HomeMy WebLinkAbout20190868 Ver 1_Mitigation Information_20220525From:
Davis, Erin B
To:
Baker, Caroline D
Subject:
FW: NCDMS As -Built Review / Dynamite Creek / SAW-2019-00909 / Rockingham Co.
Date:
Wednesday, May 25, 2022 11:12:43 AM
Attachments:
imaae001.ona
Dynamite Creek 100125 RO 03 STR RW Initial Release.odf
Laserfiche Upload: Email & Attachment
DWR#: 20190868 v.1
Doc Type: Mitigation Information
From: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>
Sent: Monday, May 23, 2022 9:05 AM
To: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <casey.m.haywood@usace.army.mil>; Davis, Erin B
<erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>
Cc: Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Stanfill, Jim
<jim.stanfill@ncdenr.gov>; Jason Lorch <jlorch@wildlandseng.com>
Subject: NCDMS As -Built Review / Dynamite Creek / SAW-2019-00909 / Rockingham Co.
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT
review:
Project Information
Name:
Dynamite Creek
USACEID:
SAW-2019-00909
DWR ID:
20190868
DMS Project #:
100125
RFP:
16-007727—Issued 11/13/2018
Institution:
5/16/2019—Full Delivery
River Basin:
Roanoke 03010103
County:
Rockingham
Mitigation Plan Assets:
3,601.700 SMUs (Warm) / 9.191 WMUs
Provider:
Wildlands Engineering, Inc., Jason Lorch, 919-851-9986
DMS PM:
Jeremiah Dow, 919-218-0226
Please note:
Stream construction was completed November 2021 and planting was completed January 2022; 2022 will be Monitoring Year 1
for this project. Deviations from the construction plan are shown in Section 2 of the report. The as -built stream length is 44
linear feet more than the centerline design length. No change in project stream credits is requested.
The final baseline (as -built) report, record drawings, and video were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for
IRT review
https://ncconnect.sharepoint.com/sites/I RT-DMS/Site Pages/Home.aspx
A video of the site is available here: Dynamite Creek As -built Video
The credit ledger for the 30% release is attached for review and signature.
Lindsay Crocker
Eastern Regional Supervisor
Division of Mitigation Services
e, �ro 0.1. D_E
QF% -,- A -
NORTH CAROLINA
flepartmaut of Environmemal 4uali\ /T
217 West Jones St., Raleigh, NC 27603
Cell: 919/594/3910
Mitigation Project Name
Dynamite Creek
USACE Action ID
DMS ID
100125
DWR Permit
River Basin
Roanoke
Date Project Instituted
Cataloging Unit
03010103
Date Prepared
County
Rockingham
Stream/Wet. Service Area
Signature of Official Approving Credit Release
2019-00909
2019-0868
5/16/2019
5/18/2022
Roanoke 03010103
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed Not Approved
Released # #Releases
Approved
Credits
Anticipated Approved
Release Release
Year Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,080.510
1,080.510
0.000
1,080.510
2022
5/18/2022
3 - Year 1 Monitoring
10.00%
360.170
2023
4 - Year 2 Monitoring
10.00%
360.170
2024
5 - Year 3 Monitoring
10.00%
360.170
2025
6 - Year 4 Monitoring
5.00%
180.085
2026
7 - Year 5 Monitoring
10.00%
360.170
2027
8 - Year 6 Monitoring
5.00%
180.085
2028
9 - Year 7 Monitoring
10.00%
360.170
2029
Stream Bankfull Standard
10.00%
360.170
2026
Totals
1,080.510
Total Gross Credits
3,601.700
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,080.510
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,521.190
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases 0/6Release
Estimated
Scheduled
#
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
2.756
2.756
0.000
2.756
2022
5/18/2022
3 - Year 1 Monitoring
10.00%
0.919
2023
4 - Year 2 Monitoring
10.00%
0.919
2024
5 - Year 3 Monitoring
15.00%
1.379
2025
6 - Year 4 Monitoring
5.00%
0.460
2026
7 - Year 5 Monitoring
15.00%
1.379
2027
8 - Year 6 Monitoring
5.00%
0.460
2028
9 - Year 7 Monitoring
10.00%
0.919
2029
Totals
2.756
Total Gross Credits
9.191
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2.756
Total Percentage Released
29.99%
Remaining Unreleased Credits
6.435
Dynamite Creek
Page 1 of 2 Roanoke 03010103
Mitigation Project Name
Dynamite Creek
USACE Action ID
DMS ID
100125
DWR Permit
River Basin
Roanoke
Date Project Instituted
Cataloging Unit
03010103
Date Prepared
County
Rockingham
Stream/Wet. Service Area
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,101.000
Warm Stream
Enhancement I
555.000
Warm Stream
Preservation
1,307.000
Riparian
I Restoration
11.016
2019-00909
2019-0868
5/16/2019
5/18/2022
Roanoke 03010103
Debits
Warm Stream
Restoration
Credits
Warm Stream
Equivalent Restoration
Credits
Riparian
Restoration
Credits
Beginning Balance (mitigation credits)
3,471.000
130.700
9.191
Released Credits
1,041.300
39.210
2.756
Unrealized Credits
0.000
0.000
0.000
Converted Credits
0.000
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,041.300
39.210
2.756
Remaining Balance (Unreleased credits)
2,429.700
91.490
6.435
Total Remaining Balance (Released and Unreleased credits)
3,471.000
130.700
9.191
Dynamite Creek
Page 2 of 2 Roanoke 03010103