Anderson, Mitchell L
From:thomas mcsweeney <tjmcs5840@gmail.com>
Sent:Wednesday, June 1, 2022 5:29 PM
To:Anderson, Mitchell L
Cc:Brown, David W CIV USARMY CESAW (USA); Steve Obst
Subject:[External] DWR 22-0276 Obst Property
Attachments:NC Steam Rock Ramp.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Afternoon Mr. Anderson,
Please find attached, a sketch identifying current conditions of the perched 18" culvert and the proposed Rock Ramp
installation.
The Rock Ramp construction includes:
placement of approximately 4 inches of rock/stone on top of the headwall spreader
headwall spreader dimensions are approximately 6" X 3 ft
placement of approximately 4 inches of rock/stone inside of the 18" culvert for +/‐ 1.5 ft. Rock/stone depth will
be tapered at the termination point inside of the culvert.
continue placement of the rock/stone for approximately 6' downstream from the spreader to match the existing
stream bed
Estimated volume of rock/stone to be used to construct the rock ramp is 12 cubic feet
Sincerely,
Tom McSweeney
786‐473‐3899
•
L,TR.FILE VIEW (o(o celifer finn
i
f DVE R/5o1 Lo I //,/
// 7 /0--
{t12CULVERt
4•
SAT) IWM .I
/ 4 AO/ /
to"S
— —t — —
EA E
• •
•-1,":!.� i y�r y: i of•
*ROCK "'AMP,
si)
Wig" 3 (ave ra3 e)
(averaje
E5tVOLuM E =izFT3
Jill
EA