Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0043460_Application (FTSE)_20220518
NC berart se14. ef Environmental Quality Received MAY 18 2022 1_ Winston-Salem II Regiopal Office 204 West Clay Street Mebane, NC 27302 Phone: (919) 563-9041 Fax: (919) 304-3234 EarthCentric Engineering, Inc. To: NC DEQ — Fast -Track Sewer Application Date: 05/1.6/2022 Address: Winston-Salem Regional Office, Water quality Section 450 W. Hanes Mill Road Suite 300 Winston-Salem, NC 27105 Project: 20-48 — Hartley's Homes Phone: 336-776-9800 Documents Enclosed: Item Pages Copies Description 1 1 1 Submittal Fee, Check #11742, $480.00 2 1 2 Cover Letter and Flow Calcs 3 8 2 Fast -Track Sewer App, (1 original, 1 copy) 4 5 2 Flow Tracking Forms (2) 5 1 2 USGS Map 6 1 2 Street Level Map Instructions/Comments: See enclosed Fast -Track Sewer Application for the Hartley's Homes subdivision. Transmitted Via: FedEx From: Shawn C. Sidener Title: Office Manager 204 West Clay Street Mebane, NC 27302 Phone: (919) 563-9041 Fax: (919) 304-3234 Project: Hartley's Homes ECE Project # 20-48 Information provided by: Shawn C. Sidener, EarthCentric Engineering Inc. " Page 1 of 1 Cover Letter, wastewater flow calculations and project narrative for NCDEQ, Division of water quality Fast -Track Sewer System extension application. Project Narative: The Hartley's Homes project consists of a new 55-unit townhome development,I with no clubhouse or other amenity structure. The project is being built on three parcelk totaling 16.44 acres o e ite is located at 962 Burlington Avenue in Gibsonville and can be identified with ?. GP II :'' � a7-40731 8845-57-3974 & 8845-58-7124. This development will require a public n t tie into the Town of Gibsonville sewer system. This gravity sewer extension manholes and 1,032.05 if of 8" SDR-35 PVC and 1,141.30 if of 8" ductile 65 if of steel carrier pipe. The new sewer main will tie into a Town of ain at an existing manhole. room dwelling units llons/day/bedroom x 3 bedrooms each = 19,800 gallons/day Total astewater Flow = 19,800 gallons / day Items included with this package: (one original and one copy) - Cover letter - Application fee of $480.00 Fast -track Application Flow Tracking / Acceptance Form USGS Map Street level Map DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Gibsonville (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation 0 General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal Q Other 3. Signature authority's name: Ben Baxley per 15A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 129 West Main Street City: Gibsonville State: NC Zip: 27249- 5. Applicant's contact information: Phone number: (336) 449-4144 Email Address: bbaxley@gibsonville.net II. PROJECT INFORMATION: 1. Project name: Hartley's Homes 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Alamance 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.106679° Longitude: -79.522872° 5. Parcel ID (if applicable): 108809, 108808 & 108813 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Charles P. Koch License Number: 22634 Firm: EarthCentric Engineering Inc. Mailing address: 204 West Clay Street City: Mebane State: NC Zip: 27302- Phone number: (919) 563-9041 Email Address: Phil.Koch@EarthCentric.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: East Burlington WWTP Permit Number: NC 00-23-868 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): N/A — Cook Road Outfall 2. Downstream (Receiving) Sewer Information: 8 inch Z Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00349 Owner Name(s): Town of Gibsonville FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No N N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No N N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No N N/A 4. Origin of wastewater: (check all that apply): N Residential (Individually Owned) ❑ Residential (Leased) ❑ School / preschool / day care ['Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels D,Swimming Pool/Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes // NC) J > If ves, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(0) Daily Design Flow a.b No. of Units Flow Dwelling Units (3-bedroom townhomes) 360 gal/day (120 gpd/bedroom) 55 19,800 GPD gal/ GPD gal/ GPD gal GPD gal GPD gal GPD Total 19,800 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 19,800 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1,032.05 SDR-35 PVC 8 1,141.30 Ductile Iron > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: J 2. Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) > This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or ❑ Standby pump > Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: > Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f & (g)? 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) , 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains J 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(f) or (g), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ❑ No If yes, does the project comply with setbacks found in the river basin rules per I5A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and proiects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: I, Charles P. Koch , attest that this application for Hartley's Homes (Professional Engineer's name from Application Item III.1.) (Project Name from Application Item II.I) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may havedeveloped certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. N J NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) As North Carolina Professional Engineer's seal, signature, and date: °°°° `atl�'AR° % 3. Applicant's Certification per 15A NCAC 02T .0106(b): %E I`% 15 R X Lc- , attest that this application for (Signature Authority Name from Ypplication Item L3.) at s t\tt LETS -tCMeS (Project Name from Application Item II.I) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: Or fiezz FORM: FTA 06-21 Page 5 of 5 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Hartley's Homes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: East Burlington WWTP b. WWTP Facility Permit #: NC 0023868 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 12.00 1.889078 5.0740 (0.019800) Gibsonville Allocation 6.963078 58.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP : None (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Available Name GPD (Firm/pf), GPD GPD GPD Flow Capacity*** N/A * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity s 0. Downstream Facility Name (Sewer) : Dry Creek Interceptor Downstream Permit Number: Page 1 of 2 FTSE 10-18 III. Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures „using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature City Engineer Title of Signing Official Date Page 2 of 2 FTSE 10-18 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Gibsonville Project Name for which flow is being requested: Hartley's Homes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Gibsonville Collection System b. WWTP Facility Permit #: 00349 All flows are in MGD c. WWTP facility's permitted flow 1.55 d. Estimated obligated flow not yet tributary to the WWTP .048 e. WWTP facility's actual avg. flow .743 f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used .049 J .811 52.4% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Travis 2.0 0.80 0.493 .0784 .571 .239 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cook Road Outfall Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 III. Certification Statement: I Ben Baxley certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Ta urn f14a alter Title of Signing Official Page 2 of 6 By//q jt az ate FTSE 10-18 !Percentage of Permitted Flaw 52.4%I !Permitted Flaws I 1,550,000 I !Total Flows 811,880 I 2 } i 2 Proposed Flows Project Name GPO Total Allocated - Non Tributary Flows I 49,080 (South Plant Total W WTP - Allocated Flows - Non -Tributary Project Name GPD East Plant Total I 29,280 -I i D 5 d W WTP - 2021 Flows GPD Total Flow 1 743,000 Town of Gibsonville FTSE - Total 3 0 ba 1. is 'Peak Capacity of Station - Current Average Daily Flow Capacity- Current Situation GPD I %of Capacity Total Allocation Flows Total Pump Station Flows (Elon & Gib) Hanleys Homes Project Name Total Allocated - Non Tributary Flows - Elon 18,600 Proposed Flows !Total Allocated - Non Tributary Flows l Edinborough - Phase 1 and 2 / Project Name W WTP- Allocated Flows - Non -Tributary Manning Meter Flow (GIB la Elan) Gibsonville Flow Total Flow Elon Flow Station Name Travis Creek Pump Station Travis Creek- FY20-21 Flows m 0 -.sr a 5. T D d2 East Plant- 2021 Flows Station Name GPO Town of Gibsonville - East Plant (North) Allocation 2,000,000 800,000 362,080 560,680 GPO 29,280 L_ 29,280 GPO 29,000 313,000 493.000 209,000 GPO 493,000 313,000 750,000 28.0% 70.1% o a % of Station Capacity 61.6% e %of Allocation Average Daily Flow Capacity - Current [Peak Capacity of Station - Current N E Y_ O [Total Flows to South Plant 449,800I 56.2% Proposed Flows Project Name GPD 'Total Allocated - Non Tributary Flows HWY 61/10 Water&Sewer Extension 'Walnut Ridge Townhomes W WTP -Allocated Flows - Non -Tributary Project Name 1 GPD Gibsonville Flaw - Westbrook 75,000 Total Flow -South Gibsonville Flaw- Back Creek South Plant- FY 20-21 Flows Description I GPD South Plant - 2021 Flows Station Name GPO Gibsonville Flow 430,000 South Plant Allocation 800,000 Town of Gibsonville - South Plant Allocation 2 D ' N/A 0 p 18,720 430,000 355.000 at' n a y Q PPG L'90S86ZS'6L-'8LS LYO L'9 !4m5!3m411 s0x885328f91 d378b33:0xd 19f68047af4d047!8m2!3d36.1036594! Map data ©2021 Google 200 ft e y uol6UiIJn8 Z96 962 Burlington Ave - Google Maps