Loading...
HomeMy WebLinkAboutSite Inspection 6.6.22 Br 57 on I-40 Cold SpringsWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210694 NCDOT - Replace Bridge 57 on I-40 (B-6054A) Haywood NCDOT - Replace Bridge 57 on I-40 (B-6054A) NC DOT Division 14 - Sylva 6/6/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 01' 26''+35° 44' 14'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 6, 2022. Isaak Jones was present during the inspection. The following are items that need attention: - Add temporary or permanent ground cover in idle areas per NPDES stabilization timeframes. - Station L 30+90- Maintain inlet protection at stormwater inlet. Add gravel. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210694 6/6/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2