Loading...
HomeMy WebLinkAboutRE_ _External_ RE_ CAMA_Dredge and Fill 7H_1100 General Permit SR 1122 Hyde County Carpenter,Kristi From:Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent:Wednesday, June 16, 2021 12:41 PM To:Trowell, Steve J Cc:Ward, Garcy; Daisey, Greg Subject:RE: \[External\] RE: CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Sounds good. I would like to see the site. I’ll send something on available dates out today. From: Trowell, Steve J <sjtrowell@ncdot.gov> Sent: Wednesday, June 16, 2021 12:38 PM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Cc: Ward, Garcy <garcy.ward@ncdenr.gov>; Daisey, Greg <Greg.Daisey@ncdenr.gov> Subject: \[Non-DoD Source\] RE: \[External\] RE: CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County Kyle: I agree whole heartedly and thus the reason for putting the Major CAMA permit application together, no more fragmenting the permit process. The intent obtaining the most recent GP was not to fragment or “phase” the project, the purpose of getting a GP was to address a safety issue as this site is heavily used pretty much year around. I cover this GP in the forthcoming Major CAMA/Dredge and Fill app. As for your database, I cannot explain that. DCM database is gonna be a better source of past permits. If you would like to meet on the project give me some dates your available and I will send out an invite to you, Greg and Garcy. Steve J. Trowell Division Environmental Specialist Division One NC Department of Transportation (252) 482-1876 office (252) 402-4015 mobile (252) 482-8722 fax sjtrowell@ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, June 16, 2021 9:23 AM To: Trowell, Steve J <sjtrowell@ncdot.gov> 1 Cc: Ward, Garcy <garcy.ward@ncdenr.gov>; Daisey, Greg <Greg.Daisey@ncdenr.gov> Subject: RE: \[External\] RE: CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Steve, These type of projects should be discussed with all of us when you intend to phase projects. The existing stabilization within the project area doesn’t show on my database. There are cumulative effects and fragmenting of permit areas that need to be accounted for before things move forward. Once again we all need to meet to discuss the project and utilize the “single and complete” permitting process as much as possible. Kyle From: Trowell, Steve J <sjtrowell@ncdot.gov> Sent: Wednesday, June 16, 2021 7:42 AM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Subject: \[Non-DoD Source\] RE: \[External\] RE: CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County Yes, it was to quickly address 9 different spots where erosion from boat wakes is eaten away the shoulder and was to the gravel road. This work is to be done while the Major CAMA/Dredge and Fill permit is being processed. There is concern that people using the gravel ramp would drop a truck or trailer tire off the edge of bank. I attached the permit drawings that will be submitted with the Major app. From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, June 16, 2021 7:22 AM To: Trowell, Steve J <sjtrowell@ncdot.gov> Cc: Ward, Garcy <garcy.ward@ncdenr.gov>; Daisey, Greg <Greg.Daisey@ncdenr.gov> Subject: \[External\] RE: CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Steve, I’m a little confused after receiving this permit notification from Greg. Is this within the same th location that you sent the email on the 24 and I responded to yesterday? Kyle From: Daisey, Greg <Greg.Daisey@ncdenr.gov> Sent: Tuesday, June 15, 2021 4:32 PM To: Trowell, Steve J <sjtrowell@ncdot.gov> Cc: Ward, Garcy <garcy.ward@ncdenr.gov>; Barnes, Kyle W CIV USARMY CESAW (USA) 2 <Kyle.W.Barnes@usace.army.mil> Subject: \[Non-DoD Source\] CAMA/Dredge and Fill 7H.1100 General Permit SR 1122 Hyde County Steve – Attached is General Permit No. A78029 and the Buffer Authorization Certificate related to the shoreline stabilization (approximately 250’) along SR 1122 (Hydeland Canal Rd.) in Swan Quarter, Hyde County. Please review the permit, sign at the bottom left of the permit (both printed name and signature), sign the Buffer Authorization Certificate and scan/return to me as soon as possible. The permit is valid once you sign and will expire on October 13, 2021. If any aspect of this request should change from what was initially described and what is shown on submitted documents, please contact DCM before proceeding. Please consult with any other local, state or federal agencies that may require a permit or authorization before project initiation. Please contact me with any questions or if I could be of anymore assistance with the project and keep a copy of all updated documents on-site during the project. Greg Daisey Transportation Projects Field Representative Division of Coastal Management North Carolina Department of Environmental Quality 252.264.3901, EXT.249 (office) Greg.Daisey@ncdenr.gov 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3