Loading...
HomeMy WebLinkAboutNCG140078_DMR_20220405PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 1 QTR CERTIFICATE OF COVERAGE NO. NCG14 0 0 % 8 FACILITY NAME: chandler ConcretePiedmont -MaFIA�i(P900ED PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY:Pace Analytical Lab #633 ��Y O ZOIL LIMIT VIOLATIONS? YES ❑ NO CENTRAL FILES DWR SECTION F' Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2022 SAMPLE QUARTER: ®Jan -March []April -June ❑Jul -Sept ❑Oct -Dec COUNTY: ROCKINGHAM PHONE NO. (336) 226-1181 ADD TO LISTSERVE7.❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: a rt A: Wastewater k Monitoring Requirements Non -Polar Date Sample Suspended TotType Settleable Oil&Grease Discharge Total Flow Collected of Wastewater pal H Solids Solids using method Duration (gallons/day) Outfat No. (VE, RM, MD)z (standard) (mg (mL/L) 16645GT-HEM6 (minutes) (mm/dd/yr) (mg/L) 6-934 303.5 53 (15)6 1 NO FLOW VE RM MD -- -- N A N/A - N/A No Discharge this Period - h I uarter above ' If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge here. Please make sure to mar t e samp e q 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled- 31 f ed to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to an effluent limit is exceeded twice in a row, the permittee is requir continue monitoring. 4 pH limits are 6-9 S.U. forwastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 'TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/1-for Trout and PNA waters, and 30 mg/Lfor all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarksand provisions of Part IV, Section A, includingthe Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR_ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Last Revised 07/27/17 Permit Date:8/1/2017-06/30/2022 Page 1 of2 � N 00 � \\\ !0 o w 0 \\�\ §()\) =c C \oEE \§E \\$§) )!)�e zEaf° \®,Q am \fat\LD \//7» \w m \ cc0w of§t2 0 76 )uaj 222)« k9 22m®R - \)ka\ } � ®tom®= 2 2E®t- aa_0 ±\/D0 ez[(a )