Loading...
HomeMy WebLinkAboutI-55_LongTermStreamFlow Interim Report Feb 2019Long Term Stream Flow Project Interim Report 2/15/2019 This interim report describes activities and findings associated with the Long Term Stream Flow study (project #09-010) for the time frame from 4/1/2018 to 12/31/2018. Project status and key preliminary results are summarized in this document. The status of each project task completed is shown in the table below. Table 1. Tasks completed for the project. 2018 - Year 2 in LTSF QAPP Project task Q- Q M c >' Q a cn O o Z a0i o QAPP preparation X X X Data downloads and corrections and equipment inspections X X X X X X X X Data completeness checks X X X X X X X X Data QA reviews Level logger location survey Cross section measurement X Manual streamflow measurement Data analysis and annual report Quality Assurance Project Plan A draft Long Term Stream Flow Quality Assurance Project Plan (QAPP) was submitted to the Water Quality Unit (WQU) Manager on January 31, 2018. The QAPP was reviewed by the Assistant WQU Manager and modified during the months of June through August, 2018. Final approval of the QAPP was given in August of 2018. Data Downloads and Corrections Data downloads and corrections occurred on a monthly basis, except for in December of 2018, due to staffing issues during the holidays. Some data was not recorded during the covered time frame due to the following reasons. Table 2. Missing data and reasons. Location Dates Missing Data Reason CC2.5CC 5/25/2018 — 7/11/2018 The stilling well was washed away. CC2.5CC 7/11/2018 — 7/23/2018 Logger pulled from stream for QA check in lab. EL5.5GC 7/11/2018 — 7/23/2018 Logger pulled from stream for QA check in lab. EL5.5GC 8/24/2018 — 9/26/2018 Logger recorded for a few hours, then turned off.* EL5.5GC 9/26/2018 — 12/31/2018 Logger and well were washed away and never found. * Multiple in lab troubleshooting sessions could not remedy this. Equipment Inspections Equipment inspections on the two in stream loggers were performed in the field during data downloads. An additional equipment QA check was also performed in July, by attaching each logger to the laboratory computer, and checking it in HOBOWare to ensure it was redeployed appropriately. Redeployment occurred on 7/24/2018. Data QA Reviews Full data QA reviews were not done quarterly as planned. During each data download from the shuttle, and correction, the data was briefly checked for completeness. Thus, the malfunction of the EL5.5GC logger was found, and an attempt to remedy the problem was made. Level Logger Location Survey This was not completed as planned during the report period. Cross Section Measurement A cross section measurement of Goose Creek and Crooked creek was performed on 7/11/2018. This will serve as a benchmark for tracking any changes to stream bank morphology. The data was plotted in Excel. The Goose Creek (EL5.5GC) cross section is in Figure 1. The Crooked Creek (CC2.5CC) cross section is in Figure 2. Manual Streamflow Measurement Manual streamflow measurements were not performed during this period. Data Analysis and Annual Report More in depth data analysis and an annual report will be completed in the future. Figure 1. Goose Creek Cross Section Y c m t 0.00 on 2.00 c M v 4.00 J 6.00 3 a v 8.00 m a 10.00 ca 3 12.00 0 14.00 a, Ii 16.00 EL5.5GC Cross Section 7/11/2018 Horizontal Feet from Left Bank Pin Facing Downstream 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m 0 00 Oo 00 m rI U� Oo 00 o o m oo M ri 1:3- �D rn M�D rn M I, rn 6 ui .4 .1 N rn m M M -:3, -:5* -:1 Ln Ln lD Figure 2. Crooked Creek Cross Section C a 0.00 Y C m 1.00 41 L b4 °C 2.00 C f6 3.00 J C 4.00 3 v 5.00 a 3 6.00 0 v co 7.00 v v LL 8.00 t7/11/2. . CC2.5CC Cross Section 7/11/2018 Horizontal Feet from Left Bank Pin Facing Downstream 0 0 0 0 0 0 0 0 0 0 0 O O � M N � lD -i Ol Il 00 lz� Ln O N N lD 00 O Izt 00 O M N 00 O Ln r-I r-I r-I N N N M M M :t Zr --$--7/11/2018