HomeMy WebLinkAboutNCC214907_NOT Closeout Documents_20220531North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Duplin Project: Chinquapin Radial Transmission Line River basin: Cape Fear
Person financially responsible: Four County EMC - Gregg A Cohn, VP of Project #: DUPLI-2021-005
Engineering
Address: PO Box 667, Burgaw, NC 28425
1. Project Location: NC Hwy 50, Durwood Evans Road,
Pictures: No Chinquapin
2. Weather and soil conditions: 70 cloudy dry Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Shane Title:
Inspection report: Sent Report Date given/sent: May 27, 2022
9. Corrective action needed:
10. Comments: File Closed
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Brian Lambe Others present:
Date of inspection: May 27, 2022 Time arriving on site: 8:OOAM Time leaving site: 8:10AM