Loading...
HomeMy WebLinkAboutSWA000146_Application Form_20220526DEMLR USE ONLY Date Received Fee Paid Permit Number SW Program(s): ❑ Coastal SA-HQW ❑ Coastal SA-ORW ❑ Coastal FW-ORW ❑ Coastal Other ❑ Non -coastal HQW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ USMP NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER FAST TRACK PROCESS: "AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATION FORM Link to Application Instructions A. ELIGIBILITY FOR FAST -TRACK PERMITTING To be considered for a Fast Track ATC Permit, all of the items below must be checked. If any item cannot be checked, then the project must apply under the Standard Permitting Process. ® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project completion. ® The project is not proposing an alternative design. ® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's Certification. ® The project is not out of compliance with an existing stormwater permit or any other environmental permit. ® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25)) to an existing state stormwater permit. ® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. ® I understand that at project completion, an application with the as -built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. ® I understand that the Fast Track ATC Permit will expire five years after the date of issuance. B. GENERAL INFORMATION 1 Project Name: Oak View at Siler City 2. Previous Project Name (if applicable): N/a 3. Location of Project (street address): 226 Campus Drive City:Siler City County:Chatham Zip:27344 4. Directions to project (from nearest major intersection): From the intersction of US HWY 21 and US HWY 64, Head east on US Hwy 64. Turn Right on Progress Blvd. Continue for 0.7 miles and turn left onto Medical Park Drive. The site is on your right in 0.2 miles. 5. Latitude:35° 43' 26.68" N Longitude:-79° 24' 57.95" W of the main entrance to the project. C. PERMIT INFORMATION 1. Specify whether project is (check one): ® New, no previous application ❑ New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 1 of 9 Feb. 10. 2018 3 ❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed Maio[ modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA Applicable state stormwater program(s) (check all that apply): ❑ Coastal SA-HQW ® Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non -Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal — Other Other Permits (as applicable; write "NA" for those permit types that are not applicable): Project Name Permit/Appl Issue Date Other Information No. CAMA Major NA NA NA NA Erosion & Oak View at Siler CitV Applied TBD Disturbed Area 7.74 Sedimentation Control acre NPDES Industrial NA NA NA NA Stormwater — — 404/401 Permit NA NA NA Proposed Impacts NA If/ac 4. Local jurisdiction for building permits: Chatham Coun Point of Contact:Brandon Ancona D. CONTACT INFORMATION Phone #: (919 ) 930-5047 1. Applicant/Financially Responsible Party (may be an Organization):Oak View at Siler City, LLC (See attached sianature block) Signing Official Name & Title:Jennifer Lampman, Vice President of Development Street Address:160 W Main Street #200 City:New Albany State:OH Zip:43054 Mailing Address (if different):N/a City: State: Zip: Phone: (919) 609-3352 Fax: ( ) Email: jlampman(a)wallick.com 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent: Registered Agent Solutions, Inc. Mailing Address:176 Mine Lake Court City:Raleigh State:NC Zip:27615 Phone: (888) 705-7274 Fax: ( ) Email:clientsupportl (a)rasi.com Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018 5. Proiect area and densitv information: Total Property Area 659,538 sf Total Surface Water Area 0 sf Considered to include: • the normal pool of impounded structures; • the area between the banks of streams and rivers; and • the area below the Normal High Water (NHW) line or Mean High Water (MHM line. Total Coastal Wetlands Area 0 sf Considered to include: coastal wetlands landward from the NHW (or MHW) line. Total Project Area 659,538 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built -Upon Area (BUA) associated with Existing Development 0 sf "Existing development" means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 107,519 sf Includes proposed new BUA that is not associated with existing development. "BUA "is defined in N.C.G.S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1). Project Density w/ Existing Development: Project Density = (New BUA]/[Total Project Area —Existing BUA] x 100 or 16.30 % w/o Existing Development: Project Density = (New BUA]/Total Project Area] x 100 6. Anticipated construction start date May 2022 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes If `Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.1)df and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018 F. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only application packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Initials JM 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track Process "Authorization to Construct" (ATC) Permit Application Form. JM 2. Permit application processing fee of $505 payable to NCDEQ JM 3. Two hard copies and one electronic copy of a USGS map identifying the project location and GPS coordinates for the project. If the receiving water is Class SA or the receiving water drains to Class SA waters within %2 mile of the project boundary, include the'/ mile radius on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot radius on the map. JM 4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary of the project or project phase currently being permitted, including the locations of SCMs, streams, wetlands, and buffers. JM 5. Two hard copies and one electronic copy of a construction sequence that discusses how any future development on the project may be phased. JM 6. A copy of the most current property deed. Deed book: 0821 Page No: 0639 JM 7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide two hard copies and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of State; otherwise, the application will be returned. https://www.sosnc.gov/search/index/corp 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. JM 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one electronic copy of lease agreements, affidavits, pending sales agreement, development agreement, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. 10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy of the designer's certification. Stormwater Fast Track ATC Application Form Page 5 of 9 Feb. 10, 2018 G. CERTIFICATION OF APPLICANT/ FINANCIALLY RESPONSIBLE PARTY The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have notarized the following guaranty: 1, (print or type name of Applicant/Financially Responsible Party) Oak View at Siler City LLC, owned by WAM Oak View at Siler City, LLC, owned by Wallick Asset Management LLC authorized signor Jennifer Lampman certify that the information included on this permit application form is, to the best of my knowledge, correct and that: 1, the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, to the best of my knowledge; 2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the design shall not be exceeded, to the best of my knowledge; and 3. As the applicant, I shall maintain a licensed professional of record for the duration of the project who will prepare and certify the as -built package. If I retain another licensed professional before the project is complete, then I shall provide an updated guaranty with the current licensed professional's seal. A licensed professional shall inform the Division if he is no longer associated with this project. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I agree to provide corrected information should there be any change in the information provided herein. Oak View at Siler City, LLC owned by WAM Oak View at Siler City LLC owned by Wallick Asset Management LLC Authorized Signor: Jennifer Lampman Tema nr nrinf namA Vice President of Development T;+'^ ^r Authority /;2 Date I, r, "P, C` �1 a Notary Public for the SJQte of C's 1-1so County do hereby certify that YY1 V� personally appeared before me this day of V�_%j n)Qr— and acknowledge the exec�V\,a(Zplicati G on for a stormwater permit. Witness my hand and official seal, Jean A. Clayton Notary Public, State of ohi My Commission Expires: 06/19/2026 SEAL My commission expires Stormwater Fast Track ATC Application Form Page 6 of 9 Feb. 10, 2018 H. DESIGN PROFESSIONAL'S CERTIFICATION To be completed by the Design Professional identified in Section D.5. 1, Jeff McCluskey , attest to the following: 1. This application has been reviewed by me and is accurate and complete, to the best of my knowledge; 2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, as applicable; 3. The percentage built -upon area that is the basis for the design will not be exceeded; and 4. 1 have the expertise, education, and experience required to design the SCMs proposed in this application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062. 5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new Applicant/Property Owner. Note: In accordance with N.C.G.S. 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person who knowingly makes any false statement, representation, or certification in any application may be reported to the appropriate NC professional licensing board. Signature: Date: 31, I ZZ SEAL Stormwater Fast Track ATC Application Form Page 7 of 9 Feb. 10, 2018 1. PROPERTY r*w . OWNER'SAUTHORIZATION APPLICANT IS N .mow t * PROPERTY I, (print or type name of the Property Owner) Dan LaMonta ne City Manager (Chatham County) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of Applicant) Jennifer Lampman with (print or type name of Applicant's organization) _Wallick Asset Management. LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of V4-"lt1es of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date:.. Itno nmnre.,ck a Notary Public for the State of Nh�1 r County of f6la6go,_ , do hereby certify that ban Lak"Alv,-610 tea. personally appeared before me this 5� day of MbCL'6 and acknowledge the due executi n of the application for a stormwater permit. Witness my hand and official seal, N A M iiMq Notary Public _ Chatham County =T 2 /"//'/��TN CAC ///U/nlIIli11� O SEAL My commission expires G hn iir �ca� Cain, 0!5 Stormwater Fast Track ATC Application Form Page 8 of 9 Feb. 10, 2018 J. CERTIFICATION OF CURRENT PERMITTEE (COMPLETE ONLYIF PERMIT TRANSFER IS REQUESTED) 1, (print or type name of the Current Permittee) am submitting this request for a transfer of Fast Track ATC permit # SWA With the submission of this transfer request I am providing a copy of the most recent permit, all related documents and as - built plans certified by my design professional in hard copy and electronic format to the Proposed Perm ittee/Applicant identified in Section G of this application and to DEMLR . I further attest that this request for a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as permittee to the proposed permittee named in Section G of this form. Signatu a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Stormwater Fast Track ATC Application Form Page 9 of 9 Feb. 10, 2018