HomeMy WebLinkAbout20211405 Ver 1__External_ Request for Additional Information_ SAW-2019-00874 (NCDOT _ Bridge 267 on Coble Church Road _ SR 3336 over Climax Creek _ Guilford County _ Div 7)_20220526
Carpenter,Kristi
From:Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent:Thursday, May 26, 2022 10:00 AM
To:Parker, Jerry A
Cc:Conchilla, Ryan; Carpenter,Kristi
Subject:\[External\] Request for Additional Information: SAW-2019-00874 (NCDOT / Bridge 267
on Coble Church Road / SR 3336 over Climax Creek / Guilford County / Div 7)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jerry,
Thank you for your PCN, dated 4/27/2022, for the above referenced project. I have reviewed the information and need
clarification before proceeding with verifying the use of Regional General Permit (RGP) 50 (https://saw-
reg.usace.army.mil/RGP/RGP50.pdf). Please submit the requested information below (via e‐mail is fine) within 30 days
of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your
application withdrawn and close the file:
1) NCDOT currently proposes no compensatory mitigation for this project. To enable my evaluation, please confirm
whether or not any of the proposed hand clearing of forested wetlands at Sites 2, 4, and/or 5 would be
permanently maintained as herbaceous wetlands following construction (whether due to relocation of utilities
or some other reason). If such activities are proposed, please provide a compensatory mitigation plan to account
for the proposed permanent wetland fill and permanent conversion of forested to herbaceous wetlands. Note
that, unless otherwise justified based on a functional assessment (i.e. NCWAM), appropriate compensatory
mitigation ratios are 2:1 for permanent wetland fill and 1:1 for permanent conversion of forested to herbaceous
wetlands. Note also that a statement of availability letter would also be required for your proposed mitigation
provider.
2) Please provide the “T & E survey performed by consultants” referenced in your PCN;
3) At Site 6, the Corps is concerned that proposed toe protection extending through and downslope of the
proposed permanent impact to Stream A may redirect flow away from the continuation of Stream A and instead
into the toe-protected swale along the edge of the roadway. Please provide additional information to
ensure/justify that the flow within the downstream portion of Stream A would be maintained.
Please let me know if you have any questions.
Sincerely,
Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Office: (919) 554-4884, Ext. 30.
1
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: NCDOT_REG <NCDOT_REG@usace.army.mil>
Sent: Friday, April 29, 2022 3:54 PM
To: japarker3@ncdot.gov
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Matthews, Monte K CIV USARMY
CESAW (USA) <Monte.K.Matthews@usace.army.mil>
Subject: SAW-2022-00989 (NCDOT / Bridge 267 on Coble Church Road / SR 3336 over Climax Creek / Guilford County /
Div 7)
Good Afternoon,
Your Pre-Construction Notification (PCN) RGP request has been received, assigned action IDSAW-2022-00989 and
forwarded to Dave Bailey for further processing,
Please refer to the action ID in all correspondence.
Thank you,
Josephine Schaffer
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Wednesday, April 27, 2022 5:23 PM
To: NCDOT_REG <NCDOT_REG@usace.army.mil>
Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil>
Subject: \[Non-DoD Source\] PCN - Guilford - DOT
A new project has been received on 4/27/2022 5:21 PM for Coble Church Rd Bridge Replacement. The link below will
take you to the project folder.
https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2303172;view=browse
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses aren’t monitored.
2