Loading...
HomeMy WebLinkAbout20111075 Ver 3_In Field Mod_2014052310ron Transportation Permitting Unit In-Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit Modification Project Name/ TIP Project No.:_ Date: k' -Z 3 ,, 'z 0 T DOT Division: County:, hr,ft-61r4 DWR Project No./ Permit Type: d-J415- V�13) DOT Staff-, 61f&4 DWR Staff:,,,- rc,t4 Mard ACE Staff: DWR Regional Office_ pkinc&)L J ze Or 4_064 Goa I g4 I S 4' J Lf 4 �wzx- a 0'5�AALA ", o A wq( Modification Sketchy: < Transportation Permitting Unit 1650 Mail Service Center, Ral4h, North Carolina 27699-1617 Location: 512 N. Salisbury St, Raleigh, North Carolina 27604 Phone: 919 -807 -63001 FAX: 919-807-6492 internet: www.ncwate[guat.2M An Equal Opportunity 1 Affirmative Action Employer In-Field Modification This in-field modification is required 0nrthc EnDpwio�,u000m�): El The informalion contained ill tile application or presented in Support thereofis incorrect in the Conditions uudccwhich the original certification, issued have changed in the tbHovving Triallner: 1'his in-field Modification imvalid Only ifissued by all authorized agent of the NC Division of Water Quality, Transportation permitting Unit'. Thiuin-Dld m0difi _'�»a- '^°~rwt�f &�� �m-r� �� �������17 � Cr»Ck CA County. '"I'lle project Shall be cO1lStl-L1CtCdaS described in the Modiflication Description and Sketch oil Page I ofthis docurnent dated 1SV2'3j'Zc ;I to improve/construct the scction of' approved desigil is that described in the modification Description and Modification Sketch oil Pagc I ofthis document dated j Any further changes to the original Water Quality Certification dated 0 c'l formal written modification request. The description ofthe proposed action provides adequate assurance that the proposed action iuthe River Basin iucmt�juuudwowith the proposed development will not result in a violation ofaliplicable Watcr Quality Standards and discharge guidelines. Thum:fbru,dua State of North Carolina certifies that this activity will not violate tile applicable portions o[Scotimoa3ol,3m2,j03,3O6,3Q7or PI, 4Z-500 and PI, g5-217if conducted im accordance �*itbtile appfication. and conditions hereinafter set fiorth. Should Your pr�ect change, you are required to notify the DWQ and subrilit moo`v application. I[i6eproperty is sold, the new un/ocr Must bc given u copy ofthis Certification and approval letter, and is thereby responsible for cpaup|yimg with all the conditions. For this approval to remain valid, You are required to comply with all the conditions listed below. In addition, you should obtain all oi&erf�,doru|. otu10 on |w*u| permits, before pr000cdimg With yoorPm�jCuu ioCludimg (but not limited lo) Sediment and Enuaivo Control, Coastal Storm Water, Non-discharge and VVu1or Supply watershed regulations. This Modification Approval shall expire oil the same day as the cxpiration dateofthe conz+pondioS Corps of Engineers Permit. Conditioo(s)ofModificmduoApproval: \. As-built drawings oftho proposed action shall t*nubmine|tn tile NC DW0Tmompwrtatiwu Permitting Unit within 30-days ofthe completion ofthe action 2. All the aUth0riZCd MfiCS �Jnd conditionaof tile certification associated with the original Watcr(uality Cortificagimudatcd and a|I other corresponding modifications still apply except where Superseded hIdliuuordUuat on. In- Field Modification Page 3 of 3 3. Additional Conditions: Failure to construct the proposed action as described in the Modification Description and Sketch on Page I of this document and/or violations of any condition, herein set forth: may result in revocation of this, modification approval and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC, and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts, for this project (now or in the future) exceed (one acre, 150 linear feet, or one-third of an acre1160 linear feet, respectively), or if mitigation is required above and beyond the current mitigation requirement for this project, this in-field modification is invalid and a formal written modification is required. This in-field modification is effective upon the date the last party signs this document. This in-field modification is made upon mutuai agreement between DOT and DWR as indicated by the signatures below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification pursuant to the contested case provisions of the Administrative Procedure Act, NC Gen. Stat. 1505 -23 et, seg. Staff Signature: 1 — An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT-funded and review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional Office personnel.