Loading...
HomeMy WebLinkAbout20190868 Ver 1_Mitigation Information_20220602From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] Notice of NCDMS As -Built Review /Dynamite Creek/ SAW-2019-00909 / Rockingham Co. Date: Thursday, June 2, 2022 1:45:09 PM Laserfiche Upload: Email DWR#: 20190868 v.1 Doc Type: Mitigation Information From: Haywood, Casey M CIV USARMY CESAW (USA)[mailto:Casey.M.Haywood@usace.army.mi1] Sent: Tuesday, May 31, 2022 10:07 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; kathryn_matthews@fws.gov; fritz.rohde <fritz.rohde@noaa.gov>; Twyla Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov) <twyla.cheatwood@noaa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Jason Lorch <jlorch@wildlandseng.com>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil> Subject: [External] Notice of NCDMS As -Built Review /Dynamite Creek/ SAW-2019-00909 / Rockingham Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: May 31, 2022 15-Day Comment Deadline: June 15, 2022 45-Day Credit Release Approval Deadline: July 15, 2022 Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Name: USACE ID: DWR ID: DIMS Project #: RFP: Institution: River Basin: County: Mitigation Plan Assets Provider: DIMS PM: Dynamite Creek SAW-2019-00909 20190868 100125 16-007727—Issued 11/13/2018 5/16/2019—Full Delivery Roanoke 03010103 Rockingham 3,601.700 SMUs (Warm) / 9.191 WMUs Wildlands Engineering, Inc., Jason Lorch, 919-851-9986 Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed November 2021 and planting was completed January 2022; 2022 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in Section 2 of the report. The as -built stream length is 44 linear feet more than the centerline design length. No change in project stream credits is requested. The final baseline (as -built) report, record drawings, and video were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for IRT review https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.asp A video of the site is available here: Dynamite Creek As -built Video RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:4551832114669:::RP,278:P278_BANK_I D:5408 Thanks, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell