Loading...
HomeMy WebLinkAbout20200237 Ver 1_Approval Letter_20200311_pg1DocuSign Envelope ID: 52958A1A-D01D-444A-B657-A155D548A813 ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA EP0r0rVh#1tf*f QUdifty March 11, 2020 Guilford County NCDWR Project No. 20200237 Alamance Church Road Widening City of Greensboro APPROVAL of 401 WATER QUALITY CERTIFICATION, and JORDAN LAKE BUFFER AUTHORIZATION, with ADDITIONAL CONDITIONS Mr. Guy Ingle(Guy.In_le(&greensboro-nc.goy) City of Greensboro Engineering and Inspections Department PO Box 3136 Greensboro, NC 27402-3136 Dear Mr. Ingle, You have approval, in accordance with the conditions listed below, for the following impacts for the purpose of Alamance Church Road widening in Guilford County: Stream Impacts in the Cape Fear River Basin Permanent Fill in Permanent Fill Stream Permanent Fill in Intermittent in Perennial Total Stream Impacts Perennial Stream Site Stream Due to Stream Due to Impact Requiring Due to Culvert Bank Stabilization Excavation (linear ft) Mitigation (linear ft) (linear ft) (linear ft) (linear ft) S1 0 10 0 10 0 S2 0 10 0 10 0 S3 0 15 0 15 0 S4 33 0 50 83 0 TOTAL 1 33 35 50 1 118 1 0 Total Stream Impact for Project: 118 linear feet. r .y North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699 1617 919.707.9000