Loading...
HomeMy WebLinkAboutNCC201717_NOT Closeout Documents_20220524InspectionSedimentation/Construction Stormwater Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: 7-Eleven #41347 Person financially responsible: C4 CStore Holdings II, LLC - Timothy Sittema, Manager Address: 121 West Trade Street, Suite 2550, Charlotte, NC 28202 1. Project Location: Ellenwood Road, Concord Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils River basin: Yadkin-PeeDee Project #: CABAR-2020-046 Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: May 13, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/FormsfNCGO 1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Kenny Llywelyn Date of inspection: May 11, 2022 cc: Yes Others present: Time arriving on site: 10:00 AM Time leaving site: 10:10 AM