Loading...
HomeMy WebLinkAboutFW_ Survey at 84” pipe Carpenter,Kristi From:Williams, Paul C Sent:Tuesday, June 15, 2021 3:32 PM To:Barnes, Kyle W SAW; Ward, Garcy Cc:Trowell, Steve J; Castello, Robert C; Blankenship, Andrew Subject:FW: Survey at 84” pipe Attachments:IMG_0014.jpg; IMG_0015.jpg; IMG_0016.jpg; IMG_0017.jpg; IMG_0018.jpg Kyle and Garcy, The downstream end of Site 7 on the R-2582A project did have errors on the location of the silt-fence, toe-of-slope, and 57 stone on the skimmer basin outlet. See attached photos of the slope stakes and the extent of the mech. clearing. The disturbed outside of mechanized clear is approximately 427 sq. ft. and has been removed. I’ll send a subsequent email with more photos and information of the cleanup. Since we’re working on a permit mode for Site 8, do I need to add this area to the impacts for Site 7? nd As this is yet another error on this project, I would like to have the Project Review Day that is scheduled for the 22 on nd this project again. I spoke with Greg, and he was not going to be available on the 22 for the meeting anyway. I believe an onsite meeting will help clear up any confusion the contractor is having on the ongoing issues of this project. Afterward, we can look at the small bridge projects that are in Northampton County. Thanks, Paul C. Williams, Jr. Division Environmental Officer Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax pcwilliams2@ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 From: Braswell, Brooks N <bnbraswell@ncdot.gov> Sent: Monday, June 14, 2021 10:56 AM To: Williams, Paul C <pcwilliams2@ncdot.gov>; Trowell, Steve J <sjtrowell@ncdot.gov> Cc: Rose, Edwin W <ewrose1@ncdot.gov> Subject: FW: Survey at 84” pipe Paul/Steve, Please see the attached pics. Looks like we have gone outside mechanized clear zone. From: Lassiter, Robert W <rwlassiter@ncdot.gov> Sent: Monday, June 14, 2021 10:45 AM To: Braswell, Brooks N <bnbraswell@ncdot.gov> Subject: Survey at 84” pipe Brooks the blue flagging is the mechanized clearing and the pink is toe of slope Get Outlook for iOS Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2