HomeMy WebLinkAboutSummer 2021 Outfall Screening PlanSummer 20210utfall Screening Plan
Goal
Dry weather screening of 20-25 outfalls flagged as suspect by the recent Canine IDDE and Microbial
Source Tracking studies for potential illicit sewage discharges. `
Creek r,'
70 Little Lick
Third Ark Creek
\fir,}.
C .
t -
r1 o° r
L l
Artheast Creek �.
Stirrup Iron C,
t j 147
147
Time Period
July 1, 2021 through August 31, 2021 during normal Water Quality Unit operating hours.
Measurement and Sampling Plan
• All measurements must be conducted in situ at the outfall structure.
• All samples will be delivered to the SDWRF laboratory for analysis.
• Samples will be collected at all discharging and suspect pool outfalls, to be analyzed for fecal,
ammonia, nitrate+nitrite, TKN, total P, total Cu, total Zn, MBAS detergents, fluoride
• Cut-off time for sample delivery is 1pm. Fecal hold time is 6 hours. This means sampling will
need to occur during morning hours.
Outfall Screening Procedure Flowchart Summer 2021
Observe flow,
obstruction, damage,
depositslstains
Is there flow or a
suspect pool?
Do you seelsmell
indicators of
pollution?
No Yes FC a b samples
outfalI
No further action conduct Water if
Quality Investigation
collectfleld
measurements
(flow, pH, DO, Cond.,
C hem ets j
Lab Sample Considerations:
. What to collect
o Fecal
o Fluoride
o M BA5
o Copper
o Zinc
o Ammonia
o Nitrate+Nitrite
o TKN
o Total P
Organization
Conductivity ONLY
,1,000 u51cm [winter] Any triggers met?
�800 uSlcm (summer)
Yes
Await lab results to
determine if Water
Quality Investigation
necessary Conduct Water7
Quality Investigation
No further a cti o n
COCs
o Sample # = Outfall FIB
o AttnlContact: Jim AEarelo
Hold times
o Fecal: 6 hrs
o MBAS: 48 hrs
o BOO: 48 hrs
. All samples to lab by 1 PM
. SDWRF Contacts for sample drop-off
o Patricia:919-939-3469
o Zuri:718-730-3303
• Plan Files: F:\SW\Division Files\Water Quality\Outfalls\Documents\Annual Plans\2020-2021
Outfall Screening Plan\Summer 2021