Loading...
HomeMy WebLinkAboutNCG510207_BIMS Report_20220523United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction 1 IN I 2 21IIIIII Code NPDES yr/mo/day Inspection IL I 3 I NCG510207 111 121 22/05/18 117 Type 1810I IIIIIIIII1I Inspector Fac Type 191 S I 2011 IIIIIIIIIIIIIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67I1.0 I 70I2 I 711 1 72 I N I 73I 1 74 751 I I 1 1 1 1 1 1 1 180 l Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Charlotte Delivery Facility 7524 Kenstead Cir Paw Creek NC 28130 Entry Time/Date 10:OOAM 22/05/18 Permit Effective Date 21/06/24 Exit Time/Date 01:30PM 22/05/18 Permit Expiration Date 25/09/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jeffery Titus,7524 Kenstead Cir Charlotte NC 28214//978-314-2006/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Edward Watspr—Docusigned of Inspector(s) Agency/Office/Phone and Fax Numbers Date by: DWR/MRO WQ/ - - / £ 4V 5/23/2022 "-CA4CEBF8F85F415... Signature ercvnernit1Q A Reviewer 7Agency/Office/Phone and Fax Numbers Date 11444t4.W H P4 5.23. 22 F161FB69A2D84A3... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 31 NPDES yr/mo/day NCG510207 I11 121 22/0 5/ 18 117 Inspection Type 18 [j (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On May 18, 2022, MRO DWR staff performed a Compliance Evaluation Inspection for the Pump and Treat system present at the Colonial Pipeline Paw Creek facility under permit NCG510207. Upon arrival, MRO staff was informed the treatment system was not in operation and had not been in operation since some time around March 2021. MRO DWR had not received notification of the system failure and therefore, the facility is out of compliance with the notification requirements of the permit. DWR staff was informed there are plans to rehabilitate the pump and treat system and put the system back into service until a Bio-Sparge system can be installed and put into operation. A permit was issued for the in 2016, for the installation of 23 AS/VE paired wells under deemed UIC permit W10300341. There does not appear to be an expiration date for this permit so long as no modifications are requested from the initial permit Notice of Intent to Construct (NOI). Since the permittee failed to report the treatment system a Notice of Deficiency is being issued for failure to report the non -compliant circumstance. Page# 2 Permit: NCG510207 Inspection Date: 05/18/2022 Owner - Facility: Charlotte Delivery Facility Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new El El • ❑ application? Is the facility as described in the permit? • El El El # Are there any special conditions for the permit? El • El El Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • El El El Comment: The permit is scheduled to expire on September 30, 2025. The permittee is planning to rehabilitate the pump and treat system and return the treatment system to operating status by the end of the summer. MRO staff recommends that a follow-up visit be performed in September after the first set of effluent results are received for the rehabilitated system. The system is expected to be removed from service before the end of the permit cycle. A permit rescission request is expected to be received before the permit has expired. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • El ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ El El Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: According to the permittee, the system failed sometime around March 2021. Therefore, system maintenance has not been performed since the system went down. The Operation and Maintenance information was presented in the 2020 and 2021 Annual Reports submitted to DWM, which was forwarded to DWR by the consultant. Page# 3