Loading...
HomeMy WebLinkAboutNCC213146_NOT Closeout Documents_20220524North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Cumberland Project: Lots 6, 7, 9, 10 and 50 in The Sentinels River basin: Cape Fear Person financially responsible: Pride Homes, Inc. - Joseph Perkins, President Project #: CUNME-2021-119 NCC213146 Address: 3350 Footbridge Lane, Suite 124, Fayetteville, NC 28306 1. Project Location: Mtn Run Dr, Thruway Road, Gray's Creek Pictures: No 2. Weather and soil conditions: dry, workable soils Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 11, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: October 07, 2021 Time arriving on site: 10:35 AM Time leaving site: 10:45 AM cc: