Loading...
HomeMy WebLinkAboutNCC216025_NOT Closeout Documents_20220524North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 FB-SF-0005-21, Training Area Range County: Cumberland Project: Improvements River basin: Cape Fear Person financially responsible: US Army Public Works Department - Monica Project #: CUNME-2021-147 Stephenson, Directorate NCC216025 Address: 2175 Reilly Road, Stop A, Fort Bragg, NC 1. Project Location: Lamont Road, Fort Bragg Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Chris Hall Title: Corp -Rep Inspection report: Sent Report Date given/sent: May 13, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Latanya Reed Date of inspection: May 11, 2022 Time arriving on site: 10:26 AM Time leaving site: 10:40 AM cc: