HomeMy WebLinkAbout20190868 Ver 1_Mitigation Information_20220602From:
Davis, Erin B
To:
Baker, Caroline D
Subject:
FW: [External] Notice of NCDMS As -Built Review /Dynamite Creek/ SAW-2019-00909 / Rockingham Co.
Date:
Thursday, June 2, 2022 1:45:09 PM
Laserfiche Upload: Email
DWR#: 20190868 v.1
Doc Type: Mitigation Information
From: Haywood, Casey M CIV USARMY CESAW (USA)[mailto:Casey.M.Haywood@usace.army.mi1]
Sent: Tuesday, May 31, 2022 10:07 AM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning
<Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd
<bowers.todd@epa.gov>; kathryn_matthews@fws.gov; fritz.rohde <fritz.rohde@noaa.gov>; Twyla
Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov) <twyla.cheatwood@noaa.gov>; Wilson,
Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Merritt,
Katie <katie.merritt@ncdenr.gov>
Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>;
Jason Lorch <jlorch@wildlandseng.com>; Crumbley, Tyler A CIV USARMY CESAW (USA)
<Tyler.A.Crumbley2@usace.army.mil>
Subject: [External] Notice of NCDMS As -Built Review /Dynamite Creek/ SAW-2019-00909 /
Rockingham Co.
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Good morning IRT,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by
NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined
review process, which requires an IRT review period of 15 calendar days from this email notification.
Please provide any comments by 5 PM on the 15-day comment deadline shown below. When
providing comments please indicate if your concerns are great enough that you recommend not
issuing the credit release. Comments provided after the 15-day comment deadline (shown below)
may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and
the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing
and initial credit release.
15-Day Comment Start Date: May 31, 2022
15-Day Comment Deadline: June 15, 2022
45-Day Credit Release Approval Deadline: July 15, 2022
Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Name:
USACE ID:
DWR ID:
DIMS Project #:
RFP:
Institution:
River Basin:
County:
Mitigation Plan Assets
Provider:
DIMS PM:
Dynamite Creek
SAW-2019-00909
20190868
100125
16-007727—Issued 11/13/2018
5/16/2019—Full Delivery
Roanoke 03010103
Rockingham
3,601.700 SMUs (Warm) / 9.191 WMUs
Wildlands Engineering, Inc., Jason Lorch, 919-851-9986
Jeremiah Dow, 919-218-0226
Please note:
Stream construction was completed November 2021 and planting was completed January 2022; 2022 will
be Monitoring Year 1 for this project. Deviations from the construction plan are shown in Section 2 of the
report. The as -built stream length is 44 linear feet more than the centerline design length. No change in
project stream credits is requested.
The final baseline (as -built) report, record drawings, and video were uploaded to the DMS/IRT SharePoint,
and DWR Laserfiche for IRT review
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.asp
A video of the site is available here: Dynamite Creek As -built Video
RIBITS:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:4551832114669:::RP,278:P278_BANK_I D:5408
Thanks,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
(919) 750-7397 work cell