HomeMy WebLinkAbout20111075 Ver 3_In Field Mod_2014052310ron
Transportation Permitting Unit
In-Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No.:_ Date: k' -Z 3 ,, 'z 0
T
DOT Division: County:, hr,ft-61r4 DWR Project No./ Permit Type: d-J415- V�13)
DOT Staff-, 61f&4 DWR Staff:,,,- rc,t4 Mard
ACE Staff: DWR Regional Office_ pkinc&)L
J
ze Or 4_064 Goa I g4
I S 4' J Lf
4 �wzx- a
0'5�AALA ", o A wq(
Modification Sketchy:
<
Transportation Permitting Unit
1650 Mail Service Center, Ral4h, North Carolina 27699-1617
Location: 512 N. Salisbury St, Raleigh, North Carolina 27604
Phone: 919 -807 -63001 FAX: 919-807-6492
internet: www.ncwate[guat.2M
An Equal Opportunity 1 Affirmative Action Employer
In-Field Modification
This in-field modification is required 0nrthc EnDpwio�,u000m�):
El The informalion contained ill tile application or presented in Support thereofis incorrect in the
Conditions uudccwhich the original certification, issued have changed in the tbHovving Triallner:
1'his in-field Modification imvalid Only ifissued by all authorized agent of the NC Division of Water Quality, Transportation
permitting Unit'.
Thiuin-Dld m0difi
_'�»a-
'^°~rwt�f &�� �m-r� �� �������17 � Cr»Ck CA
County. '"I'lle project Shall be cO1lStl-L1CtCdaS described in the Modiflication Description and
Sketch oil Page I ofthis docurnent dated 1SV2'3j'Zc ;I to improve/construct the scction of'
approved desigil is that described in the modification Description and Modification Sketch oil Pagc I ofthis document dated
j Any further changes to the original Water Quality Certification dated 0 c'l
formal written modification request.
The description ofthe proposed action provides adequate assurance that the proposed action iuthe
River Basin iucmt�juuudwowith the proposed development will not result in a violation ofaliplicable Watcr Quality
Standards and discharge guidelines. Thum:fbru,dua State of North Carolina certifies that this activity will not violate tile
applicable portions o[Scotimoa3ol,3m2,j03,3O6,3Q7or PI, 4Z-500 and PI, g5-217if conducted im accordance �*itbtile
appfication. and conditions hereinafter set fiorth. Should Your pr�ect change, you are required to notify the DWQ and subrilit
moo`v application. I[i6eproperty is sold, the new un/ocr Must bc given u copy ofthis Certification and approval letter, and
is thereby responsible for cpaup|yimg with all the conditions. For this approval to remain valid, You are required to comply
with all the conditions listed below. In addition, you should obtain all oi&erf�,doru|. otu10 on |w*u| permits, before pr000cdimg
With yoorPm�jCuu ioCludimg (but not limited lo) Sediment and Enuaivo Control, Coastal Storm Water, Non-discharge and
VVu1or Supply watershed regulations. This Modification Approval shall expire oil the same day as the cxpiration dateofthe
conz+pondioS Corps of Engineers Permit.
Conditioo(s)ofModificmduoApproval:
\. As-built drawings oftho proposed action shall t*nubmine|tn tile NC DW0Tmompwrtatiwu Permitting Unit
within 30-days ofthe completion ofthe action
2. All the aUth0riZCd MfiCS �Jnd conditionaof tile certification associated with the original Watcr(uality
Cortificagimudatcd and a|I other corresponding modifications still apply except where
Superseded hIdliuuordUuat on.
In- Field Modification
Page 3 of 3
3. Additional Conditions:
Failure to construct the proposed action as described in the Modification Description and Sketch on
Page I of this document and/or violations of any condition, herein set forth: may result in revocation of this,
modification approval and may result in criminal and/or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts, for this
project (now or in the future) exceed (one acre, 150 linear feet, or one-third of an acre1160 linear feet,
respectively), or if mitigation is required above and beyond the current mitigation requirement for this
project, this in-field modification is invalid and a formal written modification is required.
This in-field modification is effective upon the date the last party signs this document. This in-field
modification is made upon mutuai agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. 1505 -23 et, seg.
Staff Signature:
1 — An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT-funded and
review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional
Office personnel.