD\ c'\1\ 4 \�\ 4 \�j\ p p p p\ \ p \^'\ p�\ \ '\P \ \ �j\ '\T '\T p \
0 0 0 'p 0 0 0 'p 0� 0� 0� 0� 0� 0� 0'V 0�
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -9
6
5
4
fD
C'1
rt
fl1
rt
3 0
n
3
CD
2
1
0
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- October 1, 2013 to
October 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
N
d
t
V
= 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
-18
-24
October 2013
N N N N N N N <3 Nb N� Nb N3 �� <b <b N3 Nb N3 Nb Nb Nb N'b N3 N15 N11b
ryo P �o yo �o ryo yo �o �o �o �o �o �o ro �o �o �o �o yo yo e\ rp �o yo �o
'o& �o�� '0& "Z� �. \ 'off\ ^o��� Ns\\ N6�' ^o�`' ', S'o\,�o��k\No��o\�o���\'( �' "'S' \^o�`��\'� �`�� ^o�` 'o �`��\^o�`� NQ�`��'Qo�\No\\ \ �\
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -10
6
5
4
0
rt
fl1
rt
3
O
n
3
CD
2
1
0
N N N N N N N <3 Nb N� Nb N3 �� <b <b N3 Nb N3 Nb Nb Nb N'b N3 N15 N11b
ryo P �o yo �o ryo yo �o �o �o �o �o �o ro �o �o �o �o yo yo e\ rp �o yo �o
'o& �o�� '0& "Z� �. \ 'off\ ^o��� Ns\\ N6�' ^o�`' ', S'o\,�o��k\No��o\�o���\'( �' "'S' \^o�`��\'� �`�� ^o�` 'o �`��\^o�`� NQ�`��'Qo�\No\\ \ �\
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -10
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- November 1, 2013 to
November 30, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
N
d
t
V
= 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
WIN
-24
November 2013
6
5
4
yo �o yo �o yo yo yo yo �o �o yo yo yo
"\ r p �4V 4P tip\ o DLO o 4V tip\ o 4P tip\ ' p tip\ � o tio�\ ro
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -11
0
rt
fl1
rt
3
O
n
3
CD
2
1
0
yo �o yo �o yo yo yo yo �o �o yo yo yo
"\ r p �4V 4P tip\ o DLO o 4V tip\ o 4P tip\ ' p tip\ � o tio�\ ro
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -11
Precipitation data obtained
from: Onsite Raingauge @
Brunswick Forest
Monitoring Well Record
- Stone Farm Mitigation
- Brunswick County, NC
-01-02-240
- Stream Reference Wells @
Brunswick Forest
- Ecotone WM 40
- December 1, 2013 to
December 31, 2013
- Reading four times per
day at 1:00 am, 7:00 am
1:00 pm, 7:00 pm
Stream Hydrology Assessment
12
6
N
d
t
V
= 0
d
d
J
I-
M -6
d
v
to
N
_ -12
0
0
Land Management Group, Inc.
www.lmgroup.net
-18
-24
December 2013
6
5
4
yo ryo �o yo e\ 'yo yo yo �o �o �o �o e\ ro �o �o �o �o yo yo �o rp �o yo �o
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -12
fD
C'1
rt
fl1
rt
3
O
n
3
CD
2
1
0
yo ryo �o yo e\ 'yo yo yo �o �o �o �o e\ ro �o �o �o �o yo yo �o rp �o yo �o
4- Upper Stream Ref (A287224)
4- Lower Stream Ref (EBD23B5)
WBF Onsite Raingauge
Slide BF -12
V L • 11 �� •1 � l� l ; Y � ��i L •I l l t t • 1:1 I i L�l ��i G\ ��
North Carolina Drought Status Flap
01/01/2013
1WRISARS Drought Monitoring
Layers Legend
l` State Boundary of HC
Basins
State Boundaries
TVA States
Counties
W, 04 - Exceptional Drought
E B3 - Extrene Drought
02 - Seyere Drought
01 - First Leuel drought
Ufa - Rbnornally Org
North Carolina. Drought hlt Status Map
p
� I �+ � �J 0 � az)ros/zai s - +k,►
'Ri Drought Monitoring
Layers Legend
/V Mate Boundary of MC
Basins
State Boundarie
TVR States
Al Counties
B4 - Exceptional Brought
03 - Extreme Draught
02 - Severe Drought
Di - First Level Draught.
DO - Abnornarlly Ury
North Carolina Drought Status Map
�l I
'WTUSARS Drought Monitoring
Layers Legend
State Boundary of HE
Basins
Mate Boundaries
TVA States
Counties
04
- Exceptional Drought
DS
- EMtrene Drought
02
- Severe Drought
D1
- First Level Drought
DD
- Abnornally Dry
North Carolina Drought Status Map
+ jr-k I I -
"13 1 &� <--, 1 04/02/2013 1�-] QI
WRISARS Draught Monitoriu
Layers Legend
State Boundary of ND
IV Basins
State Boundaries
A/ TVA States
Counties
M- N - Exceptional Drought
D3 - Extreue drought
D2 - Severe Brought
D1 - First Level Drought
Bo - Abnormally Dry
North Carolina Drought Status Map
05f07I2013
WRISARS Droudit Monitoring
Layers Legend
,J' State Boundary of HC
Basins
State Boundaries
TVA States
A counties
M D4 - Exceptional Drought
E D3 - Extren+e Brought
02 Seyere Drought
DI - First Level Drought
Do - Abnornallq Dry
North Carolina Drought Status Map
0610412013 -
1AFRISARS Drought Monitorin
Layers Legend
A/ state Boundary of HC
Al Basins
Mate Boundaries
TVR States
N counties
N - Exceptional Drought
D3 - Extrene Brought
02 - Severe Brought
Di - First Level Drought
DD - Abnormally Dry
North Carolina Drought ou ht Status Map
El (�j (-z4l +� ;:Z� J-, " do <�O� 07/02,/2013 v 4
)ATdSAR,S Drought Monitoriu
Layers Legend
,/ State Boundary of BC
,, Basins
State Boundaries
V TYR States
,/ Counties
DI - Exceptional Drought
D3 - Extrene Drought
02 - Severe Drought
Di - First Level Drought
00 - Abnornallq Dry
North Carolina ➢ rou ht Status Map
!� (i� Q ± � 10 � 08/06/2013 ' g
INTdSARS Drought Monitoring
Layers Legend
At state Boundary of HC
IV Basins
State Boundaries
`OVA States
Countie
W N - Exceptional Brought
H3 - Extrene Brought
02 - Severe Brought
H1 - First Level drought
Be - R norma.119 Dry
North Carolina Drought Status leap
Q_ � � � � � � 09l0312013
WRiSARS Drought Monitoring
Layers Legend
State Boundary of HC
Basins
State Boundaries
iv 1 VA 'States
/ Counties
04 - Exceptional Brought
03 - Extrene Drought
D2 - Severe Drought
D1 - First Level Drought
DO Abnormally Dry
North Carolina Drought h Status Map
r', 10!01/2013
WRISARS Drou it Monitorin
Layers Legend
A/ State Boundary of HC
,V Basins
State Boundaries
TVR States
Counties
M 04 - Exceptional drought
M' D3 - Extrene drought
DP - Severe Drought
Di - First Level drought
DO - Rbnornally Ivry
North Carolina Drought Status Map
Q QJ �
� � � � 1110512073 � '�
WRISARS Droudit Monitorin
Layers Legend
IV state Boundary of HNC
Basins
State Boundaries
TVA States
as -
0 a3 -
U2 -
U1 -
no -
(ties
Exceptional drought
• Extreme Drought
° Severe Brought
• First Lewel Drought
Abnornally Dr q
North Carolina Drought Status Map
12/0,312013 � "�
WRISARS DTought Monitoring
Layers Legend
State Boundary of He
Basins
State Boundaries
TVA States
Counties
04 Exceptional Droutht.
03 - Extrene Drought
D2 - Severe Drought
XI - First Level Drought
DD - Abnormally Dry
LONGITUDINAL SURVEYS /CROSS SECTION SURVEYS
CROSS SECTION PHOTOS
34
33.5
33
w 32.5
0 32
31.5
W 31
W
30.5
30
29.5
0
As -Built c
Sta. #: +
0
34
33.5
33
32.5
0 32
5 31.5
w
w 31
30.5
30
29.5
50
MAINSTEM: LONGITUDINAL PROFILE (MS -1)
—m--bed water srf t bankfull a x- section o riffle crest o pool ■ run glide
100
slope ( %)
reach 0.12
riffle 3 (2.3-3.5)
pool 0
glide - --
SECTION (MS -1)
150 200
Channel Distance (ft)
slope ratio
25 (19.2 - 29.2)
0
250
318.0
57.0 (50.9 - 69.4)
14.9 (11 - 17.9)
7.6 (6.6-8.7)
CROSS SECTION (MS -1 - pool)
AS -BUILT STATION NUMBER: 8 +51.05
300 0
N
Cl)
C)
co
0 10 20 30 40 50 60
Width (ft)
Bankfull Dimensions
51.2 "x-section area (ft.sq.)
47.5 width (ft)
1.1 mean depth (ft)
3.5 max depth (ft)
49.8 "wetted perimeter (ft)
1.0 hyd radi (ft)
44.0 ' width -depth ratio
View of MS -1 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
View of MS -1 Cross Section (looking upstream)
350
www. LMGrou p. net MS -1
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
MAINSTEM: LONGITUDINAL PROFILE (MS -2)
--m— bed water srf --9—bankfull o x- section o riffle crest O pool ■ run A glide
35
34.5
---
- - - -- - --------- -------- ------ -- - - -
- --
34
-- - - - -- - - - ---
—
_
ZE 33.5
0 33
32.5
_j 32
w 31.5
31
30.5
0— CROSS SECTION
(MS -2)
30
0
50
100 150 200 250 300 350
M
Channel Distance (ft) �t
As -Built ri
o
Sta. #: +
o
M
N
N
slope ( %) slope ratio length (ft)
reach 0.5 - -- 306.2
riffle 3.2 (2.4-3.7) 6.4 (4.8-7.4) 52.2 (43.3 - 62.7)
pool 0 (0-0.096) 0 (0-0.2) 22.4 (7.5-43.1)
glide - -- - -- 6.9 (4.9-8)
CROSS SECTION (MS -2 - pool)
AS -BUILT STATION NUMBER: 21 +45.78
34
33.5
33
32.5
0
32
31.5
w
Li
31
30.5
30
29.5
0
10
20 30 40 50 60
Width (ft)
Bankfull Dimensions
93.2 x section area (ft.sq.)
50.1 ' width (ft)
1.9 ' mean depth (ft)
4.4 ' max depth (ft)
52.4 "wetted pari meter (ft)
1.8 ' hyd radi (ft)
26.9 ' width -depth ratio
/,"
_4F
Y
e§
1:'
c. s
la �:
0 � 1
View of MS -2 Cross Section View of MS -2 Cross Section (looking upstream)
www.LMGroup.net
MS -2
Stone Farm
Mitigation Bank
LMG Phone: 910.452.0001 •1.866.LMG.1078
Year 02 Annual
Monitoring
LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060
Longitudinal
Stream Survey
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403
and Cross Section
34
33.5
33
z
32.5
0 32
31.5
W
W 31
30.5
30
29.5
0
As -Built ui
Sta. #: +
M
35.5
35
34.5
$ 34
z
0 33.5
> 33
w
J
uw 32.5
32
31.5
31
50
MAINSTEM: LONGITUDINAL PROFILE (MS -3)
—m-- bed water srf --*-- ba n kfu I I o x- section o riffle crest o pool ■ run o glide
100
CROSS SECTION (MS -3)
150 200
Channel Distance (ft)
250
CROSS SECTION (MS -3 - pool)
AS -BUILT STATION NUMBER: 34 +06.47
0 10 20
slope % slope ratio
length
ft
reach
0.12 - --
318.0
20.1
riffle
3 (2.3-3.5) 25 (19.2 - 29.2)
57.0
(50.9 - 69.4)
pool
0 0
14.9
(11 -17.9)
glide
- -- - --
7.6
(6.6-8.7)
CROSS SECTION (MS -3 - pool)
AS -BUILT STATION NUMBER: 34 +06.47
0 10 20
30
Width (ft)
Bankfull Dimensions
30.2
x- section area (ft.sq.)
20.1
width (ft)
1.5
mean depth (ft)
2.1
max depth (ft)
21.1
wetted parimeter (ft)
1.4
hyd radi (ft)
13.3
width -depth ratio
View of MS -3 Cross Section
40
50
300
�� +t t`
C
IV
N
M
e
View of MS -3 Cross Section (looking downstream)
350
Stone Farm Mitigation Bank
www.LMGroup.net MS -3
LMG Phone: 910.452.0001 •1.866.LMG.1078
Year 02 Annual Monitoring LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060 Longitudinal
Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
35.5
35
34.5
34
z
0 33.5
33
w
32.5
32
31.5
31
0
N
As -Built �►
Sta. M +
Cl)
1*
50
35.5
35
z 34.5
0
a
W
34
33
MAINSTEM: LONGITUDINAL PROFILE (MS -4)
--n—bed water srf f bankfull o x- section o riffle crest o pool ■ run v glide
100
slope ( %)
reach 0.061
riffle 3.4 (2.8-3.9)
pool 0 (0 - 0.51)
glide - --
— CROSS SECTION (MS -4)
150 200
Channel Distance (ft)
slope ratio
55.7 (45.9 - 63.9)
0 (0-8.4)
250
(ft)
319.9 (7.7 channel widths)
47.4 (39.8 - 60.7)
11.0 (1.4-21.6)
5.6 (3.6-7)
CROSS SECTION (MS -4 - riffle)
AS -BUILT STATION NUMBER: 41 +67.22
0 5 10 15 20
25 30
Width (ft)
Bankfull
Dimensions
28.8
x section area (ft.sq.)
41.3
width (ft)
0.7
mean depth (ft)
1.7
max depth (ft)
41.8
"wetted perimeter (ft)
0.7
hyd radi (ft)
59.4
width -depth ratio
View of MS -4 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
300
0
w
LO
0
35 40 45 50
�y
"by , W.
View of MS -4 Cross Section (looking upstream)
350
www.LMGroup.net MS -4
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
36.5
36
35.5
0 35
5 34.5
w
34
33.5
33
32.5
0
As -Built
Sta. #: °
LO
36.5
36
z
35.5
w
J
W
35
34.5
MAINSTEM: LONGITUDINAL PROFILE (MS -5)
--m— bed -water srf f bankfull A x- section o riffle crest o pool ■ run A glide
t
50 100 150 200
Channel Distance (ft)
slope ( %) slope ratio length
reach 0.067 - --
riffle 4.6 (3.7-5.5) 68.7 (55.2 - 82.1)
pool 0 0
glide - -- - --
250
300
M
N
tC
LO
282.8 (11.4 channel widths)
32.0 (26-42.7)
6.5 (4.6-9.3)
3.8 (2.4-4.9)
CROSS SECTION (MS -5 - riffle)
AS -BUILT STATION NUMBER: 55 +63.72
0 5 10 15 20 25 30 35
Width (ft)
Bankfull Dimensions
7.9 x section area (ft.sq.)
24.9 width (ft)
0.3 mean depth (ft)
1.1 max depth (ft)
25.4 'wetted parimeter (ft)
0.3 hyd radi (ft)
78.8 width -depth ratio
View of MS -5 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
rr+
View of MS -5 Cross Section (looking upstream)
www. LMGrou p. net MS -5
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
37.5
37
36.5
z 36
O
Q 35.5
J 35
W
34.5
34
33.5
I�I�
0
et
As-Built N
Sta. #: +
LO
tp
37.5
37
S
z
° 36.5
Q
w
J
w
36
35.5
50
MAINSTEM: LONGITUDINAL PROFILE (MS -6)
gybed water srf f bankfuII o x- section o riffle crest ® pool ■ run o glide
100
slope
reach 0.11
riffle 4.8 (1.9-6.6)
pool 0
glide - --
lsl�� I
—CROSS SECTION (MS -6)
150
Channel Distance (ft)
slope ratio
43.6 (17.3-60)
0
CROSS SECTION (MS -6 - riffle)
AS -BUILT STATION NUMBER: 63 +71.47
0 5 10 15 20
Width (ft)
Bankfull Dimensions
5.8
'x-section area (ft.sq.)
25.2
width (ft)
0.2
mean depth (ft)
1.0
max depth (ft)
25.7
wetted parimeter (ft)
0.2
hyd radi (ft)
110.0
width -depth ratio
View of MS -6 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
200
250
296.3 (11.7 channel widths)
30.0 (22.6-37)
7.4 (2 - 16.7)
4.9 (3.5-7.6)
25 30 35
View of MS -6 Cross Section (looking upstream)
0
C
N
to
www. LMGrou p. net MS -6
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
38.5
38
_ 37.5
Z 37
O
36.5
36
w
35.5
35
34.5
0
co
M
As -Built a°,
Sta. #. +
N
N
38.5
38
37.5
z
O 37
a
J 36.5
w
36
35.5
35
50
MAINSTEM: LONGITUDINAL PROFILE (MS -7)
—t bed water srf --o— bankfull a x- section o riffle crest 0 pool ■ run a glide
100
slope
reach 0.31
riffle 4.4 (2.4-5.5)
pool 0 (0- 1.6)
glide - --
—CROSS SECTION (MS -7)
150
Channel Distance (ft)
ratio
14.2 (7.7-17.7)
0 (0-5.2)
CROSS SECTION (MS -7 - pool)
AS -BUILT STATION NUMBER: 71 +51.83
200
286.9
33.7 (27.8 - 44.9)
7.1 (4.5 - 10.8)
4.9 (4.3-5.9)
250
0
vs
N
o�
co
0 5 10 15 20 25 30 35
Width (ft)
Bankfull Dimensions
11.9 x section area (ft.sq.)
13.2 'width (ft)
0.9 mean depth (ft)
2.5 max depth (ft)
14.8 wetted perimeter (ft)
0.8 hyd radi (ft)
14.6 width -depth ratio
View of MS -7 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
Close -up View of MS -7 Cross Section
www. LMGrou p. net MS -7
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
41
40.5
40
Z 39.5
0 39
> 38.5
w
w 38
37.5
37
36.5
0
00
AS -Built N
00
Sta. #: °p
00
41
40.5
40
39.5
0 39
w 38.5
J
w 38
37.5
37
36.5
MAINSTEM: LONGITUDINAL PROFILE (MS -8)
-a--bed I water sr' tbankfull o x- section o riffle crest o pool ■ run 0 glide x a + b - c
-CROSS SECTION (MS -8)
50 100 150 200 250 300 350
Channel Distance (ft) N1t
Cl)
u�
slope ( %) slope ratio length (ft) co
reach 0.51 - --
riffle 6.3 (4.4 - 8.1) 12.4 (8.6-15.9)
pool 0 0
glide - -- - --
CROSS SECTION (MS -8 - pool)
AS -BUILT STATION NUMBER: 83 +28.70
0 5 10 15
20 25
Width (ft)
Bankfull
Dimensions
15.7
x- section area (ft.sq.)
17.3
'width (ft)
0.9
" mean depth (ft)
3.0
max depth (ft)
19.0
wetted parimeter (ft)
0.8
hyd radi (ft)
19.0
width -depth ratio
View of MS -8 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
319.5
29.9 (24.3 - 40.7)
6.4 (3.2 - 9.9)
4.4 (3.3-6.2)
30 35 40 45
Close -up View of MS -8 Cross Section
www. LMGrou p. net MS -8
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
39
38.5
38
37.5
z 37
Q 36.5
J 36
W 35.5
35
34.5
NORTH TRIBUTARY: LONGITUDINAL PROFILE (NT -1)
-a--bed water srf --*--bankfull A x- section o riffle crest O pool ■ run glide
-CROSS SECTION (NT -1)
0 50 100 150 200 250 M 300
00 Channel Distance (ft)
As- Built `" 00
Sta. #: M
°n°, slope ( %) slope ratio length (ft)
081,
0*
S
z
0
37.5
w
J
W
37
36.5
reach 0.29 - -- 278.6 (9.6 channel widths)
riffle 5.5 (3.9-6.9) 19 (13.4 - 23.8) 27.5 (19.3-34)
pool 0 (0- 1.3) 0 (0-4.5) 5.3 (2.6- 13.5)
glide - -- - -- 5.1 (2.1 -8.1)
CROSS SECTION (NT -1 - riffle)
AS -BUILT STATION NUMBER: 30 +56.52
0 5 10 15 20 25 30
Width (ft)
Bankfull Dimensions
10.3 x section area (ft.sq.)
28.9 ' width (ft)
0.4 mean depth (ft)
1.2 max depth (ft)
29.1 wetted perimeter (ft)
0.4 hyd radi (ft)
80.9 width -depth ratio
View of NT -1 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
View of NT -1 Cross Section
www. LMGrou p. net NT -1
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
37.5
37
36.5
36
z
O 35.5
w 35
w 34.5
34
33.5
NORTHERN TRIBUTARY: LONGITUDINAL PROFILE (NT -2)
-a-- bed water srf tbankfull A x- section O riffle crest o pool ■ run glide
111111 �� 41111'. 111111krz:11 In
- - -- - --- -- --- - - ----
Q - CROSS SECTION (NT -2)
0
50
100
150
200
250
300
14.5
width (ft)
0.9
Channel Distance (ft)
2.5
max depth (ft)
15.7
LO
N
0.8
hyd radi (ft)
16.3
width -depth ratio
`p
N
As-Built
Sta. #: N
N
o
slope /o)
slope ratio
length
ft
reach
0.13
- --
287.7
riffle
5.6 (4.1 -8)
43.1 (31.5 - 61.5)
22.3
(12.9 - 30.3)
pool
0
0
5.4
(2.9-9.9)
glide
- --
- --
4.9
(3.1 -6.4)
CROSS SECTION (NT -2 - pool)
AS -BUILT STATION NUMBER: 24 +38.17
37.5
37
36.5
0 36
c
W 35.5
J
W
35
34.5
34
0 5 10 15
20
Width (ft)
Bankfull Dimensions
12.9
"x-section area (ft.sq.)
14.5
width (ft)
0.9
mean depth (ft)
2.5
max depth (ft)
15.7
wetted parimeter (ft)
0.8
hyd radi (ft)
16.3
width -depth ratio
View of NT -2 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
25 30 35 40
View of NT -2 Cross Section (looking downstream)
www. LMGrou p. net NT -2
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
35.5
35
34.5
ZE 34
z 33.5
Q 33
W 32.5
w 32
31.5
31
30.5
0
M
As -Built N
Sta. #: +
35
34.5
z 34
0
a
33.5
W
33
NORTHERN TRIBUTARY: LONGITUDINAL PROFILE (NT -3)
--m bed water srf f bankfull a x- section O riffle crest O pool ■ run _,� glide x a + b - c
I_
CROSS SECTION
50 100 150
Channel Distance (ft)
ratio
reach 0.069 - --
riffle 7 (5.4-9.5) 101.4 (78.3 - 137.7)
pool 0 0
glide - -- - --
CROSS SECTION (NT -3 - riffle)
AS -BUILT STATION NUMBER: 5 +24.07
200
length (ft)
250
293.2 (10.3 channel widths)
26.4 (20.2 - 31.3)
4.4 (3.3-6)
5.0 (2.8-7.1)
0 5 10 15 20 25 30
Width (ft)
Bankfull Dimensions
12.7 'x-section area (ft.sq.)
28.5 ' width (ft)
0.4 ' mean depth (ft)
1.5 ' max depth (ft)
29.0 "wetted perimeter (ft)
0.4 ' hyd radi (ft)
64.1 ' width -depth ratio
Z..
View of NT -3 Cross Section
Close -up View of NT -3 Cross Section
LO
cy
co
cc
Stone Farm Mitigation Bank
www.LMGroup.net NT -3
LMG Phone: 910.452.0001 •1.866.LMG.1078
Year 02 Annual Monitoring LANDMAhAGEMEIVTCROUP— Fax: 910.452.0060 Longitudinal
Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
40
39.5
39
_ 38.5
z 38
O
Q 37.5
w 37
w 36.5
36
35.5
35
0
o>
AS -BuHt ri
Sta. #: +
LO
N
39.5
39
38.5
38
z
37.5
w
J 7 3
W
36.5
36
35.5
50
SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -1)
--m-bed - water sr' f bankfull A x- section o riffle crest o pool ■ run L glide x a + b - c
100
slope ( %)
reach 0.068
riffle 6.2 (4.4-8)
pool 0 (0-0.15)
glide - --
L -CROSS SECTION (ST -1)
150
Channel Distance (ft)
slope ratio
91.2 (64.7 - 117.6)
0 (0-2.2)
CROSS SECTION (ST -1 - pool)
AS -BUILT STATION NUMBER: 26 +83.26
200
293.1
26.3 (20.9 - 30.9)
10.2 (3.6 - 14.6)
5.6 (2.9 - 10.1)
250
0 5 10 15 20 25 30 35 40
Width (ft)
Bankfull Dimensions
28.9 x- section area (ft.sq.)
22.9 width (ft)
1.3 mean depth (ft)
3.0 max depth (ft)
24.3 "wetted pari meter (ft)
1.2 hyd radi (ft)
18.1 width -depth ratio
r,
yid 5 `l
View of ST -1 Cross Section
View of ST -1 Cross Section (looking downstream)
300
co
N
w
N
Stone Farm Mitigation Bank
www.LMGroup.net ST -1
LMG Phone: 910.452.0001 •1.866.LMG.1078
Year 02 Annual Monitoring L wD nn1 acErnetvTCROUP- Fax: 910.452.0060 Longitudinal
Stream Survey Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
38.5
38
37.5
x
Z 37
O
Q 36.5
w 36
J
W 35.5
35
34.5
0
00
AS -Built
Sta. #: +
co
38.5
38
0 37.5
a
J 37
W
36.5
36
SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -2)
--n— bed water srf —*— bankfuII A x- section O riffle crest 0 pool ■ run a glide
Q CROSS SECTION (ST -2)
50 100
150
200 250
300
Channel Distance (ft)
o
M
Os
co
slope ( %)
slope ratio
length (ft)
reach 0.25
- --
279.2 (24.7 channel widths)
riffle 3.7 (2.9-4.4)
14.8 (11.6 - 17.6)
37.8 (33.2 - 47.3)
pool 0
0
7.9 (4.8-12.5)
glide - --
- --
5.3 (4.1 -6.8)
CROSS SECTION (ST -2 - riffle)
AS -BUILT STATION NUMBER: 17 +73.63
0 5 10 15 20 25
Width (ft)
Bankfull Dimensions
11.8 x- section area (ft.sq.)
11.2 width (ft)
1.1 mean depth (ft)
1.6 max depth (ft)
12.1 "wetted pari meter (ft)
1.0 hyd radi (ft)
10.7 width -depth ratio
View of ST -2 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
View of ST -2 Cross Section (looking upstream)
www. LMGrou p. net ST -2
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
37
36.5
36
35.5
z 35
Q 34.5
w 34
w 33.5
33
32.5
SOUTHERN TRIBUTARY: LONGITUDINAL PROFILE (ST -3)
—m-- bed water srf f bankfull o x- section O riffle crest o pool ■ run L glide
—CROSS
0 50 100 150 200 250 300
Channel Distance (ft)
to
As -Built er
ri
Sta. #: V_ °+°
c+o slope ( %) slope ratio length (ft) °p
37
36.5
36
35.5
z 35
0
34.5
w
w 34
33.5
33
32.5
reach 0.3 - --
riffle 4.6 (1.9 - 11) 15.3 (6.3-36.7)
pool 0 0
glide - -- - --
254.2
31.2 (7.4 -44.7)
7.3 (2- 16.9)
4.9 (3.2-7.7)
CROSS SECTION (ST -3 - pool)
AS -BUILT STATION NUMBER: 7 +38.92
0 5 10
15 20
Width (ft)
Bankfull Dimensions
25.0
x- section area (ft.sq.)
16.8
width (ft)
1.5
mean depth (ft)
3.1
max depth (ft)
18.7
"wetted pari meter (ft)
1.3
hyd radi (ft)
11.3
width -depth ratio
View of ST -3 Cross Section
Stone Farm Mitigation Bank
Year 02 Annual Monitoring
Stream Survey
25 30 35
�t
View of ST -3 Cross Section (looking downstream)
www. LMGrou p. net ST -3
LMG Phone: 910.452.0001.1.866.LMG.1078
LAUD MANAGEMENT GROUP we Fax: 910.452.0060 Longitudinal
Environmental Consultants 3805 Wrightsville Avenue, Wilmington, NC 28403 and Cross Section
[GRUB 1 i I; I : �' :1 L l ; \ ►�► /_ t 13 ►�i l _ I �� : \ l 11 [ I st / ] ;9
:.i
;a
/d �� ,s- . a"s w•,l, I L 7I.,'�,r �' `A ' i
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 - Presence of Litter &
Debris
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
5 - Sediment Sorting
(1) View of OHWM along Mainstem (early growing season)
I &:A"#vWW
OHWM INDICATORS
ry �Ak
1 - Natural Line Impressed
On Bank
,.
2 - Presence of Litter &
T Debris
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
5 - Sediment Sorting
(2) View of OHWM on (early growing season)
Stone Farm
Regional Mitigation Bank LMG Appendix F:
LAND MANAGEMENT GROUP
Phase II OHWM Indicators in
Year 2 AMR Stream Valleys
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 - Wracking
3 - Presence of Litter &
Debris
4 - Sediment Sorting
I i
a 5 - Water Staining
MY _
(3) View of OHWM on Mainstem (early growing season)
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 - Wracking
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
5 - Multiple Observed
Flow Events
(4) View of OHWM along Mainstem (early growing season)
Stone Farm
Regional Mitigation Bank LMG Appendix F:
LAND MANAGEMENT GROUP me
Phase II ��me ,a �an,�,an, OHWM Indicators in
Year 2 AMR Stream Valleys
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 - Wracking
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
(5) View of OHWM along North Tributary (mid growing season)
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 -Wracking
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
(6) View of OHWM along South Tributary (early growing season)
Stone Farm
Regional Mitigation Bank LMG Appendix F:
LAND MANAGEMENT GROUP
Phase II OHWM Indicators in
Year 2 AMR Stream Valleys
OHWM INDICATORS
1 - Natural Line Impressed
On Bank
2 - Wracking
3 - Vegetation matted, bent,
Or absent
4 - Water Staining
5 - Presence of Litter &
Debris
(7) View of OHWM along South Tributary (early growing season)
(8) View of overbank flow (flooded valley) along upper reach
of Mainstem (mid growing season)
Stone Farm
Regional Mitigation Bank LMG Appendix F:
LAND MANAGHUENT GROUP
Phase II OHWM Indicators in
� E��;.o�meR"a��on,� "�onE,
Year 2 AMR Stream Valleys
(9) View of overbank flow at guage 2 along Mainstem (MS) (mid growing season)
(10) View of overbank flow (flooded valley) along mid -reach
of Mainstem (mid growing season)
Stone Farm
gional Mitigation Bank LMG Appendix F:
Re
L" °h,A�A�T�R °uP,ut OHWM Indicators in
Phase II � E��;.o�meR"a��on,� "�onE,
Year 2 AMR Stream Valleys
(11) View of overbank flow (flooded valley) along lower -reach
of Mainstem (mid growing season)
(12) VView of overbank flow (flooded valley) along lower -reach
of Mainstem (mid growing season)
Stone Farm
Regional Mitigation Bank LMG Appendix F:
NnMANAGEMENT GROUP
,ut
Phase II OHWM Indicators in
� E��;.o�me��a��on,���onE,
Year 2 AMR Stream Valleys