HomeMy WebLinkAbout20211834 Ver 1_May Site Inspection_20220606Wetland Inspection Report
Project Num: 20211834
Project Name: TPB NCDOT - Sheek Street
County: Davie
Location: TPB NCDOT - Sheek Street
Latitude: +350 53' 59"
SW Plan Location:
Site Owner Name: NC DOT Division 9
Inspection Date: 5/25/2022
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Version: 1 Status: Issued
Project Type: Road
intena c /repair/improveme
Region: nston- ayem
Longitude: -80' 32' 48"
Title: Phone:
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone: 336-776-9703
page 1
Site Number: 20211834 Owner: Tippett, Lyndo
Inspection Date: 5/25/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? ❑ ❑ 0 ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I met with field rep for contractor. Staff were workine on utilities. Dewaterina was oneoiniz. Sediment
loss was evident from previous night storm event. Directed clean -out of channel to remove sediment.
Directed to protect stream bank with fabric at discharge point of dewateringPump to limit
channelization. DOT reviewed site and reported that the Town needs to be contacted since DOT has
not started with their work. Town was contacted --Brian Moore. He would ensure sediment was
removed from channel and repairs were made. Follow-up at site once DOT begins with culvert
installation.
page 2