HomeMy WebLinkAbout20211719 Ver 1_47-22 DCM Permit_20220525Permit Class
NEW
Permit Number
47-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
etmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Daniel S. Furr, 2344 Scott Hill Loop Rd, Wilmington, NC 28411
Authorizing development in Pender
Wilmington
County at adj. to AIWW, at 65 Capps Road, in
, as requested in the permittee's application dated 11/10/21 (MP-1) and 3/10/22 (MP-4), incl.
work plan drawings (2) Sheet 1 of 2 dated "received 3/16/22", and Sheet 2 of 2 dated "revised 3/10/22".
This permit, issued on May 6, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) This permit authorizes only the docks, piers, boatlifts, tie piles and other structures and uses located
in or over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this docking facility
without permit modification. No non -water dependent uses of structures shall be conducted on, in or
over Public Trust waters without permit modification.
2) This permit authorizes a maximum of 4 formalized boat slips.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Daniel S. Furr Permit No. 47-22
Page 2 of 3
ADDITIONAL CONDITIONS
All portions of the authorized structure shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's area of riparian access.
No portion of the permitted structure shall be located within 80 feet of the near bottom edge of the
federally maintained AIWW channel.
No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of
the width of the water body. Measurements to determine width of the water body shall be made from the
normal high water line or the waterward edge of any coastal wetland vegetation which borders the water
body, whichever is more restrictive.
No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which
the permittee is responsible. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Sedimentation and Erosion Control
10) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
11) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) All construction debris associated with the removal or construction of the permitted docking facilities
shall be contained within the authorized project area and disposed of in an approved upland location.
14) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
Daniel S. Furr Permit No. 47-22
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800056 (Action ID SAW-2021-02566).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4501 and assigned the project DWR Project No. 20211719.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the mean high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.