Loading...
HomeMy WebLinkAbout20211834 Ver 1_May Site Inspection_20220606Wetland Inspection Report Project Num: 20211834 Project Name: TPB NCDOT - Sheek Street County: Davie Location: TPB NCDOT - Sheek Street Latitude: +350 53' 59" SW Plan Location: Site Owner Name: NC DOT Division 9 Inspection Date: 5/25/2022 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Version: 1 Status: Issued Project Type: Road intena c /repair/improveme Region: nston- ayem Longitude: -80' 32' 48" Title: Phone: Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 20211834 Owner: Tippett, Lyndo Inspection Date: 5/25/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ 0 ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I met with field rep for contractor. Staff were workine on utilities. Dewaterina was oneoiniz. Sediment loss was evident from previous night storm event. Directed clean -out of channel to remove sediment. Directed to protect stream bank with fabric at discharge point of dewateringPump to limit channelization. DOT reviewed site and reported that the Town needs to be contacted since DOT has not started with their work. Town was contacted --Brian Moore. He would ensure sediment was removed from channel and repairs were made. Follow-up at site once DOT begins with culvert installation. page 2