HomeMy WebLinkAboutFW_ Survey at 84” pipe
Carpenter,Kristi
From:Williams, Paul C
Sent:Tuesday, June 15, 2021 3:32 PM
To:Barnes, Kyle W SAW; Ward, Garcy
Cc:Trowell, Steve J; Castello, Robert C; Blankenship, Andrew
Subject:FW: Survey at 84” pipe
Attachments:IMG_0014.jpg; IMG_0015.jpg; IMG_0016.jpg; IMG_0017.jpg; IMG_0018.jpg
Kyle and Garcy,
The downstream end of Site 7 on the R-2582A project did have errors on the location of the silt-fence, toe-of-slope, and
57 stone on the skimmer basin outlet. See attached photos of the slope stakes and the extent of the mech.
clearing. The disturbed outside of mechanized clear is approximately 427 sq. ft. and has been removed. I’ll send a
subsequent email with more photos and information of the cleanup. Since we’re working on a permit mode for Site 8,
do I need to add this area to the impacts for Site 7?
nd
As this is yet another error on this project, I would like to have the Project Review Day that is scheduled for the 22 on
nd
this project again. I spoke with Greg, and he was not going to be available on the 22 for the meeting anyway. I believe
an onsite meeting will help clear up any confusion the contractor is having on the ongoing issues of this
project. Afterward, we can look at the small bridge projects that are in Northampton County.
Thanks,
Paul C. Williams, Jr.
Division Environmental Officer
Division One
NC Department of Transportation
(252) 482-1861 office
(252) 333-9812 mobile
(252) 482-8722 fax
pcwilliams2@ncdot.gov
113 Airport Dr.
Suite 100
Edenton, NC 27932
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1
From: Braswell, Brooks N <bnbraswell@ncdot.gov>
Sent: Monday, June 14, 2021 10:56 AM
To: Williams, Paul C <pcwilliams2@ncdot.gov>; Trowell, Steve J <sjtrowell@ncdot.gov>
Cc: Rose, Edwin W <ewrose1@ncdot.gov>
Subject: FW: Survey at 84” pipe
Paul/Steve,
Please see the attached pics. Looks like we have gone outside mechanized clear zone.
From: Lassiter, Robert W <rwlassiter@ncdot.gov>
Sent: Monday, June 14, 2021 10:45 AM
To: Braswell, Brooks N <bnbraswell@ncdot.gov>
Subject: Survey at 84” pipe
Brooks the blue flagging is the mechanized clearing and the pink is toe of slope
Get Outlook for iOS
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2