Loading...
HomeMy WebLinkAboutNCG020070_Compliance Evaluation Inspection_20210525ROY COOPER Governor DIONNE DEW-GATTI Secretary BRIAN VVRENN Diaescw Martin Marietta Attention: John Tiberi 2710 Wycliff Road Raleigh, North Carolina 27607 NORTH CAROLINA Env&wwwnt+a[ Qualiry May 25, 2021 Subject: Compliance Evaluation Inspection Bakers Quarry NPDES Certificate of Coverage — NCG020070 Union County, North Carolina Dear Mr. Tiberi, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Bakers Quarry on May 20, 2021. Please note that in the stormwater inspection report summary we ask that you continue to implement the Stormwater Pollution Prevention Plan. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@,ncdenr.gov. Enclosure c: Laserfiche Sincerely, czs%'V� J s Moore Assistant Regional Engineer egow'�OD,.E Q�5 UPON" - tr#%� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCG020070 Effective: 05/06/21 Expiration: 06/30/21 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Bakers County: Union 2111 Rocky River Rd Region: Mooresville Monroe NC 28110 Contact Person: Jay Nivens Title: Phone: 704-409-1475 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/20/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 01:00PM Exit Time: 02:OOPM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: N Storm Water (See attachment summary) Page 1 of 3 £ 10 Z a6ed -L£6Z g£Z (VOL) Ie euogd Aq ao no6'Juapou@Ae>I-Al!-I }e aw loeluoo `suoiisanb aneq noA lI -peuie}uiew pue pajejado Ilem pajeadde Al!l!oel ayl -uoiloadsui jo awil aql le Iid ay} wal Now pue uapangaano 6ulA0waJ seM AI!Iioej ayl /GewwnS uoiloodsul oullnol:l IPIA Jo; uoseaa uol;enlen3 souelldwoo : edAL uollosdsul IZOZ/OZ/OO mea uolpwsul oul slepa;evy enauew ullJeyy:ftllloe:l - lsumo OLOOZOJON =IIULed I permit: NCG020070 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 05/20/2021 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices„? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ■❑❑❑ ■❑❑❑ ■❑❑❑ ■ ❑ ❑❑ ■ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■ ❑ ❑❑ ■❑❑❑ ■❑❑❑ ■ ❑ ❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, monitoring records, and the annual certification. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ ❑ ❑ ❑ Comment: Analytical monitoring records were available and all parameters were within the benchmark limitations. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status; is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Comment: Outfalls 001, 002, and 003 can be removed from the sampling schedule and the SPPP because they no longer receive industrial stormwater. No issues were observed with the other outfalls. Page 3of3