May 17,2022
LETTER OF APPROVAL WITH MODIFICATIONS
Riley & Walker Development, LLC
Attn: Braden Riley, Manager
P.O. Box 3248
Pinchurst, NC 28374
RE: Project Name: Spring Meadows Subdivision
Acres ADDroved: 53
Project ID: MOORE-2022-055
County: Moore, City: Pinebluff,
River Basin: Lumber
Stream Classification: Other
Submitted By: LKC Engineening, PLLC
Date Received by LQS: April 19, 2022
Plan Type: New
Dear Mr. Riley:
Address: Spring Meadows Drive
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will
be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $ 100 annual permit fee. After the fee is processed, you will receive
the COC via email. As the Financially Responsible Party shown on the FRO forin submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deg.nc.govNCGO 1. Please direct questions about
the eNOI form to the Stormwater Program sta in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .01 18(a) and the NCGO I permit require that the following documentation be kept on
file at the Job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
4NORT�HCA�ROLINA Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
DepWnwt of Enviromental au�l 910.433.3300
Letter of Approval with Modifications
Riley & Walker Development, LLC
May 17, 2022
Page 2 of 3
Also, this letter gives the notice required by G.S. I I 3A-6 1. 1 (a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .01 18(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina�s Sedimentation Pollution Control Act is performance-oniented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerelv,
-� J. i�
Codi Pace, El
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO I Fact Sheet
cc: Jackson Maples, LKC Engineering, PLLC (electronic copy)
Debra Ensminger, Moore County Planning (electronic copy)
DEMLR - Fayetteville Regional Office File
Letter of Approval with Modifications
Riley & Walker Development, LLC
May 17,2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: SPRING MEADOWS SUBDIVISION
ProjectNumber: MOORE-2022-055
County: MOORE
Before house construction begins on the lots, a plan showing individual lot measures is required.
Provide two full size copies of each revised plan sheet only, showing all the Modifications required
for approval, prior to beginning any land -disturbing activity.
Ref. G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 0 10000 NPDES for Construction Activities