Loading...
HomeMy WebLinkAboutWM0301204_Final Permit_20220511ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA E„vo-anr grey May 11, 2022 Ms. Huriyet Anaz (via email) MRP Realty 3050 K Street, Suite 125 Washington, DC 20007 RE: Monitoring Well Construction Permit Permit # WM0301204 Mint Street and Church Street Site, Charlotte Mecklenburg County Dear Ms. Anaz, In accordance with your completed application received on May 11, 2022, we are forwarding herewith Monitoring Well Construction Permit Numbered WM0301204 and issued for the construction of four monitoring wells located near the subject site in Charlotte, Mecklenburg County. This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Should you have any questions, please contact Edward Watson at (704) 235-2199, or by email at edward.watson@ncdenr.gov. CC: WQROS, Central Office (via Laserfiche) Scott Young, ECS Limited (via email) GDEQ1 NORTH CARCLINA Depabienl of Environmental Ouallty Sincerely, DocuSigned by: 114.I41w H P:z> F161FB69A2D84A3... Andrew H. Pitner, P.G. Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1601 East Center Avenue, Suite 301 I Mooresville, NC 28115 704.663.1699 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO MRP Realty (ECS Southeast, LLP as Agent) FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of four monitoring wells owned by the MRP Realty, at the subject site located near Mint St. and Church St., in Charlotte, Mecklenburg County. This Permit is issued in accordance with the application received on May 11, 2022, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of completion of drilling the borehole. 9. Adequate permits shall be obtained from Mecklenburg County Groundwater and Wastewater Services. Permit issued the 11th day of May 2022 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DocuSigned by: ,44.I41w H P:ue4 F161FB69A2D84A3... NCRTiCAPOLvvNA peparlmen! of Environmental Quality Andrew H. Pitner, P.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WM0301204 North Carolina Department of Environmental Quality Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663.1699