Loading...
HomeMy WebLinkAboutSW6220503_Application Form_20220605IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff w be treated. Stormwater will be treated throueh permanent swales located at various point of the vrov 2. a. If claiming vested rights, identify the supporting documents provided and ❑ Approval of a Site Specific Development Plan or PUD Appro ❑ Valid Building Permit Issued ❑ Other: Date:_ date they were approved: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the 4. Total Property Area: 8.34 acres 5. Total Coastal 6. Total Surface 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface W Area+:8.34 acres a 10. River basin. ids Area: 0 acres Area: 0 acres Area (6) = Total Project + Total project area shall be calculated to exclude the following: the normal pool of i ounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (N line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MW) Hline. The resultant pproject area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward o the NHW (or MHKq line may be included in the total project area. Project percent of impervious area: (Total Impervious Area / Total Project Are) X 100 = 23.8 % How many drainage areas does the project have?1 (For high density, count I for ach proposed engineered stormwater BMP. For low density and other projects, use I for the whole property are ) Complete the following information for each drainage area identified in Projec Information item 9. If there are more than four drainage areas in the project, attach an additional sheet wit i the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area Drainage Area Receiving Stream Name Black River Stream Class * C;Sw Stream Index Number * 18-68-12-1 Total Drainage Area (sf) 526,624 On -site Drainage Area (sf) 363,092 Off -site Drainage Area (sf) 163,532 Proposed Irn ervious Area** s 86,363 % Impervious Area** total 23.8 Impervious- Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (sf) 5,300/12 On -site Streets (sf) 22,763 On -site Parking (sf) 0 On -site Sidewalks (sf) 0 Other on -site (sf) 0 Future (so 0 Off -site (sf) 0 Existing BUA*** (sf) 0 Total (so: 1 86,363 * Stream Class and Index Number can be determined at: htt : ortalmcdenr.orz4v w s esu classi cations Impervious area is defined as the built upon area including, but not limited to, buil ings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6