June 2, 2022
Robert N. Roth, Technical Services Manager
Synagro Central, LLC
284 Boger Road
Mocksville, NC 27028
SUBJECT: Compliance Evaluation Inspection
Synagro Central, Distribution of Class A Residuals
Permit No. WQ0035207
Davie County
Dear Mr. Roth:
On May 19, 2022, Division of Water Resources staff Caitlin Caudle completed a routine
compliance inspection. Ryan Copeland, Technical Services Specialist, was present
during the entire inspection. This review reflected compliance with the subject permit.
Please refer to the enclosed inspection report for additional observations and comments.
If you have any questions, please contact me or Caitlin Caudle at the letterhead address
or phone number, or by email at caitlin.caudle@ncdenr.gov.
Sincerely,
-DocuSiiggned by:<
t- . 1. Jn.ac.,-
- 145B49E225C94EA...
Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ-WSRO
Enc: Inspection Report
Cc: Ryan Copeland, Synagro (electronic copy)
Laserfiche File WQ0035207
WSRO Electronic Files
GDE
NORTH C CUNA '
umm eo..orEMr n nt o�.iXks.
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
Compliance Inspection Report
Permit: WQ0035207 Effective: 03/10/21 Expiration: 01/01/27 Owner : Synagro Central LLC
SOC:
County: Davie
Region: Winston-Salem
Effective:
Contact Person: Gregory T Flory
Directions to Facility:
Expiration: Facility: Synagro Central DCAR
Title: Executive Director Phone: 336-498-5510
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
NCG590017 City of Greensboro - Lake Townsend WTP
NC0046345 City of Reidsville - Reidsville WTP
NC0075701 City of Albemarle - Tuckertown WTP
NC0087866 Piedmont Triad Regional Water Authority - John F. Kime WTP
NC0057533 Brunswick County - Hood Creek WTP
Inspection Date: 05/19/2022 Entry Time 10:07AM
Exit Time: 12:OOPM
Primary Inspector: Caitlin Caudle Phone: 336-776-9699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Distribution of Residual Solids (503)
Facility Status: Compliant ❑ Not Compliant
Question Areas:
▪ Miscellaneous Questions Record Keeping Sampling
▪ Land Application Site Storage Transport
(See attachment summary)
Page 1 of 4
Permit: WQ0035207 Owner - Facility: Synagro Central LLC
Inspection Date: 05/19/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Inspection Summary:
On May 19, 2022, Division of Water Resources staff Caitlin Caudle completed a routine compliance inspection. Ryan
Copeland, Technical Services Specialist, was present during the entire inspection. This review reflected compliance with the
subject permit.
Material was being spread from the Graham WTP. All required sample analysis was provided on 5/18/2022 via email. This
material was non -biological and did not require pathogen and vector reduction. Ferric sludge was being removed from a clay
lined storage pond after agitation. The PAN rate was 18lbs/6,200 gallon. Approximately 3 tankers (6,200 gallons) were
applied per acre. Web Soil Survey is used to determine the predominant soil series in a field and the NC State RYE
database used to determine the PAN rate. Pre -operations calculations are done to determine the loading rate, which is
calculated to be less than the RYE PAN rate for the field. A single pumper truck was in the field applying and two 6,200
gallon tankers were transporting material from the WTP to the field.
All minimum buffers were met, and additional courtesy buffers were put in place. Two waterways were buffered out in the
application field. The sludge appeared to be fairly thick when applied. There was little movement after applied. The grass had
not been cut or bushhoged yet, so all tall stems were weighed down. Forage grass remained upright. Mr. Copeland stated
they were going to move liquid from the second clay lined storage pond to water down the material being applied.
While viewing a tanker being loaded, an air bubble moved down the pipe and caused the loading pipe into the tanker to blow
out. A small amount of solids were sprayed on the asphalt driveway, the back of the tanker, and the truck driver. The pump
was immediately shut off and the tanker moved to better load solids into the tanker. An absorbent material was used to
cover the solids on the asphalt and shovels were used to clean up all the material. Mr. Copeland stated that the asphalt
would also be washed and all water used washed into the storage ponds next to the driveway.
Mr. Copeland stated that after land application has been completed the landowner and operator will be provided with a
summary of all nutrients applied to the field. Before land application starts Mr. Copeland obtains a landowner agreement
form and an operator agreement form. Mr. Copeland also completes a pre -operation for that includes field inspections and
verifies any limiting conditions within the application area.
Other observations:
• Graham WTP material is not longer going to the dedicated fields owned by Graham.
• The Graham WTP has three storage ponds. Two clay lined and one concrete lined.
• The WTP has more than a years worth of storage.
• A composite grab sample is collected from the lagoon that was being hauled from.
• Both tankers had spill plans and the tanker in the field had the permit, O&M plan, and spill plan.
• The WTP maintains inspection logs of the storage ponds.
Page 2 of 4
Permit: WQ0035207 Owner - Facility: Synagro Central LLC
Inspection Date: 05/19/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Type
Distribution and Marketing
Land Application
Record Keeping
Is GW monitoring being conducted, if required?
Are GW samples from all MWs sampled for all required parameters?
Are there any GW quality violations?
Is GW-59A certification form completed for facility?
Is a copy of current permit on -site?
Are current metals and nutrient analysis available?
Are nutrient and metal loading calculating most limiting parameters?
a. TCLP analysis?
b. SSFA (Standard Soil Fertility Analysis)?
Are PAN balances being maintained?
Are PAN balances within permit limits?
Has land application equipment been calibrated?
Are there pH records for alkaline stabilization?
Are there pH records for the land application site?
Are nutrient/crop removal practices in place?
Do lab sheets support data reported on Residual Analysis Summary?
Are hauling records available?
Are hauling records maintained and up-to-date?
# Has permittee been free of public complaints in last 12 months?
Has application occurred during Seasonal Restriction window?
Comment:
Yes No NA NE
El
•
Yes No NA NE
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
▪ ❑ ❑ ❑
❑ ❑ • ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
▪ ❑ ❑ ❑
Sampling Yes No NA NE
Describe sampling:
Is sampling adequate? • ❑ ❑ ❑
Is sampling representative? • ❑ ❑ ❑
Comment:
Transport Yes No NA NE
Is a copy of the permit in the transport vehicle? • ❑ ❑ ❑
Is a copy of the spill control plan in the vehicle? • ❑ ❑ ❑
Is the spill control plan satisfactory? • ❑ ❑ ❑
Page 3 of 4
Permit: WQ0035207 Owner - Facility: Synagro Central LLC
Inspection Date: 05/19/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Does transport vehicle appear to be maintained?
Comment:
Land Application Site
Is a copy of the permit on -site during application events?
Is the application site in overall good condition?
Is the site free of runoff/ponding?
If present, is the application equipment in good operating condition?
Are buffers being maintained?
Are limiting slopes buffered?
10% for surface application
18% for subsurface application
Are there access restrictions and/or signs?
Is the application site free of odors or vectors?
Have performance requirements for application method been met?
For injection?
For incorporation?
Does permit require monitoring wells?
Have required MWs been installed?
Are MWs properly located w/ respect to RB and CB?
Are MWs properly constructed (including screened interval)?
Is the surrounding area served by public water?
If Annual Report indicates overapplication of PAN, are wells nearby that may be impacted?
Are soil types consistent w/ Soil Scientist report/evaluation?
Is the water table greater than 173' bls.
Is application occurring at the time of the inspection?
Comment:
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
Page 4 of 4