Loading...
HomeMy WebLinkAbout20201094 Ver 1_Mitigation Information_20220602From: Davis, Erin B To: Baker. Caroline D Subject: FW: [External] Notice of NCDMS As -Built Review / Blair Creek/ SAW-2018-00449 / Clay Co. Date: Thursday, June 2, 2022 1:42:53 PM Attachments: imaoe001.ono Laserfiche Upload: Email DWR#: 20201094 v.1 Doc Type: Mitigation Information From: Haywood, Casey M CIV USARMY CESAW (USA)[mailto:Casey.M.Haywood@usace.army.mil] Sent: Thursday, June 2, 2022 7:26 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; hollandyouungman@fws.gov; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Cc: Wiesner, Paul <paul.wiesner@ncdenr.gov>; Reid, Matthew <matthew.reid@ncdenr.gov>; York, Jason <Jason.York@mbakerintl.com>; McKeithan, Katie <Katie.McKeithan@mbakerintl.com>; Clemmons, Micky <Mclemmons@mbakerintl.com>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil> Subject: [External] Notice of NCDMS As -Built Review / Blair Creek/ SAW-2018-00449 / Clay Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: June 02, 2022 15-Day Comment Deadline: June 17, 2022 45-Day Credit Release Approval Deadline: July 17, 2022 Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Blair Creek Mitigation Project DIMS Project # 100047 RFP# 16-007278 — Issued 6/21/2017 Institution Date: 1/31/2018 —Full Delivery SAW-2018-00449 DWR# 2020-1094 Hiwassee River Basin Cataloging Unit 06020002 Clay County, North Carolina Mitigation Plan Project Credits: 4,363.370 SMUs (cold) 5.772 WMUs (riparian) As-Built-MYO Project Credits: 4,363.370 SMUs (cold) 5.772 WMUs (riparian) Mitigation Plan Lengths/Acreages: 4469.51 ft 6.095 ac As-Built-MYO Lengths/Acreages: 4556.06 ft 6.087 ac Please Note: The Mitigation Plan Length and As -built Length appear slightly different; however, the centerlines are almost identical when the design and as -built are overlaid. There were no significant deviations from design to construction. The difference in the two numbers is due to the crossing footage removed from the mitigation plan footages/credits and included in the As -built footages. In addition, there are slight differences between as -built center line stationing compared to mitigation plan center line stationing. Project credits remain the same as specified in the IRT approved mitigation plan. Please note that Baker is requesting to move monitoring well #1 based on a DIMS comment following the MYO site visit. The well is currently in a lower location and does not represent the surrounding wetland area. Baker is proposing to move the well approximately 15-20' farther away from the channel. Baker has provided an explanation, map and is requesting IRT approval to move this gauge. Please see the DIMS comment letter response from Baker on page 4 of the PDF. Baker will move the well once the IRT has approved the request. FD Provider: Michael Baker International — Contact: Jason York, jason.yorkPmbakerintl.com, (828) 380-0118 NCDEQ- DIMS PM: Matthew Reid, matthew.reid(cDncdenr.gov, (828)-231-7912 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DIMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/I RT-DMS/SitePages/Home.asp Bla ir_Creek_100047_MYO_2022.pdf OBla ir_Creek_100047_MYO_2022.pdf Bla ir_Creek_100047_AB_2022.pdf OBIa ir_Creek_100047_AB_2022.pdf RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:4551832114669::::P278_BANK_ID:5820 Thank you, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG °