Loading...
HomeMy WebLinkAbout20220276 Ver 1_More Info Received_202206031 Anderson, Mitchell L From:thomas mcsweeney <tjmcs5840@gmail.com> Sent:Wednesday, June 1, 2022 5:29 PM To:Anderson, Mitchell L Cc:Brown, David W CIV USARMY CESAW (USA); Steve Obst Subject:[External] DWR 22-0276 Obst Property Attachments:NC Steam Rock Ramp.pdf Follow Up Flag:Follow up Flag Status:Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.      Good Afternoon Mr. Anderson,    Please find attached, a sketch identifying current conditions of the  perched 18" culvert and the proposed Rock Ramp  installation.     The Rock Ramp construction includes:     placement of  approximately 4 inches of rock/stone on top of the headwall spreader    headwall spreader dimensions are approximately 6" X 3 ft   placement of approximately 4 inches of rock/stone inside of the 18" culvert for +/‐ 1.5 ft. Rock/stone depth will  be tapered at the termination point inside of the culvert.   continue placement of the rock/stone for approximately 6' downstream from the spreader to match the existing  stream bed    Estimated volume of rock/stone to be used to construct the rock ramp is 12 cubic feet        Sincerely,    Tom McSweeney  786‐473‐3899  • L,TR.FILE VIEW (o(o celifer finn i f DVE R/5o1 Lo I //,/ // 7 /0-- {t12CULVERt 4• SAT) IWM .I / 4 AO/ / to"S — —t — — EA E • • •-1,":!.� i y�r y: i of• *ROCK "'AMP, si) Wig" 3 (ave ra3 e) (averaje E5tVOLuM E =izFT3 Jill EA