Loading...
HomeMy WebLinkAboutNCS000540_PPGH_ProgramProceduresManual_20220524Town of Mooresville Stormwater Pollution Prevention and Good Housekeeping Program and Procedures Manual Adopted May 2021 Updates: November 2021 1 Table of Contents ................................................. ...................................................................................................... 1 1 Background .................................................................................................................................................................. 3 1.1 Purpose ............................................................................................................................................................... 3 1.2 NPDES Phase 11 Permit Requirements ........................................................................................................... 3 2 Operation and Maintenance Program for Municipal Facilities ............................................................................ 4 2.1 Program Goals ..................... ............................................................................................................................. 4 2.2 Facilities Inventory ........................................................................................................................................... 5 2.3 Facility Operation and Maintenance Plans .................................................................................................... 5 2.4 Inspections ......................................................................................................................................................... 6 2.4.1 Inspection Procedures .................................................................................................................................. 6 2.5 Personnel ............................................................................................................................................................ 7 2.6 Documentation & Record Keeping ................................................................................................................. 7 2.7 Program Evaluation .......................................................................................................................................... 7 3 Operation and Maintenance Program for Municipally Owned or Maintained Structural Stormwater ControlMeasures (SCM) ............................................................. ...................................................................................... 8 3.1 General Program Information ......................................................................................................................... 8 3.2 BMP Inventory .................................................................................................................................................. 9 3.3 Inspections ......................................................................................................................................................... 9 3.3.1 Inspection Procedures .................................................................................................................................. 9 3.3.2 Follow-up Inspections ............................................................................................................................... 11 3.3.3 Annual Inspections .................................................................................................................................... 11 3.4 Maintenance ..................................................................................................................................................... 12 3.5 Personnel .......................................................................................................................................................... 12 3.6 Documentation & Record Keeping ............................................................................................................ — 12 3.7 Program Evaluation ........................................................................................................................................ 13 4 MS4 Operation and Maintenance program ........................................................................................................... 13 4.1 General Program Information ....................................................................................................................... 13 4.2 Catch Basins and Conveyance system .......... I ............................. ................................................................ 14 4.2.1 Inventory & Mapping ................................................................................................................................ 14 4.2.2 Infrastructure Inspections ......................................................................................................................... 14 4.2.3 Rain Event Inspections .............................................................................................................................. 17 4.2.4 Maintenance ................................................................................................................................................ 17 4.2.5 Maintenance Prioritization Guidance ...................................................................................................... 18 4.2.6 Personnel ..................................................................................................................................................... 19 Page I I 4.2.7 Documentation and record keeping ........................................................................................................ 20 4.3 Streets, Roads, and Public Parking Lots ....................................................................................................... 20 4.3.1 Street Sweeping Program .......................................................................................................................... 20 4.3.2 Parking Lot Maintenance and CLeaning ...................... .......................................................................... 22 4.3.3 Personnel ............................................................................................................................................. ....... 22 4.3.4 Documentation and Record Keeping ....................................................................................................... 22 4.4 Program evaluation ........................................................................................................................................ 22 5 Employee Training Program ................................................................................................................................... 23 5.1 General Program Information ....................................................................................................................... 23 5.2 Types of Employee Training ....................................................................... ................................................. 23 5.2.1 New Employee Training ........................................................................................................................... 23 5.2.2 Annual Employee Training ....................................................................................................................... 24 5.2.3 Facility Manager Training ......................................................................................................................... 24 5.2.4 Additional Trainings .................................................................................................................................. 24 5.3 Training Frequency ................................................................................................................ ........................ 24 5.4 Training Procedures ....................................................................................................................................... 25 5.4.1 New Employee Training Procedures ....................................................................................................... 25 5.4.2 Annual Employee Training ..................................................................................................................... - 26 5.4.3 Facility Manager Traning .......................................................................................................................... 26 5.5 Documentation and Record Keeping ........................................................................................................... 26 5.6 Program Evaluation ........................................................................................................................................ 27 6 Spill response procedures ........................................................................................................................................ 27 6.1 General Procedures ......................................................................................................................................... 27 6.2 Petroleum Spills .............................................................................................................................................. 28 7 Pesticide, Herbicide and Fertilizer Application Management ...................................................................................... 28 7.1 Training and Certification .............................................................................................................................. 28 7.2 Storage Practices .............................................................................................................................................. 29 8 Vehicle and Equipment Cleaning ........................................................................................................................... 29 8.1 Wash Bay at Fleet Services ......................................................................................................... ................... 29 8.2 Fire -Rescue Department ................................................................................................................................. 29 8.3 Best Management Practices ........................................................................................................................... 29 9 Appendixes ................................................................................................................................................................ 31 Page 12 1.1 Purpose This manual was developed to provide personnel with tire Town of Mooresville the information needed to correctly implement the various programs and procedures related to municipal good housekeeping and stormwater pollution prevention. 1.2 NPDES Phase Ill Permit Requirements Pollution Prevention and Good Housekeeping is one of the six minimum measures required by the Town of Mooresville's National Pollutant Discharge Elimination System (NPDES) Phase 11 Stormwater Permit as issued by the North Carolina Department of Environmental Quality (NCDEQ). To accomplish U-tis objective, the Town of Mooresville is to implement the following Best Management Practices found on Page 11 of the active permit: BW Measurable Goals a. Inventory of municipally owned The permittee shall maintain a current inventory of facilities and or operated facilities operations owned and operated by the permittee with the potential for generating polluted stormwater runoff. b. Operation and Maintenance The permittee shall maintain and implement, evaluate annually, and (O&M) for municipally owned or update as necessary an Operation and Maintenance (O&M) program for operated facilities municipal owned and operated facilities with the potential for generating polluted stormwater runoff. The O&M program shall specify the frequency of inspections and routine maintenance requirements. c. Spill Response Procedures The permittee shall have written spill response procedures for municipal operations. d . Streets, roads, and public parking The permittee shall evaluate existing and new BM?s annually that reduce lots maintenance polluted stormwater runoff from municipally -owned streets, roads, and public parking lots within their corporate limits. The permittee must evaluate the effectiveness of these BMPs based on cost and the estimated quantity of pollutants removed. e. Operation and Maintenance The permittee shall develop and implement an O&M program for the (O&M) for municipally -owned or stormwater sewer system including catch basins and conveyance systems maintained catch basins and that it owns and maintains. conveyance systems f. Identify municipally owned or The permittee shall maintain a current inventory of municipally -owned or maintained structural stormwater operated structural stormwater controls installed for compliance with the controls - permiftee's post -construction ordinance. g. O&M for municipally -owned or The pennittee shall maintain and implement an O&M program for maintained structural stormwater municipally -owned or maintained structural stormwater controls installed controls for compliance with the permiftee's post -construction ordinance. The O&M program shall specify the frequency of inspections and routine maintenance requirements. The pennittee shall inspect and maintain municipally -owned or maintained structural stormwater controls in accordance with the Page 13 BMP Measurable Goals schedule developed by permittee. The permittee shall -document inspections and maintenance of all municipally -owned or maintained structural stormwater controls. h. Pesticide, Herbicide and Fertilizer The permittee shall ensure municipal employees and contractors are Application Management. properly trained and all permits, certifications, and other measures for applicators are followed. i. Staff training The permittee shall implement an employee training program for employees involved in implementing pollution prevention and good housekeeping practices. j. Prevent or Minimize The permittee shall describe and implement measures to prevent or Contammation of Stormwater minimize contamination of the stormwater runoff from all areas used for Runoff from all areas used for vehicle and equipment cleaning. Vehicle and Equipment Cleaning - j This manual covers the implementation and/ or procedures in place to carry out the above BMPs. 2.1 Program Goals The table below outlines the BMP`s of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this program. The implementation schedule and frequency for these BMI's were established in the Stormwater Management Plan which can be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal Implementation Schedule Frequency 6.1 Inventory of The permittee shall maintain a Inventory is Review municipally current inventory of facilities and maintained annually and owned or operations owned and operated by throughoutthe update if operated the permittee with the potential for permit cycle. needed. facilities generating polluted stormwater runoff. Pige 14 6.2 Operation and The permittee shall maintain and Implemented in first Review Maintenance implement, evaluate annually and year of permit cycle. annually and (O&M) for update as necessary an Operation and update if municipally Maintenance (O&M) program for needed. owned or municipal owned and operated operated facilities with the potential for facilities generating polluted stormwater runoff. The O&M program shall specify the frequency of inspections and routine maintenance requirements. 2.2 Facilities Inventory An inventory of all municipally owned or operated facilities is maintained by the Stormwater Program Specialist. There is a spreadsheet named Municipal Facilities Inventory in the Stormwater Subfolder within Engineering on the Town of Mooresville OneDrive. This inventory is to be updated as needed by the Stormwater Program Specialist and contains the following information: Facility Name Facility Location Facility Manager Facility Contact Information Watershed Information Facility Activities Any SCM's present at the facility Facility Inspection Frequency Municipal facilities and operations are also mapped on ArcGIS Online to be used for digital inspections. It is the responsibility of the Stormwater Program Specialist to assure this Hosted Feature Layer is updated accordingly if any changes are made in the Municipal Facilities Inventory spreadsheet. 2.3 Facility Operation and Maintenance Plans Individual Operation and Maintenance Plans have been developed for each municipal facility/operation, with the exception of those facilities that have an NPDES General Permit requiring a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP will serve as the'Operation and Maintenance Plan' for that facility and is subject to inspections, training, and documentation requirements as laid out by the General Permit. An Inventory of facilities with an NPDES General Permit is included in the Municipal Facilities Inventory spreadsheet. Stormwater O&M Plans detail the stormwater pollution prevention and good housekeeping practices utilized by the employees at that facility. Each Stormwater O&M Plan also details the frequency of facility inspections, facility specific Best Management Practices (BMPs), regular maintenance activities, employee P a g e 15 training information, and spill response procedures. O&M Plans for each facility are reviewed periodically and amended as needed. Amendments are documented in the appendix of the O&M Plan. Stormwater O&M Plans for each facility are located either at the facility itself or in the Stormwater Program Specialist's office if it is impractical to keep the plan at the facility. The Municipal Facility Inventory spreadsheet will indicate the Plan location. Digital copies of the current O&M plans and past versions/drafts are saved in the Stormwater folder in OneDrive. As new facilities and operations are established, it is the responsibility of the Stormwater Program Specialist to develop an O&M Plan for said facility and establish the appropriate inspection frequency based off the facility's potential for generating pulled stormwater runoff. 2.4 Inspections Municipal Facility inspection information and frequency can be found within the individual O&M Plans and in the Municipal Facility Inventory spreadsheet. Facility inspections are to be conducted via ArcGIS Collector and Survey123. A sample of the digital form can be found in the O&M plan 2.4.1 INSPECTION PROCEDURES 1. Before Inspection a. Notify the Facility Manager that they are due for a routine or annual inspection and establish a date and time accordingly. b. Refer to the digital O&M Plan and Municipal Facilities Inventory for any information that can assist in the inspection (e.g., site plans or aerial map with marked drainage structures, facility activities fist) 2. During Inspection a. Open the Web Map for Municipal Facilities and Operations in the Arc Collector App on a mobile device i. If the device does not have the Collector App, navigate to the internet browser and open the Web Map from ArcGIS Online b. Select the facility/ operation you would like to inspect to activate the Pop -Up Window c. Within the Pop -Up Window, follow the link'Go to Facility Inspection Form in Survey123 App' L If the device does not have the Survey123 app downloaded, follow the link 'Go to Facility Inspection Form on Survey123 Website' to open in a browser d. Digitally Complete Form Fields L Assure information fields for Facility Name, Weather, Inspection Date, Inspector and Inspection type are accurately filled out before proceeding to questions ii. If any section or question is not applicable to the facility, leave it blank (ex. If there is no Oil Water Separator for the site, skip the section) iii. If the facility manager or other facility personnel is present for the inspection, educate the person on site of each inspection point and observation iv. Photos are to be taken throughout the inspection to document any areas of concern, or areas utilizing Best Management Practices that can be referenced for future trainting Page 16 v. Be thorough with any comments or observations noted on the inspection form and reference photos where applicable e. Submit Inspection i. Survey123 App: the inspection can be submdtted or saved in drafts ii. Survey123 Website: inspection can only be submitted f. Log Inspection i. In the Facility O&M Plan please note, Date, Time, Inspector Name, and any corrective actions resulting from the inspection 3. Post Inspection a. If edits need to be done after the inspection form has been submitted, this can be done on the Survey123 website. i. My Surveys4Select Survey4Data4Select inspection record from table4 Edit This Record4Make necessary changes4Submit b. Export Inspection to Template Form i. Select Record-->Report4Check box for'Selected Records OnV4Choose Template from Dropdown4Change report name accordingly4 Generate c. Send Copy of Inspection Form to Facility Manager i. Facility Manager is to be provided with a digital copy of the inspection within 3 workdays of inspection completion 2.5 Personnel The Stormwater Program Specialist is the primary personnel responsible for executing the Operation and Maintenance Program for Municipal Operations/Facilities. The Stormwater Program Specialist is to maintain facility inventories, manage ArcGIS data and conduct routine and annual inspections. Facility managers and their employees are responsible for day-to-day maintenance activities at their facility and are to follow the Best Management Practices laid out in their facility specific O&M Plan. 2.6 Documentation & Record Keeping Municipal Facilities & Operations Inventory- Stormwater OneDrive & ArcGIS Online Stormwater O&M Plan- On site at facility or in Storrawater Program Specialist's Office when it is not realistic to keep the plan on site Facility Inspection Logs- Pre 2020, logged in O&M Plan and Inspection Form saved in Binder in Stormwater Program Specialist's office. 2020-Present, logged in O&M Plan and inspection record saved digitally in ArcGIS Inspection Table. Training Information- Facility specific training will be logged in the O&M Plan, with a copy being kept with the Stormwater Program Specialist. Town Wide training will be logged via Safety Skills. 2.7 Program Evaluation This program will be evaluated at least once annually by the Stormwater Program Specialist. An amendment log can be found in Appendix E of this Manual. For any amendments to the O&M plan, please note date of change, specify page and/or section number and a summary of the amendment. P a g e 17 3.1 General Program Information The table below outlines the BMP`s of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this program. The implementation schedule and frequency for these BMPs were established in the Stormwater Management Plan which can be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal Implementation Schedule _17��e__quency 6.6 Identify The permittee shall maintain a curre—nt Implemented in Reviewed and municipally inventory of municipally -owned or first year of permit updated as owned or operated structural stormwater cycle. needed. maintained controls installed for compliance with structural the permittee's post -construction stormwater ordinance. controls O&M for The permittee shall ma �tain and� Implemented in Review municipally- implement an O&M program for first year of permit annually and owned or municipally -owned or maintained cycle. update if maintained structural stormwater controls needed. structural installed for compliance with the stormwater permittee's post -construction controls ordinance. The O&M program shall specify the frequency of inspections and routine maintenance requirements. The permittee shall inspect and maintain municipally -owned or maintained structural stormwater controls in accordance with the schedule developed by permittee. The permittee shall document inspections and maintenance of all municipally - owned or maintained structural stormwater controls. P a g e 18 3.2 BMP Inventory An inventory of all municipally owned or operated Stormwater Control Measures is maintained by the Stormwater Program Specialist. There is a spreadsheet named Town SCM Inventory in the Stormwater Subfolder within Engineering on the Town of Mooresville OneDrive. This inventory is to be updated as needed by the Storrawater Program Specialist and contains the following information: 0 SCM Name • SCM Location • Recorded Book and Page # of Lot • Type of SCM • As -Built or Plan Date (where available) • Whether the SCM was built in compliance of the Towres Post Construction Ordinance • SCM Inspection Frequency Stormwater Control Measures are also mapped on ArcGIS Online to be used for digital inspections. It is the responsibility of the Storrawater Program Specialist to assure this Hosted Feature Layer is updated accordingly if any changes are made in the Town SCM Inventory spreadsheet. 3.3 Inspections Town SCM inspection information and frequency can be found within the individual O&M Plans and in the Town SCM Inventory spreadsheet. Recommended inspection frequency for each type of SCM is also noted in the SCM Operation and Maintenance Agreement Forms saved within the Stormwater OneDrive. SCM inspections are to be conducted via ArcGIS Collector and Survey123. The forms used for Town SCM inspections are the same as used by Private SCM Owners when submitting annual inspections. These formscanbefoundontheTownofMooresviRewebsiteathttps://mooresvilleiic.gov/578/Post- Construction-BMP-Forms. Digital copies can also be found on the Stormwater OneDrive. 3.3.1 INSPECTION PROCEDURES 1. During Inspection a. Open the Web Map for Town of Mooresville Stormwater- Detention Areas in the Arc Collector App on a mobile device i. If the device does not have the Collector App, navigate to the internet browser and open the Web Map from ArcGIS Online b. Select the SCM would like to inspect to activate the Pop -Up Window c. Within the Pop -Up Window, follow the link'Go to SCM Inspection Form in Survey123 App' i. If the device does not have the Survey123 app downloaded, follow the Iink'Go to SCM Inspection Form on Survey123 Website' to open in a browser d. Digitally Complete Form Fields i. Assure information fields at the top of the form are correct before moving on to inspection points (SCM Name, SCM Type, Inspection Type, etc.) 1. Note: Inspection Questions will not pop up until the type of SCM is selected. The questionnaires are tailored for each specific type of SCM Page 19 ii. All questions for this inspection are Mandatory and you will not be able to submit the inspection form without full completion. 1. If a certain question does not pertain to this SCM (ex. Floating Islands for Wet Detention Areas) select N/A for all areas of the section and move on iii. Photos are to be taken throughout Hie inspection to document any areas of concern and to reference any changes in later inspections 1. Note: You will not be able to submit the hispection without a minimum of 2 Photos. iv. Be thorough with any comments or observations noted on the inspection form and reference photos where applicable e. Submit Inspection i. Survey123 App: the inspection can be submitted or saved in drafts ii. Survey123 Website: inspection can only be submitted f. Log Inspection i. In the Town SCM Inspection Log on OneDrive please note, Date, Inspector Name, Inspection Type (routine or annual) and any notes maintenance actions as a result of the inspection 1. Note: This spreadsheet will be phased out at the end of this permit cycle as all SCM inspections 2020-present are logged in Survey123 2. Post Inspection a. If edits need to be done after the inspection form has been submitted, this can be done on the Survey123 website. i. My Surveys->SCM Inspections4Data4Selectinspecfion record from table4 Edit This Record ->Make necessary changes ->Submit b. Export Inspection to Template Form i. Select Record4Report->Check box for'Selected Records Only'4Choose Appropriate SCM Template from Dropdown4Change report name accordingly4 Generate ii. If a template form for the particular type of SCM being inspected has not yet been created this can be done in Survey123 1. Create a copy of the appropriate Word inspection form (found at C:\Users\'user name\Town of Mooresville\Engineering - Documents\Stormwater\5-Post Construction Site Runoff Controls\O&M and Inspection\new Phase II Inspection Forms) 2. In Survey123 go to My Surveys4SCM Inspections4 Data 4 Report4Manage Templates-> Quick Reference 3. Copy and paste appropriate fields from the Quick Reference sheet into the designated areas of the Word Document. 4. Review fields and save the template as a Word Document 5. To utilize this new template go to My Surveys4SCM Inspections4 Data 4 Report4Manage Templates4 Template4Select the Saved Template Document 6. Follow Steps from subsection i. to generate the report Pa g e 110 c. Save the digital Inspection Form within the appropriate SCM folder under C:\Users\'user name�\Town of Mooresville\ Engineering- Documents\Stormwater\5—Post Construction Site Runoff Controls\Town BM[Ps d. If during the inspection the SCM was found not to be working properly are any areas were noted as 'Work Needed (WN)' that cannot be completed by the inspector, the Stormwater Maintenance Supervisor is to be notified immediately to schedule maintenance activities. 3.3.2 FOLLOW-UP INSPECTIONS If an initial inspection shows any areas as'Work Needed' or any other maintenance concerns that can not be conducted at the time of the inspection, a follow-up inspection is required to assure the SCM is back in compliance. To conduct the follow-up inspection, the Inspector is to wait until after the next rain event to visit the site and observe the functionality. When conducting a follow-up inspection, the Inspector should check the box for 'Follow -Up hispection' and follow the procedures from 3.2.1. 3.3.3 ANNUAL INSPECTIONS Town SCM`s fall under the same guidelines as Private SCM` s in terms of maintenance and inspections. Per the Town of Mooresville's Post Construction and Illicit Discharge and Connection Ordinance, SCMs owners are required to submit an Annual Inspection by March 315t of each Calendar year. The Annual Inspection must be completed by either a qualified registered North Carolina professional engineer, surveyor, landscape architect, or any other person otherwise authorized by the Town of Mooresville Stormwater Program Specialist. Under the discretion of the Stormwater Program Specialist, it has been determined that Stormwater SCM Inspection & Maintenance Certification from NC State University is another acceptable qualification. When the box is selected for Annual Inspections additional Survey Fields will populate at the bottom of the Questionnaire and should be completed as follows: a. Name of SCM Owner, Address, and Book and Page Number of the Lot can be found in the Town SCM Inventory Spreadsheet. b. If any areas are noted as'Work Needed (WN)' or any other maintenance is required the option for'Conditional Certificate of Compliance' should be selected i. The inspector should note an estimated date for SCM compliance and plan a follow- up inspection after this date c. For the Seal of the engineer, surveyor or landscape architect attachment field, the Inspector should include a digital image of their credential. If they hold an SCM Inspection and Maintenance Certification, a digital copy of their Inspector Card/Certificate showing their Certification Number and Expiration Date should be submitted here. P a g e 111 3.4 Maintenance Town owned Stormwater Control Measures are to be regularly maintained and inspected as laid out in the Operation and Maintenance Plans developed for each specific qW of SCM. As noted in section 3.2, all SCMs are inspected at least once annually, and most are inspected more frequently on a monthly basis and after significant rain events. The inspector who monitors these structures are to note if any maintenance is required as part of the inspection. If any areas are noted as'Work Needed', the Stormwater Maintenance Supervisor is to be contacted to schedule maintenance. Maintenance activities are to be prioritized along with other MS4 maintenance duties to assure the SCM is operating as designed in a timely manner. 3.5 Personnel The Stormwater Program Specialist is the primary personnel responsible for executing the Operation and Maintenance Program for Municipal Owned/Operated Structural Stormwater Control Measures (sCNrs). The Stormwater Program Specialist is to maintain SCM inventories and manage ArcGIS data. The Stormwater Program Specialist will be responsible for routine and annual SCM inspections, unless otherwise delegated to other qualified personnel. Per the Town of MooresviWs Post Construction and Illicit Discharge and Connection Ordinance, the Annual Inspection must be completed by either a qualified registered North Carolina professional engineer, surveyor, landscape architect, or hold an SCM Inspection & Maintenance Certification from NC State University. The town currently has a number of Professional Engineers on staff qualified to complete inspections and 6 employees under Engineering who hold SCM Inspection & Maintenance Certifications. Outside of annual and routine inspections, these SCMs are visually inspected by other Town employees such as facility managers, building and grounds maintenance personnel and Town inspectors. These parties are to notify the Stormwater Maintenance Supervisor of any issues observed or work that may be needed. The Stormwater Maintenance Supervisor and Maintenance Crew are responsible for any maintenance or repairs needed for SCMs that cannot be conducted on site by the Inspector. The Stormwater Maintenance Supervisor is also responsible for assuring SCMs are regularly mowed and vegetation is maintained per Minimum Design Criteria. Town maintained SCNfs that are unable to be mowed by the Stormwater Maintenance Crew are included in an annual mowing contract with an outside company that is set up by the Stormwater Maintenance Supervisor. 3.6 Documentation & Record Keeping Town Maintained SCM Imrentorym Storinwater OneDrive & ArcGIS Online SCM Plans/As-Buifts- Stormwater OneDrive SCM Inspection Logs - Pre 2020, logged in Town SCM Inspection log Spreadsheet on Stormwater One Drive. hispection Forms are saved in SCM Inspection Binder in Stormwater Program Specialisf s office or in Individual SCM folders on Stormwater OneDrive. P a g e 112 2020-Present: logged in SCM Inspection Spreadsheet on Stormwater OneDrive and inspection record saved digitally in ArcGIS Inspection Table. Digital Inspection form is exported out and saved in individual SCM folders with photos on OneDrive. Mowing Schedule & Contracts- maintained by Stormwater Maintenance Supervisor records and saved on OneDrive. 3.7 Program Evaluation This program will be evaluated at least once annually by the Stormwater Program Specialist with the assistance of other personnel responsible for executing the SCM Operation and Maintenance Program. An amendment log can be found in Appendix E of this Manual. 4.1 General Program Information The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this program. The implementation schedule and frequency for these BMP's were established in the Stormwater Management Plan which can be found in the NPDES Phase I[ Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SW'MP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal implementation Schedule Frequeney 6.4 Streets, roads, The permittee shall evaluate existing Implemented in BMPs are and public and new BMPs annually that reduce first year of permit evaluated parking lots polluted stormwater runoff from cycle. annually and maintenance municipally -owned streets, roads, and updated if public parking lots within their needed. corporate limits. The permittee must evaluate the effectiveness of these BMPs based on cost and the estimated quantity of pollutants removed. 6.5 Operation and The permittee shall develop and Implemented in Review Maintenance implement an O&M program for the first year of permit annually and (O&M) for stormwater sewer system including cycle. update if municipally- catch basins and conveyance systems needed. owned or that it owns and maintains. maintained catch basins and conveyance systems P age 113 4.2 Catch Basins and Conveyance system 4.2.1 INVENTORY & MAPPING An inventory of Stormwater infrastructure in The Town of Mooresville can be found on the ArcGIS Server. There are three main layers used to map infrastructure: • Drainage Structures- assumed structures Ounction boxes), catch basins, curb inlets, double catch basins, drop inlets, manholes, other/unknown, generic pipe inlet/outlets, pipe inlets, pipe outlets, and slab inlets. o Drainage structure layer also includes a field indicating whether or not a structure is a Major or Minor outfall • Drainage Pipes • Drainage Areas The Town hired a consultant to update Stormwater GIS infrastructure inventory in 2016 where structures were grouped into the above three feature layers. Approximately 194 structures were not classified as a specific structure type. Areas also exist where there is an absence of mapped inventory or there are duplicate features mapped for the same structure. Infrastructure should consistently be updated by Stormwater Personnel when inaccuracies are observed in the field to assure inventory is complete. 4.2.2 INFRASTRUCTURE INSPECTIONS Stormwater maintenance personnel are to routinely inspect Stormwater Infrastructure using the Drainage Structures feature layer and the Drainage Pipes feature layer discussed in Section 4.2.1. 4.2.2.1 DRAINAGE STRUCTURE AND DRAINAGE PIPE CONDITION INDICES Drainage Structures and Drainage Pipes are inspected using the fields 'Condition V, 'Condition 2' and 'Condition 3'. Each condition held will have a drop -down option of 3 different conditions for the inspection criteria. Different attributes will have different condition drop downs depending on the type of structure. Condition I will be the inspection criterion with the most importance, Condition 2 will be the inspection criterion of average importance and Condition 3 the inspection criterion of the least importance. Refer to the following tables for inspection criteria for each structure type: Index for Catch Basins, Curb Inlets, Double Catch Basins, Drop Inlets & Slab inlets Inlet (Condition 1) Ground (Condition 3) most impeo4wa AwkWANNUL- o cracks, no leaks, no block, No sag, no holes, no problem 1 (good) Not clogged, no problem missing no problem 2 (fair) small cracks, some * �M_a H cracks, small leaks, So me sagging (minimal), ci g, minor problem . minor problem minor problem clogged up, large cracks, Large cracks or leaks, missmg block, major Trees or holes around Box, I major problem — problem Major Problems Page 114 Index for Assumed Structures (junction Boxes), Manholes & Other Lid (Condition Box (Condition most � a 1,10 sag, no holes, no no problems 1110 7T least importanc No cracks, no leaks, no 1 (good) problem prc missing block, no problem 2 (fair) SO., minor Some sagging (minimal), Small cracks, small leaks, cracking/misaligned minor problem r7. minor problem 3 (bad) n-dssinglid/severe rees or holes around Box, Large cracks or leaks, missing cracking Major Problems block, major problem Index for Pipe Inlets, Pipe Outlets & Pipe InleiVOutlets Clogging (Condition 1) I L Vegetation (Condition 3) most importance no erosion/no holes least importance no obstructing vegetation 1 (good) I� No Clogging or 0 obstructions 2 (fair) Minor clog/obstruction minor erosion/small holes minor vegetation/needs monitored 3 (bad) 1� Major clog/ obstruction major erosion/ large Major vegetation/trees, brush, sinkholes obstructions need removed Index for Pipe Sy ems, Culverts & Assumed Structures Ground (Condition IL GrAddri (Condition 3) most importance No sag, no holes, no problem Joints aligned, no cracking LC rtance No crackin& good shape 1 (good) 2 (fair) Some sagging (minimal), Slight misalignment of bell minor problem or spigot, minor crackin& Minor cracking, no staining . no staining 3 (bad) Trees or holes around Misaligned/missing bell or Major cracking, pipe out of I I pipe, Major Problems I spigot, major cracking, round, water intrusion water intrusion I When these condition fields are populated, the field for 'Condition hidex' will automatically calculate a rating for the structure overnight using the following formula: Condition Index= (Condition 3 +(Condition 2 * 1.25 )+(Condition 1 *1.5))/3 Condition ratings are on a scale from 1.25 (best condition) to 3.75 (worst condition). Condition ratings will determine prioritization of repairs or potential upgrades. 4.2.2.2 INFRASTRUCTURE INSPECTION PROCEDURES 1. During Inspection a. Open the Web Map for Stormwater Inspections in the Arc Collector App on a mobile device Page 115 i. If the device does not have the Collector App, navigate to the internet browser and open the Web Map from ArcGIS Online b. Select the Structure you would like to inspect to activate the Pop -Up Window c. Within the Pop -Up Window, select the option for 'Edie d. Scroll Down to'Condition 1'. When selected, 3 conditions will show up in the drop down depending on what type of structure is being selected. i. Refer to the Condition Index sheet for guidance on how to rate structures ii. When condition is determined select the appropriate option from the drop down e. Repeat step d. for 'Condition 2' and 'Condition 3' i. There is an additional inspection field for'Safety Risk'. While completing an inspection, if a structure is found in disrepair or its current condition could be a potential threat to public health and safety, click the drop -down box and select 'Yes'. ii. There is also an additional field for any comments and notes that may be necessary to further describe the condition and any repairs that may be needed f. When completed, select'Submitif using ArcGIS Collector app. If using ArcGIS Online Map, select'Close' when complete. g. Repeat steps b-f for all additional structures inspected 2. Post Inspection a. If at any time a structure is found to be in need of repair, the inspector should contact the Stormwaber Maintenance Supervisor and submit an iWorQ ticket detailing the issues to be addressed by the maintenance crew I. If several tickets are submitted, the work orders will be prioritized based off the Condition Index Rating, whether or not the problem is deemed a Public Health or Safety Risk and additional factors discussed in Section 4.2.5 Maintenance Prioritization Guidance. *Note: as conditions calculate on a nightly basis, if an immediate Condition Rating is needed to determine repair priority the same day, the Stormwater Program Specialist zvill be able to provide ratingsfor structures in question b. Upon completion of any repairs and a closed out iWorQ ticket, the structure should be reinspected within 60 days to update the condition index fields to their current status, and change the Safety Risk, if needed. The comments field should be utilized to note the date maintenance was completed and any relevant notes. 4.2.2.3 STORMWATER INSPECTIONS DASHBOARD A Stormwater Inspection Dashboard was developed in ArcGIS Online to track the completion of infrastructure inspections, determine condition of structures, and prioritize potential repairs. The dashboard consists of a map and several indicators that can be used to filter what features are visible on the map. This tool may also be utilized by personnel to determine areas for potential Capital Improvement Projects where there are clusters of infrastructure classified under the poor condition rating. Page 116 4.2.3 RAIN EVENT INSPECTIONS Personnel from the Stormwater Maintenance Crew will regularly inspect stormwater inlets in the public right-of-way for any obstructions prior to and during rain events. Designated Public Works field personnel are also assigned to this task when they are not able to complete their normal duties due to weather conditions. Prior to 2021 this was an informal inspection process in which Stormwater Personnel would patrol parts of Town with older infrastructure and areas known for frequent drainage issues while Public Works personnel would be assigned to one of the five plow route sections to patrol. Problems encountered in the field were dealt with accordingly without any procedures or tracking mechanisms. The Town is in current development of an improved rain event inspection program. The goal of this inspection program is to move the Stormwater program to be more proactive in identifying areas that need attention and plan for potential infrastructure repairs or upgrades. The first phase of this program was introduced to Stormwater Maintenance Crew in March 2021 to elicit feedback before being introduced to Public Works personnel. "this section will be updated accordingly once the program is infill implementation. 4.2.3.1 PROCEDURES "procedures will be updated accordingly once the program is in full implementation. 4.2.4 MAINTENANCE The Stormwater Maintenance Crew is responsible for conducting maintenance on all Town owned/maintained stormwater infrastructure. Town Service Requests and Work Orders are tracked through iWorQ.net. All relevant calls, entails and direct requests are logged in this database. Stormwater Personnel use this database to prioritize work orders and plan for materials required to conduct the necessary maintenance. 4.2.4.1 ROUTINE INSPECTION FINDINGS Upon completion of a routine inspection conducted via the procedures in 4.2.2.2, the inspecting personnel will notify the Stormwater Maintenance Supervisor if any maintenance is required and submit a Work Order via iWorQ. Prioritization of work orders will be determined using the guidance provided in section 4.2.5. 4.2.4.2 CITIZEN REQUESTS Citizens are able to submit requests for service via phone call, email, or directly through an iWorQ Service Request. Depending on the nature of the request, the appropriate Stormwater personnel will be dispatched to assess the concern. If the concern is applicable to Town maintained infrastructure (Le Drainage Infrastructure or Drainage Pipes feature layers) the personnel on site is to follow the Inspection Procedures in Section 4.2.2.2 to assess the infrastructure in question. If the infrastructure is determined to be in need of maintenance, the inspecting personnel will contact the Stormwater Maintenance Supervisor and submit a Work Order through iWorQ.net. If the citizen request was originally submitted via iWorQ service request, the ticket will be converted to a work order. Work Orders will be prioritized using the guidance in section 4.2.5. P a g e 117 4.2.4.3 NON -QUALIFYING SERVICE REQUESTS If a citizen service request is determined not to be within the scope of Town maintenance or the infrastructure is not in need of maintenance, the appropriate Stormwater personnel will complete and close out an iWorQ service request ticket detailing appropriate notes about the request and reason maintenance was not deemed appropriate at that time. The party who responded to the non -qualifying issue should do their due diligence to attempt to put the citizen in contact with the proper party to address their concern. 4.2.4.4 REINSPECTION OF REPAIRS/ MAINTENANCE Within 60-days upon completion of maintenance, infrastructure will be reinspected and assigned an updated Condition Index Value. The comments field should be utilized to note the date maintenance was completed and any relevant notes. 4.2.5 MAINTENANCE PRIORITIZATION GUIDANCE Condition Index Rating Action Description —Timerine for Repair Safety N/A Immediate Repairs prioritized 24-48 hours* Concern or Maintenance Needed by criteria on Pages Property 18 & 19 Damage Poor 75 _< Maintenance Need—ed Repairs prioritize --- Y-3 —weeks* by criteria on Pages ___�.17-2.74 18 & 19 Fair Monitor Condition Structures As schedule reinspected permits _<216 annually No action re quired Structure Stays On Structure stays routine inspection on routine schedule inspection * Table is to be used as a baseline estimate of the timelines in which maintenance is to be completed on infrastructure. See Poor Condition section for list of outsidefactors which may impact the time needed to complete maintenance. Poor Condition Infrastructure that is inspected and assigned a condition index rating 2.75 or higher is classified as being in poor condition. Poor Condition Structures are allocated to the Repair Prioritization fist based off Safety Risk, Damage to property and the Condition Index value assigned to the infrastructure upon completed inspection. Repairs that pose a public health and safety risk or cause damage to property will automatically jump to the top of the Repair Prioritization list regardless of Condition Index Value. Structures that are not deemed as such will follow these repairs on the list in order of Condition Index Value from worst condition to best condition. Condition is meant to be a baseline representation of the P age 118 state of structures based off initial field inspections. Pipes and structures on the repair prioritization list will be addressed by maintenance personnel in the order listed unless outside factors including, but not limited to the following effect the feasibility of immediate maintenance: Location Weather Conditions Accessibility Easements/ Right -of -Entry Duration of repair Equipment required Cost and availability of materials In House or Contracted out If a repair or maintenance is not feasible, maintenance personnel will move down the list to the next highest priority repair to address. Fair Condition Infrastructure that is inspected and assigned a condition index rating between 2.17 and 2.74 is classified as being in fair condition. Infrastructure that is rated as Fair Condition will not be added to the work order fist unless signs of increased damage show over time. Fair Condition Structures will be monitored and reinspected annually to determine changes in condition. Poor Condition Structure Maintenance, non - infrastructure related maintenance and regularly assigned work duties will take priority over fair condition structure maintenance by Stormwater personnel. Proactive maintenance will be conducted on these structures as workload permits and addressed in order of Condition Index Value unless feasibility is limited by the factors listed in the previous section. In that event, the next highest priority infrastructure will he addressed. Good Condition Infrastructure that is inspected and assigned a condition index rating of 2.16 or below is classified as being in good condition. This infrastructure requires no action or submission of a work order. Infrastructure and pipe systems under this classification are fully operational and not in need of any maintenance to improve functionality. Good Condition infrastructure will stay on a routine inspection schedule. 4.2.6 PERSONNEL The Stormwater Program Specialist is the primary personnel responsible for maintaining Stormwater GIS data and assure applications are properly utilized. The Stormwater Maintenance Crew is the primary personnel responsible for inspecting and conducting maintenance on the stormwater conveyance system. P a g e 119 4.2.7 DOCUMENTATION AND RECORD KEEPING • Stormwater Infrastructure Inventory- ArcGIS Online and ArcGIS Server Database • Stormwater Infrastructure Inspections- ArcG]S Online and ArcGIS Server Database, Inspection Dashboard • Repair Prioritization List- ArcGIS Online Stormwater Inspection Dashboard • Service Requests & Work Orders- iWorQ.net 4.3 Streets, Roads, and Public Parking Lots 4.3.1 STREET SWEEPING PROGRAM As of September 2021, the Town owns two Street Sweepers with one full-time position dedicated to sweeping supervised under the Stormwater Department. The Street Sweeper works to remove dirt and debris from the streets and gutters within Town and minimize the amount of pollutants that are washed off the streets and gutters and into the storm drains. 4.3.1.1 STREET INVENTORY The Town of Mooresville Powell Map found on the ArcGIS Enterprise Server is used to track which streets and roads within the corporation limits are maintained by the Town or will eventually be turned over to the Town for maintenance. 4.3.1.2 SWEEPER ROUTES The street sweeper runs 4-5 days a week and works off of 10 different routes developed to follow brush pick-up routes from the sanitation department and to assure main roads and frequent problem areas reach a greater level of service throughout the year. Routes are as follows: Red Monday Red Tuesday Red Wednesday Red Thursday Red Friday • Blue Monday • Blue Tuesday • Blue Wednesday • Blue Thursday • Blue Friday As there is only 1 designated street sweeper the Red and Blue routes run on alternating weeks in hopes of reaching adequate coverage of serviced areas. It is the responsibility of the street sweeper operator to keep track their completion of their routes. Sweeper Example Scenarios The operator decides to kick off the fiscal year on a red week. The operator starts the work week at a designated point on the Monday Red Route. The operator will work their way through the route until the end of their designated shift that day and note the area they stopped at to pick up on in 2 weeks on the next Red Monday. The same procedure will be followed for the rest of the week utilizing the Tuesday - Friday Red Routes and for the following week utilizing Monday -Friday Blue Routes. Upon completion of a full route the operator will start the route over from their last designated starting point. P a g e 120 If the street sweeper operator works on a 4-day work week such as Monday -Thursday, it is the responsibility of the operator to assure the Friday route is completed/ receives adequate coverage another day during the week. The Stormwater Maintenance Supervisor may approve a modified schedule for the operator to have an earlier start time one or more days to accommodate this. *Operator may be pulledfrom street sweeping routes if there is an area that needs immediate attention, or if there are wet weather conditions that day that would prevent the sweeperfrom effectively cleaning the roadways. 4.3.1.3 TRACKING MECHANISMS Effectiveness of the street sweeping program will be tracked based on the frequency in which streets are swept and by the quantity of pollutants removed. 4.3.1.3.1 STREETS CLEANED The Town has one GPS unit dedicated to the Street Sweeper. This GPS unit is used to track completion of routes through Fleetmatics. At the end of each month, the Stormwater Program Specialist will pull the data from the Fleetmatics website to load into a hosted feature layer on ArcGIS Online. This Web Map can be used to determine the current level of service at the end of each year, see which areas are not receiving enough attention and address citizen inquiries. The Stormwater Program Specialist will also develop a map at the end of each month to provide to the Stormwater Maintenance Supervisor to review with the operator. Maps will be saved in the Storrawater OneDrive under Street Sweeping. 4.3.1.3.2 ESTIMATED QUANTITY OF POLLUTANTS REMOVED Pollutants that are removed utilizing the street sweeper are dumped in the decant area located at the Public Services Operations Facility. When the decant area is full the waste is to be disposed of at the Iredell County Landfill. Each load is weighed upon arrival and the quantity is billed to the Town of Mooresville. The decant area is primarily used by the street sweeper but is also utilized to dispose of waste from several other departments. The tonnage removed from decant is to be used as an estimate of the quantity of pollutants removed from street sweeping activities with some margin of error. The following table shows the quantity of pollutants removed monthly from decant in the most recent fiscal year: MONTH TONNAGE AMOUNT Jul-20 29.42 1176.8 Aug-20 9.73 389.2 Oct- 20 27.62 1104.8 Nov-20 22.47 898.8 Jan-21 55.17 2206.8 Feb-21 28.08 1132.2 Mar-21 44.26 1770.4 M 21 43.86 1754.4 13.54 541.6 TOTALS 274.15 10975 Page 121 4.3.1.4 ESTIMATED LEVEL OF SERVICE STREET Frequency Residential 5 times per year Main Street Bi-WeekIy NC150 Monthly Brawley School Road Every 6 weeks *Table to be updated at the end of each Fiscal Year based off monthly averages of streets swept 4.3.2 PARKING LOT MAINTENANCE AND CLEANING The Town of Mooresville maintains approximately 51 Parking lots between Town owned facilities, parks and public parking areas. Parking lots equipped with curbs are routinely cleaned by the Street Sweeper on an as needed basis. Parking lots are also to be regularly inspected and cleaned by facility personnel per the guidelines in the facility specific Operation and Maintenance Plans and the Parking Lot Maintenance and Cleaning Standard Operating Procedure. 4.3.3 PERSONNEL The Stormwater Equipment Operator responsible for Street Sweeping duties is the primary personnel responsible for carrying out street and parking lot cleaning. This position reports to the Stormwater Maintenance Supervisor who is responsible for delegating tasks to the operator. The Stormwater Maintenance Supervisor is responsible for obtaining the billing totals from Iredell County Land Fill to determine the quantity of pollutants removed from decant area at the end of the Fiscal Year. The Stormwater Program Specialist is responsible for documentation of this program element. The Stormwater Program Specialist is to modify routes, track completion of sweeping and develop maps to detern-dne the effectiveness of this program 4.3.4 DOCUMENTATION AND RECORD KEEPING Street Inventory- POWELL Map on ArcGIS Online Street Sweeper Routes- Map on ArcGIS Online, printed copies Streets Sweeping Completion- Fleetmatics, ArcGLS Online, Individual Maps on Stormwater OneDrive 0 Quantity of Pollutants Removed- Spreadsheet on Stormwater OneDrive 4.4 Program evaluation This program will be evaluated at least once annually by the Stormwater Program Specialist with the assistance of other personnel responsible for executing the MS4 Operation and Maintenance Program. An amendment log can be found in Appendix E of this Manual. P a g e 122 5.1 General Program Information The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this program. The implementation schedule and frequency for these BMP's were established in the StormwateT Management Plan which can be found in the NPDES Phase Il Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal Implementation Schedule Frequency 6.9 Staff tramimg The permittee shall implement an Implemented in Staff training employee training program for first year of permit for the employees involved in implementing cycle. employees pollution prevention and good described here housekeeping practices. will be conducted at least once per 5.2 Types of Employee Training All employees of the Town of Mooresville play a role, whether it be big or small, in Municipal Pollution Prevention and Good Housekeeping. Taking this into consideration, it was decided that all Town employees should receive basic Stormwater training at least once during the fiscal year. Certain departments are more likely to deal with Stormwater concerns as a part of their day-to-day duties and may receive additional trainings as discussed below, 5.2.1 NEW EMPLOYEE TRAINING All Town employees are to attend New Employee Orientation put on by the Human Resources Department within the first quarter of their employment. Employees that attend this orientation receive an introductory handout that discusses general stormwater information such as the definition of stormwater, stormwater pollution, and what employees can do to prevent or minimize stormwater pollution. 5.2.1.1 DEPARTMENT SPECIFIC CHECKLISTS New employees based in the maintenance departments at the Public Operations Services facility and Building and Grounds Maintenance Shop receive additional training in the form of a New Employee checklist. The checklist describes specific actions employees can take to minimize or prevent stormwater pollution at the Public Services Operations Center/ Building & Grounds Maintenance Shop, as well as at their work sites. P a g e 123 5.2.2 ANNUAL EMPLOYEE TRAINING All Town employees who have a registered Safety Skills account are required to complete Annual Stormwater Training. These trairdngs become active in Safety Skills January 1st of each calendar year and are due by December 31$1. Three separate trainings are loaded into Safety Skills: • Illicit Discharge and Elimination Presentation (created in 2020 by Stormwater Program Specialist) • Pollution Prevention and Good Housekeeping Presentation (created in 2020 by Stormwater Program Specialist) • Stormwater Pollution: Baseline Best Management Practices'Microlearning' (training video with an interactive quiz provided by Safety Skills) 5.2.3 FACILITY MANAGER TRAINING In 2020 the 2016 versions of each facilit/,s Operation and Maintenance Plan were collected and updated by the Stormwater Program Specialist When these plans were updated and redistributed to the facility managers (or appropriate building/operation contact) the Stormwater Program Specialist completed a training called "Introduction to the O&M". Upon completion of this brainin& the facility manager was presented with a Stormwater Facility Manager Checklist to sign off on verifying they received training on the contents of the O&M plan and would follow the Best Management Practices specific to their facility. 5.2.4 ADDITIONAL TRAININGS Additional training may be provided under the discretion of the Stormwater Program Specialist. Trainings may be developed based off findings during routine or annual facility inspections, if reoccurring stormwater issues arise in the Town that need to be addressed, or if job specific duties call for additional stormwater pollution prevention or illicit discharge detection training. Trainings may be provided in person or in an online presentation format depending on the number of personnel the lesson is targeted to and the feasibility to conduct in person training. 5.3 Training Frequency New Employee Training- Once, upon hire with The Town of Mooresville (all employees) Department Specific Checklists (Ops & B&G)- once, upon hire within a field position working out of the Building and Grounds Maintenance Shop or Public Operations Center Pollution Prevention and Good Housekeeping- Annually (all employees) Illicit Discharge Detection and Elimination- Annually (all employees) Stormwater Pollution: Baseline Best Management Practices- Annually (all employees) Introduction to Operation and Maintenance Plans- Once, upon receival of new O&M plan or entering a new facility manager position (managers or designated facility contact only) Facility Manager Checklist- Once, upon receival of new O&M plan or entering a new facility manager position (managers or designated facility contact only) Page 124 5.4 Training Procedures 5.4.1 NEW EMPLOYEE TRAINING PROCEDURES HR was provided with a PDF version of the updated'New Employee Stormwater Brochure' in 2021. This brochure is to be distributed at New Hire Orientation by the HR personnel responsible for leading these sessions. *In past years, the Stormwater Program Specialist attended these sessions in person to present a short slide shozv on Stormwater Services in addition to the handout. This practice was discontinued due to time limitations and the extensive amounts of other information covered during orientation. The following steps should be taken to assure New Employee Stormwater Brochures are updated, distributed, and tracked: Check with Human Resources to assure they have adequate copies on hand of the New Employee Stormwater Brochure o The brochure is saved on the Stormwater OneDrive under FY21 Training and can be provided to the HR office to print additional copies. • Assure the brochure is up to date with current contact information for the Stormwater Program Specialist & Stormwater Maintenance Supervisor • At the end of the Fiscal Year (June 30th) reach out to Human Resources for a count of how many new employees went to Orientation during the reporting year. • The number of employees who received this brochure should be logged in the'FY## Training Log' for that reporting year. • A list of all new employees can be requested from HR as well if further documentation is deemed necessary. 5.4.1.1 DEPARTMENT SPECIFIC CHECKLISTS Blank copies of New Employee Checklists are located in the Training Tab of the Operation and Maintenance Plans for the Building and Ground Maintenance Shop and Public Operations Center. Facility Managers/designated facility stormwater contacts for these facilities are the primary personnel responsible for assuring the checklist gets distributed. The following steps should be taken to assure New Employee Checklists are completed and returned to the Stormwater Program Specialist • When a new employee is hired out of one of these locations the facility manager or supervisor will provide the employee with the checklist to complete. • The facility manager or supervisor is to provide a copy of this checklist to the Stormwater Program Specialist upon completion. • The number of employees who completed facility specific checklists should be logged in the 'FY## Training Log' for that reporting year. "*Stormwater Program Specialist may request a list of all new hires from Human Resources at the end of the year to assure all necessary personnel completed a checklist P a g e 125 5.4.2 ANNUAL EMPLOYEE TRAINING Employee training runs on the calendar year January 1st -December 316t. Completion of these trainings is mandatory for all employees. Risk Management personnel tracks completion of assigned trainings. At the end of the calendar year, Supervisors and Department Heads will be notified of the employees who have outstanding training to be completed by December 315t. At the end of the Fiscal Year, the Stormwater Program Specialist is to contact Risk Management to obtain records of employees who completed training for NPDES Permit Annual Reporting. The number of employees who completed annual training should be logged in the'FY## Training Log' for that reporting year. At the beginning of each calendar year, the Stormwater Program Specialist is to contact Risk Management Personnel to assure stormwater training will be assigned to all employees to complete that year and provide them with any updated trainings. Content included in Annual Training is to be reviewed for relevancy once annually. The content is to be updated accordingly based off results of facility inspections, documented town issues, implementation of new BMP`s, etc. 5.4.3 FACILITY MANAGER TRANING All existing Facility Managers completed a Facility Manager Checklist in Fiscal Year 2021. Completed checklists are kept with the Stormwater Program Specialist's files. Blank copies of this form are saved under FY21 Employee Training on the Stormwater OneDrive. In the event of a change in personnel, the Stormwater Program Specialist is to schedule a meeting with the new facility manager within 90 days of their employment to complete Introduction to the O&M training. At this meeting, the new facility manager will complete the Stormwater Facility Manager Checklist and return it to the Stormwater Program Specialist to retain with employee training files. The number of employees who received this brochure should be logged in the'FY## Training Log' for that reporting year. 5.5 Documentation and Record Keeping New Employee Training- records of New Employee Orientation attendees are kept with Human Resources. The number of employees who attended Orientation and received the introductory brochure are logged in the Employee Training spreadsheet for each Fiscal Year. Department Specific Checklists (Ops & B&G)- Pre-2020: completed checklists are kept in a binder in the Stormwater Program Specialist's office 2020-Present. completed checklists are stored digitally on the Stormwater OneDrive and logged in Employee Training spreadsheet for each Fiscal Year. Annual Employee Training (Safety Skills)- Records of employees who completed the 3 required stormwater trainings on Safety Skills are kept with Risk Management. The number of employees who completed training each year are logged on Stormwater OneDrive in the Employee Training spreadsheet for each Fiscal Year. Facility Manager Checklist- Completed checklists are stored digitally on the Stormwater OneDrive and logged in Employee Training spreadsheet for each Fiscal Year. P a g e 126 5.6 Program Evaluation This program will be evaluated at least once annually by the Stormwater Program Specialist with the assistance of other personnel responsible for executing the Stormwater Employee Training Program. An amendment log can be found in Appendix E of this Manual. The table below outlines the BMI's of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this section. The implementation schedule and frequency for these BMP`s were established in the Stormwater Management Plan which can be found in the NPDES Phase 11 Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal Implementation Frequency Schedule 6.3 Spill Response The permittee shall have written spill Implemented in Review Procedures response procedures for municipal first year of permit annually and operations. cycle. update if needed. 6.1 General Procedures General spill response guidelines from NCDEQ are contained within the facility specific Operation and Maintenance Plans along with blank copies of a Spill Response Report to keep on file at the facility. General Procedures are as follows: All spill response should be conducted with safety in mind first and protection of the environment and property as a secondary concern. Response to spills that can be handled by personnel on -site and the time of the spill should be conducted as follows: Safety First - Don't take risks Keep people away from the area where the spill occurred Do not touch or walk in the spilled material Be on the guard for any gas or vapor Stay up wind and at a higher elevation Do not inhale any gases, fumes, or smoke Stop the spill at its source if it can be done safely, i.e., close valves, shut down pumps, and/or rotate or upend leaking containers Cover storm drains and sanitary sewer drains Dig a ditch or build a temporary berm with absorbent material or sand to contain spill Pump or remove access material and use absorbent material or sand to clean up the spill Collect and package used absorbent and waste Report spill and arrange for waste pick-up Response to spills that present a risk to health or safety of personnel should be conducted as follows: Page 127 • Evacuate area to ensure personnel safety • Set up barricades to keep people away from the area • Report spill information to appropriate emergency responders In the event of a spill of a hazardous material or chemical, call 911. In the event of a spill of petroleum of 25 gallons or more or if the petroleum cases a sheen on nearby surface water or if the petroleum is discharged at a distance of 100 feet or less from any surface water body, report the discharge to the Department within 24 hours of the discharge and begin to restore the area affected by the discharge. North Carolina Department of Environmental Quality 24 Hour Emergency Response Number for Reporting Spills Em�� 6.2 Petroleum Spills All Drivers and Equipment Operators for the Town of Mooresville are to follow the Safe Operating Procedure for Prevention and Control of Petroleum Spills, last revised August 25, 2020. The table below outlines the BMVs of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this section. The implementation schedule and frequency for these BMP`s were established in the Stormwater Management Plan which can be found in the NPDES Phase Il Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of Mooresville website. No. BMP Measurable Goal Implementation Schedule Frequency 6.8 Pesticide, The permittee shall ensure municipal Implemented in All training and Herbicide and employees and contractors are properly first year of permit certifications Fertilizer trained and all permits, certifications, cycle. are Application and other measures for applicators are continuously Management. followed. maintained and updated as -needed. 7.1 Training and Certification Per North Carolina State standards only a certified pesticide applicator or someone working under his or her supervision may apply restricted use pesticides. The Town strictly upholds to this standard and all employees with this licensure undergo annual required training to maintain their status. Records of the necessary training and certifications for each employee are maintained by the employee's supervisor. P a g e 128 7.2 Storage Practices At the Building and Grounds Maintenance Shop pesticides are stored in a room with restricted access. Only employees that hold a pesticide application license are able to access this room through their employee identification badge. At all Town facilities, fertilizers are stored under cover or within secondary containment where they are prevented from coming into contact with stormwater. For applicable facilities, the site -specific Operation and Maintenance Plan will contain additional Best Management Practices for this measure in Section 3 of the binder. The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit requirements (as found in Section 1) that are addressed through this section. The implementation schedule and frequency for these BMPs were established in the Stormwater Management Plan which can be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the Stormwater OneDrive and the current Annual ReportlSWMP is available to the public on the Town of Mooresville website. 6ao Prevent or The permittee shall describe and Implemented in Review annually Minimize implement measures to prevent or year one of and update if Contamination minimize contamination of the permit cycle. needed. of Stormwater stormwater runoff from all areas used for Runoff from all vehicle and equipment cleaning. areas used for Vehicle and Equipment Cleaning 8.1 Wash Bay at Fleet Services The Wash Bay is located at the Public Services Operations Facility located at 2523 Charlotte Highway Mooresville, NC 28117. The wash bay discharges to the oil water separator and then the sanitary sewer. Soaps and deodorizers are stored in a closed room with a drain that leads to the oil water separator and sanitary sewer system. 8.2 Fire -Rescue Department Fire -Rescue Department vehicles will be washed following procedures detailed in the Fire Administration and Operations Department Apparatus Washing General Order. This Order went into effect March 7, 2012. 8.3 Best Management Practices When it is not feasible to use the Wash Bay at Fleet Services, the following Best Management Practices should be followed to reduce discharges to storm drains: P a g e 129 • Use a commercial car wash whenever possible • Use dry cleaning methods to remove debris and sweep area; avoid washing with water when possible • Wash cars and equipment on gravel, grass or other permeable areas • Use only biodegradable, phosphate -free detergents • Block off storm drains or utilize a catch basin insert to filter out soaps and debris Certain Town facilities will have additional Best Management Practices for vehicle and equipment washing located within their facility specific Stormwater Operation & Maintenance Plan. * Farjurther guidance please reference the EPA Mu nicipal Vehicle and Equipinen t Wasidng Fact Sheet P a g e 130 9.1 Appendix A: Reference Materials I , �, , 1 31 0 tkO m 5; 4 4K .0 I Il i z Heil 'I "Elf �fj � 61 � J if Ln LO 0 E 0 u -2 0 t 5 If 12 4M Nit NO IIA 1:7 m E 0 U- CY 0 0 0 m IA cr cu am p z >1 H JIM 11111,18.0 SIMI I MUM 9 h m 9.2 Appendix B: Inspection Forms I � ,i g (, 1 32 9.3 Appendix C: Training Examples I � t-I , 1 33 Routine Inspection Log Facility Name: Address: 80( Inspection Corrective Actions Conducted I Year: Date Corrective Action Completed *Corrective Actions- detail the items needed to be corrected based on inspection report *All inspections will be completed through Survey123. Within 3 days of inspection completion, the facility manager will be provided with a digital copy. *If there is evidence ofstormwater pollution, describe the problem and location in space providedfor corrective actions required andlor comments Routine Inspection Form Facility Name: Golf Course Facility Address: 800 Golf Course Drive Weather: Inspection Completed By: Inspection Date: Question Yes No Tank and Container Management (if section not applicable, put N/A for questi 1. Are any materials or products stored outside in tanks and/or containers? 2. Are any waste materials stored outside? 3. Are any empty containers stored outside? 4. Is secondary containment provided for tanks and containers? S. Is the secondary containment free of any debris, cracks, holes, or evidence ofleaks? 6. Are all containers in good condition and properly store, labeled, and closed? 7. Are the tank and container storage areas in good condition? Corrective Actions Required/Comments: General Site Conditions 8. Are any activities conducted outside where chemicals could be exposed to stormwater runoff7 If yes to 8, detail: 9. Are there any signs of residual or past spills, leaks, releases or illicit discharges? Check vehicle and equipment maintenance and storage areas, material storage and handling areas, fueling areas, areas in and around storm drains, areas where activities may have been conducted outside, and any outfalls. If yes to 9, detail and describe cleanup methods and whether log notes past spill: 10. Are any material handling equipment, industrial machinery equipment and vehicles stored outside? If yes to 10, describe: Question I Yes No- 11. Are materials protected from rainfall, run-on and run-off? Describe: 12. Are stormwater inlets and outlets clearly identified and accessible? 13. Are catch basins and inlets in good condition? 14. Are catch basins and inlets free of trash and debris, floatables, pollutants, oil and grease? 15. Are vegetated ditches in good condition and free of debris �nd —sediment? 16. Are the solid waste containers free of recyclable materials, hazardous materials, tires, and liquids? 17. Do solid waste collection containers have lids? —waste 18.-�re solid collection containers free of any leaks? 19. Are solid waste containers in good condition? 20. Are solid waste collection containers of sufficient size to contain —all materials? 21. Is there any evidence of offsite tracidng of industrial or �waste materials, or sediment where vehicles exit or enter the site? 22. Is there any evidence of tracidng or blowing of raw, final or waste —materials from areas of no exposure to exposed areas? Corrective Actions Required/Comments: Additional Comments: Annual Inspection Log Facility Name: Golf Course Address: 800 Golf Course Drive Year Date/ Time _ Inspection Com leted By Corrective Actions Completed Date Corrective Action Completed *Use Corrective Actions Required numbersfirom Annual Inspection Form to note when each corrective action was completed and who completed each item *All inspections will be completed through Survey123. Within 3 days of inspection completion, the facility manager will be provided with a digital copy. *Inspect all exposed areas of thefacilityfor evidence of contamination of runoff. Areas that need to be inspected include all areas identified in the O&M Plan, areas where spills have or are likely to occur, all structural and non-structural BMPs, the stormwater collection system, and all discharge pointsfirom thefacility. Facility Name: Facility Address: Weather: Annual Inspection Form Golf Course 800 Golf Course Drive Inspection Completed By: Inspection Date: Year: Question Yes No 1. Has the facility developed an inspection program to minimize/prevent exposure? 2. Are copies of inspections and follow-up records maintained? 3. Does the facility keep records of any deficiencies observed? Corrective Actions Required/Comments: Stormwater Control Devices 4. Other than secondary containment and oil water separators, does the facility have any structural stormwater controls, i.e. ponds, sediment basins, etc.? S. Are the stormwater control devices maintained and functioning properly? Corrective Actions Required/Comments: Tank and Container Management 6. Are any materials or products stored outside in tanks andZor containers? 7. Are any waste materials stored outside? 8. Are any empty containers stored outside? 9. Is secondary containment provided for tanks and contain�—rs—? 10. Is the secondary containment free of any debris, cracks, holes, or evidence ofleaks? 11. Is secondary containment free of accumulated water? 12. Are all containers in good condition and properly store, labeled, �nd closed? 13. Are the tank and container storage areas in good condition? Corrective Actions Required/Comments: General Site Conditions 14. Are any activities conducted outside ere chemicals could be exposed to stormwater runoff7 If yes to 14, detail: Question Yes No 15. Are there any signs of residual or past spills, leaks, releases or illicit discharges? Check vehicle and equipment maintenance and storage areas, material storage and handling areas, fueling areas, areas in and around storm drains, areas where activities may have been conducted outside, and any outfalls. If yes to 15, detail and describe cleanup methods and whether log notes past spill: 16. What precautions are taken to minimize exposure? 17. Are any material handling equipment, industrial machinery and/or equipment and vehicles stored outside? If yes to 19, describe: 18. Are materials protected from rainfall, run-on and run -ow. Describe: 19. Are loading/unloading areas designed to minimize stormwater run-on? Describe: 20. Do employees know where the drains discharge? 21. Are stormwater inlets and outlets clearly identified and accessible? 22. Are catch basins and inlets in good condition? 23. Are catch basins and inlets free of trash and debris, floatables, pollutants, oil and grease? 24. Are there catch basins and inlets that are clogged? 2S. Are the vegetated ditches in good condition and free of debris and sediment? 26. Are the solid waste containers free of recyclable materials, hazardous materials, tires, and liquids? 27. Do solid waste collection containers have lids? 28. Are solid waste collection containers free of any leaks? 29. Are solid waste containers in good condition? 30. Are solid waste collection containers of sufficient size to contain all materials? No. Name of Attendee Department Training Topic -5a—te Initials 28 29 30- 31 32 33 34 35 36 37 38 39 40 43 44 45 46 47 48 49 Town Project (Town Use Only) Dry Extended Detention Basin Operation and Maintenance Inspection Report Town of Mooresville, North Carolina Project Name: Inspector Phone #: Inspector Name: Recent Rainfall: 00-2 days 03-5 days 05+ days Inspection Date: Inspector Email: Inspector Signature: DInitial Inspection ElFollow-up inspection D Aerial Photo of Site and Photographs of BMP Attached (Required) Code Key: N/A WN - Not Applicable M = Monitor (potential for future problem) Work Needed S = Satisfactory (or no maintenance needed at tim, of inspection) Potential Pr M Comments E"tire BMP �ash/debds is present Perimeter of the Dry Detention Basin Bare soil/erosive gullies Other (describe) Inlet Device: Pipe or Swale The pipe is clogged (if applicable) The pipe is cracked or otherwise damaged Erosion is occurring in the swale (if applicable) Other (describe) Forebay Sediment accumulation Erosion has occurred or riprap is displaced Weeds are Present Other (describe) ent Area Sediment accumulation Standinq water more than 5 dayi after storm -event Weeds/noxious plants present Other(clescribe) Town of Mooresville Dry Detention Inspection Report — October 2017 Page I I Town Project (Town Use Only) Dry Extended Detention Basin Operation and Maintenance Inspection Town of Mooresville, North Carolina 1.* zkos� Embankment Shrubs/trees present Grass cover is unhealthy or eroding Signs of seepage on the downstream face Evidence of muskrat or beaver activity is present Needs repair (determined by appropriate professional) Other (describe) Outlet Device Clogging has occurred Device is damaged Debris on trash rack Other (describe) � Meiv Water Erosiorl other signs of damage at the outlet Other (describe) Miscellaneous Access Vandalism Signage (if applicable) Other (describe) Additional Comments/Recommendations: Please notify us when work is complete or if you have questions. Town of Mooresville Dry Detention Inspection Report — October 2017 Page 12 Town Project Number (Town Use Only) I I ow Dry Extended Detention Basin Operation and Maintenance Inspection Report Town of Mooresville, North Carolina 1. Name of the land owner: Address of the land owner: 2. Recorded book and page number of the lot for this structural SCM: Book Pag 3. The following repairs and maintenance are needed at this time: If no repairs or maintenance are needed at this time, insert N/A and move to item 4. Town of Mooresville Dry Detention Inspection Report — October 2017 Page 13 Town Project Number (Town Use Only) 1 10--, Dry Extended Detention Basin Operation and Maintenance Inspection Report Town of Mooresville, North Carolina 4. Compliance Certification: Please complete Section A or B as appropriate. A. Certificate of Compliance I do certify that I conducted an inspection of the SCM described herein. I certify that at the time of my inspection this SCM was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement as required by the Town of Mooresville Phase 11 Post Construction and Illicit Discharge and Connection Ordinance. Original signature and seal of the engineer, surveyor, or landscape architect. Signature and title Date Seal B. Conditional Certificate of Compliance I do certify that I conducted an inspection of the SCM described herein. I certify that at the time of my inspection this SCM was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement as required by the Town of Mooresville Phase 11 Post Construction and Illicit Discharge and Connection Ordinance with the exception of the items listed in the above inspection sheet that require correction by the owner/permittee. I will inspect once the repairs are complete and submit a certified report. Estimated Date of Compliance: Original signature and seal of the engineer, surveyor, or landscape architect. Signature and title Date Seal Town of Mooresville Dry Detention Inspection Report — October 2017 Palge 14 C: 0 4� E TO: 0 Ln Ul LU 4-J LLJ z 9� 0 0 E 0.0 -C 4-J 0 Z; Gj 4-- LO 0 E- 0 4-j Ln 4-J Ul -6 c- o 0 S-. 4� U 0 E m M c 0 4z 0 0 C U c 0 4� a- o 4- D 0 0 0 C) 4-J cl) 4� r 4� Z7) of 0 0 0 E (MI) 4� 0 -4L C M z m (1) > u (L) > W u Z5 - 0 > .2 4- L- 4� V) L.- 0- 0 LLI C: u c 0 c 0 u u 4� u L) 4� LA CL a- u 0 CL 0 0- C: Qj —0 0 0 0 E Q) cu 0— a) " Ci) -2 0- E E CD 0 �0- 2- -C ra LA 0 pN30V 4� 0/ oo'� 0 RL W A� m c 0 op u (1) (L) M L.0 m E =3 .2 M O.S E cu E —o .5 cr Ul ,::I, Lf) m M 4-J W L- m tm > 0 " 4-J * 71 0 In CL 4� -0 +- m -I-- 4� E 4- - Fa > m 0 EL a) 'i� +� c m o c 0 4-1 -0 c bn -P Ln a) +� 0 4-0 tu a o >� +, m cu > 0- 0 Ln o 0 -0 W (U -�z u ro = > 0 0 u m \> CV LZ C: (3) Q) u 4-J > "S-- Ln 0= (1) 4� L- Ln 0 4-j V) 0 :t L- 0 ru Ul) 0 4-J 4-J 4-J 0-0.2 4-J 0 4-j ro V) u ro a) r- (1) 0 c: C: < .2 4-J m-- o 0 cy, u (a u U bb -- C: Q- 4-J ro a) 06 4-J V) 4-J t).o CA ra m 0 Li- U G E _I_- E 'E Q) U E aj +-j Ln Ln u 0 Ln 0 i5 m = tnj +05 E L>n- C E -AAA IA z 0 cc L.L 0 ui :03 c :D 75 E 0 W =3 C) z 0 0 0 ui -0 4-j -0 Fa C) 4-J 4� 0 0 4-JI +j 0 0 m C (D C)_ 4-J V) LU M CO E 3: +j 0 0 C) -1-j M Ln c: V) a) buo V) 4--) 4-J 4-J 0 4-J _0 0 W E m E -0 (U — c L- -�-j C: ro M 0 < Ln Ln V) U tj ur E < u 0 -u L- i2L 40 0 0 (3) Q) (3) 4-j C) E cu— m 0 X LLJ 4-J c C- u L40 _0 C) 0 L- r) 4- 0 a) CDL E m x LU -a co c 0 4� > 0 4� 0 a_ V) c =3 L- LI.- +j 0 4-J 4-J 4-J Ln a) +j a) E tn 0 V, 44 M C) E 0 4a ai +j ai ai > Ln 4-1 0 0 0 4-1 E lu u 0 0 a) 4-1 co -0 a) bn 4-j ai a) u Zn -70 4-j mom 00000 f MMVWNMWM! c- 0 4--J D 0 r) L.- Q) E S..- 0 4-j Ul CL E OJ 12 Q) E 4mi > 4-J 0 aj -;.1 Ln 0 fu CL M fu m Ln E C " un CL 43 0 o CML CL C;- *E E ai (u o QJ :3 4-d 0 co E -�E (>A� N 0 /Vf, 0 CO Ir li�AIVIRO cn 4-0 E cu cr 4-j E Ln LU z Iffol (a) L- 0 0 0 F14- 0 S-. L4-- :t E (U 4-j E 0 Ln -C L/) LU C) a_ P� r-i r--A 0 r%j cu u c M, 4� L- 0 0 4-j V) *a,- 4-j 4-j :3 4S 76 c 0 4-j H V) U-i 0 0 E Gi V) c 0 E U.j u Ln We 4-J .4� W u Q) 4-j E Ln (A V) 0 .4� = >, u 4� 4� 0 0 Q) 4— Ln C) 0 Q) 4� Ln u CU Q) ra 4� LZ 0 0 V) LU z E LU 0 .C: a) 4-J 0 0 a) 4-J E 01 E CU L.Li -6 Q) Uc a) 0 o CL) 0) 0 4-J V) C: Z5 V) E E 0 =3 u u Z5 E D u 4-j Ul -E LU LI) u Z5 c 0 u u 0 4� u �A 4� L/) Z5 :3 0 0 0 0- u 0- m r� ry)* 4 Lfi �0, P.10, �Gzllk LO Q) 4--) u m Lj- QL u C: D 2 0 4—) 4-0 0 co 0 4-J E E (U c 4� p E E OFZ- 4� 0 S U (A 4-J 4� 0 up) V) = 0 U CL M4� M-C- u cn V) 0 (U. u c --'E Or- 0 0 4� u -1E 4� U M u C c 0 M CL M Q) M 0.— Ln 0 4� ca 0 a- (n -0 a4� M CL (U= o " c u L- u cu U 0-.— CL cc (U V`4� E 4� 4— V) w S? it' +� M X Ln m-- u (u ai W.�- mv too ra 4� E E a 0 =-F6 EM--Q CL E >- u C) dj -0 :3 4� 0 49 M -0 U ul) C �E V) W LU v) M 00 E -0 0 cu un 0 cm u > cu 0 u Ln 0 0 E fu V) Q) CL) Q. E 0 LO U D 0 4� c (V 4� c V) CU 0 uo Q) E Ln 0 E 25 Q) U, ro Lor) r) 7�; V) Q) u 4—J u 4-j C- Q) E C) 4—J V) r) 7�; rn V) (1) u 4--J u r) Q) E 4--d Lr) (a) co V) r) 7-> co Lf) (1) u 4-J u 4-) c- Q) E Q) tD.0 V) (1) ry) 2: -E! 0 E 0- Lo V) 0 u (3) = --z u > 0 0 4� o E c 0- 0 . 5 (U u E Ln 0 Q) E > u Ln o C) 0-0 U.S 8 Ln m Ln Q) > m is Ul) r) V) (1) u 4-) u m 4—j E Q) co 0 4� -C U) V) 0 CU a) U) V) -0 Q) 4� Le) 0 (11 -2 -0 u 0) Q) *4 L CL 0 E 0 Ln E -5 E 0 1 4� 0 C: = E CU Ln -0 E V) > Ln E 4� 0 0 4� 0 (U Ll c 0 U m 3: _r_ V) 4� Ln lu m U u V) tA Ln U W _0 tn .— m UO -0 E " o C: o c -a mo 4- Ln U Q_-a 4� CL — 0 N 0 C� 0 u m LI) L) 4� Ln E Ln Ln 0 a) C: 0 M U L.L -C V) 4� --1 0 +, (D (A 3: U V) cu 0 -C E �: 4� M m 0 4� D 0 4� 0 E CL 0 L- 4-j 4� V) E c tn 4� E 0 4r' 0 0 (U 4� co 4� Ln M V) fu 4� 4� >- aj E 4� -C cu 0 -0 -0 Ln 0 LU (u c 0) +j E CA cu CL CL D C L m cu U M 0) V) CU 40- C: " aj > Z Ln 0 0 0 > CU u CU 4-J U E V) CU E Ln 0 V) 4- 0 4� Ln '— U C: 0 4� m 0 c o +� c 3: ro -0 Ln m u cu *zl- w C 0 cu Q) E E Q- 4� V) CU CL L-. =3 V) E o kn < CL =3 0 4� V) 4- 0 0 4� m CL V) G) 0 0 I C- ro u LLJ 4—J ro C— C 0 0 U m m 72 u ,u V) E 0 M u 2 w Co iL .a w m 0 E mo 0 CL 0 X o 0� m c E M 0 0 'o M 0 E 0 r o E 0 E 2 0 E 0 o E 0 0 0 Z, = r M CL m u 0 E Lo m E 0— u 0 u c 0 0 cm M E m 0 cu 0 0 om� a CL M 0 E di 0 W M 3: 0 E om c to r C C w 0 , W CL.s 02 m 0 0 E = E :L� m 0) m Ln cu m E 0 Ln 0 4- 0 u m 4� a 0 m c 0 m E 0 4-- 0 m 0 U- E 0 0 C Ln 0 tw J C a) a) 0 0 E 9.4 Appendix D: Standard Operating Procedures g �U �) L) � -V 0-,)C) 3 � V � C- � k �) � P i g e 1 34 9.5 Appendix E: Amendment Logs Page 135 40_ _K3 z 0 4 a CL 2� Q� CL �3 (b zs rb U� z 0 Cr rb S, UD Ln (b rb m Z lb z Z3 Ll r CL