Loading...
HomeMy WebLinkAbout20140237 Ver 2_6_McLeansville_ROW_Plans_01-03-14_20100726McLEANSVILLE RD FRIEDEN CHURCH RD B IR T C H C R E E K R D 70 BET HEL C HUR C H RD VICINITY MAP END PROJECT BEGIN PROJECT NS/NCRR -Y1- NS/NCRR DETOURS 4 5 6 7 SR 2819 S R 2 9 3 0 S R 2 8 2 6 S R 2 8 2 1 H A R V E S T R D SR 2820DICKS MILL RD SR 2746 SR 2 8 14 K N O X R D M c L E A N S V I L L E R D S R 2 8 19 McLEANSVILLE -Y 5 - -L- STA 25+23.73 -L- STA 23+74.48 BETHEL CHURCH ROAD SR 2930 P-5204 BEGIN TIP PROJECT -L- STA 10+00.00 TO BURLINGTON RD (HWY 70) S R 2 8 2 6 -Y4 - B IR C H C R E E K R D BEGIN CONSTRUCTION -Y1- STA 10+00.00 -Y1- STA 26+87.43 END CONSTRUCTION TO KNOX RD B E T H E L C H U R C H S R 2 9 3 0 R O A D HINES ANDREWS ROAD SR 2858 -Y3- TO RANHURST RD END BRIDGE BEGIN BRIDGE TO REIDSVILLE HWY (HWY 29) - L - M c L E A N S V I L L E R O A D S R 2 8 1 9 P-5204 END TIP PROJECT -L- STA 36+50.00 SR 2746 -Y2- FRIEDEN CHURCH ROAD TO GIBSONVILLE -Y2- STA 23+00.00 END CONSTRUCTION BEGIN CONSTRUCTION -Y2- STA 12+00.00 SR 2858 HINES ANDREWS RD MUNICIPAL BOUNDARIES THIS PROJECT IS NOT WITHIN ANY TO THE LIMITS ESTABLISHED BY METHOD II CLEARING ON THIS PROJECT SHALL BE PERFORMED 8A RAIL CROSSING CLOSURE **DESIGN EXCEPTION FOR VERTICAL AND HORIZONTAL ALIGNMENT REQUIRED P - 5 2 0 4 D C N DHV D T V = = = = = = 6,600 10,000 10 50 % % MPH ADT ADT 2012 2035 % * DUAL=7%*TTST =1% FUNC CLASS = COLLECTOR 10 PROJECT ENGINEER SANDRA STEPNEY, PE NCDOT CONTACT: TOTAL LENGTH TIP PROJECT P-5204 = 0.502 MILES LENGTH STRUCTURE TIP PROJECT P-5204 = 0.028 MILES LENGTH ROADWAY TIP PROJECT P-5204 = 0.474 MILES255010050 25 50 100100 5 2010 DHV D T V = = = = = = 70 8 % % MPH ADT ADT % * FUNC CLASS = SUB-REGIONAL TIER 0 0 0 PROFILE (HORIZONTAL) DESIGN DATAGRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ C O N T R A C T : PROJECT LENGTH BRYAN LAMBETH, PE DAVID BASS, PE OCTOBER 28, 2013 SEPTEMBER 16, 2014 RIGHT OF WAY DATE: LETTING DATE: Prepared in the Office of: SIGNATURE: SIGNATURE: P.E. P.E. 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN A R T MEN N A S O H NC DEPARTMENT OF TRANSPORTATION CN N CNORTH CAROLINA D E P T O F TRA SPORT T IO N T A TEOFN RT CAR O LI N A AND SAFETY ENGINEERING COORDINATION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SUBMITTAL: DATE: OCTOBER 28, 2013 See Sheet 1-A For Index of Sheets FRA-FR-HSR-0006-10-01-00 52400.1.STR03T1B STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1P-5204 T I P P R O J E C T : RAIL DIVISIONS STATE OF NORTH CAROLINA GUILFORD COUNTY SR 2819 (McLEANSVILLE ROAD) GRADE SEPARATION OVER LOCATION: GRADING, DRAINAGE, PAVING, AND STRUCTURE NS/NCRR RAILROAD FROM SR 2826 TO NORTH OF SR 2746 TYPE OF WORK: 43219.2.STR01P5204 PE, PE UTIL ROW ROW PLANS 8 - S R 1 - N A D 8 3 N S R S 2 0 0 7 N A D 8 3 N S RS 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ; z v W K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R } T p Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW v v Drainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) *S.U.E. = Subsurface Utility Engineering WLB EIP B ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Note: Not to Scale SHEET NO.PROJECT REFERENCE NO. 1-BP-5204 Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland Proposed Permanent Easement with Iron Pin and Cap Marker Proposed Temporary Utility Easement TUE Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Proposed Right of Way Line with DUEProposed Permanent Drainage / Utility Easement AUEProposed Aerial Utility Easement CRProposed Curb Ramp STATE OF NORTH CAROLINA CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring UST Known Soil Contamination: Area or Site Potential Soil Contamination: Area or Site D C N RAIL DIVISION (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "Y4807F-1" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 858709.3260(ft) EASTING: 1805511.6750(ft) ELEVATION: 762.73'(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999952493 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "Y4807F-1" TO -L- STATION 10+00.00 IS N 5°20'40" W 571.23' ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 NS/NCRR -Y1- -Y 5 - BETHEL CHURCH ROAD SR 2930 P-5204 BEGIN TIP PROJECT -L- STA 10+00.00 TO BURLINGTON RD (HW Y 70) S R 2 8 2 6 -Y 4 - B IR C H C R E E K R D BEGIN CONSTRUCTION -Y1- STA 10+00.00 -Y1- STA 26+87.43 END CONSTRUCTION TO KN O X R D B E T H E L C H U R C H S R 2 9 3 0 R O A D HINES ANDREWS ROAD SR 2858 -Y3- T O R A N H U R S T R D END BRIDGE BEGIN BRIDGE TO REIDSVILLE HWY (HWY 29) - L - M c L E A N S V I L L E R O A D S R 2 8 1 9 P-5204 END TIP PROJECT -L- STA 36+50.00 SR 2746 -Y2- FRIEDEN CHURCH ROAD TO GIBSONVILLE -Y2- STA 23+00.00 END CONSTRUCTION BEGIN CONSTRUCTION -Y2- STA 12+00.00 100 101 > > > > > > > > > > > > > >>> > > BY1-130 BY1-131 BY1-132 BY1-133 BL-102 BY1-101 BY3-135 Y4807F-1 BY1-134 ELEV = 735.35 BM5 ELEV = 724.11 BM7 ELEV = 711.13 BM2 ELEV = 767.72 BM6 ELEV = 748.09 BM1 ELEV = 733.79 BM8 BL-107 BL-106 BL-104BL-103 BL-105 HARVEST RD SR 2821 TO GREENSBORO ELEV = 745.56 BM3 BY3-140 -L- STA 23+74.48 -L- STA 25+23.73 BY4-138 BY2-123 BY2-136 > BY4-137 > BY4-139 -BL- Y4807F-2 > NC GRID NAD 83/NSRS 2007 NOTES SHEET NO.PROJECT REFERENCE NO. Location and Surveys 52400.1 1C 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ L o c a t i o n S u r v e y s \ S u r v e y C o n t r o l S h e e t s f r o m N C D O T \ p 5 2 0 4 _ l s _ 1 c _ 1 3 1 0 0 2 . d g n $ $ $ $ U S E R N A M E $ $ $ $ NOTE: DRAWING NOT TO SCALE >INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL BY THE NCDOT LOCATION AND SURVEYS UNIT. PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. SEE GPS CALIBRATION SHEET FOR HORIZONTAL AND VERTICAL COORDINATE VALUES. WILL ALLOW THE END USER TO WORK WITHIN THE SAME COORDINATE SYSTEM WHEN USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES. 2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING PROJECT CONTROL DATA AT: THE FILES TO BE FOUND ARE AS FOLLOWS: THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT. IF FURTHER INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. HTTPS://CONNECT.NCDOT.GOV/RESOURCES/LOCATION/ 1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE p5204_ls_gpscalib_131002.PDF NAD 83 / NSRS2007 ADJUSTMENT. THIS CALIBRATION p5204_ls_gpscalib_131002.HTML p5204_ls_wgs84_131002.TXT p5204_ls_local_131002.TXT p5204_ls_control_131002.TXT D C N - S R 1 - DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "Y4807F-1" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 858709.3260(ft) EASTING: 1805511.6750(ft) ELEVATION: 762.73'(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999952493 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "Y4807F-1" TO -L- STATION 10+00.00 IS N 5°20'40" W 571.23' ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 BASELINE DATA BENCHMARK DATA 122 BL-122 859000.0650 1812167.0670 767.15 26+59.05 6581.16 RT 121 BL-121 859108.9460 1811531.8140 757.14 26+90.50 5963.18 RT 120 BL-120 859084.5180 1811135.8920 751.55 26+95.67 5567.50 RT 119 BL-119 859128.1780 1810640.2240 737.17 27+18.02 5083.11 RT 118 BL-118 859134.9290 1810375.0820 728.84 27+27.95 4822.21 RT 117 BL-117 859143.6820 1810199.2810 734.99 27+35.93 4650.14 RT 116 BL-116 859159.7080 1809979.2850 740.78 27+47.73 4436.02 RT 115 BL-115 859185.7740 1809672.6350 734.20 27+66.59 4139.13 RT 114 BL-114 859207.5280 1809379.8300 734.38 27+96.73 3856.18 RT 113 BL-113 859205.2010 1809027.5530 731.57 28+64.81 3510.54 RT 112 BL-112 859186.5760 1808761.4800 741.65 28+99.70 3246.10 RT 111 BL-111 859254.3870 1808546.4490 742.96 30+09.09 3048.95 RT 110 BL-110 859041.3080 1808303.0370 743.29 28+48.92 2767.88 RT 109 BL-109 858944.7080 1808163.3360 738.43 27+82.18 2611.71 RT 108 BL-108 858677.2260 1807968.0630 734.70 27+03.19 2373.73 RT 107 BL-107 858309.6220 1807850.1750 730.42 25+74.74 2222.77 RT 106 BL-106 857987.8100 1807620.7090 711.09 24+51.45 1994.96 RT 105 BL-105 857846.2250 1807234.5210 733.24 23+79.34 1621.36 RT 104 BL-104 857805.5350 1806993.2090 731.69 23+47.08 1386.73 RT 103 BL-103 857811.3470 1806706.9240 745.37 23+29.56 1102.44 RT 102 BL-102 857865.7850 1805675.5720 739.52 22+37.65 77.69 RT ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION L STATION OFFSET BL 130 BY1-130 856349.0040 1804006.1197 736.59 OUTSIDE PROJECT LIMITS 131 BY1-131 856681.0101 1804469.9486 746.06 OUTSIDE PROJECT LIMITS 132 BY1-132 857038.6149 1805039.4997 737.22 12+08.08 26.97 RT 133 BY1-133 857460.7090 1805666.0697 731.16 18+91.12 209.24 RT BL102 BL-102 857865.7850 1805675.5720 739.52 22+37.65 77.69 RT 101 BY1-101 858116.3270 1805706.5660 746.26 24+76.26 76.94 RT GPS1 Y4807F-1 858709.3260 1805511.6750 762.73 30+81.12 33.54 LT 134 BY1-134 859577.6771 1805450.5239 764.90 OUTSIDE PROJECT LIMITS ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION L STATION OFFSET BY1 136 BY2-136 856723.6067 1806676.1943 729.72 26+52.27 17.00 RT 123 BY2-123 857384.5280 1806744.6740 739.53 21+37.23 277.51 LT BL103 BL-103 857811.3470 1806706.9240 745.37 19+55.17 576.32 LT ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET BY2 GPS2 Y4807F-2 859256.6620 1806819.6700 759.72 OUTSIDE PROJECT LIMITS BYGPS1 Y4807F-1 858709.3260 1805511.6750 762.73 16+78.99 48.24 LT 140 BY3-140 858377.6152 1805154.4645 757.56 11+97.83 17.38 LT 135 BY3-135 857943.6307 1804799.2065 751.84 OUTSIDE PROJECT LIMITS ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET BY3 139 BY4-139 857281.8377 1808563.7304 729.55 OUTSIDE PROJECT LIMITS 138 BY4-138 857298.1895 1808037.9112 726.59 26+32.55 22.34 RT 137 BY4-137 857358.0213 1807600.8180 702.86 21+93.00 13.02 LT BY123 BY2-123 857384.5280 1806744.6740 739.53 13+36.89 19.16 RT ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION Y3 STATION OFFSET BY4 **************************************** RR SPIKE IN BASE OF POWER POLE L STATION 26+06.00 111 RIGHT N 858256 E 1805739 BM1 ELEVATION = 748.09 **************************************** **************************************** RR SPIKE IN BASE OF 18IN GUM L STATION 24+15.00 2014 RIGHT N 857894 E 1807633 BM2 ELEVATION = 711.13 **************************************** **************************************** RR SPIKE IN BASE OF 15IN PINE TREE L STATION 30+98.00 3111 RIGHT N 859354 E 1808590 BM3 ELEVATION = 745.56 **************************************** **************************************** RR SPIKE IN BASE OF 12IN GUM TREE L STATION 27+41.00 5566 RIGHT N 859319 E 1811099 BM4 ELEVATION = 751.78 **************************************** **************************************** RR-SPIKE IN BASE OF POWER POLE S 53°13'50.07" W Dist 1361.76 L STATION 10+00.00 N 856123 E 1803764 BM5 ELEVATION = 735.35 **************************************** **************************************** RR-SPIKE IN BASE OF 36IN OAK TREE N 10°47'19.09" E Dist 2734.85 L STATION 10+00.00 N 859625 E 1805367 BM6 ELEVATION = 767.72 **************************************** **************************************** RR-SPIKE IN BASE OF POWER POLE S 09°30'39.84" E Dist 205.00 Y1 STATION 26+87.00 N 856489 E 1806732 BM7 ELEVATION = 724.11 **************************************** **************************************** RR-SPIKE IN BASE OF POWER POLE N 84°59'39.30" E Dist 2284.72 Y3 STATION 10+00.00 N 857490 E 1808721 BM8 ELEVATION = 733.79 **************************************** NOTES PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. PROJECT CONTROL DATA AT: THE FILES TO BE FOUND ARE AS FOLLOWS: CONTROL BY THE NCDOT LOCATION AND SURVEYS UNIT. INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT> SHEET NO.PROJECT REFERENCE NO. Location and Surveys 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ L o c a t i o n S u r v e y s \ S u r v e y C o n t r o l S h e e t s f r o m N C D O T \ p 5 2 0 4 _ l s _ 1 d _ 1 3 1 0 0 2 . d g n $ $ $ $ U S E R N A M E $ $ $ $ NOTE: DRAWING NOT TO SCALE P5204_LS_CONTROL_131002.txt P5204_LS_GPSCALIB_131002.HTML P5204_LS_WGS84_131002.txt P5204_LS_LOCAL_131002.txt P5204_LS_GPSCALIB_131002.pdf SELECTING 1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY HTTPS://CONNECT.NCDOT.GOV/RESOURCES/LOCATION/ 1D D C N DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "Y4807F-1" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 858709.3260(ft) EASTING: 1805511.6750(ft) ELEVATION: 762.73'(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999952493 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "Y4807F-1" TO -L- STATION 10+00.00 IS N 5°20'40" W 571.23' ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 >INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL BY THE NCDOT LOCATION AND SURVEYS UNIT. PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. SEE GPS CALIBRATION SHEET FOR HORIZONTAL AND VERTICAL COORDINATE VALUES. NOTES: WILL ALLOW THE END USER TO WORK WITHIN THE SAME COORDINATE SYSTEM WHEN USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES. 2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING PROJECT CONTROL DATA AT: THE FILES TO BE FOUND ARE AS FOLLOWS: THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT. IF FURTHER INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. HTTPS://CONNECT.NCDOT.GOV/RESOURCES/LOCATION/ SHEET NO.PROJECT REFERENCE NO. 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ L o c a t i o n S u r v e y s \ S u r v e y C o n t r o l S h e e t s f r o m N C D O T \ p 5 2 0 4 _ l s _ 1 e _ 1 3 1 0 0 2 . d g n $ $ $ $ U S E R N A M E $ $ $ $ Location and Surveys NOTE: DRAWING NOT TO SCALE P-5204 SURVEY CONTROL SHEET 1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE p5204_ls_gpscalib_131002.PDF NAD 83 / NSRS2007 ADJUSTMENT. THIS CALIBRATION p5204_ls_gpscalib_131002.HTML p5204_ls_wgs84_131002.TXT p5204_ls_local_131002.TXT p5204_ls_control_131002.TXT D C N -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- -L- 39+48.68 39+00.00 38+00.00 37+00.00 36+00.00 35+00.00 34+00.00 33+00.00 32+00.00 31+00.00 30+00.00 29+00.00 28+00.00 27+00.00 26+00.00 25+00.00 24+00.00 23+00.00 22+00.00 21+00.00 20+00.00 19+00.00 18+00.00 17+00.00 16+00.00 15+00.00 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 859,575.83 859,527.28 859,427.55 859,327.86 859,228.34 859,129.02 859,029.94 858,931.15 858,832.66 858,734.53 858,636.54 858,538.56 858,440.57 858,342.12 858,242.64 858,142.69 858,042.86 857,943.75 857,845.94 857,750.00 857,656.51 857,566.02 857,479.06 857,396.15 857,317.77 857,244.40 857,176.47 857,114.37 857,055.72 856,997.08 856,938.45 1,805,435.03 1,805,438.61 1,805,445.97 1,805,453.84 1,805,463.57 1,805,475.21 1,805,488.75 1,805,504.20 1,805,521.55 1,805,540.77 1,805,560.74 1,805,580.71 1,805,600.69 1,805,618.10 1,805,628.02 1,805,630.27 1,805,624.83 1,805,611.73 1,805,591.05 1,805,562.92 1,805,527.50 1,805,485.00 1,805,435.68 1,805,379.81 1,805,317.74 1,805,249.83 1,805,176.48 1,805,098.13 1,805,017.14 1,804,936.13 1,804,855.13 -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- -Y1- 39+48.68 39+00.00 38+00.00 37+00.00 36+00.00 35+00.00 34+00.00 33+00.00 32+00.00 31+00.00 30+00.00 29+00.00 28+00.00 27+00.00 26+00.00 25+00.00 24+00.00 23+00.00 22+00.00 21+00.00 20+00.00 19+00.00 18+00.00 17+00.00 16+00.00 15+00.00 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 26+87.43 26+00.00 25+00.00 24+00.00 23+00.00 22+00.00 21+00.00 20+00.00 19+00.00 18+00.00 17+00.00 16+00.00 15+00.00 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 856.691.37 856,777.83 856,876.71 856,974.93 857,069.01 857,156.22 857,234.15 857,300.63 857,353.83 857,392.26 857,414.87 857,426.52 857,437.89 857,449.25 857,460.62 857,477.02 857,509.17 857,554.44 1,806,698.25 1,806,685.21 1,806,670.30 1,806,651.85 1,806,618.31 1,806,569.62 1,806,507.14 1,806,432.59 1,806,348.05 1,806,255.86 1,806,158.57 1,806,059.25 1,805,959.90 1,805,860.55 1,805,761.19 1,805,662.64 1,805,568.07 1,805,478.94 -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- -Y2- POINT #CHAIN STATION NORTHING (Y)EASTING (X)POINT #CHAIN STATION NORTHING (Y)EASTING (X)POINT #CHAIN STATION NORTHING (Y)EASTING (X)POINT #CHAIN STATION NORTHING (Y)EASTING (X)POINT #CHAIN STATION NORTHING (Y)EASTING (X) 26+93.59 26+00.00 25+00.00 24+00.00 23+00.00 22+00.00 21+00.00 20+00.00 19+00.00 18+00.00 17+00.00 16+00.00 15+00.00 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 859,103.85 859,064.70 859,022.87 858,981.04 858,939.21 858,897.38 858,855.55 858,813.72 858,771.89 858,729.96 858,681.12 858,622.17 858,560.58 858,498.97 858,434.83 858,366.74 858,294.89 858,219.69 1,806,455.19 1,806,370.18 1,806,279.34 1,806,188.51 1,806,097.68 1,806,006.85 1,805,916.02 1,805,825.19 1,805,734.36 1,805,643.57 1,805,556.39 1,805,475.67 1,805,396.88 1,805,318.12 1,805,241.42 1,805,168.19 1,805,098.65 1,805,032.75 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 -Y4- -Y4- -Y4- -Y4- 12+75.05 12+00.00 11+00.00 10+00.00 856,997.30 856,925.23 856,826.15 856,730.93 1,804,936.43 1,804,956.57 1,804,949.59 1,804,919.03 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- -Y3- 27+14.68 27+00.00 26+00.00 25+00.00 24+00.00 23+00.00 22+00.00 21+00.00 20+00.00 19+00.00 18+00.00 17+00.00 16+00.00 15+00.00 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 857,317.58 857,318.11 857,321.68 857,325.82 857,332.00 857,338.18 857,344.53 857,351.74 857,358.96 857,366.45 857,374.04 857,381.64 857,388.18 857,394.06 857,399.94 857,405.82 857,398.00 857,358.27 857,290.87 1,808,120.79 1,808,106.12 1,808,006.18 1,807,906.28 1,807,806.47 1,807,706.66 1,807,606.86 1,807,507.12 1,807,407.38 1,807,307.66 1,807,207.95 1,807,108.24 1,807,008.46 1,806,908.63 1,806,808.80 1,806,708.98 1,806,609.73 1,806,518.46 1,806,445.22 90 89 88 87 94 93 92 91 -Y5- -Y5- -Y5- -Y5- 12+31.08 12+00.00 11+00.00 10+00.00 857,685.05 857,716.10 857,816.01 857,867.37 1,805,722.49 1,805,723.82 1,805,728.08 1,805,797.38 100 99 98 97 96 95 -Y6- -Y6- -Y6- -Y6- -Y6- -Y6- 14+44.74 14+00.00 13+00.00 12+00.00 11+00.00 10+00.00 859,367.97 859,323.23 859,223.23 859,113.45 859,117.38 859,108.73 1,811,133.68 1,811,133.57 1,811,133.33 1,811,162.96 1,811,260.70 1,811,360.33 D C N CENTERLINE COORDINATE LIST SHEET NO.PROJECT REFERENCE NO. 1-FP-5204 RAIL DIVISIONS STATE OF NORTH CAROLINA 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 1 F . d g n $ $ $ $ U S E R N A M E $ $ $ $ -D1- -D1- -D1- 103 102 101 857,468.22 857,386.83 857,287.58 1,805,704.17 1,805,694.37 1,805,706.53 11+82.21 11+00.00 10+00.00 107 106 105 104 -SR1- -SR1- -SR1- -SR1- 12+49.33 12+00.00 11+00.00 10+00.00 858,040.26 857,990.98 857,891.10 857,795.18 1,806,686.40 1,806,688.77 1,806,693.57 1,806,680.12 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 24' *12'12' SHLD 8' SHLD 8' PS 4' GUARDRAIL IS REQUIRED USE 11' SHOULDER WHERE* PS 4' CL-L- (McLEANSVILLE RD) ORIGINAL GROUND 12' 4 :1 ORIGINAL GROUND POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 1 VARIES 2:1 TO 4:1 .08 .02 .02 .08.02 .02 10.5" C1 D1E1 TT CLBRIDGE CL POINT GRADE 35' - 4" .06 .06 TYPICAL SECTION ON STRUCTURE * *NOTE: OFFSET CENTERLINE DUE TO WITH TANGENT STRUCTURE DESIGN ROADWAY ALIGNMENT IN HORIZONTAL CURVE -L- SR 2819 (McLEANSVILLE RD) TYPICAL SECTION NO. 2 15'15' CL-R1- (NS/NCRR) SIDING NS/NCRR MAIN TRACK NS/NCRR FUTURE TRACK NS/NCRR FUTURE TRACK NS/NCRR TYPICAL SECTION NO. 2A 0' TO 1.65' VARIES TYPICAL SECTION UNDER STRUCTURE LOOKING EAST -L- STA 23+74.48 TO 25+23.73 EXISTING -L- Sta. 25+23.73 (END BRIDGE) THRU Sta. 30+45.00 -L- Sta. 12+55.00 THRU Sta. 23+74.48 (BEGIN BRIDGE) 29' -8 Ž"27' -3 •" 3:1 DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2P-5204 PAVEMENT DESIGN D C N 2 9 - O C T - 2 0 13 17 : 4 0 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ LL VARIABLE POINT GRADE Detail Showing Method Of Wedging MIN. MIN. C SURVEY C EXISTING U D3 E2 D3D2D1 C2 C1 E2 MIN 3" 2.5" MIN D2 D1 2.5" 3" MIN. 1.5" 1.5" 1.5" U U MILL TO THIS LINE W PROP. GRADEMINIMUM RESURFACING Detail for Incidental Milling 13'-9 †" 100' -10 „" EARTH MATERIAL.T EXISTING PAVEMENT.U PAVEMENT SCHEDULE NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED PROP. 8" AGGREGATE BASE COURSEJ1 PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO THAN 5•" IN DEPTH. BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE2 PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, D3 GREATER THAN 4" IN DEPTH. TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2•" IN DEPTH OR D2 PROP. APPROX. 2•" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS. C1 VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAIL W THIS SHEET) D1 PROP. APPROX. 3•" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF 399 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH. C2 PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.E1 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 24' *12'12' SHLD 8' SHLD 8' GUARDRAIL IS REQUIRED USE 11' SHOULDER WHERE* PS 2' CL PS 2' -Y1- (BETHEL CHURCH RD) POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 3ORIGINAL GROUND ORIGINAL GROUND 12' 4 :1 VARIES 2:1 TO 4:1 9.5" .08 .02 .02 .08.02 .02 24' 12'12' SHLD 8' SHLD 8' PS 4' PS 4' CL-L- (McLEANSVILLE RD) ORIGINAL GROUND 12' 4 :1 ORIGINAL GROUND POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 1A VARIES 2:1 TO 4:1 .08 .02 .02 .08.02 .02 24' 12'12' SHLD 8' SHLD 8' PS 2' CL PS 2' -Y1- (BETHEL CHURCH RD) POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 3AORIGINAL GROUND ORIGINAL GROUND 12' 4 :1 VARIES 2:1 TO 4:1 9.5" .08 .02 .02 .08.02 .02 T T W D1E1 U T T T T C1 W E1 E1 U D2 D2 10.5" THIS LINE GRADE TO THIS LINE GRADE TO -L- Sta. 30+45.00 THRU Sta. 36+50.00 -L- Sta. 10+00.00 THRU Sta. 12+55.00 -Y1- Sta. 10+12.00 THRU 24+75.00 -Y1- Sta. 24+75.00 THRU 26+87.43 C1 C1 D1 E1 C1 C1 D2 E1 3:1 3:1 3:1 DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2AP-5204 PAVEMENT DESIGN D C N 2 9 - O C T - 2 0 13 17 : 4 0 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ T EARTH MATERIAL U EXIST. PAVEMENT C1 3" S9.5B D1 3•" I19.0B E1 4" B25.0B D2 2•" I19.0B W WEDGING (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 18' SHLD 4' SHLD 4' CL -Y3- (HINES ANDREW RD) 8' POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 5 9'9' VARIES 2:1 TO 4:1 4 :1 ORIGINAL GROUND ORIGINAL GROUND .08 .02 .02 .08 POINT GRADE 24' 12'12' SHLD 8' SHLD 8' CL 4 :1 8' THIS LINE GRADE TO TYPICAL SECTION NO. 4ORIGINAL GROUND VARIES 2:1 TO 4:1 ORIGINAL GROUND 9.5" -Y2- (FRIEDEN CHURCH RD) .08 .02 .02 .08 7" T T T T W C1 E1 E1 U D2 THIS LINE GRADE TO 18' SHLD 4' CL 8' TYPICAL SECTION NO. 5A 1.5" .08 C1 T T U -Y3- (HINES ANDREWS RD) 9'9' -Y2- Sta. 17+14.30 THRU Sta. 23+00.00 -Y2- Sta. 12+00.00 THRU Sta. 16+75.55 -Y3- Sta. 10+12.00 THRU Sta. 12+93.29 -Y3- Sta. 12+93.29 THRU Sta. 13+60.00 C1 ORIGINAL GROUND ORIGINAL GROUND EX EX POINT CROWN C1 D2 E1 SHLD EXIST 3:1 3:1 3:1 4 :1 EX VA RI ES 2: 1 TO 4: 1 ORIGINAL GROUND DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2BP-5204 PAVEMENT DESIGN D C N 2 9 - O C T - 2 0 13 17 : 4 0 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ T EARTH MATERIAL U EXIST. PAVEMENT C1 3" S9.5B D2 2•" I19.0B E1 4" B25.0B W WEDGING (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 10' SHLD 2' SHLD 2' CL -Y5- (OLD BETHEL CHURCH RD) 22' 11'11' SHLD 6' SHLD 6' CL -Y4- (BIRCH CREEK RD) 8' 4 :1 POINT GRADE POINT GRADE THIS LINE GRADE TO THIS LINE GRADE TO TYPICAL SECTION NO. 7 TYPICAL SECTION NO. 6 ORIGINAL GROUND VARIES 2:1 TO 4:1 ORIGINAL GROUND 8' 4 :1 ORIGINAL GROUND ORIGINAL GROUND VARIES 2:1 TO 4:1 9.5" .08 .02 .02 .08 .08 .02 .02 .08 22' 11'11' SHLD 6' SHLD 6' CL -Y4- (BIRCH CREEK RD) POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 6A 8' 4 :1 ORIGINAL GROUND VARIES 2:1 TO 4:1 9.5" .08 .02 .02 .08 ORIGINAL GROUND T T T T C1 W E1 E1 U D2 D2 THIS LINE GRADE TO C1 T T E1 -Y4- Sta. 11+40.00 THRU Sta. 12+62.63 -Y4- Sta. 10+80.00 THRU Sta. 11+40.00 -Y5- Sta. 10+53.04 THRU Sta. 12+01.07 C1 C1 D2 E1 7" 3:1 3:1 3:1 VARIES 20' - 50' VAR. 10' - 40' DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2CP-5204 PAVEMENT DESIGN 2 9 - O C T - 2 0 13 17 : 4 0 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ D C N T EARTH MATERIAL U EXIST. PAVEMENT D2 2•" I19.0B E1 4" B25.0B W WEDGING C1 3" S9.5B (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 18' SHLD 2' SHLD 2' CL -SR1- (SERVICE ROAD) 8' POINT GRADE THIS LINE GRADE TO THIS LINE GRADE TO TYPICAL SECTION NO. 9 9'9' ORIGINAL GROUND 4 :1 ORIGINAL GROUND .08 .02 .02 .08 7" T T C1 E1 4'2'6'6'2' 2: 1 M A X 6"6" 4:12:1 M A X ORIGINAL GROUND ORIGINAL GROUND POINT GRADE .02 11" CL 20' 10'10' SHLD 2' SHLD 2' CL -Y5- (OLD BETHEL CHURCH RD) 8' 4 :1 POINT GRADE THIS LINE GRADE TO TYPICAL SECTION NO. 7AORIGINAL GROUND VARIES 2:1 TO 4:1 ORIGINAL GROUND .08 .02 .02 .08 W T T U TYPICAL SECTION NO. 10 .02 -D1- DRIVEWAY -Y5- Sta. 10+00.00 THRU Sta. 10+53.04 -D1- Sta. 10+00.00 THRU Sta. 11+70.21 THIS LINE GRADE TO THIS LINE GRADE TO 3:1 E1 C1 7" THIS LINE GRADE TO 11' SHLD 2' CL POINT GRADE TYPICAL SECTION NO. 8ORIGINAL GROUND VARIES 2:1 TO 4:1 ORIGINAL GROUND .08 T U -Y6- Sta. 10+00.00 THRU Sta. 10+90.00 E1 C1 7" THIS LINE GRADE TO -Y6- (CARMON RD) EX ORIGINAL GROUND 3: 1 4:1 ORIGINAL GROUND 35' MIN. RADIUS FOR PROPOSED CUL-DE-SACS EX EX VARIES 22' - 70' VAR. 11' - 59' T T C1 J1 DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2DP-5204 PAVEMENT DESIGN 2 9 - O C T - 2 0 13 17 : 4 0 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ r d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ D C N 2:1 2:1 -SR1- Sta. 10+00.00 THRU Sta. 12+49.33 T EARTH MATERIAL U EXIST. PAVEMENT C1 3" S9.5B J1 8" ABC W WEDGING E1 4" B25.0B (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 PB 4 PG 174 PB 4 PG 174 M C L E A N S V I L L E R O A D ( S R 2 8 1 9 ) GAIL MOSELEY DB 6394 PG 550 DB 3804 PG 149 ROBERT STONE 2 4' B S T DB 65 PG 351 RAILROAD COMPANY NORTH CAROLINA DB 65 PG 351 RAILROAD COMPANY NORTH CAROLINA EXISTING PAVEMENT NEATLY SAWCUT SEE NOTE 3 EXISTING PAVEMENT NEATLY SAWCUT NORFOLK SOUTHERN/NCRR RR PARKING SOIL & GR 200.00' EXISTING RR R/W EXISTING RR R/W 25 11 10 12 PAVEMENT REMOVAL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS P-5204 0 PLANS 1020 20 40 GRAPHIC SCALE 2-E D C N 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 2 E . d g n $ $ $ $ U S E R N A M E $ $ $ $ REMOVED AS WELL. CULVERTS IN THE RAILROAD DITCHES SHALL BE GRADE EXISTING DITCHES TO DRAIN. ANY EXISTING GRADE AREA TO MATCH ADJACENT TOPOGRAPHY AND 6. CONTRACTOR SHALL REMOVE EXISTING ROADBED AND AREA. LOCATE ALL UNDERGROUND UTILITIES IN THE WORK 5. CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 TO DISTURBED AREA OUTSIDE THE RAILROAD BALLAST LINE. 4. CONTRACTOR SHALL SEED AND MULCH THE CONTRACTOR. CROSSBUCKS SHALL BE REMOVED BY THE RAILROAD THE RAILROAD CONTRACTOR. THE EXISTING RAILROAD ASPHALT OVER THE TIES WILL ALSO BE REMOVED BY BY THE RAILROAD CONTRACTOR. THE RAIL SEAL AND SOUTHERN RAILROAD BALLAST LINE WILL BE REMOVED 3. THE EXISTING PAVEMENT INSIDE THE NORFOLK BE REMOVED BY THE RAILROAD CONTRACTOR. POWER LINE/POLES TO SERVICE THE SIGNAL BOX WILL 2. THE RAILROAD SIGNALS, SIGNAL BOX, AND OVERHEAD MCLEANSVILLE ROAD. AT 919-715-0296 TO SCHEDULE THE CLOSURE OF 1. CONTACT THE NCDOT RAIL DIVISION PROJECT ENGINEER NOTES: REMOVED EX. SIGNS TO BE CONTRACTOR RAILROAD REMOVED BY SIGNAL TO BE EX. RAILROAD CONTRACTOR RAILROAD REMOVED BY SIGNAL TO BE EX. RAILROAD OBLITERATE OBLITERATE REMOVED EX. SIGNS TO BE REMOVED BY RAILROAD CONTRACTOR CONTRACTOR ONCE SIGNAL IS EX. WALL TO BE REMOVED BY CONTRACTOR BY RAILROAD TO BE REMOVED MILEPOST 8 TO BE REMOVED ADDRESS MARKER 10' 10' P4 P5 EIP EIP T T 24" C O N C GR SSWITCH S OI L & G R P A R KI N G 24" CONC 10' GR DR 22' BST T Tb H H b N S R R NSRR } B O X S IG N A L R R PE - M E T E R A T & T ( F O ) M C I ( F O ) M C I A T & T AT&T AT&T 4 " P N G S IG N A L R R S IG N A L R R S IG N A L R R W O O D S G R A S S W D L O A D I N G D O CK W E L L A T & T W O O D S 1 S F D N A D 8 3 N S R S 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 SEE NOTE 2 SEE NOTE 2 EXISTING PAVEMENT NEATLY SAWCUT REGRADE DITCH 18" CMP TO BE REMOVED REGRADE DITCH 18" CMP TO BE REMOVED EXISTING RR R/W EXISTING RR R/W 2 0 0 . 0 0 ' THOMAS BLACK DB 3290 PG 816 LOUISE BULLARD DB 2549 PG 897 PAVEMENT REMOVAL GRAVEL REMOVAL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS P-5204 0 PLANS 1020 20 40 GRAPHIC SCALE 2-F D C N 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 2 F . d g n $ $ $ $ U S E R N A M E $ $ $ $ REMOVED AS WELL. CULVERTS IN THE RAILROAD DITCHES SHALL BE GRADE EXISTING DITCHES TO DRAIN. ANY EXISTING GRADE AREA TO MATCH ADJACENT TOPOGRAPHY AND 5. CONTRACTOR SHALL REMOVE EXISTING ROADBED AND AREA. LOCATE ALL UNDERGROUND UTILITIES IN THE WORK 4. CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 TO DISTURBED AREA OUTSIDE THE RAILROAD BALLAST LINE. 3. CONTRACTOR SHALL SEED AND MULCH THE BE REMOVED BY THE RAILROAD CONTRACTOR. POWER LINE/POLES TO SERVICE THE SIGNAL BOX WILL THE RAILROAD SIGNALS, SIGNAL BOX, AND OVERHEAD WILL ALSO BE REMOVED BY THE RAILROAD CONTRACTOR. BY THE RAILROAD CONTRACTOR. THE TIMBER FLANGES SOUTHERN RAILROAD BALLAST LINE WILL BE REMOVED 2. THE EXISTING PAVEMENT INSIDE THE NORFOLK DRIVE. AT 919-715-0296 TO SCHEDULE THE CLOSURE OF 1. CONTACT THE NCDOT RAIL DIVISION PROJECT ENGINEER NOTES: CONTRACTOR RAILROAD REMOVED BY SIGNAL TO BE EX. RAILROAD OBLITERATE OBLITERATE CONTRACTOR RAILROAD REMOVED BY SIGNAL TO BE EX. RAILROAD EXISTING PAVEMENT NEATLY SAWCUT 10' 10' GUARDRAIL GUARDRAIL THOMAS BLACK DB 3290 PG 816 NORFOLK SOUTHERN RR 10' GR 18" CMP 18" CMP B S T 12 ' GR N A D 8 3 N S R S 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 SEE NOTE 2 EXISTING PAVEMENT NEATLY SAWCUT EXISTING PAVEMENT NEATLY SAWCUT REGRADE DITCH 15" RCP TO BE REMOVED CARMON ROAD (SR 2755 ) 25' PAVED RDWY NORFOLK SOUTHERN RR DB 4994 PG 1857 WALTER SHULER, JR. DAMON CARTER DB 5339 PG 2161 EXISTING RR R/W EXISTING RR R/W REGRADE DITCH 15" RCP TO BE REMOVED BY OTHERS REMOVED SIGN TO BE REMOVED SIGN TO BE W1-6 TO BE REMOVED REMOVED W1-6 TO BE PAVEMENT REMOVAL GRAVEL REMOVAL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS P-5204 0 PLANS 1020 20 40 GRAPHIC SCALE 2-G D C N 0 3 - J A N - 2 0 1 4 0 8 : 2 5 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 2 G . d g n $ $ $ $ U S E R N A M E $ $ $ $ WESTBOUND CARMON ROAD TRAFFIC. OF INTERSECTION AT CARMON & KNOX ROAD FOR 10. CONTRACTOR TO INSTALL "DEAD END" SIGN 40' WEST TO ALTERING ANY TRAFFIC PATTERN. 9. ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR DRAWINGS AND TRAFFIC CONTROL PLANS. THE ROAD ACCORDING TO THE ROADWAY STANDARD 8. PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE 7. PROVIDE PERMANENT SIGNING AS SHOWN. WELL. SIDE OF THE RR CROSSING NEED TO BE REMOVED AS MARKINGS ON CARMON ROAD ON THE NORTH AND SOUTH 6. THE RR CROSSING ADVANCE WARNING PAVEMENT REMOVED AS WELL. CULVERTS IN THE RAILROAD DITCHES SHALL BE GRADE EXISTING DITCHES TO DRAIN. ANY EXISTING GRADE AREA TO MATCH ADJACENT TOPOGRAPHY AND 5. CONTRACTOR SHALL REMOVE EXISTING ROADBED AND AREA. LOCATE ALL UNDERGROUND UTILITIES IN THE WORK 4. CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 TO DISTURBED AREA OUTSIDE THE RAILROAD BALLAST LINE. 3. CONTRACTOR SHALL SEED AND MULCH THE CONTRACTOR. THE SIGNAL BOX WILL BE REMOVED BY THE RAILROAD BOX, AND OVERHEAD POWER LINE/POLES TO SERVICE RAILROAD CONTRACTOR. THE RAILROAD SIGNALS, SIGNAL SEAL FLANGES WILL ALSO BE REMOVED BY THE BY THE RAILROAD CONTRACTOR. THE TIMBER AND RAIL SOUTHERN RAILROAD BALLAST LINE WILL BE REMOVED 2. THE EXISTING PAVEMENT INSIDE THE NORFOLK CARMON ROAD. AT 919-715-0296 TO SCHEDULE THE CLOSURE OF 1. CONTACT THE NCDOT RAIL DIVISION PROJECT ENGINEER NOTES: REMOVE BY RAILROAD CONTRACTOR EX. RAILROAD SIGNAL TO BE REMOVED CONTRACTOR RAILROAD TO BE REMOVED BY EX. RAILROAD SIGNAL REMOVED BY RAILROAD CONTRACTOR CONTRACTOR ONCE SIGNAL IS EX. GUARDRAIL TO BE REMOVED BY RAILROAD CONTRACTOR TO BE REMOVED BY EX. RAILROAD SIGNAL BOX REMOVE EXISTING PAVEMENT NEATLY SAWCUT 10' 10' 2 0 0 ' R A IL R OA D R O W GUARDRAIL OM4-3 (TYP.) REGRADE DITCH 12" RCP TO BE REMOVED R E V IS I O N S R / W R E V . U P D A T E D P R O P E R T Y I N F O R M A T I O N A R O U N D - Y6 - ( 1- 3 - 14 ) E XE XOBLITERATE OBLITERATE PT Sta. 12+64.97 P C S t a . 11 + 6 8 .3 4 P O T S t a . 10 + 0 0 .0 0 R = 65.00' T = 59.75' L = 96.63' PI Sta 12+28.09 D R=35' R=50' -Y6- -Y6- - Y6 - 10' 50' 20' E X R=10' R=10' R=5'R=25' Sta. 10+60.00 BEGIN CONSTRUCTION Sta. 13+83.64 BEGIN CONSTRUCTION Sta. 14+13.62 END CONSTRUCTION Sta. 11+75.15 END CONSTRUCTION 34 34.06 LT +83.78 90.00 LT +50.00 45.21 LT +97.65 55.00 LT +83.05 88.00 LT +95.00 97.00 LT +03.00 61.80 LT +12.00 EXISTING RR R/W T 15" RCP 15" RCPMTL HW 10 ' GR RR SIG RR SIG SWITCH 12 " RC P 18" C&G 18 " C & G 4 ' 3 S E L E C T b } P E-METER NSRR NSRR N S R R D U K E E N E R G Y A T & T A T & T AT&T AT&T A T & T A T & T L E G A C Y A T & T LEGACY AT&T AT&T LEGACY (FO) A T & T L E G A C Y (F O ) PASTURE FIELD OVERGROWN CULTIVATED -BL-120 55.85 LT -Y1- 11+97.94 BL STATION 66+29.00 230' LEFT RR SPIKE IN BASE OF 12" GUM N 859319 E 1811099 BM#4 ELEVATION = 751.78' DB 3242 PG 160 ANN DEAL DB 3242 PG 160 ANN DEAL N A D 8 3 N S R S 2 0 0 7 C C (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 -L- Sta. 11+38 RT 403 24 30 15" RCP -Y4- Sta. 12+17 RT 402 24 37 15" RCP -Y4- Sta. 12+29 CL 401 735.98737.7 95 110 18" RCP -L- Sta. 13+78 RT 405 20 15 15" RCP -L- Sta. 14+88 RT 406 24 52 15" RCP -L- Sta. 13+50 1 1LT410735.10737.85 -L- Sta. 16+66 CL 409 719.30722.05 161 50 24" RCP -L- Sta. 19+50 LT 413 758.42761.17 1 1 -Y1- Sta. 11+42 CL 419 730.60 725.60 172 -Y1- Sta. 11+34 RT 416 756.12758.88 1 1 -L- Sta. 28+50 LT 501 770.00 767.25 1 1 -Y2- Sta. 15+30 LT 506 20 24 15" RCP -L- Sta. 32+98 RT 507 756.80 756.33508 40 21 15" RCP -L- Sta. 33+20 RT 508 759.50 756.33 1 1 REMOVE EXISITNG DI -L- Sta. 33+29 RT 509 756.75 756.33508 13 40 15" RCP -L- Sta. 33+02 CL 508 510 756.33 755.50 82 -L- Sta. 34+75 RT 511 71 52 15" RCP -Y2- Sta. 19+70 RT 601 20 40 15" RCP -Y2- Sta. 20+27 RT 602 24 47 15" RCP -Y2- Sta. 20+27 LT 603 60 60 15" RCP -Y1- Sta. 15+50 LT 706 739.44 736.69 1 1 -Y3- Sta. 10+38 CL 702 729.12 728.53 90 -Y1- Sta. 25+05 LT 704 24 21 12" RCP -Y1- Sta. 25+88 LT 705 24 20 12" RCP -L- Sta. 13+50 LT 411 412 725.45 7 1 @ 15" -L- Sta. 13+50 LT 410 411 735.10 30 -L- Sta. 19+50 LT 414 415 729.72 13 1 @ 15" -L- Sta. 19+50 LT 413 414 758.42 61 -Y1- Sta. 11+34 RTRT 417 418 724.36 5 1 @ 15" -Y1- Sta. 11+34 RTRT 416 417 756.12 63 -L- Sta. 28+50 LT 502 503 756.00 11 1 @ 15" -L- Sta. 28+50 LT 501 502 767.25 35 1 @ 15"-Y2- Sta. 13+70 LT 504 505 752.26 15 M . H . F R A M E & C O V E R S T D . 8 4 0 . 5 4 -Y1- Sta. 15+50 CL 706 707 736.58736.69 36 -Y1- Sta. 15+50 RT 707 1 1739.33 736.58 -Y1- Sta. 16+00 RT 707 708 736.58 733.75 100 -Y1- Sta. 16+50 RT 708 1 1733.75735.00 -Y1- Sta. 17+00 RT 708 728.45733.75709 96 -Y1- Sta. 17+50 RT 709 732.10 728.45 1 -Y1- Sta. 17+50 RT 709 728.35728.45710 15 -L- Sta. 12+64 CL 404 733.92 60734.14 -Y1- Sta. 14+80 CL 701 716.20 715.20 145 4.5 SHEET TOTALS 8 1 82256962991723064.5 4 @ 15"1 @ 15"679 100721.00727.40703CL-Y1- Sta. 22+00 100 D C N J . B . S TD . 8 4 0 . 3 1 O R 8 4 0 . 3 2 G . D . I. F R A M E W I T H G RA T E S T D . 8 4 0 . 2 2 G . D . I . ( N . S . ) F R A M E W ITH G R A TE S TD . 8 4 0 . 2 4 G . D . I. ( N . S . ) F R A M E W ITH T W O G R A T E S S TD . 8 4 0 . 2 4 SIZE A B Q U A N T IT IE S F O R D R A IN A G E S TR U C T U R E S ENDWALLS STATION S TRU C T U R E N O . R . C . P . C . S . P . . 1 0 9 . 0 7 9 . 1 0 9 P E R E A C H ( 0 ' TH R U 5 . 0 ' ) 5 . 0 ' TH R U 1 0 . 0 ' 1 0 . 0 ' A N D A B O V E * TO TA L L. F . F O R P A Y Q U A N T IT Y S H A LL B E C O L. ' A ' + ( 1 . 3 X C O L. ' B ' ) F R O M T O TYPE OF GRATE FE GC . B . S T D . 8 4 0 . 0 1 O R S TD . 8 4 0 . 0 2 ABBREVIATIONS 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 3 a . d g n $ $ $ $ U S E R N A M E $ $ $ $ LO C A T I O N ( LT , R T , O R C L) 4 / 0 4 / 0 6 REMARKS SHEET NO.PROJECT REFERENCE NO. 3-AP-5204 COMPUTED BY: CHECKED BY:DATE: DATE: 12"15"18"24"30"36"42"48"12"36"42"48" LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48" & UNDER) RAIL DIVISIONS STATE OF NORTH CAROLINA STANDARD 840.03 AND HOOD FRAME, GRATES CU. YDS. OR GAUGE THICKNESS *FT. LIN. 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 3 a . d g n $ $ $ $ U S E R N A M E $ $ $ $ SHEET NO.PROJECT REFERENCE NO. TO P E LE V A TIO N IN V E R T E LE V A T I O N IN V E R T E LE V A TIO N S LO P E C R IT IC A L OTHERWISE) NOTED (UNLESS STD. 838.80 OR STD. 838.11 STD. 838.01, C.B. N.D.I. D.I. J.B. M.H. CATCH BASIN NARROW DROP INLET DROP INLET JUNCTION BOX MANHOLE TRAFFIC BEARING DROP INLETT.B.D.I. T.B.J.B.TRAFFIC BEARING JUNCTION BOX G.D.I.GRATED DROP INLET G.D.I. (N.S.) (NARROW SLOT) GRATED DROP INLET 48"42"36"30"24"18"15" D R O P IN LE T C A T C H B A S IN S E C T IO N T R A N S IT IO N A L C O N C R E T E (RCP, CSP, CAAP, HDPE, or PVC) DRAINAGE PIPE C O R R . S T E E L E LB O W S N O . & S IZ E C O N C . C O LLA R S C L. " B " C . Y . S TD 8 4 0 . 7 2 C O N C . & B R IC K P IP E P LU G , C . Y . S TD . 8 4 0 . 7 1 P IP E R E M O V A L LIN . F T. D O N O T U S E R C P D O N O T U S E C S P D O N O T U S E C A A P D O N O T U S E H D P E C.S. PIPE 15"18"24" . 0 6 4 . 0 6 4 . 0 6 4 . 0 6 4 (CLASS III) R.C. PIPE 12"18"24"30"36"42"48"15" * * " R. C . P IP E ( C LA S S V ) * * " R . C . P IP E C U LV E R TS , C O N T R A C TO R D E S IG N P IP E * * " R . C . P IP E C U LV E R TS , C O N T R A C TO R D E S IG N P IP E 1 5 " S ID E D RA IN P I P E 1 8 " S ID E D RA IN P I P E (CLASS IV) R.C. PIPE SUB-REGIONAL NOTE: Invert Elevations are for Bid Purposes only and shall not be used for project construction stakeout. See "Standard Specifications For Roads and Structures, Section 300-5". G . D . I. F RA M E W ITH T W O G R A TE S S T D . 8 4 0 . 2 0 54 -SR1- Sta. 11+07 CL 801 739.78 738.00 54 15" CMP28 -Y6- Sta. 11+80 LT 901 18 12" RCP32 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 -L- -L- -L- -L- -L- -Y1- -Y1- -Y1- 13+00.00 15+21.00 19+06.00 25+10.00 25+38.00 10+61.00 10+60.00 12+56.00 23+57.50 18+67.85 23+91.00 29+08.50 29+56.00 17+00.00 12+29.00 17+05.00 LT RT RT LT RT LT RT RT 312.5 637.5 450 400 425 175 450 62.5 62.5 350 12.5 75 14+00.00 16+00.00 19+50.00 28+00.00 28+50.00 16+00.00 12+00.00 16+00.00 8'11' 11'8' 11'8' 11'8' 11'8' 11'8' 11'8' 11'8' 50' 50' 50' 50' 50' 50' 50' 12.5' 1' 1' 1' 1' 1' 1' 1'1' 1 1 1 1 1 2 1 1 1 1 1 -L- -L- -Y1- -Y1- -Y1- 25+25 23+40 28+50 10+19 11+35 11+59 13+29 15+50 16+50 325' 145' 391' 321' 7 4 1 7 4 1 7 4 1 13+50 990' 2,172' 2,172' GUARDRAIL SUMMARY "N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL. TOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT. FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL. W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL. LENGTH SHOP CURVED DOUBLE FACED WARRANT POINT APPROACH END TRAILING END DIST. FROM E.O.L. TOTAL SHOUL. WIDTH FLARE LENGTH APPROACH TRAILING APPROACH TRAILING END END END END W ANCHORS REMARKS "N" STRAIGHT SURVEY LINE BEG. STA.END STA.LOCATION XI MOD XI GRAU 350 M-350 TYPE III VI MOD BICCAT-1 1 2 / 0 6 / 0 7 AT-1 RAIL DIVISIONS STATE OF NORTH CAROLINA TYPE 350 ATTENUATOR IMPACT GUARDRAIL FACED SINGLE GUARDRAIL EXISTING REMOVE GUARDRAIL EXISTING STOCKPILE AND REMOVE EA G NG G = GATING IMPACT ATTENUATOR TYPE 350 NG = NON-GATING IMPACT ATTENUATOR TYPE 350 COMPUTED BY: CHECKED BY:DATE: DATE: SHEET NO.PROJECT REFERENCE NO. 3-BP-5204 2 9 - O C T - 2 0 13 17 : 4 0 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 3 B . d g n $ $ $ $ U S E R N A M E $ $ $ $ STATION SUMMARY OF EARTHWORK STATION EXCAV. UNCL. +% EMBANK. BORROW WASTE SAY: GRAND TOTALS: PROJECT TOTALS: STATIONSTATION SAY: LINE SURVEY 2 YD LT/ RT/ CL LOCATION STATIONSTATION LINE SURVEY 2 YD LT/ RT/ CL LOCATION EXISTING ASPHALT PAVEMENT SUMMARY OF BREAKING TOTAL: SAY: TOTAL: STATIONSTATION LINE SURVEY LENGTH SAY: TOTAL: SHOULDER BERM GUTTER SUMMARY SAY: SUBTOTAL: PROJECT TOTALS: LESS 7 GRAU-350 @ 50' EACH LESS 1 CAT-1 @ 12.5' EACH LESS 4 TYPE III ANCHORS @ 18.75' EACH PARCEL INDEX NO. PARCEL SHEET NO.PROPERTY OWNER NAME COMMUNITY FOUNDATION REAL ESTATE MANAGEMENT FUND INC EDWARD AND ETHEL ADAMS FAMILY TRUST ANDREW CLEMENT MELINDA COLEMAN NICKY THELEN JAMES GREER, JR. NORTH JEFFERSON, INC. JOHN LOWE GAIL MOSELEY ROBERT STONE NORTH CAROLINA RAILROAD COMPANY MCLEANSVILLE FIRE DEPARTMENT WILLIAMS FAMILY TIES INC. DEBORAH HINES PAUL BOONE JR. CHARLES TERRY MCLEANSVILLE SHOPPING CENTER CORP DEAN WILLIAMS ANNIE BROWN CLARA COBB REVOCABLE LIVING TRUST STEVEN COBB CLARA COBB REVOCABLE LIVING TRUST JERRY KING MARK WILSON THOMAS BLACK ROBERT BRADSHAAW 1 & 5 4 & 7 5 & 6 5 & 6 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 4 4 4 4 4 4 4 5 5 5 5 5 5 5 7 7 7 7 8A 8A -L- -Y1- -L- 10+00 -L- 23+50 -Y1- 10+50 -Y1- 26+50 -Y3- 10+50 -Y3- -Y1- 13+50 -Y4- 11+00 -Y4- -Y4- 12+50 -Y5- 10+00 -Y5- -Y5- 12+00 SUBTOTALS: #1 SUBTOTALS: #2 -L- 25+50 -L- -L- 36+50 -Y2- 12+00 -Y2- -Y2- 16+50 -Y2- 17+50 -Y2- 23+00 117,009 480 -109,190 370 67,632 1,038 1,185 1,185 5 853 848 64 163 41,664 916 -40,748 887 187 -700 315 510 195 184,949 -173,504 -41,253 7,709 7,339 3,736 42,866 1,613 7,709 227,579 5,677 -214,871 -L- -L- -Y1- 21+42 25+36 21+17 25+11 26+77 23+94 RT RT LT 652 231 1,122 2,005 2,010 -L-12+25 16+22 CL 980 -L-21+75 23+90 RT 362 -L-25+85 30+42 CL -Y1-11+63 11+87 CL 467 1,438 3,247 3,250 125 125 125 -66,224 1,062.5 3,912.5 3,475 3,500 D C N 29 30 31 32 7 7 4 6 SUSAN C COBB REVOCABLE LIVING TRUST RALPH AND SUSAN COBB TRUSTEES OF THEODORE ANDERSON WILLIE FOUST CHRISTOPHER WALSH ASPHALT PAVEMENT REMOVAL SUMMARY OF EXISTING 33 34 2-G WALTER SHULER, JR. 8A LOUISE BULLARD 8 & 8A 8 & 8A 8 & 8A 99 343 -SR1- -SR1- 10+00 -SR1- 12+40 3 -340 SUBTOTALS: #3 3 343 -340 -D1- 10+00 -D1- -D1- 11+50 -22223917 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 Slope Fill Slope FillSlope Ditch Front Slope Ditch Front Geotextile -L- STA 23+00MATCHLINE SEE SHEET 5 -Y1- STA 13+00 M ATCHLINE SEE SHEET 7 -L- McLeansville Rd. - Y1- Bethel Church Rd. PAVEMENT REMOVAL RR-SPIKE IN BASE OF POWER POLE S 46°58'34.8" W Dist 330.79 BY1 STATION 46+50.74 N 856123 E 1803764 BM5 ELEVATION = 735.35 2012 BUILD ADT 2035 BUILD ADT McLEANSVILLE RD McLEANSVILLE RD ROAD BIRCH CREEK 3900 5000 1300 1200100 7900 7800 1700 800900 TRAFFIC DIAGRAM McLEANSVILLE RD AT BIRCH CREEK RD 2012 BUILD ADT 2035 BUILD ADT McLEANSVILLE RD McLEANSVILLE RD 5000 6600 2400 2000400 7800 4400 33001100 TRAFFIC DIAGRAM McLEANSVILLE RD AT BETHEL CHURCH RD 10000 ROAD BETHEL CHURCH 2 2 . 5 ' 20.5' SEE SHEET 13 FOR -D1- PROFILE VIEW SEE SHEET 12 FOR -Y5- PROFILE VIEW SEE SHEET 12 FOR -Y4- PROFILE VIEW SEE SHEET 10 FOR -Y1- PROFILE VIEW NOTE: SEE SHEET 9 FOR -L- PROFILE VIEW T YP 16'TY P16' +60.00 20' BST MANAGEMENT FUND INC COMMUNITY FOUNDATION REAL ESTATE DB 7085 PG 1240 1 9 JOHN LOWE PG 147DB 4867 PG 174PB 4 30.00 RT +96.00 40.00 RT +96.00 40.00 RT +75.00 30.00 RT +75.00 DB 6394 PG 550 GAIL MOSELEY 10 183.94 RT +89.67 121.39 RT +83.42 PB 4 PG 174 5 PAVED SHOULDER 30.00 RT +50.81 36.00 RT +35.45 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4P-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 4 . d g n $ $ $ $ U S E R N A M E $ $ $ $ D C N PI Sta 21+31.42 D L = 1,488.91' T = 838.14' R = 1,300.00' PI Sta 11+67.46 D L = 224.21' T = 113.43' R = 600.00' 10 1 5 2 0 -L- - Y1- -L--Y1- PI Sta 11+77.40 D L = 169.27' T = 88.02' R = 250.00' 12'12' 11' 12' 12' 12'12' 11' -Y4- -Y4- POT Sta. 12+75.05 -L- Sta. 11+00.37 = -L- Sta. 18+86.93 = -Y1- POT Sta. 10+00.00 R=50' -L- POT Sta. 10+00.00 BEGIN PROJECT P-5204 0101 00 017015 E X E X 0 5 0 2 0 4 0 3 0 2 0 2 0 1 0 0 0 1 0 2 0 3 0 4 0 1 0 5 0 6 0203030201 00 01 02 03 04 05 0 16 + 9 6 .0 0 TYP 24' + 3 6 . 4 8 TYP 24'+16.38TYP27'2 7 '+22.00TYP21' + 0 4. 6 5 057 15:1 TAPER B E GIN T AP E R +94.00 BEGIN TAPER BEGIN TAPER GRAU 350 15:1 TAPER GRAU 350 15:1 TAPER BEGIN TAPER +60.00 +52.67 G R A U 350 GR A U 350 8' 4' 8' 8' 8'8'R=20' - Y4- Sta. 10+80.00 SE = 6% DS = 50MPH DS = 40MPH SE = 6% DS = 30MPH SE = 6% B E GIN C O NST R U CTIO N 50' SHLD TAPER PI Sta 11+14.27 D L = 44.65' T = 22.49' R = 150.00' -D1- PI Sta 10+67.04 D L = 78.98' T = 50.44' DS = 15 MPH SE = 6% R = 50.00' -Y5- Sta. 10+00.00 BEGIN CONSTRUCTION R=50' R=50' R=50' -Y5- OBLITERATE 01 003 017 01 0 2 0 0 0 1 0 2 02 01 00 01 N C N C -Y1- BEGIN CONSTRUCTION - Y4- P OT Sta. 10+00.00 - Y4- P C Sta. 10+89.38 -L- PC Sta. 12+93.28 -D1- POT Sta. 11+82.21 -D1- PT Sta. 11+36.43 -D1- PC Sta. 10+91.78 -D1- POT Sta. 10+00.00 - Y5- P OT Sta. 12+31.08 -Y5- PT Sta. 10+95.58 -Y5- PC Sta. 10+16.60 -Y1- PC Sta. 10+54.04 -Y1- PT Sta. 12+78.24+27.76 BEGIN SBG +59.42 BEGIN SBG -Y1- Sta. 12+42.46 = BEGIN CONSTRUCTION 10'10' 10'10' 4' 12' 12' 4' PT Sta. 12+58.65 30'2 5 '2 0 ' 1 0 ' 1 0 ' 1 0 ' 1 2 3 4 5 8 6 30.10 LT +00.00 46.00 LT +75.00 50.79 RT +92.57 56.00 RT +50.00 70.00 RT +00.00 98.00 RT +50.00 119.39 RT +58.00 128.69 LT +38.00 88.35 RT +69.93 97.61 RT +64.96 142.53 RT +35.78 195.05 RT +53.82 30.00 LT +80.00 73.00 LT +50.00 123.00 LT +00.00 127.95 LT +56.90 84.45 RT +90.00 100.00 RT +84.00 150.00 RT +10.00 152.00 RT +45.00 180.00 RT +28.00 155.36 RT +42.00 7 9 78.00 LT +50.00 46.00 LT +50.00 132.64 LT +94.56 189.47 LT +65.31 236.16 LT +41.38 286.70 LT +57.15 284.34 LT +71.87 201.02 LT +50.23 157.60 LT +97.70 126.84 LT +67.56 PL +24.50 PL +10.23 -Y1- PL +67.78 -Y1- 123.00 LT +00.00 PL +10.00 PL +58.66 29.26 LT +30.00 46.00 LT +76.12 56.12 LT +03.57 63.98 LT +02.38 65.48 LT +50.00 55.00 LT +13.83 57.37 LT +83.10 90.60 RT +21.75 75.66 RT +40.57 131.35 LT +23.83 150.87 LT +42.00 131.35 LT +23.83 38.23 RT +00.00 -L- 94.29 LT +57.34 -Y4- 104.47 LT +81.00 -Y4- 94.29 LT +57.34 -Y4- 30.00 LT +60.95 36.85 LT +62.11 38.52 LT +52.25 31 PL +65.00 -Y1- 179.00 LT +35.00 -Y1- 84.98 RT +28.74 167.32 RT +35.13 190.24 RT +75.23 190.39 RT +83.96 173.32 RT +84.24 739.99 738.77 741.03 739.39 741.89 742.94 743.87 744.80 74503 743.65 741.77 740.53 738.74 0401 0402 0403 0404 0405 0406 0409 1 8 " 15" 15"18" 1 8 " 18" 3: 1 3:1 D ( Not to Scale) STANDARD 'V' DITCH FROM -L- STA. 15+50 TO -L- STA. 16+28 (RT) Min. D= 1 Ft. DETAIL D Ground Natural Ground Natural 10 SY FF CLASS B RIP RAP EST 3 TONS 10 SY FF CLASS B RIP RAP EST 3 TONS HW EST 40 SY FF CLASS B RIP RAP EST 33 TONS EST 42 SY FF CLASS B RIP RAP EST 32 TONS FRO M -Y1- STA. 14+75 TO STA. 17+27 Type of Liner= CLASS B Rip-Rap ( Not to Scale) 3:13: 1 D B b LATERAL BASE DITCH 1"/Ft. FROM -L- STA. 13+50 TO -L- STA. 23+00 (LT) DETAIL E b= 5.0 Ft. B= 3.0 Ft. Min. D= 2.0 Ft. Ground Natural LATERAL 'V' DITCH ( Not to Scale) D 3: 1 3:1 b 1"/Ft. FROM -L- STA. 14+00 TO -L- STA. 15+50 (RT) b= 3.0 Ft. Min. D= 1.0 Ft. DETAIL C Ground NaturalFlatter3:1 or D 2: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -L- STA. 11+35.59 TO -L- STA. 13+64 (RT) DETAIL B Min. D= 1.0 Ft. Ground NaturalFlatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y4- STA. 10+80 TO -Y4- STA. 11+50 (RT) FROM -Y4- STA. 10+80 TO -Y4- STA. 12+00 (LT) FROM -L- STA. 12+00 TO -L- STA. 13+00 (LT) DETAIL A Min. D= 1.0 Ft. Ground Natural SEE DETAIL A SPECIAL CUT DITCH SEE DETAIL A SPECIAL CUT DITCH SEE DETAIL E 3.0' LATERAL BASE DITCH SEE DETAIL E 3.0' LATERAL BASE DITCH 3:13: 1 D ( Not to Scale) STANDARD BASE TAIL DITCH B d -L- STA. 16+40 DETAIL F B= 4.0 Ft. Max. d= 2.0 Ft. Min. D= 6.0 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= CLASS B Rip-Rap SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL C LATERAL 'V' DITCH SEE DETAIL D STANDARD 'V' DITCH SEE DETAIL F BASE TAIL DITCH 0412 0411 EST 10 SY FF CLASS B RIP RAP EST 4 TONS 2GI ELB RETAIN REMOVE REMOVE REMOVE REMOVE REMOVE R E M O V E R EM O V E R E T A I N 0410 SAG 12+93.94 CREST STA 10+68.65 C R E S T S T A 1 0 + 7 6.0 5 4 2 " - IV (SEE X-SECTIONS) GRADE TO DRAIN EST 47 SY FF CLASS B RIP RAP EST 42 TONS N o D e c k D ra in s R e q u ire d S h o u ld e r = 4 .0 ' S p re a d = 2 .0 ' S x = 0 .0 6 0 ft/ft S = 0 .0 1 4 1 ft/ft Q = 0 .2 2 c fs Q = C IA = 0 .9 (4 .0 )(0 .0 6 ) Are a = 0 .0 6 Ac S TA 2 3 + 5 7 L T S P R E AD C AL C U LATIO N T ELB 0413 0414 0415 EST 10 SY FF CLASS B RIP RAP EST 4 TONS 2GI SHOULDER BERM GUTTER SHOULDER BERM GUTTER ELB 0416 2GI 0417 0418 EST 7 SY FF CLASS B RIP RAP EST 2 TONS ELBOWPIPE 15" COR.SBG S B G REMOVE REMOVE R E M O V E 4 2 " - IV 18" - IV 0419 1 5 " ELBOW 15"PIPE 15"ELBOW 15" PIPE Se e d w ith n a tive g ra sse s a t in sta lla tio n . SEED POND AFTER DRAINING REMOVE POND DAM TO DRAIN (SEE X-SECTIONS) GRADE TO DRAIN DETAIL A DITCH SEE SPECIAL CUT SHOULDER BERM GUTTER 15" -100 year HW/D=0.69 (<1.5) -Min size diameter = 36" hydraulic design standards: within Norfolk Souther RR Railroad culvert is performing v DB 6820 PG 927 JAMES GREER, JR. EIP EIP EIP EIP EIP E XISTIN G R/ W E XISTI N G R/ W 6 0 .0 0 '17 8 .0 6' 133.72' M C L E A N S V IL L E R O A D (S R 2 8 19 ) 206.03' 39.24' 60.00' T 60" C O N C 3 6 " C M P HW HW 1 2 " R C P 10' G R 1 5 " R C P GR GR 36" VIN YL 6 W/LT 10 11 P ORC H -BY1-132 W P A V E RS B K 46 1 5 " R C P CONC WALK 15" RCP 9' SO IL & G R D R 41 43 40 PORCH CONCCONC WALK CONC STEPS WD S 12 ' S OIL & GR D R 4' WW W/ 2 S BW PO R C H 15" RCP 10 ' S OIL & GR DR LT GRASS 11' S OIL & GR DR 15" RCP 15" RCP DECKWD BK GAR 15" RCP 10' S OIL & G R D R 374' WW W/ 2 S BW WD S 32 33 34 CONC PAVED PARKING WALK CONC 12" TC 4' WW W/ 2 S BW PUMP HOUSE WELL S RR SIGNAL RR SIGNAL WOODS WOODS S S 18" RCP 2 4 " R C P15" RCP A R B O R F E N C E GRAPEVINES CONC HW MTL RET WALL/GUARD RAIL MTL RET WALL/GUARD RAIL 18 " RC P C O N C W A L K 12" RCP N 71°48'00" W 191.67' N 85°19'57" W 138.74' S 4 5 ° 2 2 ' 4 1" E 119 . 3 4 ' N 68°45'00" W 45.30' N 76°06'10" W 211.47'S 04°48'44" W 249.81' N 85°24'17" W 220.82'S 0 2 °4 0 '4 4 " W 4 2 1 .6 8 ' EIP EIP EIP RR IRON EXISTING RAILROAD R/W EXISTING RAILROAD R/W EXISTING R/W EXISTING R/W 6 0 . 0 0 ' EXISTING R/W EXISTING R/W 60.00' 2 0 0 . 0 0 ' EARTH DAM MELINDA COLEMAN DB 7085 PG 1236 DB 7197 PG 1245 ADAMS FAMILY TRUST EDWARD AND ETHEL GEORGE RAYNOR DB 4116 PG 1568 ANDREW CLEMENT DB 7325 PG 103 NICKY THELEN DB 5924 PG 2786 DB 5664 PG 208 PB 4 PG 174 DB 2397 PG 648 NORTH JEFFERSON, INC. 1S B K D 1 S B K D ( A B A N D) 1 S B L K D W O O DS C O N C S T E P S R O C K S S W ( A B A N D) 1 S F D NORFOLK SOUTHERN/NCRR RR T5 7 8 W /L T 4 5 4 4 42 39 35 36 38 n c b b b b b HH NSRR NSRR NSRR AT &T ( A AT U R)AT &T AT&T A T& T (FO ) M C I (FO) M CI 4" PN G 4" PNG bb 4" PNG 4" PNG 4" PNG 4" PNG AT&T (AATUR) (FO) MCI (FO) MCI (FO) MCI (FO) MCI AT&T AT&T AT&T A T & T A T & T A T &T A T &T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T P N G n OFF 26.97' RT -L- Sta. 12+08.08 OFF 77.68' RT -L- Sta. 22+37.65 -BL-102 OFF 77.68' RT -L- Sta. 22+37.65 -BY1-133 BIRCH CREEK ROAD (SR 2826) MCLEANSVILLE ROAD (SR 2819) (S R 2930) BET HEL C H U R C H R O A D 22.5' BST 20.5' BST 22' BST 2 4 ' B S T 2 S F D GRASS GRASS GRASS 1 1/2 S F D ROCK WALK 1 S BK D BK RET WALL GRASS GRASS WOODS SHED WOODS GRASS WOODS G MTL 1SFD WOODS OVERFLOW PIPE POND PASTURE 1 S F D GAR FALLOW AT&T GRASS PARKING SOIL & GR 1 S F D GAR ROCK WALL ROCK PLANTER CONC GRASS GRASS 26.23' WOODS 1SFBUS GRASS PARKING SOIL & GR G R D R 11' S OIL & WILLIE FOUST DB 3545 PG 882 N A D 8 3 N SRS 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 C C C C C F F C C F F F F F F C C C C F C C F F F F C F F F F F FC C C F C C C C C F C C C C Slope Ditch Front Outlet Pipe or Ditch Scour Hole (PSH) Square Preformed D PSRM MIN. 1' TUCK WITH NATURAL GROUND INSTALL LEVEL AND FLUSH WITH GEOTEXTILE LINER: CLASS B RIPRAP Slope Ditch Front Slope Ditch Front -L- S T A 2 3 + 0 0 MAT C H LIN E S E E S H E E T 4 -L- - Y 2- -Y2- STA 19+00 MATCHLINE SEE SHEET 6 PAVEMENT REMOVAL -L- McLeansville Rd. - Y 2- Freid e n C h urc h R d. PI Sta 21+31.42 D L = 1,488.91' T = 838.14' R = 1,300.00' -L- SE = 6% DS = 50MPH END BRIDGE END APPROACH SLAB BEGIN BRIDGE BEGIN APPROACH SLAB 3 5 ' 4 " SKETCH SHOWING THE RELATIONSHIP OF THE BRIDGE TO THE PAVEMENT 12 ' 12 ' 12 ' 12 ' TYPE-III TYPE-III TYPE-III TYPE-III 12 ' 12 ' -L- 2 5 + 0 0 2012 BUILD ADT 2035 BUILD ADT McLEANSVILLE RD ROAD FRIEDEN CHURCH McLEANSVILLE RD ROAD FRIEDEN CHURCH 6600 4700 1700 1400 200 3001000 1400 2000 7100 3100 10000 500 4002500 1300 TRAFFIC DIAGRAM McLEANSVILLE RD AT FRIEDEN CHURCH RD 2 2 ' -L- McLeansville Rd. 18'( 4 ' M I N .) V A R . ( 4 ' M I N .) V A R . TRACK FUTURE TRACK FUTURE-L- Sta. 23+57.01+/- -L- Sta. 23+74.48+/--L- Sta. 25+23.73+/- -L- Sta. 25+37.93+/- END BRIDGE -L- Sta. 25+23.73+/- END APPROACH SLAB -L- Sta. 25+37.93+/- BEGIN BRIDGE -L- Sta. 23+74.48+/- BEGIN APPROACH SLAB -L- Sta. 23+57.01+/- MAIN SIDING PAVED SHOULDER CLOSURE DETAILS SEE SHEET 2-E FOR CROSSING SEE SHEET 11 FOR -Y2- PROFILE VIEW NOTE: SEE SHEET 9 FOR -L- PROFILE VIEW HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 5P-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 5 . d g n $ $ $ $ U S E R N A M E $ $ $ $ D C N PI Sta 34+42.71 D L = 662.61' T = 331.75' R = 5,200.00' 2 5 3 0 PC Sta. 31+10.96 3 5 -L--Y2- PI Sta 12+24.08 D L = 378.47' T = 189.86' R = 1,900.00' PI Sta 17+20.93 D L = 185.49' T = 93.16' R = 800.00' 15 12' 12' 12' 12' 12' 12' 1 2' 1 2'1 2' 12'12'1 2' + 7 8 .6 0 + 3 5 .4 0 +0.00 -Y2- Sta. 16+95.02 -L- Sta. 30+42.72 = 2 5 0' U NI F O R M T A P E R 300' UNIFORM TAPER TAPER UNIFORM 300 ' -L- Sta. 36+50.00 0 6 0 5 0 4 0 3 0 2 0 1 0 0 0 1 0 2 0 2 0 3 0 1 0 0 0 1 0 2 0 3 0 3 0 2 E X 0 10 00 10 2 EX 0003 04 01 02 03 04 04 03 02 01 00 01 02 03 027 02 01 00 01 02 02 029 027 01 00 01 02 TYP 24' + 2 0 .0 0 TYP 24' + 3 8 .9 9 + 0 6 .0 0 TYP 24' +21.00 T Y P 2 1' T Y P 2 1' +13.49 T Y P 2 1'+70.55 T Y P 2 1' +19.41 - Y 2- 10:1 TAPER 15 :1 TAPER 15 :1 TAPER 15: 1 TAP ER +77.50 END TAPER END TAPER +72.66 +55.08 BEGIN TAPER GRAU 350 END PROJECT P-5204 12' 12' 4' 4' 4' BEGIN CONSTRUCTION -Y2- Sta. 12+00.00 12'12' OBLITERATE OBLITERATE DS = 50MPH DS = 40MPH SE = 4%SE = 3% DS = 40MPH SE = 6% R=50' R=50' R=50' R=50' 15:1 TAPER 15:1 TAPER END TAPER +55.61 END TAPER +14.64 CAT1 TYPE III TYPE III T Y P E III T Y P E III - L - P T S t a . 2 7 + 8 2 .19 -Y2- PC Sta. 16+27.77 -Y2- PT Sta. 14+12.69 -Y2- POT Sta. 10+00.00 -Y2- PC Sta. 10+34.22 TIE TO MAIN TRACK -L- Sta. 24+59.04+/- 8' 8' 4' -Y2- PT Sta. 18+13.26 10 11 12 13 14 15 16 17 16 19 97.32 LT +10.00 64.00 LT +17.00 68.21 RT +49.00 53.00 LT +40.00 49.70 LT +20.03 29.87 RT +50.12 43.00 RT +50.21 50.00 RT +41.00 49.62 RT +98.00 50.00 LT +89.00 46.00 LT +35.00 34.00 LT +00.00 25.37 LT +00.00 24.62 RT +29.00 60.76 LT +06.68 141.00 LT +75.00 118.00 LT +19.00 68.87 LT +32.07 76.47 LT 88.00 LT +36.50 72.28 LT 88.00 LT +63.50 54.00 LT +65.00 62.00 LT +52.00 40.00 RT +50.00 40.00 RT +56.00 SEAL EXISTING WELL NO ACCESS TO BE PROVIDED 134.44 RT +19.26 274.77 RT +35.76 285.90 RT +23.09 114.16 RT +53.45 149.84 RT +71.72 163.03 RT +78.10 92.15 RT +66.34 93.57 RT +05.92 65.58 LT +29.91 60.12 LT +25.13 68.87 LT +32.0763.31 LT +78.55 62.17 LT +45.04 51.60 LT +38.37 50.65 RT +60.80 66.00 LT +87.70 25.35 LT +78.83 48.13 LT +98.93 58.52 LT +96.24 55.98 LT +86.85 64.55 LT 74.98 LT +84.94 64.13 LT 75.51 LT +95.07 53.00 LT +95.00 70.59 LT +42.15 69.83 LT +52.00 59.87 LT +51.24 48.45 RT +46.11 65.83 RT +66.92 58.17 RT +73.43 47.80 RT +60.97 40.17 RT +22.41 97.11 LT +58.37 0504 0505 15" 15" 0506 0507 18" 0508 0509 15"15 " Flatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y2- STA. 18+00 TO -Y2- STA. 22+50 (LT) FROM -L- STA. 33+00 TO -L- STA. 34+00 (LT) DETAIL J Min. D= 1.0 Ft. Ground Natural EST 9 SY FF CLASS B RIP RAP EST 4 TONS 15" 0511 SEE DETAIL H SPECIAL CUT DITCH SEE DETAIL H SPECIAL CUT DITCH SEE DETAIL J SPECIAL CUT DITCH SEE DETAIL J SPECIAL CUT DITCH 0501 0502 0503 0510 EST 20 SY FF CLASS B RIP RAP EST 7 TONS 2GI ELB RETAIN R E T A I N RETAIN REMOVE REMOVE R E M O V E R E M O V E E S T 4 7 S Y F F C L A S S B RI P R A P E S T 4 2 T O N S SBG R EM O V E FLOWABLE MAT'L FILL WITH 15 " 15" PIPE ELBOW AA W PLAN VIEW SECTION A-A (4'min typ.) Permanent Soil Reinforcement matting (PSRM) Seed with native grasses at installation. PREFORMED SCOUR HOLE STA. 28+50 -L- LT *NOT TO SCALE B FI L L S L O P E 2:1 2: 1 PIPE (d = 15") INFLOW 3/08 W= 4.0' D= 1.0' B= 3.0' not shown for clarity) (Rip Rap in basin GROUND NATURAL EST 8 SY FF CLASS B RIP RAP EST 3.5 TONS SCOUR HOLE 6:1 D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -L- STA. 33+50 TO -L- STA. 36+00 (LT) DETAIL K Min. D= 1.0 Ft. Ground NaturalCOLLAR PIPE Flatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y2- STA. 12+50 TO -Y2- STA. 15+50 (LT) DETAIL H Min. D= 1.0 Ft. Ground Natural DI SEE DETAIL K SPECIAL CUT DITCH v v v v v v v PB 4 PG 174 PB 4 PG 174 ROBERT STONE DB 3804 PG 149 GAIL MOSELEY DB 6394 PG 550 E IP E IP E IP 15 0 .18' 200.00' 15 6 .7 4' E XI S TI N G R R R/ W E XIS TI N G R R R/ W 17 8 .9 1' 6 0 .0 0 ' BM#1 ELEVATION = 748.09' N 858256 E 1805739 RR SPIKE IN BASE OF POWER POLE TT 6 0 " C O N C S 24" CONC G R S S WI T C H S 2 9 MI L E M A R K E R # 8 S Y4807F-1 -BY3-140 1.5 ' CONC C & G 15" RCP 65 W B L K W W D S S O I L & G R D R 58 15" RCP 57 15" RCP 15" R C P PAVED DR PAVE D PARKING 5' P A VE D W AL K M ULC H PL A NTER M ULC H PL A NTER M ULC H PL A NTER M ULC H PL A NTER 4' CONC WALK PAVED DR 4' CONC WALK 6' CHL 11' SOIL & GR DR 15' SOIL & GR DR 12" C MP GRASS 12' SOIL & GR DR 12' SOIL & GR DR (C O M M U NIT Y CE NTER) 1 S B K BL D G WOODS CONC C O N C GRASS GR ASS G R A VEL P A R KIN G 8" P V C C O N C C O N C G E N E R A T O R C O N C W/ 4' C O N C W A L KC O N C S H E D P A V E D P A R KI N G W/ A/ G F U E L T A N K C O N C P A D G U A R D P O S T M T L 10 8 6' C H L W/ 3 S B W U/ G S OI L C O N T A MI N A TI O N S A M P L E W E L L S F O R U/ G S OI L C O N T A MI N A TI O N S A M P L E W E L L S F O R U/ G H E A TI N G OI L T A N K S P O U T M T L S W 3' W D WD FIREHOSE RACK 10 6 W/ L T 10 7 L T P O L E A B A N D 101W/ L T 71 G R A S S WOODS PASTURE 4' 4 S B W 7 0 W GRASS 1 5 " R C P 11' SOIL & GR DR 6 8 W/ L T M T L L T P A V E D D R PAVED DR 6 7 FO BOX BLDG PERMIT BOX P V C S 5 6 5 5 F A L L O W 69 1 5 " R C P DECK WD CONC PAVED DR CONC WALK PAVED PARKING C O N C GRASS SOIL & GR PARKING 51 50 15" RCP 10" T C 15 " R C P 15" RCP DI BL STATION 18+71.76 74.17' LEFT W 18 " R C P S H E D P R 5 P R 15 P R 17 T N7 T N 6 N 23°33'16" W61.85' JOHN CLAPP JR. GUILFORD COUNTY BOARD OF EDUCATION DB 1521 PG 285 DB 4503 PG 1972 DB 5096 PG 1862 DB 1187 PG 586 COMMUNITY BUILDING MCLEANSVILLE N 44°31'46" E 100.00' PAUL BOONE JR. DB 7328 PG 123 DB 3229 PG 671 DB 7377 PG 691 DB 4526 PG 1990 CHARLES TERRY DEBORAH HINES DB 7130 PG 1585 S 5 5 ° 5 1' 1 8 " W 2 5 7. 5 8' S 71°45'08" W122.46' DEPARTMENT MCLEANSVILLE FIRE PAUL BOONE JR. DB 7328 PG 123 DB 2646 PG 456 MCLEANSVILLE SHOPPING CENTER CORP N 8 7 °4 6 '5 4 " W 3 0 7 .2 3 ' N 50°38'14" W192.99' N 50°38'14" W190.89' N 25°46'27" W 232.66' S 38°16'02" E128.35' S 45°00'59" E240.21' S 45°22'41" E226.33' N 4 8°5 5'5 4" E 10 4.2 0' N 5 5 ° 3 3' 4 1" E 5 9. 8 9' S 4 9°4 8'3 0" W 9 0.6 4' S 5 4 ° 1 7' 5 0 " W 7 5. 2 2' N 5 1° 5 2' 4 3 " E 15 5. 3 9' S 45°10'50" E EIPEIP N 51°52'43" E4.43' EIP EIP EIP EIP E I P EI P EI P EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP MONCORRIDORNCRR MONCORRIDORNCRR RAILROAD COMPANY NORTH CAROLINA DB 65 PG 351 RAILROAD COMPANYNORTH CAROLINA DB 65 PG 351 7 5 . 0 0 ' 6 0 . 0 0 ' 50.00' E XIS TI N G R/ W E XIS TI N G R/ W DI DIDI L T L T E N D B U R R IE D L T B A R N 18 " C MP 1 S F D B O X WA T E R 2 4 " C O N C S IG R / R S IG R / R 10 ' G R D R 2 2 ' B S T C ON C C A N M T L TIES INC. WILLIAMS FAMILY N O R F O L K S O U T H E R N/ N C R R R R -BY1-101 -Y1- Sta. 11+97.83 -L- Sta. 24+76.26 -L- Sta. 30+81.11 TT 1 3 4 64 66 103 102 72 7 0 5 5 bb d c n a I a IHb I H b a a IH b a I aIc b | HH H H HH b T P E - ME T E R 4 " P N G 4 " P N G 4" PNG 4" PNG P N G D U K E E N E R G Y T WC T W C (FO) MCI (FO) MCI (FO) MCI A T & T A T & T AT&T AT&T AT&T A T & T AT&T A T & T A T & T A T & T A T & T AT&T 4" BLOW OFF RUNNING TO SMH ACROSS STREET CATV STRUCTURE WITH 4" PVC DRAIN NOTE: 2" BLOW OFF CONTAINED IN 8 " C O G 8" C O G A T & T ( A A T U R) A T & T A T & TA T & T A T & T A T & TA T & T 4" P N G 4" PNG 4" P N G PNG PNG PN G PNG PNG N S RR N S R R } B O X S IG N A L R R P E -M E T E R A T & T (FO) MCI (FO) MCI (F O ) M C I A T & T A T & T A T & T AT&T 4 " PNG S I G N A L R R S IG N A L R R S IG N A L R R PNG ( A A T U R) ( A A T U R) ( A A T U R) ( A AT UR) 8" (VC PER RECORD) COG 8" OUT (S) = 752.1' 8" IN (E) = 752.2' 8" IN (N) = 752.1' RIM ELEV. = 761.53' SAN. MANHOLE 4-2 8 " C O G ( V C P E R R E C O R D ) 8" (VC PER RECORD) COG 8" OUT (S) = 750.0' 8" IN (N) = 750.1' RIM ELEV. = 760.55' SAN. MANHOLE 4-4 8" (VC PER RECORD) 8" OUT (SW) = 749.0' 8" IN (SE) = 756.7' 8" IN (NE) = 749.2' RIM ELEV. = 762.40' SAN. MANHOLE 3-1 d 8" ( V C P E R R E C O R D) C O G 8" OUT (SW) = 746.4' 8" IN (NE) = 746.4' RIM ELEV. = 758.07' SAN. MANHOLE 3-2 MANHOLE INACCESIBLE SANITARY SEWER 8" (V C PE R RE C O R D) C O G 8" OUT (S W) = 744.6' 8" IN (NE) = 744.7'RI M ELEV. = 755.55' SAN. MANHOLE 3-3 OFF 17.38' LT OFF 76.94' RT OFF 33.54' LT MCLEANSVILLE ROAD (SR 2819) MCLEANSVILLE ROAD (SR 2819)24' BST F RIE D E N C H U R C H R D 18' BS T 22' BST 1 S B K B U S WOODS GRASS WAREHOUSE 1 S MTL WD LOADING DOCK 1 S BK BUS WELL MH 1 S BK BUS WELL AT&T WOODS PAVED PARKING PAVED DR AT&T AT&T MON CONC RIP RAP TREE LINE GRASSTREE LINE WOODS WD DECK GRASS PIPING FOUND NO ASSOCIATED GM 1 S BLK BUS BLK W CONC PARKING PAVED PARKING 1 S BK FIRESTATION 22' PAVED DR BL MARQUEE FLAG POLE 8" PVC GRASS GRASS 1SFD GRASS GRASS MTL S W/ LT AT&T GRASS 15" RCP PARKING PAVED GRASS CONC CONCCONC 1 S F D 1 S F D 1 1/2 S F D GAR DB 4826 PG 979 JOHN PAUL JONES WD POST 1 S BK SCHOOL TANK SPOUT AROUND U/G OIL MTL GUARD POST (S R 2746) FIRESTATION ENTRANCE. CASING PIPE UNDER 140' OF 24" STEEL CANOPY W/ WD SIGN NAD 8 3 N SRS 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 F F F F F F F F F C C F C C C C C F F C C C F C F C C C C C F F C C F F Slope Ditch Front -Y2- - Y 2 - S T A 1 9 + 0 0 M A T C H L I N E S E E S H E E T 5 NOTE: SEE SHEET 11 FOR -Y2- PROFILE VIEW PAVEMENT REMOVAL -Y2- Freiden Church Rd. 2 2 ' HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6P-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS D C N 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 6 . d g n $ $ $ $ U S E R N A M E $ $ $ $ -Y2- 2 0 2 5 12' 12' 12' + 7 5 .3 0 250' UNIFORM TAPER 0 2 0 3 0 4 0 2 0 3 E X TYP 21' + 3 7 .0 0 12' 12' END CONSTRUCTION -Y2- Sta. 23+00.00 - Y2 - P O T S t a . 2 6 + 9 3 .5 9 20'15' 19 29.38 LT +00.00 46.09 RT +00.00 54.00 RT +50.00 46.68 RT +00.00 45.83 LT +12.00 65.00 LT +12.00 70.00 LT +05.00 45.61 LT +05.00 15 65.47 LT 75.03 LT +41.34 65.17 LT 75.32 LT +53.93 29.94 LT 37.27 LT +36.25 32 54.00 RT +50.00 50.00 LT +00.00 4 8 .4 5 RT + 4 6 .11 5 8 .17 RT + 7 3 .4 3 4 7 .8 0 RT + 6 0 .9 7 56.77 LT +99.14 76.00 LT +00.00 50.31 LT +10.82 0602 0603 15" 15" Flatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y2- STA. 19+50 TO -Y2- STA. 22+50 (RT) FROM -Y2- STA. 18+00 TO -Y2- STA. 22+50 (LT) DETAIL L Min. D= 1 Ft. Ground Natural SEE D ETAIL J SPEC IAL C U T D ITC H SEE DETAIL L SPECIAL CUT DITCH SEE DETAIL L SPECIAL CUT DITCH REMOVE REMOVE RETAIN 15" 0601 SEE D ETAIL K SPEC IAL C U T D ITC H vv v v v v v v N 8 5 8 2 5 6 E 18 0 5 7 3 9 R R S P IK E IN B A S E O F P O WE R P O L E WD S BLK W WD S SOIL & GR DR 5 9 CONC CONC 54 WD SIGN SOIL & GR DR 10 0 W/ L T W/ LT 15" RCP GRASS 99 GRASS 98 12" RCP 10 'S OIL & GR DR WOODS FLOWER GARDEN FALLOW 53 15" CMP15" RCP SOIL & GR PARKING 52W 12' SOIL & GR DR 18 " R C P 18 " R C P B L S T A T IO N 18 + 7 1.7 6 7 4 .17 ' L E F T TN 8 DEBORAH HINES DB 7130 PG 1585 MCLEANSVILLE SHOPPING CENTER CORP DB 2646 PG 456 MC L E A N S V IL L E S H O P P IN G C E N T E R C O R P S 65°21'13" W 147.00' S 65°21'13" W 148.00' N 2 3 ° 3 6 ' 0 7 " W 2 6 5 . 3 8 ' CHRISTOPHER WALSH DB 6982 PG 1198 EIP EIP EIP N 2 4 ° 5 7 ' 5 9 " W 2 7 2 . 5 2 ' EXISTING R/W EXISTING R/W MCLEANSVILLE CORPORATION DB 1940 PG 681 TO GIBSONVILLE 1 S B K B U S LT LT LT LT M TL S S W/ LT PO W ER B O X G R A SS LT LT P O WE R B O X 54 99 98 bb } n n n n b |bb | b 4" PNG 4" PNG P N G P N G P N G P N G P N G PNG DUKE ENERGY DUKE ENERGY T WC T W C TWC AT&T AT&T A T & T AT&T AT&T AT&T AT&T AT&T AT&T 8 " O U T (S ) = 7 5 2 .1' 8 " IN (E ) = 7 5 2 .2 ' 8 " IN (N ) = 7 5 2 .1' R IM E L E V . = 7 6 1.5 3 ' S A N . MA NHO L E 4 - 2 (VC PER RECORD) 8" (VC PER RECORD) COG 8 " O U T (S ) = 7 5 0 .0 ' 8 " IN (N ) = 7 5 0 .1' R IM E L E V . = 7 6 0 .5 5 ' S A N . MA N H O L E 4 - 4 FRIEDEN CHURCH RD 22' BST PAVED PARKING PAVED PARKING 40' PAVED DR 1 S BK BUS 1 S BK BUS WOODS CULTIVATED WOODS GRASS GRASS (SR 2746) 8" OUT (SW) = 752.9' 8" IN (E) = 753.0' RIM ELEV. = 761.13' SAN. MANHOLE 4-3 UNDER DUMPSTER - INACCESIBLE SANITARY SEWER MANHOLE APPROXIMATE LOCATION OF N AD 8 3 N S RS 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 F C C C C C C F F Geotextile Slope Ditch Front Slope Ditch Front Slope Ditch Front Slope Fill TO BYPASS CONVEYANCE DRAWDOWN SYSTEM OUTLET CONCRETE MASONRY UNIT) WEIR AND ENDWALL (OR 8" 6" REINFORCED CONCRETE (SEE NOTE 8) 4" CONCRETE TROUGH SYSTEM OPTIONAL DRAWDOWN CONCRETE FOOTER 6" REINFORCED NATURAL GROUND CONCRETE MASONRY UNIT) WEIR AND ENDWALL (OR 8" 6" REINFORCED CONCRETE IN ON ALL SIDES (PSRM). MIN. 1ft KEY REINFORCED MAT PERMANENT SOIL TOP OF LEVEL SPREADER WEIR 4" END WALL Slope Ditch Front -Y 1- - Y 1 - S T A 1 3 + 0 0 M A T C H L I N E S E E S H E E T 4 SEE SHEET 11 FOR -Y3- PROFILE VIEW NOTE: SEE SHEET 10 FOR -Y1- PROFILE VIEW PAVEMENT REMOVAL - Y 1- B et hel C hur ch R d. -Y3- Hines Andrews Rd. 26' 18 ' 2012 BUILD ADT 2035 BUILD ADT ROAD BETHEL CHURCH ROAD BETHEL CHURCH 100* 2400 2400 100* 100* 2300 4400 100* 4400 100* 100* 4300 TRAFFIC DIAGRAM HINES ANDREWS RD AT BETHEL CHURCH RD ROAD HINES ANDREWS ESTIMATED USING ITE TRIP GENERATION MANUAL * TRAFFIC VOLUME NOT IN NCDOT FORECAST. DRAIN GRADE TO PAVED SHOULDER D C N 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 7 . d g n $ $ $ $ U S E R N A M E $ $ $ $ HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 7P-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS - Y 3 - S T A 1 5 + 5 0 S E E S H E E T 8 A M A T C H L I N E MATCHLINE SEE SHEET 8 PI Sta 21+40.90 D L = 784.32' T = 459.54' R = 600.00' 15 20 25 PI Sta 11+57.98 D L = 290.83' T = 157.98' R = 300.00' -Y1- -Y3- -Y 1- -Y3- 12'12' 9'9' 12' 12' -Y3- PC Sta. 10+00.00 -Y1- Sta. 20+15.96 E X 0 3 0 4 0 50 6 060504 03 046054 05 04 03 02 01 00 01 02 03 04 05 06 E X 0 6 0 5 0 4 0 3 0 2 0 1 0 0 0 1 0 2 0 2 0 1 0 0 0 1 + 7 0 .6 4 TYP 21' + 3 8 .5 7 TYP 21' +14.43 T Y P 2 1' +9.27TYP19' + 7 7 . 5 0 TYP 19' GRAU 350 GRAU 350 GRAU 350 5 :1 TAPER 15:1 TAPER +62.58 +52.69 END TAPER END TAPER -Y3- STA 12+93.29 OBLITERATE SE = 6% DS = 40MPH SE = 6% DS = 40MPH T A P E R S H L D 2 5' R=50' R=50' BEGIN RESURFACING END FULL DEPTH CONSTRUCTION -Y3- STA 13+80.00 END CONSTRUCTION R=50' -Y5- POT Sta. 12+31.08 -Y5- PT Sta. 10+95.58 -Y3- POT Sta. 13+97.27 -Y3- PT Sta. 12+90.83 -Y1- PT Sta. 24+65.68 -Y1- POT Sta. 26+87.43 END CONSTRUCTION 8' 8' 2'2'-Y1- PC Sta. 16+81.37 +28.64 BEGIN SBG THEODORE ANDERSON PB 73 PG 316 ANNIE BROWN DB 686 PG 203 200.00' E X IS T IN G R / W E X IS T IN G R / W B E T H E L C H U R C H R O A D ( S R 2 9 3 0 ) HINES ANDREWS ROAD (SR 2858) EIP 206.03' 220.04' 60.00' T T T S 1819 20 21 23 46 4 S B W 7 5 7 6 8 0 GRASS GRASS WOODS W D H W 12" C MPO VERFL O W PIPE 3SBW 3 S B W 3SBW C O N C W A L K CONC C O N C W A L K 11' SOIL & GR DR B K H W B K H W 1 2 " R C P 6 ' C H L C O N C W A L K W D D E C K DOG LOT 12 " R C P W D H W W D H W S 0 1° 0 2 ' 0 1" W 2 5 2 . 2 1' S 0 4 ° 2 2 ' 3 1" W 7 5 8 . 4 4 ' N 0 1° 5 9 ' 5 6 " E 9 8 . 14 ' 13 0 . 9 6 ' N 88°28'04" W 239.00' S 88°28'22" E 234.72' S 87°02'57" E 223.41' S 88°30'44" E 223.30'S 8 8 ° 3 0 ' 4 4 " E 3 . 9 5 ' S 8 7 ° 0 2 ' 5 7 " E 3 . 6 9 ' CLARA COBB REVOCABLE LIVING TRUST DB 5675 PG 1995 DB 3056 PG 944 STEVEN COBB S 88°32'46" E 472.90' E I P E I P E I P E I P DB 6862 PG 262 E I P S E ART H DAM DB 2397 PG 648 NORTH JEFFERSON, INC. REVOCABLE LIVING TRUST TRUSTEES OFSUSAN C COBB RALPH AND SUSAN COBB 1 S BK D (ABAND)1 S F D B S T T 21 7 5 7 6 7 7 b b b A T & T A T & T AT&T A T & T ( A A T U R ) A T & T ( A A T U R ) A T & T ( A A T U R ) A T & T ( S R 2 9 3 0 ) R O A D B E T H E L C H U R C H OFF -17.00 -Y1- Sta. 26+52.27 -BY2-136 OFF -19.16 -Y3- Sta. 10+60.38 -BY2-123 18' BST DB 7085 PG 1236 MELINDA COLEMAN ANNIE BROWN DB 686 PG 203 ANNIE BROWN DB 686 PG 203 DB 5675 PG 1995 REVOCABLE LIVING TRUST CLARA COBB GRASS GRASS POND PVC PIPE WOODS GRASS WOODS 1 S BK D GRASS LID TANK SEPTIC BLK W GAR BARN GRASS WOODS DB 7085 PG 1236 MELINDA COLEMAN 24' BST WILLIE FOUST DB 3545 PG 882 0701 0702 0703 24" 1 8" 1 8 " 1 8 " 0704 0705 SEE DETAIL N SLOPE PROTECTION ( Not to Scale) TOE PROTECTION d FROM -Y1- STA. 14+75 TO STA. 17+27 Fill Slope2:1 or Flatter Fill Sl o p e 2: 1 or Flatter DETAIL N d= 2.0 Ft. Type of Liner= CLASS B Rip-Rap EST 10 SY FF CLASS B RIP RAP EST 3 TONS Flatter4:1 or D 1 2: 1 ( Not to Scale) SPECIAL CUT DITCH -Y1- STA. 24+00 (LT) DETAIL R Min. D= 1.0 Ft. Ground Natural Flatter4:1 or D 4: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y1- STA. 24+50 TO -Y1- STA. 26+50 (LT) DETAIL S Min. D= 1.0 Ft. Ground Natural EST 40 SY FF CLASS B RIP RAP EST 30 TONS SEE DETAIL O SPECIAL CUT DITCH SEE DETAIL O SPECIAL CUT DITCH SEE DETAIL O SPECIAL CUT DITCH SEE DETAIL P LATERAL 'V' DITCH SEE DETAIL P LATERAL 'V' DITCH Flatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y1- STA. 18+50 TO -Y1- STA. 20+63 (RT) FROM -Y1- STA. 20+61 TO -Y1- STA. 21+00 (LT) DETAIL Q Min. D= 1.0 Ft. Ground Natural SEE DETAIL Q SPECIAL CUT DITCH SEE DETAIL R SPECIAL CUT DITCH SEE DETAIL S SPECIAL CUT DITCH R E M O V E R E M O V E 0706 0708 4 2 " - I V EST 130 SY FF CLASS B RIP RAP EST 125 TONS 2GI 2GI 2GI MH EST 75 SY FF CLASS B RIP RAP EST 72 TONS LEVEL SPREADER FOREBAY LATERAL 'V' DITCH ( Not to Scale) D 3: 1 3:1 b 1"/Ft. FROM -Y1- STA. 20+63 TO -Y1- STA. 22+00 (RT) FROM -Y1- STA. 21+26 TO -Y1- STA. 23+67 (LT) b= 5.0 Ft. Min. D= 2.0 Ft. DETAIL P Ground Natural SEE DETAIL M LEVEL SPREADER EST 36 SY FF CLASS B RIP RAP EST 25 TONS GRADE TO DRAIN 0709 0710 *NOT TO SCALE DETAIL M FROM STA. 17+70 TO STA. 19+00 -Y1- RT TB TB B U F F E R Z O N E 1 S TR E A M 20'30' A A B B 1.0' B U F F E R Z O N E 2 3' min 8" ( 1 3 ' M IN . ) L (3 ' M IN . ) B 2 FLOW (3' MIN.) 1.0' MIN. 1' MIN. 3' MIN. Z O N E 2 B U F F E R INSET 1.0' 8" 4" 18" (see note 3) 4:1* D ( 1' M IN . ) B1 (3' MIN.) (NOT SHOWN) RECOMMENDED OPTIONAL FOREBAY 17+50 -Y1- RT - - - - - - 130 - - - - - -- - - - - - 1.0 3.0 - - - - - - - - - - - - - 728.0 - - - - - - CONFIGURATION STRUCTURE AND INLET SEE PLANS FOR BYPASS GROUND NATURAL 6" REINFORCED CONCRETE FOOTER L D B1 B2LOCATION (APPROX.) WIER ELEV. DIMENSIONS FIELD CONDITIONS. DIMENSIONS SHOULD NOT VARY. NOTE: WEIR ELEVETIONS MAY BE ADJUSTED BASED ON ACTUAL 6" REINFORCED CONCRETE FOOTER TROUGH SECTION-BB SECTION-AA w/VEGETATED TROUGH LEVEL SPREADER PLAN 8) FOR THE FOOTING ITSELF THE REINFORCING SHALL BE 2 #5 BARS @ 12" CENTERS. THE LENGTH OF THE WALL SHALL BE BENT AND EXTENDED INTO THE WALLS BY 1'-4" TYPICAL. 7) AT THE CORNERS OF THE CONNECTING WALL STEMS, THE #4 @ 12" CENTER REBARS ALONG ALTERNATING PATTERN. 6) THE BENT REBAR AT THE ENDS OF THE #4 @ 18" BARS SHALL BE PLACED IN A STEM AND #4 BARS @18" CENTERS FOR THE HEIGHT OF THE WALL 5) THE REINFORCING SHALL BE #4 BARS @ 12" CENTERS ALONG THE LENGTH OF THE WALL BASED ON SITE CONDITIONS. 4) OPTIONAL DRAWDOWN SYSTEM TO BE DESIGNED AND DETAILED BY ENGINEER IN COASTAL PLAIN. A SLOPE OF 2:1 OR FLATTER IN PEIDMONT AND MOUNTAINS AND 3:1 OR FLATTER 3) TROUGH SHOULD TRANSISTION SMOOTHLY INTO EXISTING GROUND AND HAVE 2) LENGTH AND FLOW CAPACITY OF LEVEL SPREADER TO BE DETERMINED BY ENGINEER. VEGETATION COVER. 1) PORTIONS OF THE LEVEL SPREADER TROUGH CAN BE LINED WITH NATIVE OR APPROVED NOTES: 15 " 15"15" 15 " SBG SBG SBG 0707 Flatter4:1 or D 3: 1 ( Not to Scale) SPECIAL CUT DITCH FROM -Y3- STA. 10+48 TO -Y3- STA. 12+00 (RT) FROM -Y3- STA. 10+32 TO -Y3- STA. 12+00 (LT) FROM -Y1- STA. 19+00 TO -Y1- STA. 20+00 (LT) DETAIL O Min. D= 1.0 Ft. Ground Natural EST 72 SY FF EST 70 TONS CL B RIP RAP SEE DETAIL N SLOPE PROTECTION 20 4 20 20 21 22 23 30.39 LT +87.43 70.44 LT +78.57 35.00 LT +50.26 116.88 RT +84.49 116.67 RT +18.55 45.00 LT +95.00 85.58 RT +75.73 133.81 RT +16.91 80.00 LT +00.00 68.00 LT +60.00 -Y1- 79.09 RT +61.67 45.00 RT +05.00 50.00 RT +50.00 50.00 RT +50.00 56.00 LT +75.00 115.06 LT +84.00 100.53 RT +22.00 111.84 RT +07.47 98.65 RT +44.50 65.16 RT +96.86 79.56 RT +12.32 56.26 RT +20.02 171.07 RT +69.05 168.77 RT +43.00 66.87 RT +17.39 66.93 RT +85.09 4 PL +30.00 PL +71.48 105.00 RT +00.00 100.00 RT +10.00 PL+67.78-Y1- 45.00 RT +00.00 30.00 LT 48.80 LT +99.90 30.00 LT 48.80 LT +09.90 46.73 RT +35.78 34.13 RT 30.00 RT +05.00 29 3031 80.00 RT +60.00 29.61 RT +87.43 77.71 RT +75.73 71.72 RT +16.91 362.73 RT +97.95 355.12 RT +70.63 200.39 RT +64.61 92.09 LT +69.27 96.04 LT +43.12 98.05 LT +80.11 72.76 LT +04.18 101.29 LT +72.00 89.06 LT +80.86 88.33 RT +85.32 51.04 RT +08.18 68.47 LT 80.00 LT +75.00 81.00 RT +16.91 N A D 8 3 N S R S 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 F F F F F F C C C C F C F C F C C C C F F F F D C N 2 9 - O C T - 2 0 13 17 : 4 1 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 8 . d g n $ $ $ $ U S E R N A M E $ $ $ $ HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 8P-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS MATCHLINE SEE SHEET 7 NOTE:SEE SHEET 13 FOR -SR1- PROFILE VIEW P I S t a . 19 + 7 1. 6 2 PC Sta. 10+13.70 POT Sta. 10+00.00 PI Sta 10+30.25 L = 31.96' T = 16.55' R = 50.00' D -SR1- PT Sta. 10+45.66 2 0 ' 40' R=10' 9'9' R=15' R=30' Sta. 10+15.39 BEGIN CONSTRUCTION - S R 1 - POT Sta. 12+59.33 Sta. 12+49.33 END CONSTRUCTION R/R IRON EIP AXLE 20' UTILITY EASEMENT 158.73' 151.27' JOHN BOODY, JR. DB 6900 PG 796 PB 73 PG 316 HARRY BOODY DB 3118 PG 788 PB 73 PG 316 5 6 . 2 2 ' EIP EIP EIP EIP 219.99' 2 0 9 . 9 4 ' EIP EUGENE BROWN DB 2450 PG 34 J. E. BROWN DB 2064 PG 152 ANNIE BROWN DB 686 PG 203 ANNIE BROWN DB 4044 PG 311 EIP EIP EIP EIP ANGLE IRON EIP DB 4335 PG 881 SIDNEY HARRELL PB 4 PG 174 DB 3172 PG 216 CATHY JUSTICE PB 4 PG 174 DB 3172 PG 216 CATHY JUSTICE PB 4 PG 174 DB 3680 PG 1352 JERRY KING P B 4 P G 174 172.36'130.00' 4 8 5 . 7 7 ' 6 3 3 . 7 6 ' 5.09' EXISTING R/W EXISTING R/W 6 0 . 0 0 ' 2 3 1. 9 4 ' 18 3 . 0 6 ' 18 4 . 9 4 ' 4 2 0 . 9 5 ' 17 5 . 6 0 ' 16 5 . 6 3 ' 332.30' 2 0 4 . 7 8 ' EIP 17 0 . 0 9 ' T T T T 36" RCP 15 " R C P 15" CM P 15" RCP INV=741.31' INV=741.60' CUL1 CUL2 CE1HW1 CONC HW CONC HW APPROXIMATE U/G JUNCTION CULVERT #1 2'X2' CONC N/A N/A N/A FOR PIPE SIZE SEE TYPICAL SECTION 4 8 " W W CAN MTL 1SFD 10 ' G R 3SBW 3 S B W 12" RCP 1SFD 10 ' B S T S CAN MTL S S S S 1SBKD 3 6 " C O N C 8' C O N C 4 8 " C H L CONC G 1SBKD 4 S B W 8' SOIL 12' GR 3 6 " C O N C 1SBKD S G 4 8 " W D S H T R S 8 ' B S T 3 S B W 4 S B W 10 ' S O I L CARPORT 8 ' G R VINEYARD CANOPY MTL 13 14 15 16 W/LT 17 24 25 26 27 28 29 WOODS WOODS WOODS WOODS 30 PLANTER CONC DOG LOT WOOD DECK WOOD DECK ROCK WALK WALL BLK WALL BLK CONC N 0 3 ° 2 6 ' 4 7 " W 3 6 5 . 4 1' S 0 3 ° 2 2 ' 0 7 " E 3 6 6 . 11' S 0 3 ° 2 1' 3 8 " E 3 10 . 6 2 ' 1•SFD 1SFD 1SFD B B S S S S 48" WW T T T T 13 14 15 25 26 27 28 29 A T & T AT&T (AATUR) AT&T 20' BST -BL-104 -BL-105 JERRY KING DB 3680 PG 1352 MARK WILSON DB 6110 PG 1589 DB 3290 PG 816 THOMAS BLACK -BL-103 -SR1- 10+25.09 14.92 RT 3 0" REM O VE 0801 EST 35 SY FF CLASS B RIP RAP EST 30 TONS 24 25 26 25.00 LT +59.33 PL +59.33 25.00 RT +46.56 PL +23.17 PL +22.13 PL +19.00 PL +72.00 40.00 RT +86.00 N A D 8 3 N S R S 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 F F F F F F 24 25 26 28 HARRY BOODY JR. DB 5203 PG 1140 KIMBERLY FUQUAY DB 3699 PG 1758 DEAN WILLIAMS DB 6160 PG 715 FUQUAY KIMBERLY AND TOOD DB 7147 PG 1567 PB 73 PG 316 BONNIE WILLIAMS DB 2960 PG 373 PB 73 PG 316 BONNIE WILLIAMS DB 4241 PG 828 PB 73 PG 316 TERESA PINNIX DB 3118 PG 784 PB 73 PG 316 HARRY BOODY DB 3118 PG 788 PB 73 PG 316 JOHN BOODY, JR. DB 6900 PG 796 PB 73 PG 316 THEODORE ANDERSON PB 73 PG 316 ANNIE BROWN DB 4044 PG 311 ANNIE BROWN DB 686 PG 203 DB 3680 PG 1352 JERRY KING DB 6110 PG 1589 MARK WILSON THOMAS BLACK DB 3290 PG 816 DB 5714 PG 1354 ROBERT BRADSHAAW 27 - Y 3 - S T A 1 5 + 5 0 S E E S H E E T 7 M A T C H L I N E CLOSURE DETAILS NOTE: SEE SHEET 2-F FOR CROSSING LOUISE BULLARD DB 2549 PG 897 33 0 PLANS GRAPHIC SCALE HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 8AP-5204 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 100 20010050 D C N 2 9 - O C T - 2 0 13 17 : 4 1 O : \ T r a n s p o r t a t i o n \ R o a d w a y \ N C D O T \ M c l e a n s v i l l e \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p s h 0 7 a . d g n $ $ $ $ U S E R N A M E $ $ $ $ HINES ANDREWS ROAD (SR 2858) P I S t a . 16 + 6 1.4 7 P I S t a . 19 + 7 1.6 2 P I S t a . 2 2 + 16 .7 7 P I S t a . 2 5 + 2 1.8 0 P O T S t a . 2 7 + 14 .6 8 2 52 0 15 PC Sta. 10+13.70 POT Sta. 10+00.00 PT Sta. 10+45.66 2 0 ' 40' R=10' 9'9' R=15' R=30' Sta. 10+15.39 BEGIN CONSTRUCTION - S R 1- POT Sta. 12+59.33 Sta. 12+49.33 END CONSTRUCTION 25.00 LT +59.33 PL +59.33 25.00 RT +46.56 PL +23.17 PL +22.13 PL +19.00 PL +72.00 40.00 RT +86.00 R/R IRON EIP AXLE EIP 20' UTILITY EASEMENT 20' UTILITY EASEMENT 2 0 ' D R A I N A G E E A S E M E N T 158.73'151.27'149.97'95.35' 3 6 7 . 0 3 ' 5 6 . 2 2 ' EIP EIP EIP EIP EIP 219.99' 2 0 9 . 9 4 ' EIP 447.91' E IP 659.79' EIP ANGLE IRON 130.00' 6 3 3 . 7 6 ' 5.09' 2 3 1. 9 4 ' 16 5 . 6 3 ' 332.30' 2 0 4 . 7 8 ' 8 8 8 . 0 7 ' EXISTING RR R/W EXISTING RR R/W EXISTING RR R/W EIP T T 15 " R C P 15" CM P 15" RCP INV=741.31' INV=741.60' CUL1 CUL2 CE1 HW1 APPROXIMATE U/G JUNCTION CONC HW CULVERT #2 1.8'X2.7' CONC CONC HW APPROXIMATE U/G JUNCTION FOR PIPE SIZE SEE TYPICAL SECTION FOR PIPE SIZE SEE TYPICAL SECTION 36" C O N C 8 ' C O N C 4 8 " C H L CONC G 4 S B W 8' SOIL NORFOLK SOUTHERN RR NORFOLK SOUTHERN RR NORFOLK SOUTHERN RR 12' GR 3 6 " C O N C 1SBKD S G 48" WD 4 8 " W D 48" WD 4 8 " W D S B B HTR 10' GR 18" CMP 18" CMP BS T 12' GR H T R S 4 S B W 10 ' S O I L S 8 ' GR CANOPY MTL W/LT 17 1819 2223 24 25 26 27 29 WOODS WOODS WOODS WO O DS CULTIVATED WOODS WOOD DECK ROCK WALK WALL BLK WALL BLK CONC WELL - B Y 4 - 13 9 15" RCP CABLE GATE 15" RCP 81 74 DR GR 11' S O I L & G R D R WOODS 83 10 ' S OIL & GR D R 15" RCP 82 WOODS GRASS 5 S ELEC 5 S ELEC WOODS 84 85 86 87 88 15" RCP 10 ' S OIL & GR DR W HOUSE PUMP BLK GRASS GRASS GRASS GRASS GRASS PASTURE S 1 S F D DECK WD CONC WALK W 9 ' S O I L & G R D R 18 ' S O I L & G R D R 3 ' WD GRASS MTL GATE 5 S E L E C 5 S ELEC 5 S E L E C 5 S ELEC 5 S E L E C 90 91 92 93 W FLOWER BED CONC PARKING CONC WALK DECK WD 10 ' S OIL & GR DR GRASS GRASS PASTURE MTL GATE 3' WD 9' S OIL & GR DR 10 ' S OIL & GR DR GRASS GRASS WOODS FALLOW CONC SSS 6 ' C H L DOG LOT GRASS GRASS GRASS MTL GATE POND WOODS WOODS WOODS WOODS WOODS FALLOW S BK STEPS 89 WOODS WOODSWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS 94 95GAR 1 S F D C ON C WA L K & GR SOIL CONC PARKING W 96 W/ LT W/ LT 3' W D3' WD 3' W D 10' SOIL & GR D R GRAPEVINES GARDEN FENCE GAR MTL H T R HTR S WD STEPS 97 GRASS GRASS GRASS GRASS GRASS S OIL & GR DR 10' SO IL & G R D R CULTIVATED CULTIVATED CULTIVATED CULTIVATED 4 2 " R C P INV=695.52' INV=696.03' BM8 733.79 RR-SPIKE IN BASE OF POWER POLE 73 N 0 3 °0 6 ' 2 7 " E 2 6 4 . 0 0 ' S 0 3 °2 7 ' 18 " W N 0 3 ° 2 6 ' 4 7 " W 3 6 5 . 4 1' S 0 3 ° 2 2 ' 0 7 " E 3 6 6 . 11' S 0 3 ° 2 1' 3 8 " E 3 10 . 6 2 ' TN12 TN14 TN13 EXISTING R/W EXISTING R/W EIP EIP EIP EIP EIP EIP EIP EIP MAINTENANCE END STATE S 85°55'02" E 70.42' S 86°52'10" E 147.00' S 86°39'27" E 154.00' S 86°39'27" E 374.94' EIP EIP EIP EIP EIP S 86°41'11" E 674.20' N 0 3 °0 6 ' 2 7 " E 3 9 4 . 9 5 ' S 0 0 ° 0 2 ' 2 6 " E 3 9 5 . 3 7 ' S 0 0 ° 0 0 ' 5 1" E 2 6 4 . 5 2 ' N 85°24'50" W 727.50' N 86°54'22" W 704.72' S 0 7 °3 5 '16 " W 3 4 8 .3 5 ' N 07°35'16" E 30.29' N 02°36'23" E 30.00' N 78°32 '59" W S 0 7 °5 6 ' 0 0 " W 3 6 1.9 2 ' 20' UTILITY EASEMENT N 19°17'10" E 15.29' S 58°48'50" W 60.60' S 19 °2 6 '11" W 3 2 1.6 1' S 0 7 °2 9 '0 3 " W 3 5 4 .2 8 ' 1•SFD 1SFD PLANTER 1SFD B B S S S S CULTIVATED WOODS POND POOL 1 S F D 2 S F D 2 S BK D B 1 S F D T T 25 26 27 29 82 88 91 95 b A T & T AT&T AT&T AT&T b HINES ANDREWS ROAD (SR 2858) OFF -13.02 -Y3- Sta. 21+93.00 -BY4-137 -BL-104 -BL-105 -BL-106 -BL-107 -BL-108 -BL-109 -BL-110 BL STATION 24+54.00 92' RIGHT N 857894 E 1807633 BM#2 ELEVATION = 711.13' RR SPIKE IN BASE OF 18" GUM RR-SPIKE IN BASE OF POWER POLE N 37°04'50.49" E Dist 261.21 BY4 STATION 23+23.80 N 857490 E 1808721 BM8 ELEVATION = 733.79 -BL-112 -BL-113 -BL-111 -BL-103 -SR1- 10+25.09 14.92 RT N A D 8 3 N S R S 2 0 0 7 (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 310 F F F F F F DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 9P-5204 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p f l _ p s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 2210 24 720 730 740 750 760 770 720 730 740 750 760 770 -L- 780 790 800 810 770 780 790 720 730 740 750 760 770 770 720 730 740 750 760 770 770 780 790 800 11 12 13 14 15 16 17 18 19 20 21 23 25 26 27 28 29 30 31 32 33 34 35 36 37 FOR -L- PLAN VIEW NOTE: SEE SHEET 4 & 5 -L- PLAN VIEW NOTE: SEE SHEET 5 FOR RR-SPIKE IN BASE OF POWER POLE S 46°58'34.8" W Dist 330.79 BY1 STATION 46+50.74 N 856123 E 1803764 BM5 ELEVATION = 735.35 -L- STATION 26+06.27 111.42' RT RR-SPIKE IN BASE OF 36IN OAK TREE N 60°28'18.0" E Dist 95.93 BY1 STATION 5+00.00 N 859625 E 1805367 BM6 ELEVATION = 767.72 ELEV. = 742.20 -L- STA. 10+00 BEGIN GRADE 23 DITCH LEGEND LEFT DITCH 710 710 DITCH LEGEND LEFT DITCH RIGHT DITCH RR SPIKE IN BASE OF POWER POLE N 858256 E 1805739 BM#1 ELEVATION = 748.09' DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 739.11 = 6 = 100+ = 25 = 5.21 = 735.42 = 5.72 = 735.50 = 1.83 Structure No. 0404 Sta. 12+64 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 735.00 = 182 = 100+ = 25 = 56.7 = 725.48 = 90.3 = 727.18 = 31.47 Structure No. 0409 Sta. 16+68 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 761.11 = 18.7 = 100+ = 25 = 5.53 = 757.55 = 6.07 = 757.63 = 1.26 Structure No. 0510 Sta. 33+02 -L- ELEV. = 762.93 -L- STA. 36+50 END GRADE D C N PI = 14+45.00 EL = 732.57' VC = 780' K = 97 (+)5.9168% (-)2.1648% (+)5.9168% DS = 50 MPH P I = 12 + 6 3 .9 4 0 E l = 7 3 4 .14 P I = 13 + 5 0 .0 0 0 E l = 7 3 2 .5 5 PI =14+50.000 El = 727.00 B E G I N R T D I T C H P I = 11+ 3 5 .5 9 E l = 7 3 5 .7 8 P I = 11+ 5 0 .0 0 B E G I N L T D I T C H E l = 7 3 5 .2 7 P I = 13 + 0 0 .0 0 E N D L T D I T C H (+)3.13%El = 723.65 PI=16+00.00 E l = 7 3 5 .9 8 42" RCP-CLASS IV (-) 1.60% (-) 1.44% (- ) 5. 5 5% (-) 2.23% 18" RCP El = 723.30 El = 722.05 (-) 2.00% (-) 0.50% (+) 2.50% BEGIN LT DITCH PI=13+50.00 El = 725.30 PI =14+50.00 PI =17+00.00 END RT DITCH E N D L T D I T C H P I = 2 3 + 0 0 .0 0 E l = 7 3 7 .0 5 PI = 35+30.00 EL = 762.65' VC = 125' K = 103 PI = 32+25.00 EL = 758.24' VC = 480' K = 100 PI = 23+65.00 EL = 787.00' VC = 565' K = 61 ( - )3 .3452% ( - )3 .3452%(+)1.4490% RET. WALL STRUCTURE RET. WALL EXISTING RAILROAD TRACKS TRACKS RAILROAD FUTURE (+)0.2294% DS = 45 MPH DS = 50 MPH DS = 50 MPH (+) 2.0840% E l = 7 5 6 .8 7 P I = 3 3 + 0 0 .0 0 E N D L T D I T C H B E G I N L T D I T C H P I = 3 2 + 8 4 .2 6 E l = 7 5 5 .5 0 18" RCP DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 10P-5204 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p f l _ p s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 700 710 720 730 740 750 760 770 24 -Y1- -Y1- 740 750 760 770 780 740 750 760 700 710 720 730 FOR -Y1- PLAN VIEW NOTE: SEE SHEET 4 & 7 -Y1- PLAN VIEW NOTE: SEE SHEET 7 FOR ELEV. = 759.44 -Y1- STA. 10+12 BEGIN GRADE RR-SPIKE IN BASE OF POWER POLE S 13°25'11.89" E Dist 241.00 BY2 STATION 15+92.94 N 856489 E 1806732 BM7 ELEVATION = 724.11 ELEV. = 729.05 -Y1- STA. 26+87 END GRADE DITCH LEGEND LEFT DITCH DITCH LEGEND LEFT DITCH RIGHT DITCH DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 732.00 = 31.7 = 100+ = 25 = 10.09 = 728.98 = 11.06 = 729.08 = 5.26 Structure No. 0703 Sta. 22+00 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 732.00 = 207 = 100+ = 25 = 54 = 719.55 = 86 = 721.11 = 28.89 Str. No. 0701 Sta. 14+80 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 733.70 = 10.35 = 100+ = 25 = 2.89 = 731.48 = 3.18 = 731.53 = 1.31 Str. No. 0419 Sta. 11+42 D C N 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 700 710 720 730 PI = 23+40.00 EL = 736.01' VC = 150' K = 51 PI = 17+40.00 EL = 730.58' VC = 400' K = 68 PI = 11+20.00 EL = 761.60' VC = 205' K = 29 (+)2.0000%(-)5 . 0 0 3 0% (-)5 . 0 0 3 0% (+)0.9045% (+)0.9045% DS = 35 MPH DS = 40 MPH DS = 40 MPH 24" RCP P I = 2 1+ 0 0 .0 0 0 E l = 7 2 8 .2 5 P I = 2 2 + 0 0 .0 0 0 E l = 7 2 7 .4 0 P I = 2 1+ 0 0 .0 0 0 E l = 7 2 6 .6 0 E l = 7 2 1.0 9 P I = 2 2 + 0 0 .0 0 E N D R T D I T C H E l = 7 2 9 .3 3 P I = 2 3 + 5 0 .0 0 E N D L T D I T C H B E G I N L T D I T C H P I = 18 + 5 0 .0 0 E l = 7 3 0 .0 1 B E G I N R T D I T C H P I = 17 + 5 0 .0 0 E l = 7 2 8 .3 5 B E G I N L T D I T C H P I = 2 4 + 0 0 .0 0 E l = 7 3 0 .3 3 42" RCP-CLASS IV (-) 0.50% (-) 0.70% (-) 0.85% (+) 1.29% (- ) 5. 5 1% 18" RCP-CLASS IV 24 25 26 PI = 26+68.00 EL = 729.34' VC = 35' K = 69 (-)2.0322% (-)1.5259% DS = 40 MPH E l = 7 2 7 .17 P I = 2 6 + 5 0 .0 0 E N D L T D I T C H (-) 1.26% DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 11P-5204 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p f l _ p s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 760 750 740 730 720 710 700 -Y2- -Y3- 730 740 750 760 770 10 11 12 13 14 15 16 17 18 19 20 21 22 23 FOR -Y2- PLAN VIEW NOTE: SEE SHEET 5 & 6 ELEV. = 764.39 -Y2- STA. 16+75.55 END GRADE ELEV. = 764.13 -Y2- STA. 17+14.30 BEGIN GRADE ELEV. = 733.795 -Y3- STA. 10+12.00 BEGIN GRADE 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 690 -Y3- STA. 13+80.00 END RESURFACING RR SPIKE IN BASE OF 18" GUM BL STATION 24+54.00 92' RIGHT N 857894 E 1807633 BM#2 ELEVATION = 711.13' ELEV. = 757.56 -Y2- STA. 12+00 BEGIN GRADE ELEV. = 757.11 -Y2- STA. 23+00 END GRADE LEFT DITCH RIGHT DITCH DITCH LEGEND -Y3- PLAN VIEW NOTE: SEE SHEET 7 FOR LEFT DITCH RIGHT DITCH DITCH LEGEND DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 761.11 = 13.7 = 100+ = 25 = 2.29 = 753.15 = 2.73 = 753.08 = 0.84 Structure No. 0505 Sta. 13+74 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 732.83 = 14.7 = 100+ = 25 = 7.78 = 730.79 = 8.54 = 730.89 = 3.85 Structure No. 0702 Sta. 10+38 ELEV. = 741.00 -Y3- STA. 12+93.29 BEGIN 3" RESURFACING END GRADE D C N 730 740 750 760 770 PI = 13+80.00 EL = 756.20' VC = 275' K = 66 PI = 16+10.00 EL = 764.04' VC = 130' K = 45 PI = 18+40.00 EL = 760.49' VC = 160' K = 66 PI = 20+25.00 EL = 759.61' VC = 100' K = 173 PI = 21+45.00 EL = 758.35' VC = 50' K = 228 PI = 21+90.00 EL = 757.97' VC = 20' K = 398' (-)0.4747% (-)2 .9000% (+)0.5407% (+)3.4091% (-)0.7563% (-)1.0529%(-)0.8335%(-)0.7833% DS = 40 MPH DS = 40 MPH DS = 40 MPH DS = 60 MPH DS = 75 MPH DS = 80 MPH P I = 13 + 0 0 .0 0 0 E l = 7 5 3 .8 3 P I = 13 + 6 8 .0 9 0 E l = 7 5 2 .2 6 P I = 15 + 5 0 .0 0 0 E l = 7 5 6 .6 0 P I = 2 0 + 5 0 .0 0 0 E l = 7 5 5 .6 0 P I = 12 + 0 0 .0 0 E l = 7 5 7 .4 1 P I = 2 2 + 0 0 .0 0 0 E l = 7 5 4 .8 5 P I = 18 + 0 0 .0 0 E l = 7 5 8 .10 E l = 7 5 3 .4 2 P I = 2 3 + 0 0 .0 0 B E G I N L T D I T C H ( - ) 3 .59% (-) 2.30% (+) 2.39% B E G I N L T D I T C H (-) 1.00%(-) 0.50% (-) 1.43% E N D L T D I T C H P I = 2 2 + 0 0 .0 0 0 E l = 7 5 4 .3 5 E l = 7 5 3 .0 9 P I = 2 3 + 0 0 .0 0 E N D R T D I T C H B E G I N R T D I T C H P I = 19 + 5 0 .0 0 E l = 7 5 5 .6 0 (-) 1.26% (-) 0.50% 15" RCP EXISTING PI = 11+50.00 EL = 740.69' VC = 220' K = 46 DS = 40MPH (+)5.0000%(+)0.2129% 18" RCP B E G I N L T D I T C H E l = 7 2 9 .12 P I = 10 + 3 1.8 7 E l = 7 3 9 .2 3 P I = 12 + 5 0 .0 0 E N D L T D I T C H E l = 7 3 8 .18 P I = 12 + 5 0 .0 0 E N D R T D I T C H B E G I N R T D I T C H P I = 10 + 4 7 .8 6 E l = 7 2 8 .5 3 (+) 4.64% (+) 4.77% P I = 13 + 5 0 .0 0 E l = 7 3 8 .2 6 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 12P-5204 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p f l _ p s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ -Y4- -Y4- PLAN VIEW NOTE: SEE SHEET 4 FOR ELEV. = 739.90 -Y4- STA. 12+62.63 END GRADE ELEV. = 737.69 -Y5- STA. 10+00 BEGIN GRADE ELEV. = 738.00 -Y5- STA. 12+31.08 END GRADE -Y5- -Y5- PLAN VIEW NOTE: SEE SHEET 4 FOR ELEV. = 745.18 -Y4- STA. 10+80.00 BEGIN GRADE DITCH LEGEND LEFT DITCH RIGHT DITCH DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 739.11 = 5 = 100+ = 25 = 4.52 = 738.85 = 4.99 = 738.92 = 2.56 Structure No. 0401 Sta. 12+29 D C N 10 11 12 700 710 720 730 740 750 EL = 744.50' PI = 11+09.21 VC = 57' K = 86 (- )3 .0000% (-)2.3329% DS = 50 MPH 18" RCP B E G I N L T D I T C H E l = 7 4 3 .2 2 E l = 7 3 7 .7 0 P I = 12 + 0 0 .0 0 E N D L T D I T C H E l = 7 3 5 .9 8 P I = 12 + 5 0 .0 0 E N D R T D I T C H B E G I N R T D I T C H P I = 10 + 8 0 .0 0 E l = 7 4 3 .3 0 P I = 10 + 8 0 .0 0 (-) 4 .3 1% (-) 4 .6 0% PI = 10+50.00 (+)4.00%(-)0.9333% DS = 25 MPH K = 12 VC = 60' EL = 739.69' 11 12 700 710 720 730 740 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 2 8 / 9 9 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 13P-5204 2 9 - O C T - 2 0 13 17 : 4 1 R : \ R o a d w a y \ P r o j \ P 5 2 0 4 _ R d y _ p f l _ p s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ ELEV. = 726.83 -D1- STA. 10+00 BEGIN GRADE -D1- ELEV. = 755.83 -D1- STA. 11+70.21 END GRADE 750 760 770 D C N 10 11 12 760 770 -SR1- ELEV. = 746.75 -SR1- STA. 12+49.33 END GRADE ELEV. = 746.50 -SR1- STA. 10+15.39 BEGIN GRADE -D1- PLAN VIEW NOTE: SEE SHEET 4 FOR -SR1- PLAN VIEW NOTE: SEE SHEET 8 FOR 700 710 720 730 740 (+)2 5 .0 0 0 0% (+)15.0000% (+)4.0000% (+)2.0000% (+)2.2972% PI = 10+41.50 EL = 727.78' VC = 70' K = 3 PI = 11+49.00 EL = 754.66'EL = 755.41' PI = 11+54.00 EL = 755.61' PI = 11+59.00 10 11 12 700 710 720 730 740 750 PI = 10+40.00 EL = 746.74' PI = 11+50.00 EL = 741.78' (-)4 .5 0 8 3%(+)5.0000% VC = 165' (+)1.00% K = 17 K = 7 VC = 40' DS = 20 MPH DS = 20 MPH