Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220504_Design Calculations_20220606
Storm wafer Management Report Jon uory 5, 2022 Cameron Village Club Pond Road Raeford, Hoke County, NC Prepared for: - Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 TRIANGLE SITE DESIGN a Bowman company PLLC) ,,►�►►►► I I. T I I t!!!!�i •q4 of •. �_ SEAL 051571 - � �Srraa- OVERVIEW This report contains the storm water management overview for the proposed residential development site, Cameron Village, on Club Pond Road in Raeford, NC. The project site is currently undeveloped wooded area. The proposed site consists of 42.3088 acres and approximately 17.66 acres will be disturbed as part of this project for the construction of the site improvements. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panels 3710944600J and 3710944500J with an effective date of 10/17/06, Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. There will be a future phase to be built following the current phase. The development of the site will result in an impervious area of 735,961sf (16.90ac impervious). The drainage area also consists of 17,230sf of existing impervious area. The site grading and storm drainage systems are designed to convey stormwater runoff from the impervious areas of the site to the proposed storm water management facilities (wet ponds. Wet pond #1 has been designed to include the future phase and will be used to provide peak flow attenuation of the 10—year storm event for an overall drainage area of 42.84 ac with an overall impervious area of 20.67 ac. For the current permit, wet pond #1 will be used to provide peak flow attenuation of the 10—year storm event for a drainage area of 26.21 ac with an impervious area of 10.92 ac. Wet pond #2 will be used to provide peak flow attenuation of the 10—year storm event for a drainage area of 12.68 ac with an impervious area of 5.98 ac. The balance of the site is open space and will by—pass the proposed SCM. The SCM are designed to treat a 1.0" storm event. i nlgeryious Area Summary — Wet Pond # I On -Site Pavement 110,940 2.55 Sidewalk 46 590 1.07 Lots 308,000 7.07 Pool 10,018 0.23 Total IA to Wet Pond#1 475,548 10.92 _I_mperyious Arga Summary — Wet Pond # 1 Overall On -Site _ Pavement 110,940 2.55 Sidewalk 46 590 1.07 Lots 308,000 7.07 Pool 10,018 0.23 On -Site Future Pavement 82,670 1.90 Sidewalk 30113 0.69 Lots 312,000 7.16 Total IA to Wet Pond#1 900,331 20.67 Impervious Area Summary — Wet Pond #2 On -Site Pavement 53,709 1.23 Sidewalk 18.704 0.43 Lots 188 000 4.32 Total IA to Wet Pond#2 260,413 5.98 Soils The County Soils Survey indicates that McColl Loam, Norfolk Loamy Sand, and Rains Sandy Loam soils are present on the site. FIGURES 35' 0' a- N f 3l•R33'!I Hydrologic Soil Group —Hoke County, Forth Carolina a b I. Lu?3"A esmFT6:77 6£30 O%eco f63n71 < 3 Map Sra;e: 13,940 if pnnte? on A p7trail' (BS" x 11 ") sheet. Meters N� o 51 111) 2CO — - --- -•-sa] Y 0 111') :5`_7:1 ryl) cx Map p, oJ.>.t;on: 11'a5 'Armotor Coma o�,:)rdlra,�L_�'. VVGSBa E • tics: UTM Zorti 171v VlGSSA Natural Resources Vdeb Soil Survey 1U/4i2U? Conservation Service National Cooperative Soil Survey Pico 1 of 4 X_wwN 0 Z d d_ C o O CD O Q cn O O N = < CO C Cl) < O l< (n o. D ■■■■ i Z t t d LC❑❑0UDU;o o 3 W W D 0 'v Z O n 0 m CD D 40 Z O 0 n m CO D CD D 'm v - ° o o v ° o o v o M. v m m t o D in a N n o N O > m 0 (D > d a)O' Q N N O a0 c „o■■o ID d D a 3 C 0 c N 7 CD O O CD N N Z1 .'0 O C (D 3 m a N N a N N = 7 a O N C N N O N W. m CD - �d3 uoco�CO o yDa_-0 y cn O OCD 3m o�3m0 7 d CJ S (D y 3 QNO n (n N (D Q u o d�S D f- y Q O = C, a S a N y O O'D `(D C D 2 (D� fD a y O (D ID ID0 0 7 M �. O C (D (D y y -- O (D O 7 (o O 00 = 3 a 7� (DOl �_ N `� CD O .CO. 3 °' N 7 o- S y G cn C1D '� 0 0 3 N 7 N(D p C 2 y n 0 .� a 0 N- N D D 7 a O A- C y y n (CD y w N 7 N 7 7 ,.7+ O = .� C O n^ 3 (O O d m d D' y (O N (D C o D' v-0 (D CD _n N 7 d N r7- Q Oj (ND (o N = D N (D ._N CD N O D m S N (n 3 C Z .-L7 y 7 y 0 ° a 3 O a C S (D F fD (D CO (D 7c (n' (p 7,� O n (D O. CrC < N (n 0 3 O d CS d 'G O O Q N o Q CD ol N N a m j C) (� a a �, a-o m(D U) K l0 o (n C m CS m v (ten a< a s (D 7 3 3i Co 3 m 3 m CDD o CD CD ° < D °' a nCD Z 3 3 N a y o Op m 'O m < S c7i o07 y 0 n C (D (D O OT C CD O y -0 (O y _< (n (D d 0 7 y N_ (D O N y S C, N - i O' N N O 41 S a 7 6 7 o d v D CD a n o n pD a a CD j 7 soo y a 3 0 v N) Z D C, 2 3 pn G) CD to S g N y 3 N CD 7 S 3 L O .(7 CD y (D N 7 W y (D 7 7 y 0--o O y Nn d Cn EnO CD 73 0) N O O N 3 CD C (D CS (cp d N ^ O y- A j' C 10 3 y (D 9 N �. (D G a (! a (D C S N (D 3 fD O d N 0 (D S O CD C N co I N (D a N O S O < O (D 0 7 a O O L CD Cn a O y (fin N CD O C n* (p C d N O y N M fD N S O O_ O. CD (dn N D r m G) m z v D z n X D O z d Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI i Mc McColl loam D 2.8 5.7% NoB Norfolk loamy sand: 2 to A 39.8 79.8% 6 percent slopes Ra Rains sandy loam, 0 to A/D 7.3 14.6% 2 percent slopes Totals for Area of Interest _ 49.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources web Soil Survey 10/4/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 rojM-k qArk i a a a s r E :Y o u cr3 _ w v a ca h F 4 W Ol i PT 8 0 u.9 Is Q N 0 6rtreekm \} © } \ §� n f \ ¢ ƒ } 2 8 ± 2 U 3 � ! § $ � ] o � § 2 2 u \§ » �� f � � Jk y /uq 10/4/21. 1:07 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* A Latitude: 35.0097*, Longitude:-79.1752' t Elevation: ft** } ' source: ESRl SRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M. Bonnin, D. Marlin B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration •• Average recurrence interval (years) 1 2 ����� 5 10 25 50 100 200 500 1000 5-min 0.436 0.514 0.600 0.664 0.741 0.797 0.850 0.899 0.961 1.01 (0.39G-0.482J (0.468-0.569) ( 0 545-0.664) (0,602-0.733) (0.669-0.S1G) (0.717-0.876) (0.761-0,933) 0,801-0,987) t0.848-1.06( U.884-1.11) 10-min 0.696 0.823 0.961 1.06 1.18 1.27 1.35 1.43 1.52 1.59 I (0 633-0.770) (0 749-0 911) (0 873-1 06) (0 963-1 17) (1.07-1 30) 1 (1.14-1.40) (1.21-1 48) 1.27-1.57) (1 34-1.67) [{1.39-1 74 2 6 1 15-min 0.79180 963) (0.941-11.15) (1 11--1-35) (1.22 1448 (1.355 ,65) (1.45-11.77 (1.53 187) 1,608 .98 1.69 2110 9 1.75 219 1.19 1.43 1.73 1.95 2.22 2.42 2.61 2.80 3.04 3.23 30-min 1.08-1.32) (130-1.58) (1.57-191) (1.77-2.15) (2.00-2.44) (2,18-2.66) (2.34-287) 2.50-3.07) 269-3.34 (2.83-3.55 60-min 1.49 1.79 2.21 2.54 2.95 3.28 3.60 3.93 4.37 4.71 (1 35-1 65) (1.63-1 981 (2.01-2 45) [7,30-a.80) (2.67-3.25) (2.95-3.60 (3.22-3 95) (3.50-4.31 ) 3 86-4.79) (4.13-5.18) 2-hr l (1.5 1.95) (1 fl '2.36) (2.38 2496) (2. 50.42) f3.23 4104) (3.61 4653) (3.995 03) (4. 69.54) (4 6 6.23 (5.25 6579) 3-hr 6-hr 1.84 (1.66-2 07) 2.19 2.23 2.01.2.50J 2.65 2.81 2.53-3.T5 3.35 3.27 2.1)4--167) 3.91 3.92 (3.49-4.39) 4.70 4.44 3.94-4.97 5.35 4.99 1 (4.39-5 58) 6.03 (4.86-6.21 6.74 1 6.38 1 5.50-7.12) 7.76 F-7-.0-31 (6.00-7.84) 8.58 (1.98-2.44) (2,40-2.95) (3.03-3.72) (3.53-4.35) (4.20-5.21) (4.75-5.91) (5.31-6.65) (5.89-7.43) ( 6.69-8.54) (7,32-9.45) 12-hr 2.58 3.13 3.97 4.66 5.64 6.45 7.31 8.24 9.57 10.7 2.33-2,88) (2 83-3.49) (3 58-4 43) (4 19-5.19) (5.42.5.25 (5.70-7.13) (6 40-8 07 7A4-9.08) (8 17-10.5) (8.99-11.7 3.04 3.68 4.66 5.44 6.52 7.39 8.28 9.21 10.5 11.5 24-hr Z82-: 29) (3 41-3.98) (4.32-5 04) (5.03-5.88) 1 (6.00-7.04) (6.78-7.96) 7.58-8-M 8A0-9.92 9.52-11.3 10-4-12,4 3.53 4.26 5.35 6.22 7.42 8.38 9.37 10.4 91.8 12.9 2-day 3.29-3.79) (3.974.58) (4.98-5.76) (5.77-6•69) (6.86-7.97) (7.72-9.00) 1 (8.61-10.1) 1 (9,51-11.2) 10.7-12.7 11.7-13.9 3-day 3.75 (3,50-4.01) 4.51 5.64 (5.26-6.04) 6.54 (6,09.7.00) 7.77 (7.21-8.32) 8.76 (8.10-9.37) 9.78 10.8 1 (9.94-11.6) 12.3 (11.2-13.2) 1 13.4 (12.2-14.4) 3.97 4.77 5.93 6.86 8.13 9.14 10.2 7 12.7 13.9 4-day (3.72-4.24) (4.47-5.10) (5.55-6.33) (6.40-7.31) j (7.56-8.66) 1 (8.47-9.74 1. (9.41-10.9) (104-120) (11.7-13.6) (12.7-14.9) 7-day 4.314193 5. 6-5 89) (6X-7.24 7.25 8731) (8. 019,77) (9.49-10 9 10.5- 2.1 (11 15-13.4) (1219-15.1) (14.10--16.5) 10-day 5.28 6.30 7.62 8.65 10.0 11.1 12.2 13.4 14.9 IF 16.1 (4.97-5.61) (5 93-6.70) (7.16-8.09) (8.12-9.18) (9.40-10.7) (10.4-11 8) (11.4-13.0) (12 4-14.2) (13.8-15.9) (14.8-17 1) 20-day (6.72 7_56) 1 (7 97-8.95) (9.46-10.6) (10.6-12 0) (12.12--13.8) (13-4-15.2) (1416-16 6) (1518-18 0) (17 5- 0 0) (18 7021.6) 30-day (8. 6 9537) (9 88-141.0 11 5-12.9) 12.8-14.4 5.4 (14.15- 6.3) 15.18-187 8 17[0-19.2) (1813 0.7) (19 9- 2.7) (21.1z 4.2) 11.2 13.1 15.1 16.6 18.6 20.1 21.5 23.0 24.8 26.3 45-day [10.6-11.8 12.5-13.8) [14 3-16.Q) (15.7-17.6 [17 6-19.6) [18.9-21 2 {2f7.3-22.8] [21 6-24.3) [7.3.3.26.3} (24,5-27,9) 7-9 60-day (1217-_14 1] 04.[9- 6.5) . t1710-188} (1816.20.6) (20,6-22.8i (2423 45) (L3242 2) (24..9-2.8) (26283v.0) [28.0- 1A Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Nrlmber4 in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%, Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Pleaae refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:llhdsc.nvvs.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0097&Ion=-79.1752&data=depth&units=english&series=pds 1 /4 WATER QUANTITY -WET POND #1 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Cameron Vlils e 2 Project Area ac 42.3088 3 Coastal Wetland Area ac - 4 Surface Weler Area aC - 5 Is thisproject High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02M.1003(4) 7 Width of ve petaled setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? NIA 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 (c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 S1ormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION Name and Title: Carlo Pardo, PE 28 Or anization: Bowman North Carolina, Ltd. F3127 29 Street address: 4004 Barrett Drive, Suite 101 30 City, State, Zip: Raleigh, NC 27609 Phone numbers : 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ■■�lllllillII!I •,+1 ti*■■■■ �H C A I\' p�'''�.f r ti .�0; •OF 4.S SI�n; I�q r%. w SEAL 051571 r •� 1 �rrr'"•���LIU • E • p �RD �■` ti t t ��Yll�l, Signature of Designer - ) /5/,?Q- Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site T 2 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area (sq ft 1842972 sf 1141886 sf 552343 sf 6 Onsite drainage area (sq ft 1842972 sf 1141886 sf 552343 sf 7 Offsite drainage areas ft 8 Total BUA in project (sq ft 735961 sf 475548 sf 260413 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft Sidewalk (sq ft) 65294 sf 46590 sf 18704 sf Roof (sq ft 496000 sf 308000 sf 188000 sf Roadway s ft 164649 sf 110940 sf 53709 sf Future sq ft Other, please specify in the comment box below (sq ft) 10018 sf 10018 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 17230 sf 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 41.65% 47.15% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 40424 cf 21832 cf 21 1 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Drainage Area #1 - Pool Impervious Area = 10,018sf Drainage Area #1 has been designed for an area of 1,866,124 sf with an impervious area of 900,331 sf. The future phase includes an additional 724,238 sf of drainage area with an additional impervious area of 424,783 sf WET POND 1 J.Drainage area number 1 1 2 2 1 Minimum required treatment volume (cu ft) 40424 cf 21832 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewaterinq the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the devicespecific MDC? Yes Yes 17 Was the SCM designed bv an NC licensedprofessional? Yes Yes VWAET POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 251.00 250.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 252.00 251.00 22 Elevation of the bottom of the vegetated shelf fmsl) 255.50 254.50 23 Elevation of the permanent pool fmsl 256.00 255.00 24 Elevation of the top of the vegetated shelf (fmsl) 256.50 255.50 25 Elevation of the temporary pool fmsl 257.00 255.90 26 Surface area of the main permanent pool (square feet) 51435 18440 27 Volume of the main permanent pool cubic feet) 183364 cf 60353 cf 28 Avera a depth of the main pool (feet) 3.76 ft 3.59 ft 29 Average depth equation used Equation 3 Equation 3 30 If usin equation 3, main pool perimeter (feet) 975.0 ft 593.0 ft 31 If using equation 3, width of submerged ve . shelf (feet) 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet 35620 cf 9396 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba (inches) 24 in 24 in 35 Design volume of SCM cu ft 40424 cf 21832 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter inches 5.0 in 2.50 in 38 If weir, weir height (inches) 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 2.06 2.36 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes 43 Depth of forebay at entrance inches 36 in 36 in 44 Depth of forebay at exit (inches) 30 in 30 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the ordrawdown from below the top surface of the permanent Pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y. please provide documentation that MDC 9 is met. No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 8:21 AM 1/5/2022 a Bowman North Carolina, Ltd. Cameron Village, Raeford, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #1 Drainage Area (acres) 26.21 Existing Soil Groups: Soil Grow Map Symbol Soil Description Acres Percent of DA A/D Ra Rains Sandy Loam 1.50 6% A NoB Norfolk Loamy Sand 21.91 84% D Mc McColl Loam 2.80 11% Existin_4 Land Uses: Land Use Description Existing Soil G_ mum Acres Curve # Weighted CN Wooded - Good Stand A 21.51 52 42.7 Open - Good A 1.50 55 &1 Wooded - Good Stand D 2.80 80 8.5 Impervious -Dirt A 0.40 77 1.2 Cumulative Curve # = 55.5 Bowman North Carolina, Ltd.' Cameron Village, Raeford, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #2 Drainage Area (acres Z 26.21 Existing Soil Groups: Soil GrouD Map Symbol Soil Description Acres Percent of DA A/D Ra Rains Sandy Loam 1.50 6% A NoB Norfolk Loamy Sand 21.91 84% D Mc McColl Loam 2.80 11% Proposed Land Uses., Land Use Description Existing Soil Group Acres Curve # Weicghled CN Impervious Area A & D 10.92 98 40,8 Open Space - Good Condition A 12.76 55 26.8 Open Space - Good Condition D 2.53 77 7.4 Cumulative Curve # = 75.0 Proposed Wet Pond #1 Project Information Project Name: Cameron Village Project #: Designed by: CEP Date: 12/29/2021 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 26.21 Acres 1,141,886 sf Impervious Area (IA) = 10.92 Acres 475,548 sf Percent Impervious (I) = % 41.65 % Required Surface Area Permament Pool Depth: 3.76 ft SA/DA = 1.35 Min Re 'd Surface Area = 15,415 sf (at Permanent Pool Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.425 in/in Storage Volume Required = 40,424 cf above Permanent Pool) Elevations Top of Pond Elevation = 261.50 ft Temporary Pool Elevation = 257.00 ft Permanent Pool Elevation = 256.00 ft Shelf Begining Elevation = 256.50 ft Forebay Weir = 255.00 ft Shelf Ending Elevation = 255.50 ft Bottom Elevation = 252.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 51,435 sf Volume of Temporary Storage = 78,983 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 51435 > 15415) sf Volume of Storage for Design Storm = 78,983 Yes ( 78983 > 40424) cf Incremental Drawdown Time STORMWATER POND #1 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Cameron Village Project #: Bsigned by: CEP iecked by: Date. 12/29/2021 Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 Cp * D2 (Z-D/24-Ei)"") Q2 = 0.372 CD * D*(Z-Ei)n(3n) Q, = 0 5 in 0.6 256 Orifice Inv. 0.00 to 256 256 to 256.1 256.1 to 257 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 256.00 74.990 0 0.00 2.00 0.000 — 256.50 79345 38.584 0.50 3.00 0.354 1.817 257.00 82250 40,399 0.50 3.00 0.583 1.154 Total -- 78,983 -- - 2,971 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 78,983 cf Total Time = 2,971 min Total Time = 2.06 days 12/29/2021 Prop Wet Pond- new design-CV#1 1 of 1 Project: Pond #1 Date: 12/29/2021 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 256 51,435 24,994 183,364 A2 (Perm -Pool) 255.5 48,540 24,033 158,370 Al (Bottom -Shelf) 255 47,590 46,645 134,338 254 45,700 44,770 87,693 253 43,840 42,923 42,923 252 42,005 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FBI FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 256 17,460 4,920 22,380 10,941 35,620 255.5 16,740 4,645 21,385 10,446 24,679 255 16,020 4,380 20,400 14,233 14,233 254 6,455 1,610 8,065 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) 19.4% *Between 15% & 20% 3.26 *At least 3' average depth Vpp 183,364 permeter of shelf 975 width of shelf 3 Al (Bottom -Shelf): 48,540 Average Depth = 3.76 Proposed Wet Pond #1 Project Information Project Name: Cameron Village Project #: Designed by: CEP Date: Revised by: Date: Checked by: Date: Site Information 12/29/2021 Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 26.21 Acres Impervious Area (IA) = 10.92 Acres Percent Impervious (1) = 41.65 % (Drainage Area) Orifice Sizing Orifice Size = 5.00 in (Diameter) Drawdown Time = 2,06 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? erg Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 152.0 cf Weight: 9485 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 11,382 Ibs Volume of Concrete Req'd: 75.9 cf Volume Provided: 125.5 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (4'x4' riser x 5.5' = 88sf, 5'x5' footing x 1.5'=37.5cf) duawc ttu� sr � 19 so I NCH - rD FEET WET POND PLAN VIEW (""STAG E STAGE (FT) /STORAGE TABLE ELEVATION CONTOUR (FT) AREA (SF) INCREMENTAL TOTAL STORAGE (CF) STORAGE (CF) 0.0 256.0 74990 0 0 0.5 256.5 79345 38584 38584 1.0 257.0 82250 40399 78983 (WQv) 2.0 258.0 88090 85170 164153 3.0 259.0 93565 90828 254980 4.0 260.0 97410 95488 350468 ,5.0 261.0 101310 99360 449828 5.5 261.5 103285 51149 500976 !STORMWATER MANAGEMENT WET DETENTION POND#1 RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 03030004 POND DESIGN SUMMARY DESIGN DRAINAGE AREA TO POND: 26.21 ACRES SITE IMPERVIOUS AREA TO POND: 10.92 ACRES OFF SITE DESIGN IMPERVIOUS AREA TO POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 10.92 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED THROUGH POND DRAINAGE AREA: 26.21 AC 26.21 AC CURVE NUMBER: 55.5 75.0 1.0" STORM EVENT: 0.323 CFS 0.005 CFS 1-YEAR STORM EVENT: 1.574 CFS 36.24 CFS 0.533 CFS 2-YEAR STORM EVENT: 4.631 CFS 53.41 CFS 0.678 CFS 10-YEAR STORM EVENT: 20.06 CFS 106.35 CFS 3.806 CFS 100-YEAR STORM EVENT: 56.79 CFS 198.82 CFS 20.77 CFS 10 m m w O W v W Co J Q i O Z o m Lo m n p H w � N W a QQ Q _C N 4" PVC SCREW CAP FOR CLEANING ACCESS_ 12" MIN. 4"x4" PVC T PERM. POND ELEV.=256.0 12" MIN. 5"DIA. HOLE DRILLEI INTO BOTTOM CAP nicrn crnunri inr. PVC DRAIN OUTLET LY.TEND 4" PVC THROUGH RISER STRUCTURE rno nr c'oUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. 44 REBAR 0 12" OC IN FRONT A REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC. COVER FROM EDGE OR FACE OF COLLAR NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON -FLY ASH. 2. APPLY I" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES. 4. TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER. ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 TYPE 1: ASTM-D-2822-75 TYPE 1. CONCRETE SEEPAGE COLLAR SCALE: N.T.S. Pond Report s Hydraflow Hydrographs Extension for Autodesk(D Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 256.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 256.00 74,990 0 0 0.50 256.50 79,345 38,584 38,584 1.00 257-00 82,250 40,399 78,983 2.00 258.00 88,090 85,170 164,153 3.00 259.00 93,565 90,828 254,980 4.00 260.00 97,410 95,488 350,468 5.00 261.00 101,310 99,360 449,828 5.50 261.50 103,285 51,149 500,976 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 5.00 Inactive Inactive Crest Len (ft) = 4.00 12.00 Inactive Inactive Span (in) = 24.00 5.00 0.00 0.00 Crest El. (ft) = 257.80 259.10 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 256.00 256.00 0.00 0.00 Weir Type = Rect Broad -- Length (ft) = 35.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 3.70 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 s - 0.00 300 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) 6.00 9.00 Stage / Discharge Elev (ft) 262.00 I 261.00 260.00 259.00 258.00 - 257.00 - - 256-00 12.00 1500 18.00 21.00 24.00 27.00 30.00 3300 Discharge (cfs) Hydrograph Summary Repo lydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) - -- Maximum elevation (ft) - Total strge used (cuft) Hydrograph Description Pre -Developed -Overall Site 1 SCS Runoff 1.574 2 754 20,745 ------ 2 SCS Runoff 36.24 2 722 96,844 — -- — Post Developed to Pond 3 Reservoir 0.533 2 1444 85,411 2 256.95 75,097 Post Through Pond 5 SCS Runoff 0.323 2 360 2,973 --- ------ - 1.0 Post -Developed to Pond 6 Reservoir 0.005 2 378 1,253 5 256.04 2,947 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 1 Year Wednesday, 01 / 5 / 2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year I Wednesday, 01 / 5 / 2022 = 1.574 cfs = 754 min = 20,745 cuft = 55.5 = Oft = 40.50 min = Type II = 484 Q (cfs) 2.00 1.00 -j- -' ' - N. ' 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post ,Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs Q (cfs) 40.00 30.00 10.00 M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 1 Year Wednesday, 01 / 5 / 2022 = 36.24 cfs = 722 min = 96,844 cuft = 75 = Oft = 10.00 min = Type II = 484 i 120 240 360 480 600 720 840 Hyd No. 2 Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.533 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 85,411 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 256.95 ft Reservoir name = Wet Pond Max. Storage = 75,097 cuft Storage Indication method used Q (cfs) 40.00 30.00 - 20.00 - 10.00 Post Through Pond Hyd. No. 3 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 3 Hyd No. 2 ❑T_M- Total storage used = 75,097 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 6000 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Wednesday, 01 / 5 / 2022 Peak discharge = 0.323 cfs Time to peak = 360 min Hyd. volume = 2,973 cuft Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year 60 120 180 240 300 Hyd No. 5 Q (cfs) 0.50 0.45 040 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 360 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Hyd. No. 6 1.0inPost Through Pond- Hydrograph type = Reservoir Peak discharge = 0.005 cfs Storm frequency = 1 yrs Time to peak = 378 min Time interval = 2 min Hyd. volume = 1,253 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to Pofotx. Elevation = 256.04 ft Reservoir name = Wet Pond Max. Storage = 2,947 cuft Storage Indication method used 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 - 1 � T I - - - , i 1 _ I 0 600 Hyd No. 6 1200 1800 2400 Hyd No. 5 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 o.00 3000 3600 4200 4800 5400 6000 Time (min) TITTIT Total storage used = 2,947 cuft Hydrograph Summary Repo - FTydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 4.631 2 742 40,632 -- -- - — - Pre -Developed -Overall Site 2 SCS Runoff 53.41 2 722 140,374 - — ------ Post Developed to Pond 3 Reservoir 0.678 2 1444 124,562 2 257.39 112,438 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 256.00 0.000 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 2 Year Wednesday, 01 / 5 / 2022 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs 4.00 3.00 2.00 1.00 Wednesday, 01 / 5 / 2022 = 4.631 cfs = 742 min = 40,632 cuft = 55.5 = Oft = 40.50 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year Q (cfs) 5.00 3.00 2.00 1.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs 50.00 40.00 30.00 20.00 10.00 Wednesday, 01 / 5 / 2022 = 5 3.4 1 cfs = 722 min = 140,374 cult = 75 = Oft = 10.00 min Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 2 Year Q (cfs) 60.00 50.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 ' 'ydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.678 cfs Storm frequency = 2 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 124,562 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 257.39 ft Reservoir name = Wet Pond Max. Storage = 112,438 cult Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 20.00 Post Through Pond Hyd. No. 3 -- 2 Year i- I I Q (cfs) 60.00 50.00 40.00 30.00 I 20.00 10.00 � ; 10.00 I 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 LLJI P Total storage used = 112,438 cuft 15 Hydrograph Summary Repo r3ydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc v2022 Hyd. No. Hydrograph (Peak type flow (origin) (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 20.06 2 740 118,124 - -- Pre -Developed -Overall Site 2 SCS Runoff 106.35 2 720 275,765 — --- Post Developed to Pond 3 Reservoir 3.806 2 888 251,776 2 25817 179,804 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 -- - - ------ 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 256.00 0.000 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 10 Year Wednesday, 01 / 5 / 2022 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 . 11 Mire, Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year Wednesday, 01 / 5 / 2022 = 20.06 cfs 740 min 118,124 cuft = 55.5 = Oft = 40.50 min = Type II 484 Q (cfs) 21.00 18.00 15.00 12.00 • 1/ ME 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 17 P'ydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 :M A 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 10 Year Wednesday, 01 / 5 / 2022 = 106.35 cfs = 720 min = 275,765 cuft = 75 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 -- - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 18 Hydrograph- Repoit Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 3.806 cfs Storm frequency = 10 yrs Time to peak = 888 min Time interval = 2 min Hyd. volume = 251,776 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 258.17 ft Reservoir name = Wet Pond Max. Storage = 179,804 cuft Storage Indication method used Q (cfs) 120.00 100.00 40.00 20.00 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 -- - -- - -. 0.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 3 Hyd No. 2 LL 11LI Total storage used = 179,804 CA Time (min) 21 Hydrograph Summary Re p o - FTydraflow Hydrographs Extension for Autodesk® Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) - Hydrograph Description 1 SCS Runoff 56.79 2 738 288,606 - - --- Pre -Developed -Overall Site 2 SCS Runoff 198.82 2 720 519,524 ------ - -- Post Developed to Pond 3 Reservoir 20.77 2 754 494,595 2 259.31 284,923 Post Through Pond 5 SCS Runoff 0 000 2 n/a 0 --- - - — - - 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 256.00 0.000 1.0inPost Through Pond Wet_pond#1.gpw Return Period: 100 Year Wednesday, 01 / 5 / 2022 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.28 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 we Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year Wednesday, 01 / 5 / 2022 = 56.79 cfs = 738 min = 288,606 cuft = 55.5 = Oft = 40.50 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 s. %ydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 26.210 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.28 in Storm duration = 24 hrs 180.00 150.00 120.00 30.00 Wednesday, 01 / 5 / 2022 = 198.82 cfs = 720 min = 519,524 cuft = 75 = Oft = 10.00 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 100 Year Q (cfs) 210.00 180.00 150.00 120.00 .1 1It 30.00 0.00 , L I I --r- } 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 31DO by Autodesk, Inc. v2022 Wednesday, 01 / 5 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 20.77 cfs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 494,595 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 259.31 ft Reservoir name = Wet Pond Max. Storage = 284,923 cuft Storage Indication method used. Q (Cfs) 210.00 180.00 150.00 120.00 MOOR -M 30.00 Post Through Pond Hyd. No. 3 -- 100 Year Q (Cfs) 210.00 180.00 150.00 120.00 •1 I1 60.00 clews, - 0.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 3 Hyd No. 2 _l1 1 1 1 Total storage used = 284,923 cult Time (min) E E E � a f F 2 >e � f o � UN � 2 E z = c i' x y N 8 U � O ti U Z O w P, ry ui yr ei - C o E re m 3 ci u zo_ ooa V V t O [ N U m WATER QUANTITY -WET POND #2 SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name Cameron Village 2 Project Area ac 42.3088 3 Coastal Wetland Area (ac 4 Surface Water Area (ac)_ 5 Is this roject High or Low Density? High No 6 Does this project use an off -site SCM? COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A_ B Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCIMS: 11 1ntillration 5 Istem 0 12 Bioretention Cell 0 13 lWet Pond 2 14 iStormwater Wetland 0 15 1permeabie Pavement 0 16 ISand Filter 0 17 1 Rainwater Harvesting RWH _ 0 18 lGreen Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo, PE 2B Or anization: Bowman North Carolina, Ltd. 29 Street address: 4004 Barrett Drive, Suite 101 30 City, State. Zip: Raleigh, NC 27609 31 Phone number(s): _._ 919-553-6570 32 Email: cpardo@bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. =. oFESS/04� 4� SEAL 051571 - 1. Signature of Designer Dale DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area (sq ft 1842972 sf 1141886 sf 552343 sf 6 Onsite drainage area (sg ft 1842972 sf 1141886 sf 552343 sf 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 735961 sf 475548 sf 260413 sf 9 New BUA on subdivided lots (subject to permitting) 1 (sq ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 65294 sf 46590 sf 18704 sf Roof (sq ft 496000 sf 308000 sf 188000 sf Roadway (sq ft) 164649 sf 110940 sf 53709 sf Future (sq ft) Other, please specify in the comment box below (sq ft 10018 sf 10018 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft 15 Existing BUA that will remain (not subject to permitting) (sq ft) 17230 sf 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 41.65% 47.15% 19 Design storm inches 1.0 in 1.0 in 20 Desi n volume of SCM cu ft 40424 cf 21832 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 ]drainage area(s): Drainage Area #1 - Pool Impervious Area = 10,018sf Drainage Area #1 has been designed for an area of 1,866,124 sf with an impervious area of 900,331 sf. The future phase includes an additional 724,238 sf of drainage area with an additional impervious area of 424,783 sf. WET POND 11 Drainage area number 1 2 2 Minimum re9uired treatment volume (cu ft) 40424 cf 21832 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slo es of the SCM H: ? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No Are the inlets, outlets, and receiving stream protected from erosion 7 (10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC(10)? N/A NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes Yes 16 Does the SCM follow the devicespecific MDC? I Yes Yes 17 Was the SCM designed by an NC. licensed rofessional7 I Yes Yes IVU 1 rUNU IYn]C I-KUM Vi Hl r2's3 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 251.00 250.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 252.00 251.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 255.50 254.50 23 Elevation of the permanent pool (fmsl) 256.00 255.00 24 Elevation of the top of the vegetated shelf (fmsl) 256.50 255.50 25 Elevation of the temporary pool fmsl 257.00 255.90 26 Surface area of the main permanent pool (square feet) 51435 18440 27 Volume of the main permanent pool (cubic feet) 183364 cf 60353 cf 28 Average depth of the main pool feet 3.76 ft 3.59 ft 29 Average depth euation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 975.0 ft 593.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet 35620 cf 9396 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba (inches) 24 in 24 in 35 Design volume of SCM (cu ft) 40424 cf 21832 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 5.0 in 2.50 in 38 If weir, weir height inches 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.06 2.36 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes 43 Depth of forebay at entrance (inches) 36 in 36 in 44 Depth of forebay at exit inches 30 in 30 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met. No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 8:21 AM 1/5/2022 }-lam -? D flo^r Se A-&- - 10 . c0? 4 C- Bowman North Carolina, Ltd. Cameron Village, Raeford, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #2 Drainage Area (acres,): 12.68 Existing Soil Groups: Soil Grouo Map Symbol Soil Description Acres Percent of DA__ A/D Ra Rains Sandy Loam 5.30 42% A NoB Norfolk Loamy Sand 7.38 58% Existing Land Uses: Land Use Description Exislinci Soil Grov Acres Curve # We4ahled CN Wooded - Good Stand A 2.58 52 10.6 Open - Good A 10.10 55 418 Cumulative Curve # = 54.4 Bowman North Carolina, Ltd. Cameron Village, Raeford, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #2 Drainage Area LacresZ 12.68 Existing Soil Groups: Soil Grow Map Symbol Soil Description Acres Percent of DA A/D Ra Rains Sandy Loam 5.30 42% A NoB Norfolk Loamy Sand 7.38 58% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Impervious Area A/C 5.98 98 462 Open Space - Good Condition A 6.70 55 29.1 Cumulative Curve # = 75.3 Proposed Wet Pond #2 Project Information Project Name: Cameron Village Project #: Designed by: CEP Date: 12/29/2021 Revised by: Date: Checked by: Date: ite Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 12.68 Acres 552,343 sf Impervious Area (IA) = 5.98 Acres 260,413 sf Percent Impervious (1) = % 47.15 % Required Surface Area Permament Pool Depth: 3.59 ft Non -Coastal County SA/DA = 1.55 Min Re 'd Surface Area = 8.561 sf at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.474 in/in Storage Volume Required = 21,832 cf above Permanent Pool Elevations Top of Pond Elevation = 259.00 ft Temporary Pool Elevation = 265.90 ft Permanent Pool Elevation = 255.00 ft Shelf Begining Elevation = 255.50 ft Forebay Weir = 254.00 ft Shelf Ending Elevation = 254.50 ft Bottom Elevation = 251.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 18,440 sf Volume of Temporary Storage = 78,983 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 18440 > 8561 ) sf Volume of Storage for Design Storm = 78,983 Yes ( 78983 > 21832 ) cf Incremental Drawdown Time Project Information Project Nar Cameron Village Project #: Bsigned by: CEP iecked by: STORMWATER POND #2 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Date: 12/29/2021 Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 Co * D2 (Z-D/24-Ei)^(112) Q2 = 0.372 Co * D*(Z-Ei)A(3rz) Q,=0 2.5 in 0.6 255 Orifice Inv. 0.00 to 255 255 to 255.1 255.1 to 256 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 255.00 25,040 0 0.00 2.00 0.000 -- 255.50 27485 13.128 0.50 3.00 0.103 2.122 255.90 28745 11.246 0.40 3.00 0.146 1.282 Tots l 24,374 - 3.404 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 24,374 cf Total Time = 3,404 min Total Time = 2.36 days 12/29/2021 Prop Wet Pond- new design-CV#1 1 of 1 Project: Pond #1 Date: 12/29/2021 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 255 18,440 8,783 60,353 A2 (Perm -Pool) 254.5 16,690 8,203 51,570 Al (Bottom -Shelf) 254 16,120 15,558 43,368 253 14,995 14,448 27,810 252 13,900 13,363 13,363 251 12,825 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 255 3,020 3,155 6,175 2,979 9,396 254.5 2,805 2,935 5,740 2,768 6,418 254 2,600 2,730 5,330 3,650 3,650 253 965 1,005 1,970 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 15.6% *Between 15% & 20% 3.09 *At least 3' average depth 60,353 593 3 16,690 Average Depth = 3.59 Project Information Site Information Proposed Wet Pond #2 Project Name: Cameron Village Project # Designed by: CEP Date: 12/29/2021 Revised by: Date - Checked by: Date. Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) _ 12.68 Acres Impervious Area (IA) = 5.98 Acres Percent Impervious (1) = 47.15 % (Drainage Area) Orifice Sizing Orifice Size = 2.50 in (Diameter) Drawdown Time = 2.36 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 128.0 cf Weight: 7987 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 9,585 Ibs Volume of Concrete Req'd: 63.9 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 101.5 cf (4'x4' riser x 4' = 64sf, 5'x5' footing x 1.5'=37.5cf) aurx�c snu u is sa � t imm=sorm WLI POND PLAN VIEW 'STAGE/STORAGE TABLE _ STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 255.0 25040 0 0 0.5 255.5 27485 13131 13131 0.9 255.9 28745 11246 24377 (WQv) 1.0 256.0 29065 2891 27268 2.0 257.0 32275 30670 57938 3.0 258.0 35075 33675 91613 4.0 259.0 37925 36500 128113 "'STORMWATER MANAGEMENT DESIGN WET DETENTION POND#2 RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 03030004 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 12.68 ACRES SITE IMPERVIOUS AREA TO POND: 5.98 ACRES OFF DESIGN IMPERVIOUS AREA TO POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.98 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED DRAINAGE AREA: 12.68 AC 12.68 AC CURVE NUMBER: 54.4 75.3 1.0" STORM EVENT: 0.150 CFS 0.005 CFS 1-YEAR STORM EVENT: 0.655 CFS 21.60 CFS 0.174 CFS 2-YEAR STORM EVENT: 2.257 CFS 31.26 CFS 0.945 CFS 10-YEAR STORM EVENT: 10.92 CFS 60.56 CFS 10.38 CFS 100-YEAR STORM EVENT: 31.91 CFS 111.73 CFS 20.07 CFS ` ] - k\ }� Sig �m ■a M% | B 2 S s e!! \ .� .mpg\■ ) So g2§22� I, T �o 1 O o N �� Is T N J m O z _ r z _ s m O \_ m A T W N X Z U .--1 —4 LA m K _^ o z m m N co 1TC7 sLn = < N -1 =i T . O OIQCD QTW IPTI IOC 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. PERM. POND ELEV.=255.0 12" MIN. 4"x4" PVC T i 21"DIA. HOLE DRILLEL INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. CMERC£N Cy �5.0 �563 EXTEND 4" PVC THROUGH RISER STRUCTURE TAn ^r CT4UCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. #4 REBAR ® 12" OC IN FRONT do REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC. COVER FROM EDGE OR FACE OF COLLAR NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON —FLY ASH. 2. APPLY J" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES. 4. TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER. ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 TYPE 1: ASTM—D-2822-75 TYPE 1. CONCRETE SEEPAGE COLLAR SCALE: N.T.S. ri E E a E u - � E z S x E 3 - _ y f U C � - c j h U � N O w U a o w N m 9 m w n z r — °a rc wo u= F � K w i'n m Pond Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Wednesday, 12 129 / 2021 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 255.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 255-00 25,040 0 0 050 255,50 27,485 13,131 13,131 090 255-90 28,745 11,246 24,377 1.00 256-00 29,065 2,891 27,268 2.00 25700 32,275 30,670 57,938 3-00 258-00 35,075 33,675 91,613 4.00 259.00 37,925 36,500 128,113 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.50 Inactive Inactive Crest Len (ft) = 6.00 10.00 Inactive Inactive Span (in) = 24.00 2.50 000 0.00 Crest El. (ft) = 256.30 257.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3-33 Invert El. (ft) = 255.00 255.00 000 000 Weir Type = Rect Broad - -- Length (ft) = 204.00 050 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.54 1.00 0.00 n/a N-Value = 013 .013 013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0 000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and oullet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 259.00 258.00 257.00 - I I 1.00 - 256.00 I 0.00 - - 255.00 000 200 400 600 800 1000 1200 1400 1600 1800 20.00 22.00 24.00 Total Q Discharge (cfs) Hydrograph Summary Repo Oydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description Pre -Developed -Overall Site 1 SCS Runoff 0.655 2 748 8,767 ------ -- 2 SCS Runoff 21.60 2 718 43,297 -- - ------ Post Developed to Pond 3 Reservoir 0.174 2 1442 37,422 2 256.29 36,195 Post Through Pond 5 SCS Runoff 0.150 2 360 1,409 ------ ------ - -- 1.0 Post -Developed to Pond 6 Reservoir 0.005 2 368 984 5 255.05 1,383 1.0inPost Through Pond Wet_pond#2.gpw Return Period: 1 Year Wednesday, 12 / 29 / 2021 K Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs Wednesday, 12 / 29 / 2021 Peak discharge = 0.655 cfs Time to peak = 748 min Hyd. volume = 8,767 cuft Curve number = 54.4 Hydraulic length = 0 ft Time of conc. (Tc) = 29.70 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Q (cfs) Q (cfs) Hyd. No. 1 -- 1 Year 1.00 - -- - —- 1.00 0.90 0.90 i 0.80 0.80 I ! 0.70 - - 0.70 i 0.60 - - ---- - 0.60 I 0.50 -- - - 0.50 i 0.40 -- - - 0.40 0.30 - ! 0.30 0.20 - -- - 0.20 0.10 - — -- i— 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = Total precip. = 3.04 in Storm duration = 24 hrs Q (cfs) 24.00 -- - 20.00 16.00 12.00 Wednesday, 12 / 29 / 2021 Peak discharge = 21.60 cfs Time to peak = 718 min Hyd. volume = 43,297 cuft Curve number = 75.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 1 Year Q (cfs) 24.00 20.00 - — — 16.00 12.00 8.00 8.00 i 4.00 — 4.00 0.00 - -� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk( Civil 3D® by Autodesk, Inc. v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.174 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 37,422 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 256.29 ft Reservoir name = Wet Pond Max. Storage = 36,195 cuft Storage Indication method used Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 24.00 - 24.00 I ' I I 20.00 - 20.00 I I 16.00 --�. --I 16.00 12.00 -I - --- -- - 12.00 8.00 - - — - - - 8.00 4.00 4.00 0.000.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 — Hyd No. 2 - Total storage used = 36,195 cuft (ydrograph Report R Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = Total precip. - 1.00 in Storm duration - 6.00 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 025 020 015 0.10 0.05 0.00 0 60 Hyd No. 5 Wednesday, 12 / 29 / 2021 Peak discharge = 0.150 cfs Time to peak = 360 min Hyd. volume = 1,409 cuft Curve number = 75.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year 120 180 240 300 360 Q (cfs) 0.50 0.45 0.40 0.35 030 0.25 0.20 0.15 0.10 - 0.05 0.00 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc. v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.005 cfs Storm frequency = 1 yrs Time to peak = 368 min Time interval = 2 min Hyd. volume = 984 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to PofVWX. Elevation = 255.05 ft Reservoir name = Wet Pond Max. Storage = 1,383 cuft Storage Indication method used Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 I 0.05 I 0.00 + 0 600 Hyd No. 6 1.0inPost Through Pond Hyd. No. 6 -- 1 Year Q (cfs) - — - — - --- 0.50 -- - --- - 0.45 i ' I —------- - 0.40 � I 0.35 I 0.30 � I I 0.25 0.20 - - — -- -- - 0.15 0.10 ' I - — - - - 0.05 I 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 _ Time (min) Hyd No. 5 1 Tl I I I! Total storage used = 1,383 cuft Hydrograph Summary Repo - Xydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd, No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) 2 Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.257 736 17,776 - — - - Pre -Developed -Overall Site 2 SCS Runoff 31 26 2 718 62,592 - -- - - Post Developed to Pond 3 Reservoir 0 945 2 888 56,412 2 256.41 39,926 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ --- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 255.00 0 000 1.0inPost Through Pond I Wet_pond#2.gpw Return Period: 2 Year Wednesday, 12 / 29 / 2021 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1 00 Wednesday, 12 / 29 / 2021 Peak discharge = 2.257 cfs Time to peak = 736 min Hyd. volume = 17,776 cuft Curve number = 54.4 Hydraulic length = 0 ft Time of conc. (Tc) = 29.70 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year Q (cfs) - - 3.00 1.00 000 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Eydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = Total precip. = 3.68 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 20.00 15.00 11 Wednesday, 12 / 29 / 2021 Peak discharge = 31.26 cfs Time to peak = 718 min Hyd. volume = 62,592 cuft Curve number = 75.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shane factor = 484 Post Developed to Pond Hyd. No. 2 -- 2 Year Q (cfs) 35.00 - — — - 30.00 — 25.00 I 20.00 15.00 10.00 l— 10.00 5.00 - - - - 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc. v2022 Wednesday, 12 / 29 12021 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.945 cfs Storm frequency = 2 yrs Time to peak = 888 min Time interval = 2 min Hyd. volume = 56,412 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 256.41 ft Reservoir name = Wet Pond Max. Storage = 39,926 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 35.00 35.00 30.00 1 - j 30.00 25.00 — — - - rt ' - 25.00 I 20.00 - - — — - — — —.i. 20.00 15.00 i 15.00 10.00 - 10.00 5.00 r - - - 5.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 1_I1-Lll! Total storage used = 39,926 cuft 15 Hydrograph Summary Repo - FTydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 10.92 2 732 53,677 — -- Pre -Developed -Overall Site 2 SCS Runoff 60.56 2 716 122,465 - - - - -- Post Developed to Pond 3 Reservoir 1038 2 726 116,131 2 256.97 56,969 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 255.00 0.000 1.0inPost Through Pond Wet_pond#2.gpw Return Period: 10 Year i Wednesday, 12 / 29 / 2021 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 . IM 4.00 2.00 0.00 - 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year Wednesday, 12 / 29 / 2021 = 10.92 cfs = 732 min = 53,677 cuft 54.4 = Oft = 29.70 min = Type II = 484 Q (cfs) 12.00 10.00 OM WO 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 12.680 ac Basin Slope = 0.0 % Tc method = Total precip. = 5.44 in Storm duration = 24 hrs Wednesday, 12 / 29 / 2021 Peak discharge = 60.56 cfs Time to peak = 716 min Hyd. volume = 122,465 cuft Curve number = 75.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 70.00 - - 70.00 60.00 - - - —; - - 60.00 50.00 - - - 50.00 40.00 - - I I ' - - ._. .. 40.00 30.00 - — ! — 30.00 20.00 7 20.00 10.00 10.00 0.00 - - -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 2 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk. Inc v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 10.38 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 116,131 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 256.97 ft Reservoir name = Wet Pond Max. Storage = 56,969 cuft Storage Indication method used Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 70.00 70.00 60.00 - - - - - - 60.00 50.00 - j 50.00 I 40.00 - — — -� - 40.00 I 30.00 30.00 20.00 - - — - - 20.00 10.00 - - - - 10.00 000 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) Hyd No. 3 Hyd No. 2 I11-I-11J' Total storage used = 56,969 cuft 21 Hydrograph Summary Re p o lydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 31.91 2 732 133,936 ------ -- -- Pre -Developed -Overall Site 2 SCS Runoff 111.73 2 716 230,020 -- Post Developed to Pond 3 Reservoir 20.07 2 726 223,576 2 25847 108,644 Post Through Pond 5 SCS Runoff 0 000 2 n/a 0 - — ---- ---- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 255.00 0.000 1.0inPost Through Pond Wet_pond#2.gpw Return Period: 100 Year Wednesday, 12 / 29 / 2021 22 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge = 31.91 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 133,936 cuft Drainage area = 12.680 ac Curve number = 54.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.70 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre -Developed -Overall Site Q (cfs) Hyd. No. 1 -- 100 Year 35.00 30.00 25.00 20.00 15.00 Q (cfs) 35.00 I - —j 30.00 25.00 20.00 15.00 10.00 - — 10.00 5.00 — — - -- 5.00 0.00— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc. v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 111.73 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 230,020 cuft Drainage area = 12.680 ac Curve number = 75.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 120.00 100.00 40.00 20.00 Post Developed to Pond Hyd. No. 2 -- 100 Year Q (cfs) 120.00 100.00 4000 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 12 / 29 / 2021 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 20.07 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 223,576 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 258.47 ft Reservoir name = Wet Pond Max. Storage = 108,644 cuft Storage Indication method used- Q (cfs) 120.00 - 100.00 :m .M 40.00 20.00 Post Through Pond Hyd. No. 3 -- 100 Year Q (cfs) - 120.00 100.00 :M .M 40.00 20.00 000 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 3 Hyd No. 2 _LLI I IS Total storage used = 108,644 CA Time (min) 3§ | }| | ) }f k !. i# ! 2 � | k` f\ ! k� I i# k § 7 2 /§ § §) � a n � $ƒ\ ! i|! � pit \| k f` § ■ g� k�� { §k10 ` § �