HomeMy WebLinkAbout20220208 Ver 1_More Info Received_20220520o� s �o m 1 PIPE CHANNEL STABILIZATION I I EST.50 TONS CL / RIP RAP I I EST.85 SY GEOTEXTILE I I 60 IN CSP ) BURIED I -FT 9I-FT LENTGH I I \ I \ I \ \ I SCALE \ I 12.5 0 12.5 25 \ I PLAN \ \ I ALB EMAR LlE DUMP R EMIEOIA` ION SI°l[°]E CULVERT DETAILS HEADWALL PROJECT REFERENCE NO. SHEET NO. ALBEMARLE DUMP ed in N e NC of: 5438 Wa" LICENSE N.: 2 Park BN7 S7Ite200 (9191461W-�IW11009� 191"'14151FA%1 STREAM BED ELEVATION 60" I.D. 9'_3" 2'-6" 9„ CROSS SECTION 1VTS NOTE: HEADWALL TO BE CONSTRUCTED IN ACCORDANCE WITH NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2018 ROADWAY ENGLISH STANDARD DRAWING 838.27 REINFORCED CONCRETE ENDWALL FOR SINGLE 60" PIPE — 90' SKEW (SEE NEXT SHEET) 91' NANNY DR w RIP P 4 4A :7 -4 FLOW 17+20.24 se 43 4e 33 3e 33 3e 15 111 s L W s zW 1z 4 y s PROFILE 4'-6" 2'-1%6" rii � I I 0 71 3-N1- 6 T4 ro 71/4 „ I 9„ 2'-11 16" ' 7, P LAN N� c m N T1 TOP & BOTTOM T5 @ 6" TOP & BOTTOM 5 SPA. @ 11" Z" BARS IN TOP OF FOOTING T Z1 Z2 Z3 -3 -N2 5 SPA. @ 11" "N" BARS IN BOTTOM OF FOOTING 9'-0" N 2-G1 B 2-V1 @ 9" FILL FACE / k1 1-V1 STR. FACE ��.. 2-B2 i 6„ 3" 0 DRAINS 6" ABOVE FLOW LINE Tj CONST. JT, L-2-B1 2 N1 B ELEVATION z z Z1 3'-9" ZII Z2 3,_3„ 7„ O 6" Z3 2'-8" N N H1 5'-5" I HK. H2 3'-5" L7-7 "H" BARS "N" BARS "Z" BARS "H" "N", & "Z" BAR DIMENSIONS ARE OUT TOT OUT. 10" 2 „G„ 2 �-r I .I__211 FILL FACE V1 @ 9" V1 @ 1'-6" / g' @ WING WALL - @ WING WALL PIPE NOT SHOWN LA NT 6 - „T„ T5 @ 6" 3'-0" SECTION - BB 4" U) w w + v PIPE NOT o w SHOWN � a SLOPE TAPER DETAIL 5 SPA. @ 11" FILL 2 SPA @ 1'-10 % " STR � FACE 2-V2, 2-V3, 2-V4 FACE 2-H1, 1-H2 3 SPA. @ 1'-3" FILL H2 FACE 3-H1, 1-H2 V2 2 SPA. @ V-10" N� T4 3-N1 3-N2 5 SPA. @ 11" WING ELEVATION 10' F- 2 z O � FILL FACE 12 Q � „V"@ 11" „V„@ 1'-10" ZOC=C..) J O H ' Z „H„ 0 0 u) 2 Z „Z„ LJJ Q LL QU�OH Ir T4 r� I—=~Zw cnHLLOJ 00CD T4 N Z H r =1 L r W p � SECTION - AA r p H2 FILL FACE 1-V2, 1-V3, 1-V4 V4 V4 H1 SEE STD. # 838.45 FOR GENERAL NOTES. J J It Q Lu Y OLL G U) C'3 z Z W O H � Q LLI o W w CC n- a z BILL OF MATERIAL FOR ENDWALL REINF. STEEL 1 PIPE BAR SIZE LENGTH NO. WEIGHT B1 #4 5'-6" 4 15 B2 #4 4' - 6" 4 12 G1 #7 8'-8" 2 35 H1 #4 6'-0" 10 40 H2 #4 4'-0" 4 11 N1 #5 3'-11" 10 41 N2 #4 3'-5" 6 14 T1 #4 12 -8 6 51 Q V 0 H G � W J >-V Z 0 Q LL U) HO Lu LL. � T4 #4 5' - 6" 6 22 T5 #4 2' - 6" 36 60 V1 #4 6'-3" 6 25 V2 #4 5' -1 " 6 20 V3 #4 3' -1 1 " 6 16 V4 #4 2' - 9" 6 11 Z1 #5 4'-4" 4 18 Z2 #4 3'-10" 4 10 Z3 #4 3' - 2" 4 8 REINF. STEEL LBS. 409 CON./C.S. CU. YDS 5.9 ISHEET 2 OF 2 838.27 Strickland, Bev From: Benton, Charlie <charles.benton@aecom.com> Sent: Friday, May 20, 2022 12:14 PM To: Perez, Douglas J; Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) Cc: Stone, Madalyn; Gallagher, sean Subject: RE: [EXTERNAL] RE: SAW-2014-2014-02251 - Albemarle Dump Remediation Site Attachments: Albemarle Landfill_Culvert Detail.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Doug, Please find attached for your review the culvert design for the Albemarle Dump Remediation project. Regards, Charlie Benton, PWS Natural Resources Manager Impact Assessment and Permitting (IAP) Environment - Southeast D 1-919-461-1431 I C 1-919-946-3122 charles.benton@aecom.com AECOM 5438 Wade Park Boulevard, Suite 200 Raleigh, NC 27607 T 1-919-461-1100 I F 1-919-461-1415 www.aecom.com Built to deliver a better world From: Perez, Douglas J <doug.perez@ncdenr.gov> Sent: Friday, May 13, 2022 8:52 AM To: Benton, Charlie <charles.benton@aecom.com>; Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) <Krystyn ka. B. Styga r@ usace. a rmy. m i l> Cc: Stone, Madalyn <madalyn.stone@aecom.com>; Gallagher, sean <sean.gallagher@ncdenr.gov> Subject: [EXTERNAL] RE: SAW-2014-2014-02251 - Albemarle Dump Remediation Site Hi Charlie, You might be under the threshold for the Corps, but it still appears that you are above threshold for the associated GC for us (see attached). This means that I will need to see the design specs for the culvert in question for the road, i.e. size of culvert, size of stream, etc. It will need to be buried, of course, but how much depends on the size of the culvert. Typically, culverts 48" or smaller are buried zoom of the diameter of the culvert, and anything larger has to be buried a foot. Let me know your next steps, 1 Doug From: Benton, Charlie [mailto:charles.benton@aecom.com] Sent: Thursday, May 12, 2022 3:04 PM To: Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) <Krystynka.B.Stygar@usace.army.mil> Cc: Perez, Douglas J <doug.perez@ncdenr.gov>; Stone, Madalyn <madalyn.stone@aecom.com>; Gallagher, sean <sean.gallagher@ncdenr.gov> Subject: [External] SAW-2014-2014-02251 - Albemarle Dump Remediation Site CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Krysta, Thank you for your recent site visit to the Albemarle Dump Remediation Site and discussing our proposed project. Based on our conversation, we've reevaluated the road relocation design that was depicted on the Aquatic Resources Impact map. Upon review, we've found that the Road Relocation/Culvert impact was incorrectly stated as 190 linear feet. The actual permanent stream impact associated with the road relocation is 130 linear feet. This includes 110 linear feet for the culvert, and 20 linear feet for the placement of riprap within the channel at the downstream end of the culvert. The project also includes 20 feet of temporary construction easement stream impacts. Based on measurements taken along the proposed impacted stream reach, the width of the ordinary highwater mark is approximately five feet. Table 1 below, and the attached figure, have been prepared to provide the proposed road relocation stream impacts in units of linear feet, square feet, and acreage, as well as differentiating the type of impact. Based on these calculations, the stream impacts for the road relocation phase of this project fall below the 0.02 acre threshold for requiring a PCN for Nationwide Permit #14. If you concur that no PCN is required for the road relocation stream impacts, we will formally withdrawal our permit request for a NWP 38 and NWP 14 under a separate cover letter. We will resubmit a PCN application for the NWP 38 at a future date when design plans for the remediation of Disposal Areas A and B are further refined. We will also be submitting a new PJD request for the entire property based on your recent field review. Please let me know if you have any questions regarding the information provided. We look forward to your confirmation that a PCN is not required for the proposed road impacts as presented in this email. Table 1. Road Relocation Stream Impacts Impact Type Linear Feet Square Feet Acre Temporary Construction Easement 20 105 0.002 Permanent Class I Rip Rap 20 108 0.002 Permanent Fill for Culvert 110 556 0.013 150 769 0.017 Regards, Charlie Benton, PWS Natural Resources Manager Impact Assessment and Permitting (IAP) Environment - Southeast 2 D 1-919-461-1431 I C 1-919-946-3122 charles.benton@aecom.com AECOM 5438 Wade Park Boulevard, Suite 200 Raleigh, NC 27607 T 1-919-461-1100 I F 1-919-461-1415 www.aecom.com Built to deliver a better world 3