HomeMy WebLinkAboutSW6220504_Supplement-EZ Form_20220606SUPPLEMENT-EZ COVER PAGE
M MS WAKD
PROJECT INFORMATION i
1
Project Name
Cameron Village
2
Pro act Area ae
42.3088
-
3
Coastal Wetland Area ac
4
Surface Water Area ac
-
5
Is this project High or Low Den slt ?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4
Width of vegetated setbacks provided feet
N/A
8
Will the vegetated setback rerrlaln vegetated?
N/A
9
0107
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMS:
Infiltration System
0
12
Bioretention Ceil
0
E1511
13
Wet Pond
2
14
Stormwater Wetland
0
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting(RWH
0 ._
18
Green Roof
0
19
Level spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0 _
22
D Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
1 0
F RM L-0 DED
DESIGNER CERTIFICATION
27
Name and Title:
Carlo Pardo, PE
28
Organization:
Bowman North Carolina, Ltd.
29
Street address:
4004 Barrett Drive, Suite 101
30
City, State, Zip:
Raleigh. NC 27609.
31
Phone number(s):
919-553-6570
32
Email:
cpardo@bowman.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
A h' �( •��ri
�d4a��.s5i�1
��yf'
a V _
SEAL _
i ❑51571
r
� /1/trllF�ia111
Signature of Designer
- 10/51/9/2-
Date
DRAINAGE AREAS
1
Is this a high density r9ject?
Yes
2
If so, number of drainage areas/SCMs
2
3
Does this project have low density areas?
No
4
If so, number of low density draina a areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
-
Wet Pond
Wet Pond
5
Total drainage area (sq ft
1842972 sf
1141886 sf
552343 sf
6
Onsite drainage areas ft
1842972 sf
1141886 sf
552343 sf
7
Offsite drainage area (sq ft
8
Total BUA in project (sq ft)
735961 sf
475548 sf
260413 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
10permitting)
New BUA not on subdivided lots (subject to
s
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
65294 sf
46590 sf
18704 sf
Roof (sq ft
496000 sf
308000 sf
188000 sf
Roadway s ft
164649 sf
110940 sf
53709 sf
Future (sq ft
Other, please specify in the comment box
below Jpq ft
10018 sf
10018 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
17230 sf
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft
18
Percent BUA
41.65%
47.15%
Desi n storm inches
1.0 in
1.0 in
L
Desi nvolume of SCM (cu ft)
40424 cf
21832cf
Calculation method for design volume
Simple Method
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Drainage Area #1 - Pool Impervious Area = 10,018sf Drainage
Area #1 has been designed for an area of 1,866,124 sf with an impervious area of
900,331 sf The future phase includes an additional 724,238 sf of drainage area with an
additional impervious area of 424,783 sf
WET POND
1
Drainage area number
i 1
2
2
Minimum re uired treatment volume cu ft)
40424 cf
21832 of
GENE RAL
MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Pum referred
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
NIA
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
161
Does the SCM follow the devicespecific MDC?
Yes
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SAIDA
S)VDA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
251.00
250.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
252.00
251.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
255.50
254.50
23
Elevation of the permanent pool fmsl
256.00
255.00
24
Elevation of the top of the vegetated shelf (fmsl)
256.50
255.50
25
Elevation of the temporary pool fmsl
257.00
255.90
26
Surface area of the main permanent pool (square feet)
51435
18440
27
Volume of the main permanent pool cubic feet
183364 cf
60353 of
28
Average depth of the main pool (feet)
3.76 ft
3.59 ft
29
Average depth euation used
Equation 3
Equation 3
30
If using equation 3, main pool perimeter (feet)
975.0 ft
593.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
3.0 ft
32
Volume of the foreba (cubic feet)
35620 cf
9396 cf
331
Is this 15-20% of the volume in the mainpool?
Yes
Yes
34
Clean -out depth for foreba (inches)
24 in
24 in
35
Design volume of SCM (cu ft)
40424 of
21832 of
36
Is the outlet an orifice or a weir?
Orifice
Orifice
37
If orifice, orifice diameter inches
5.0 in
2.50 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.06
2.36
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
Yes
43
Depth of forebay at entrance (inches)
36 in
36 in
44
Depth of forebay at exit inches
30 in
30 in
45
Does water flow out of the forebayin a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
6 ft
6 ft
47
Slope of vegetated shelf (H:
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
r 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
S ecies of turf that will be used on the dam and embankment
H brid Bermuda
Hybrid Bermuda
54
Hasa alantin Ian been rovided for the ve etated shelf?
Yes
Yes
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond , 8-21 AM 1/5/2022