HomeMy WebLinkAboutNCS000540_PPGH_ProgramProceduresManual_20220524Town of Mooresville
Stormwater
Pollution Prevention and Good Housekeeping
Program and Procedures Manual
Adopted May 2021
Updates:
November 2021
1 Table of Contents ................................................. ......................................................................................................
1
1 Background ..................................................................................................................................................................
3
1.1 Purpose ...............................................................................................................................................................
3
1.2 NPDES Phase 11 Permit Requirements ...........................................................................................................
3
2 Operation and Maintenance Program for Municipal Facilities ............................................................................
4
2.1 Program Goals ..................... .............................................................................................................................
4
2.2 Facilities Inventory ...........................................................................................................................................
5
2.3 Facility Operation and Maintenance Plans ....................................................................................................
5
2.4 Inspections .........................................................................................................................................................
6
2.4.1 Inspection Procedures ..................................................................................................................................
6
2.5 Personnel ............................................................................................................................................................
7
2.6 Documentation & Record Keeping .................................................................................................................
7
2.7 Program Evaluation ..........................................................................................................................................
7
3 Operation and Maintenance Program for Municipally Owned or Maintained Structural Stormwater
ControlMeasures (SCM) ............................................................. ......................................................................................
8
3.1 General Program Information .........................................................................................................................
8
3.2 BMP Inventory ..................................................................................................................................................
9
3.3 Inspections .........................................................................................................................................................
9
3.3.1 Inspection Procedures ..................................................................................................................................
9
3.3.2 Follow-up Inspections ...............................................................................................................................
11
3.3.3 Annual Inspections ....................................................................................................................................
11
3.4 Maintenance .....................................................................................................................................................
12
3.5 Personnel ..........................................................................................................................................................
12
3.6 Documentation & Record Keeping ............................................................................................................
— 12
3.7 Program Evaluation ........................................................................................................................................
13
4 MS4 Operation and Maintenance program ...........................................................................................................
13
4.1 General Program Information .......................................................................................................................
13
4.2 Catch Basins and Conveyance system .......... I ............................. ................................................................
14
4.2.1 Inventory & Mapping ................................................................................................................................
14
4.2.2 Infrastructure Inspections .........................................................................................................................
14
4.2.3 Rain Event Inspections ..............................................................................................................................
17
4.2.4 Maintenance ................................................................................................................................................
17
4.2.5 Maintenance Prioritization Guidance ......................................................................................................
18
4.2.6 Personnel .....................................................................................................................................................
19
Page I I
4.2.7 Documentation and record keeping ........................................................................................................
20
4.3 Streets, Roads, and Public Parking Lots .......................................................................................................
20
4.3.1 Street Sweeping Program ..........................................................................................................................
20
4.3.2 Parking Lot Maintenance and CLeaning ......................
.......................................................................... 22
4.3.3 Personnel .............................................................................................................................................
....... 22
4.3.4 Documentation and Record Keeping .......................................................................................................
22
4.4 Program evaluation ........................................................................................................................................
22
5 Employee Training Program ...................................................................................................................................
23
5.1 General Program Information .......................................................................................................................
23
5.2 Types of Employee Training .......................................................................
................................................. 23
5.2.1 New Employee Training ...........................................................................................................................
23
5.2.2 Annual Employee Training .......................................................................................................................
24
5.2.3 Facility Manager Training .........................................................................................................................
24
5.2.4 Additional Trainings ..................................................................................................................................
24
5.3 Training Frequency ................................................................................................................
........................ 24
5.4 Training Procedures .......................................................................................................................................
25
5.4.1 New Employee Training Procedures .......................................................................................................
25
5.4.2 Annual Employee Training .....................................................................................................................
- 26
5.4.3 Facility Manager Traning ..........................................................................................................................
26
5.5 Documentation and Record Keeping ...........................................................................................................
26
5.6 Program Evaluation ........................................................................................................................................
27
6 Spill response procedures ........................................................................................................................................
27
6.1 General Procedures .........................................................................................................................................
27
6.2 Petroleum Spills ..............................................................................................................................................
28
7 Pesticide, Herbicide and Fertilizer Application Management ......................................................................................
28
7.1 Training and Certification ..............................................................................................................................
28
7.2 Storage Practices ..............................................................................................................................................
29
8 Vehicle and Equipment Cleaning ...........................................................................................................................
29
8.1 Wash Bay at Fleet Services .........................................................................................................
................... 29
8.2 Fire -Rescue Department .................................................................................................................................
29
8.3 Best Management Practices ...........................................................................................................................
29
9 Appendixes ................................................................................................................................................................
31
Page 12
1.1 Purpose
This manual was developed to provide personnel with tire Town of Mooresville the information needed
to correctly implement the various programs and procedures related to municipal good housekeeping
and stormwater pollution prevention.
1.2 NPDES Phase Ill Permit Requirements
Pollution Prevention and Good Housekeeping is one of the six minimum measures required by the Town
of Mooresville's National Pollutant Discharge Elimination System (NPDES) Phase 11 Stormwater Permit
as issued by the North Carolina Department of Environmental Quality (NCDEQ). To accomplish U-tis
objective, the Town of Mooresville is to implement the following Best Management Practices found on
Page 11 of the active permit:
BW
Measurable Goals
a. Inventory of municipally owned
The permittee shall maintain a current inventory of facilities and
or operated facilities
operations owned and operated by the permittee with the potential for
generating polluted stormwater runoff.
b. Operation and Maintenance
The permittee shall maintain and implement, evaluate annually, and
(O&M) for municipally owned or
update as necessary an Operation and Maintenance (O&M) program for
operated facilities
municipal owned and operated facilities with the potential for generating
polluted stormwater runoff. The O&M program shall specify the
frequency of inspections and routine maintenance requirements.
c. Spill Response Procedures
The permittee shall have written spill response procedures for municipal
operations.
d . Streets, roads, and public parking
The permittee shall evaluate existing and new BM?s annually that reduce
lots maintenance
polluted stormwater runoff from municipally -owned streets, roads, and
public parking lots within their corporate limits. The permittee must
evaluate the effectiveness of these BMPs based on cost and the estimated
quantity of pollutants removed.
e. Operation and Maintenance
The permittee shall develop and implement an O&M program for the
(O&M) for municipally -owned or
stormwater sewer system including catch basins and conveyance systems
maintained catch basins and
that it owns and maintains.
conveyance systems
f. Identify municipally owned or
The permittee shall maintain a current inventory of municipally -owned or
maintained structural stormwater
operated structural stormwater controls installed for compliance with the
controls -
permiftee's post -construction ordinance.
g. O&M for municipally -owned or
The pennittee shall maintain and implement an O&M program for
maintained structural stormwater
municipally -owned or maintained structural stormwater controls installed
controls
for compliance with the permiftee's post -construction ordinance.
The O&M program shall specify the frequency of inspections and routine
maintenance requirements.
The pennittee shall inspect and maintain municipally -owned or
maintained structural stormwater controls in accordance with the
Page 13
BMP
Measurable Goals
schedule developed by permittee. The permittee shall -document
inspections and maintenance of all municipally -owned or maintained
structural stormwater controls.
h. Pesticide, Herbicide and Fertilizer
The permittee shall ensure municipal employees and contractors are
Application Management.
properly trained and all permits, certifications, and other measures for
applicators are followed.
i. Staff training
The permittee shall implement an employee training program for
employees involved in implementing pollution prevention and good
housekeeping practices.
j. Prevent or Minimize
The permittee shall describe and implement measures to prevent or
Contammation of Stormwater
minimize contamination of the stormwater runoff from all areas used for
Runoff from all areas used for
vehicle and equipment cleaning.
Vehicle and Equipment Cleaning -
j
This manual covers the implementation and/ or procedures in place to carry out the above BMPs.
2.1 Program Goals
The table below outlines the BMP`s of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this program. The implementation
schedule and frequency for these BMI's were established in the Stormwater Management Plan which can
be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
Implementation
Schedule
Frequency
6.1
Inventory of
The permittee shall maintain a
Inventory is
Review
municipally
current inventory of facilities and
maintained
annually and
owned or
operations owned and operated by
throughoutthe
update if
operated
the permittee with the potential for
permit cycle.
needed.
facilities
generating polluted stormwater
runoff.
Pige 14
6.2
Operation and
The permittee shall maintain and
Implemented in first
Review
Maintenance
implement, evaluate annually and
year of permit cycle.
annually and
(O&M) for
update as necessary an Operation and
update if
municipally
Maintenance (O&M) program for
needed.
owned or
municipal owned and operated
operated
facilities with the potential for
facilities
generating polluted stormwater
runoff. The O&M program shall
specify the frequency of inspections
and routine maintenance
requirements.
2.2 Facilities Inventory
An inventory of all municipally owned or operated facilities is maintained by the Stormwater Program
Specialist. There is a spreadsheet named Municipal Facilities Inventory in the Stormwater Subfolder
within Engineering on the Town of Mooresville OneDrive. This inventory is to be updated as needed by
the Stormwater Program Specialist and contains the following information:
Facility Name
Facility Location
Facility Manager
Facility Contact Information
Watershed Information
Facility Activities
Any SCM's present at the facility
Facility Inspection Frequency
Municipal facilities and operations are also mapped on ArcGIS Online to be used for digital inspections.
It is the responsibility of the Stormwater Program Specialist to assure this Hosted Feature Layer is
updated accordingly if any changes are made in the Municipal Facilities Inventory spreadsheet.
2.3 Facility Operation and Maintenance Plans
Individual Operation and Maintenance Plans have been developed for each municipal facility/operation,
with the exception of those facilities that have an NPDES General Permit requiring a Stormwater
Pollution Prevention Plan (SWPPP). The SWPPP will serve as the'Operation and Maintenance Plan' for
that facility and is subject to inspections, training, and documentation requirements as laid out by the
General Permit. An Inventory of facilities with an NPDES General Permit is included in the Municipal
Facilities Inventory spreadsheet.
Stormwater O&M Plans detail the stormwater pollution prevention and good housekeeping practices
utilized by the employees at that facility. Each Stormwater O&M Plan also details the frequency of facility
inspections, facility specific Best Management Practices (BMPs), regular maintenance activities, employee
P a g e 15
training information, and spill response procedures. O&M Plans for each facility are reviewed
periodically and amended as needed. Amendments are documented in the appendix of the O&M Plan.
Stormwater O&M Plans for each facility are located either at the facility itself or in the Stormwater
Program Specialist's office if it is impractical to keep the plan at the facility. The Municipal Facility
Inventory spreadsheet will indicate the Plan location. Digital copies of the current O&M plans and past
versions/drafts are saved in the Stormwater folder in OneDrive. As new facilities and operations are
established, it is the responsibility of the Stormwater Program Specialist to develop an O&M Plan for said
facility and establish the appropriate inspection frequency based off the facility's potential for generating
pulled stormwater runoff.
2.4 Inspections
Municipal Facility inspection information and frequency can be found within the individual O&M Plans
and in the Municipal Facility Inventory spreadsheet. Facility inspections are to be conducted via ArcGIS
Collector and Survey123. A sample of the digital form can be found in the O&M plan
2.4.1 INSPECTION PROCEDURES
1. Before Inspection
a. Notify the Facility Manager that they are due for a routine or annual inspection and
establish a date and time accordingly.
b. Refer to the digital O&M Plan and Municipal Facilities Inventory for any information
that can assist in the inspection (e.g., site plans or aerial map with marked drainage
structures, facility activities fist)
2. During Inspection
a. Open the Web Map for Municipal Facilities and Operations in the Arc Collector App on a
mobile device
i. If the device does not have the Collector App, navigate to the internet browser
and open the Web Map from ArcGIS Online
b. Select the facility/ operation you would like to inspect to activate the Pop -Up Window
c. Within the Pop -Up Window, follow the link'Go to Facility Inspection Form in Survey123
App'
L If the device does not have the Survey123 app downloaded, follow the link 'Go
to Facility Inspection Form on Survey123 Website' to open in a browser
d. Digitally Complete Form Fields
L Assure information fields for Facility Name, Weather, Inspection Date, Inspector
and Inspection type are accurately filled out before proceeding to questions
ii. If any section or question is not applicable to the facility, leave it blank (ex. If
there is no Oil Water Separator for the site, skip the section)
iii. If the facility manager or other facility personnel is present for the inspection,
educate the person on site of each inspection point and observation
iv. Photos are to be taken throughout the inspection to document any areas of
concern, or areas utilizing Best Management Practices that can be referenced for
future trainting
Page 16
v. Be thorough with any comments or observations noted on the inspection form
and reference photos where applicable
e. Submit Inspection
i. Survey123 App: the inspection can be submdtted or saved in drafts
ii. Survey123 Website: inspection can only be submitted
f. Log Inspection
i. In the Facility O&M Plan please note, Date, Time, Inspector Name, and any
corrective actions resulting from the inspection
3. Post Inspection
a. If edits need to be done after the inspection form has been submitted, this can be done on
the Survey123 website.
i. My Surveys4Select Survey4Data4Select inspection record from table4 Edit
This Record4Make necessary changes4Submit
b. Export Inspection to Template Form
i. Select Record-->Report4Check box for'Selected Records OnV4Choose
Template from Dropdown4Change report name accordingly4 Generate
c. Send Copy of Inspection Form to Facility Manager
i. Facility Manager is to be provided with a digital copy of the inspection within 3
workdays of inspection completion
2.5 Personnel
The Stormwater Program Specialist is the primary personnel responsible for executing the Operation and
Maintenance Program for Municipal Operations/Facilities. The Stormwater Program Specialist is to
maintain facility inventories, manage ArcGIS data and conduct routine and annual inspections.
Facility managers and their employees are responsible for day-to-day maintenance activities at their
facility and are to follow the Best Management Practices laid out in their facility specific O&M Plan.
2.6 Documentation & Record Keeping
Municipal Facilities & Operations Inventory- Stormwater OneDrive & ArcGIS Online
Stormwater O&M Plan- On site at facility or in Storrawater Program Specialist's Office when it is
not realistic to keep the plan on site
Facility Inspection Logs- Pre 2020, logged in O&M Plan and Inspection Form saved in Binder in
Stormwater Program Specialist's office. 2020-Present, logged in O&M Plan and inspection record
saved digitally in ArcGIS Inspection Table.
Training Information- Facility specific training will be logged in the O&M Plan, with a copy
being kept with the Stormwater Program Specialist. Town Wide training will be logged via Safety
Skills.
2.7 Program Evaluation
This program will be evaluated at least once annually by the Stormwater Program Specialist. An
amendment log can be found in Appendix E of this Manual. For any amendments to the O&M plan,
please note date of change, specify page and/or section number and a summary of the amendment.
P a g e 17
3.1 General Program Information
The table below outlines the BMP`s of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this program. The implementation
schedule and frequency for these BMPs were established in the Stormwater Management Plan which can
be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
Implementation
Schedule
_17��e__quency
6.6
Identify
The permittee shall maintain a curre—nt
Implemented in
Reviewed and
municipally
inventory of municipally -owned or
first year of permit
updated as
owned or
operated structural stormwater
cycle.
needed.
maintained
controls installed for compliance with
structural
the permittee's post -construction
stormwater
ordinance.
controls
O&M for
The permittee shall ma �tain and�
Implemented in
Review
municipally-
implement an O&M program for
first year of permit
annually and
owned or
municipally -owned or maintained
cycle.
update if
maintained
structural stormwater controls
needed.
structural
installed for compliance with the
stormwater
permittee's post -construction
controls
ordinance.
The O&M program shall specify the
frequency of inspections and routine
maintenance requirements.
The permittee shall inspect and
maintain municipally -owned or
maintained structural stormwater
controls in accordance with the
schedule developed by permittee. The
permittee shall document inspections
and maintenance of all municipally -
owned or maintained structural
stormwater controls.
P a g e 18
3.2 BMP Inventory
An inventory of all municipally owned or operated Stormwater Control Measures is maintained by the
Stormwater Program Specialist. There is a spreadsheet named Town SCM Inventory in the Stormwater
Subfolder within Engineering on the Town of Mooresville OneDrive. This inventory is to be updated as
needed by the Storrawater Program Specialist and contains the following information:
0 SCM Name
• SCM Location
• Recorded Book and Page # of Lot
• Type of SCM
• As -Built or Plan Date (where available)
• Whether the SCM was built in compliance of the Towres Post Construction Ordinance
• SCM Inspection Frequency
Stormwater Control Measures are also mapped on ArcGIS Online to be used for digital inspections. It is
the responsibility of the Storrawater Program Specialist to assure this Hosted Feature Layer is updated
accordingly if any changes are made in the Town SCM Inventory spreadsheet.
3.3 Inspections
Town SCM inspection information and frequency can be found within the individual O&M Plans and in
the Town SCM Inventory spreadsheet. Recommended inspection frequency for each type of SCM is also
noted in the SCM Operation and Maintenance Agreement Forms saved within the Stormwater OneDrive.
SCM inspections are to be conducted via ArcGIS Collector and Survey123. The forms used for Town SCM
inspections are the same as used by Private SCM Owners when submitting annual inspections. These
formscanbefoundontheTownofMooresviRewebsiteathttps://mooresvilleiic.gov/578/Post-
Construction-BMP-Forms. Digital copies can also be found on the Stormwater OneDrive.
3.3.1 INSPECTION PROCEDURES
1. During Inspection
a. Open the Web Map for Town of Mooresville Stormwater- Detention Areas in the Arc
Collector App on a mobile device
i. If the device does not have the Collector App, navigate to the internet browser
and open the Web Map from ArcGIS Online
b. Select the SCM would like to inspect to activate the Pop -Up Window
c. Within the Pop -Up Window, follow the link'Go to SCM Inspection Form in Survey123
App'
i. If the device does not have the Survey123 app downloaded, follow the Iink'Go
to SCM Inspection Form on Survey123 Website' to open in a browser
d. Digitally Complete Form Fields
i. Assure information fields at the top of the form are correct before moving on to
inspection points (SCM Name, SCM Type, Inspection Type, etc.)
1. Note: Inspection Questions will not pop up until the type of SCM is
selected. The questionnaires are tailored for each specific type of SCM
Page 19
ii. All questions for this inspection are Mandatory and you will not be able to
submit the inspection form without full completion.
1. If a certain question does not pertain to this SCM (ex. Floating Islands for
Wet Detention Areas) select N/A for all areas of the section and move on
iii. Photos are to be taken throughout Hie inspection to document any areas of
concern and to reference any changes in later inspections
1. Note: You will not be able to submit the hispection without a minimum
of 2 Photos.
iv. Be thorough with any comments or observations noted on the inspection form
and reference photos where applicable
e. Submit Inspection
i. Survey123 App: the inspection can be submitted or saved in drafts
ii. Survey123 Website: inspection can only be submitted
f. Log Inspection
i. In the Town SCM Inspection Log on OneDrive please note, Date, Inspector
Name, Inspection Type (routine or annual) and any notes maintenance actions as
a result of the inspection
1. Note: This spreadsheet will be phased out at the end of this permit cycle
as all SCM inspections 2020-present are logged in Survey123
2. Post Inspection
a. If edits need to be done after the inspection form has been submitted, this can be done on
the Survey123 website.
i. My Surveys->SCM Inspections4Data4Selectinspecfion record from table4
Edit This Record ->Make necessary changes ->Submit
b. Export Inspection to Template Form
i. Select Record4Report->Check box for'Selected Records Only'4Choose
Appropriate SCM Template from Dropdown4Change report name
accordingly4 Generate
ii. If a template form for the particular type of SCM being inspected has not yet
been created this can be done in Survey123
1. Create a copy of the appropriate Word inspection form (found at
C:\Users\'user name\Town of Mooresville\Engineering -
Documents\Stormwater\5-Post Construction Site Runoff
Controls\O&M and Inspection\new Phase II Inspection Forms)
2. In Survey123 go to My Surveys4SCM Inspections4 Data 4
Report4Manage Templates-> Quick Reference
3. Copy and paste appropriate fields from the Quick Reference sheet into
the designated areas of the Word Document.
4. Review fields and save the template as a Word Document
5. To utilize this new template go to My Surveys4SCM Inspections4
Data 4 Report4Manage Templates4 Template4Select the Saved
Template Document
6. Follow Steps from subsection i. to generate the report
Pa g e 110
c. Save the digital Inspection Form within the appropriate SCM folder under
C:\Users\'user name�\Town of Mooresville\ Engineering-
Documents\Stormwater\5—Post Construction Site Runoff Controls\Town BM[Ps
d. If during the inspection the SCM was found not to be working properly are any areas
were noted as 'Work Needed (WN)' that cannot be completed by the inspector, the
Stormwater Maintenance Supervisor is to be notified immediately to schedule
maintenance activities.
3.3.2 FOLLOW-UP INSPECTIONS
If an initial inspection shows any areas as'Work Needed' or any other maintenance concerns that can not
be conducted at the time of the inspection, a follow-up inspection is required to assure the SCM is back in
compliance.
To conduct the follow-up inspection, the Inspector is to wait until after the next rain event to visit the site
and observe the functionality. When conducting a follow-up inspection, the Inspector should check the
box for 'Follow -Up hispection' and follow the procedures from 3.2.1.
3.3.3 ANNUAL INSPECTIONS
Town SCM`s fall under the same guidelines as Private SCM` s in terms of maintenance and inspections.
Per the Town of Mooresville's Post Construction and Illicit Discharge and Connection Ordinance, SCMs
owners are required to submit an Annual Inspection by March 315t of each Calendar year.
The Annual Inspection must be completed by either a qualified registered North Carolina professional
engineer, surveyor, landscape architect, or any other person otherwise authorized by the Town of
Mooresville Stormwater Program Specialist. Under the discretion of the Stormwater Program Specialist, it
has been determined that Stormwater SCM Inspection & Maintenance Certification from NC State
University is another acceptable qualification.
When the box is selected for Annual Inspections additional Survey Fields will populate at the bottom of
the Questionnaire and should be completed as follows:
a. Name of SCM Owner, Address, and Book and Page Number of the Lot can be found in the
Town SCM Inventory Spreadsheet.
b. If any areas are noted as'Work Needed (WN)' or any other maintenance is required the
option for'Conditional Certificate of Compliance' should be selected
i. The inspector should note an estimated date for SCM compliance and plan a follow-
up inspection after this date
c. For the Seal of the engineer, surveyor or landscape architect attachment field, the Inspector
should include a digital image of their credential. If they hold an SCM Inspection and
Maintenance Certification, a digital copy of their Inspector Card/Certificate showing their
Certification Number and Expiration Date should be submitted here.
P a g e 111
3.4 Maintenance
Town owned Stormwater Control Measures are to be regularly maintained and inspected as laid out in
the Operation and Maintenance Plans developed for each specific qW of SCM. As noted in section 3.2, all
SCMs are inspected at least once annually, and most are inspected more frequently on a monthly basis
and after significant rain events. The inspector who monitors these structures are to note if any
maintenance is required as part of the inspection. If any areas are noted as'Work Needed', the
Stormwater Maintenance Supervisor is to be contacted to schedule maintenance. Maintenance activities
are to be prioritized along with other MS4 maintenance duties to assure the SCM is operating as designed
in a timely manner.
3.5 Personnel
The Stormwater Program Specialist is the primary personnel responsible for executing the Operation and
Maintenance Program for Municipal Owned/Operated Structural Stormwater Control Measures (sCNrs).
The Stormwater Program Specialist is to maintain SCM inventories and manage ArcGIS data.
The Stormwater Program Specialist will be responsible for routine and annual SCM inspections, unless
otherwise delegated to other qualified personnel. Per the Town of MooresviWs Post Construction and
Illicit Discharge and Connection Ordinance, the Annual Inspection must be completed by either a
qualified registered North Carolina professional engineer, surveyor, landscape architect, or hold an SCM
Inspection & Maintenance Certification from NC State University. The town currently has a number of
Professional Engineers on staff qualified to complete inspections and 6 employees under Engineering
who hold SCM Inspection & Maintenance Certifications.
Outside of annual and routine inspections, these SCMs are visually inspected by other Town employees
such as facility managers, building and grounds maintenance personnel and Town inspectors. These
parties are to notify the Stormwater Maintenance Supervisor of any issues observed or work that may be
needed.
The Stormwater Maintenance Supervisor and Maintenance Crew are responsible for any maintenance or
repairs needed for SCMs that cannot be conducted on site by the Inspector. The Stormwater Maintenance
Supervisor is also responsible for assuring SCMs are regularly mowed and vegetation is maintained per
Minimum Design Criteria. Town maintained SCNfs that are unable to be mowed by the Stormwater
Maintenance Crew are included in an annual mowing contract with an outside company that is set up by
the Stormwater Maintenance Supervisor.
3.6 Documentation & Record Keeping
Town Maintained SCM Imrentorym Storinwater OneDrive & ArcGIS Online
SCM Plans/As-Buifts- Stormwater OneDrive
SCM Inspection Logs -
Pre 2020, logged in Town SCM Inspection log Spreadsheet on Stormwater One Drive.
hispection Forms are saved in SCM Inspection Binder in Stormwater Program
Specialisf s office or in Individual SCM folders on Stormwater OneDrive.
P a g e 112
2020-Present: logged in SCM Inspection Spreadsheet on Stormwater OneDrive and
inspection record saved digitally in ArcGIS Inspection Table. Digital Inspection form is
exported out and saved in individual SCM folders with photos on OneDrive.
Mowing Schedule & Contracts- maintained by Stormwater Maintenance Supervisor
records and saved on OneDrive.
3.7 Program Evaluation
This program will be evaluated at least once annually by the Stormwater Program Specialist with the
assistance of other personnel responsible for executing the SCM Operation and Maintenance Program.
An amendment log can be found in Appendix E of this Manual.
4.1 General Program Information
The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this program. The implementation
schedule and frequency for these BMP's were established in the Stormwater Management Plan which can
be found in the NPDES Phase I[ Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SW'MP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
implementation
Schedule
Frequeney
6.4
Streets, roads,
The permittee shall evaluate existing
Implemented in
BMPs are
and public
and new BMPs annually that reduce
first year of permit
evaluated
parking lots
polluted stormwater runoff from
cycle.
annually and
maintenance
municipally -owned streets, roads, and
updated if
public parking lots within their
needed.
corporate limits. The permittee must
evaluate the effectiveness of these
BMPs based on cost and the estimated
quantity of pollutants removed.
6.5
Operation and
The permittee shall develop and
Implemented in
Review
Maintenance
implement an O&M program for the
first year of permit
annually and
(O&M) for
stormwater sewer system including
cycle.
update if
municipally-
catch basins and conveyance systems
needed.
owned or
that it owns and maintains.
maintained
catch basins
and
conveyance
systems
P age 113
4.2 Catch Basins and Conveyance system
4.2.1 INVENTORY & MAPPING
An inventory of Stormwater infrastructure in The Town of Mooresville can be found on the ArcGIS
Server. There are three main layers used to map infrastructure:
• Drainage Structures- assumed structures Ounction boxes), catch basins, curb inlets, double catch
basins, drop inlets, manholes, other/unknown, generic pipe inlet/outlets, pipe inlets, pipe
outlets, and slab inlets.
o Drainage structure layer also includes a field indicating whether or not a structure is a
Major or Minor outfall
• Drainage Pipes
• Drainage Areas
The Town hired a consultant to update Stormwater GIS infrastructure inventory in 2016 where structures
were grouped into the above three feature layers. Approximately 194 structures were not classified as a
specific structure type. Areas also exist where there is an absence of mapped inventory or there are
duplicate features mapped for the same structure. Infrastructure should consistently be updated by
Stormwater Personnel when inaccuracies are observed in the field to assure inventory is complete.
4.2.2 INFRASTRUCTURE INSPECTIONS
Stormwater maintenance personnel are to routinely inspect Stormwater Infrastructure using the Drainage
Structures feature layer and the Drainage Pipes feature layer discussed in Section 4.2.1.
4.2.2.1 DRAINAGE STRUCTURE AND DRAINAGE PIPE CONDITION INDICES
Drainage Structures and Drainage Pipes are inspected using the fields 'Condition V, 'Condition 2' and
'Condition 3'. Each condition held will have a drop -down option of 3 different conditions for the
inspection criteria. Different attributes will have different condition drop downs depending on the type
of structure. Condition I will be the inspection criterion with the most importance, Condition 2 will be
the inspection criterion of average importance and Condition 3 the inspection criterion of the least
importance. Refer to the following tables for inspection criteria for each structure type:
Index for Catch Basins, Curb Inlets, Double Catch Basins, Drop Inlets & Slab inlets
Inlet (Condition 1)
Ground (Condition 3)
most impeo4wa
AwkWANNUL-
o cracks, no leaks, no
block, No sag, no holes, no problem
1 (good)
Not clogged, no problem
missing no problem
2 (fair)
small cracks, some
*
�M_a H cracks, small leaks, So me sagging (minimal),
ci g, minor problem
.
minor problem minor problem
clogged up, large cracks,
Large cracks or leaks,
missmg block, major Trees or holes around Box,
I
major problem
—
problem Major Problems
Page 114
Index for Assumed Structures (junction Boxes), Manholes & Other
Lid (Condition
Box (Condition
most � a
1,10 sag, no holes, no
no problems 1110
7T
least importanc
No cracks, no leaks, no
1 (good)
problem
prc
missing block, no problem
2 (fair)
SO.,
minor Some sagging (minimal),
Small cracks, small leaks,
cracking/misaligned minor problem
r7.
minor problem
3 (bad)
n-dssinglid/severe rees or holes around Box,
Large cracks or leaks, missing
cracking Major Problems
block, major problem
Index for Pipe Inlets, Pipe Outlets & Pipe InleiVOutlets
Clogging (Condition 1)
I L
Vegetation (Condition 3)
most importance
no erosion/no holes
least importance
no obstructing vegetation
1 (good)
I�
No Clogging or
0 obstructions
2 (fair)
Minor clog/obstruction
minor erosion/small holes
minor vegetation/needs
monitored
3 (bad)
1�
Major clog/ obstruction
major erosion/ large
Major vegetation/trees, brush,
sinkholes
obstructions need removed
Index for Pipe Sy ems, Culverts & Assumed Structures
Ground (Condition
IL
GrAddri (Condition 3)
most importance
No sag, no holes, no
problem
Joints aligned, no cracking
LC rtance
No crackin& good shape
1 (good)
2 (fair)
Some sagging (minimal),
Slight misalignment of bell
minor problem
or spigot, minor crackin&
Minor cracking, no staining
.
no staining
3 (bad)
Trees or holes around
Misaligned/missing bell or
Major cracking, pipe out of
I I
pipe, Major Problems
I
spigot, major cracking,
round, water intrusion
water intrusion I
When these condition fields are populated, the field for 'Condition hidex' will automatically calculate a
rating for the structure overnight using the following formula:
Condition Index= (Condition 3 +(Condition 2 * 1.25 )+(Condition 1 *1.5))/3
Condition ratings are on a scale from 1.25 (best condition) to 3.75 (worst condition). Condition ratings
will determine prioritization of repairs or potential upgrades.
4.2.2.2 INFRASTRUCTURE INSPECTION PROCEDURES
1. During Inspection
a. Open the Web Map for Stormwater Inspections in the Arc Collector App on a mobile
device
Page 115
i. If the device does not have the Collector App, navigate to the internet browser
and open the Web Map from ArcGIS Online
b. Select the Structure you would like to inspect to activate the Pop -Up Window
c. Within the Pop -Up Window, select the option for 'Edie
d. Scroll Down to'Condition 1'. When selected, 3 conditions will show up in the drop down
depending on what type of structure is being selected.
i. Refer to the Condition Index sheet for guidance on how to rate structures
ii. When condition is determined select the appropriate option from the drop down
e. Repeat step d. for 'Condition 2' and 'Condition 3'
i. There is an additional inspection field for'Safety Risk'. While completing an
inspection, if a structure is found in disrepair or its current condition could be a
potential threat to public health and safety, click the drop -down box and select
'Yes'.
ii. There is also an additional field for any comments and notes that may be
necessary to further describe the condition and any repairs that may be needed
f. When completed, select'Submitif using ArcGIS Collector app. If using ArcGIS Online
Map, select'Close' when complete.
g. Repeat steps b-f for all additional structures inspected
2. Post Inspection
a. If at any time a structure is found to be in need of repair, the inspector should contact the
Stormwaber Maintenance Supervisor and submit an iWorQ ticket detailing the issues to
be addressed by the maintenance crew
I. If several tickets are submitted, the work orders will be prioritized based off the
Condition Index Rating, whether or not the problem is deemed a Public Health
or Safety Risk and additional factors discussed in Section 4.2.5 Maintenance
Prioritization Guidance.
*Note: as conditions calculate on a nightly basis, if an immediate Condition Rating is needed to
determine repair priority the same day, the Stormwater Program Specialist zvill be able to provide
ratingsfor structures in question
b. Upon completion of any repairs and a closed out iWorQ ticket, the structure should be
reinspected within 60 days to update the condition index fields to their current status,
and change the Safety Risk, if needed. The comments field should be utilized to note the
date maintenance was completed and any relevant notes.
4.2.2.3 STORMWATER INSPECTIONS DASHBOARD
A Stormwater Inspection Dashboard was developed in ArcGIS Online to track the completion of
infrastructure inspections, determine condition of structures, and prioritize potential repairs. The
dashboard consists of a map and several indicators that can be used to filter what features are visible on
the map. This tool may also be utilized by personnel to determine areas for potential Capital
Improvement Projects where there are clusters of infrastructure classified under the poor condition
rating.
Page 116
4.2.3 RAIN EVENT INSPECTIONS
Personnel from the Stormwater Maintenance Crew will regularly inspect stormwater inlets in the public
right-of-way for any obstructions prior to and during rain events. Designated Public Works field
personnel are also assigned to this task when they are not able to complete their normal duties due to
weather conditions. Prior to 2021 this was an informal inspection process in which Stormwater Personnel
would patrol parts of Town with older infrastructure and areas known for frequent drainage issues while
Public Works personnel would be assigned to one of the five plow route sections to patrol. Problems
encountered in the field were dealt with accordingly without any procedures or tracking mechanisms.
The Town is in current development of an improved rain event inspection program. The goal of this
inspection program is to move the Stormwater program to be more proactive in identifying areas that
need attention and plan for potential infrastructure repairs or upgrades. The first phase of this program
was introduced to Stormwater Maintenance Crew in March 2021 to elicit feedback before being
introduced to Public Works personnel.
"this section will be updated accordingly once the program is infill implementation.
4.2.3.1 PROCEDURES
"procedures will be updated accordingly once the program is in full implementation.
4.2.4 MAINTENANCE
The Stormwater Maintenance Crew is responsible for conducting maintenance on all Town
owned/maintained stormwater infrastructure. Town Service Requests and Work Orders are tracked
through iWorQ.net. All relevant calls, entails and direct requests are logged in this database. Stormwater
Personnel use this database to prioritize work orders and plan for materials required to conduct the
necessary maintenance.
4.2.4.1 ROUTINE INSPECTION FINDINGS
Upon completion of a routine inspection conducted via the procedures in 4.2.2.2, the inspecting personnel
will notify the Stormwater Maintenance Supervisor if any maintenance is required and submit a Work
Order via iWorQ. Prioritization of work orders will be determined using the guidance provided in
section 4.2.5.
4.2.4.2 CITIZEN REQUESTS
Citizens are able to submit requests for service via phone call, email, or directly through an iWorQ
Service Request. Depending on the nature of the request, the appropriate Stormwater personnel will be
dispatched to assess the concern. If the concern is applicable to Town maintained infrastructure (Le
Drainage Infrastructure or Drainage Pipes feature layers) the personnel on site is to follow the Inspection
Procedures in Section 4.2.2.2 to assess the infrastructure in question. If the infrastructure is determined to
be in need of maintenance, the inspecting personnel will contact the Stormwater Maintenance Supervisor
and submit a Work Order through iWorQ.net. If the citizen request was originally submitted via iWorQ
service request, the ticket will be converted to a work order. Work Orders will be prioritized using the
guidance in section 4.2.5.
P a g e 117
4.2.4.3 NON -QUALIFYING SERVICE REQUESTS
If a citizen service request is determined not to be within the scope of Town maintenance or the
infrastructure is not in need of maintenance, the appropriate Stormwater personnel will complete and
close out an iWorQ service request ticket detailing appropriate notes about the request and reason
maintenance was not deemed appropriate at that time. The party who responded to the non -qualifying
issue should do their due diligence to attempt to put the citizen in contact with the proper party to
address their concern.
4.2.4.4 REINSPECTION OF REPAIRS/ MAINTENANCE
Within 60-days upon completion of maintenance, infrastructure will be reinspected and assigned an
updated Condition Index Value. The comments field should be utilized to note the date maintenance was
completed and any relevant notes.
4.2.5 MAINTENANCE PRIORITIZATION GUIDANCE
Condition
Index Rating
Action
Description
—Timerine for
Repair
Safety
N/A
Immediate
Repairs prioritized
24-48 hours*
Concern or
Maintenance Needed
by criteria on Pages
Property
18 & 19
Damage
Poor
75 _<
Maintenance Need—ed
Repairs prioritize
--- Y-3 —weeks*
by criteria on Pages
___�.17-2.74
18 & 19
Fair
Monitor Condition
Structures
As schedule
reinspected
permits
_<216
annually
No action re quired
Structure Stays On
Structure stays
routine inspection
on routine
schedule
inspection
* Table is to be used as a baseline estimate of the timelines in which maintenance is to be completed on
infrastructure. See Poor Condition section for list of outsidefactors which may impact the time needed to complete
maintenance.
Poor Condition
Infrastructure that is inspected and assigned a condition index rating 2.75 or higher is classified as being
in poor condition. Poor Condition Structures are allocated to the Repair Prioritization fist based off Safety
Risk, Damage to property and the Condition Index value assigned to the infrastructure upon completed
inspection. Repairs that pose a public health and safety risk or cause damage to property will
automatically jump to the top of the Repair Prioritization list regardless of Condition Index Value.
Structures that are not deemed as such will follow these repairs on the list in order of Condition Index
Value from worst condition to best condition. Condition is meant to be a baseline representation of the
P age 118
state of structures based off initial field inspections. Pipes and structures on the repair prioritization list
will be addressed by maintenance personnel in the order listed unless outside factors including, but not
limited to the following effect the feasibility of immediate maintenance:
Location
Weather Conditions
Accessibility
Easements/ Right -of -Entry
Duration of repair
Equipment required
Cost and availability of materials
In House or Contracted out
If a repair or maintenance is not feasible, maintenance personnel will move down the list to the next
highest priority repair to address.
Fair Condition
Infrastructure that is inspected and assigned a condition index rating between 2.17 and 2.74 is classified
as being in fair condition. Infrastructure that is rated as Fair Condition will not be added to the work
order fist unless signs of increased damage show over time. Fair Condition Structures will be monitored
and reinspected annually to determine changes in condition. Poor Condition Structure Maintenance, non -
infrastructure related maintenance and regularly assigned work duties will take priority over fair
condition structure maintenance by Stormwater personnel. Proactive maintenance will be conducted on
these structures as workload permits and addressed in order of Condition Index Value unless feasibility
is limited by the factors listed in the previous section. In that event, the next highest priority
infrastructure will he addressed.
Good Condition
Infrastructure that is inspected and assigned a condition index rating of 2.16 or below is classified as
being in good condition. This infrastructure requires no action or submission of a work order.
Infrastructure and pipe systems under this classification are fully operational and not in need of any
maintenance to improve functionality. Good Condition infrastructure will stay on a routine inspection
schedule.
4.2.6 PERSONNEL
The Stormwater Program Specialist is the primary personnel responsible for maintaining Stormwater GIS
data and assure applications are properly utilized. The Stormwater Maintenance Crew is the primary
personnel responsible for inspecting and conducting maintenance on the stormwater conveyance system.
P a g e 119
4.2.7 DOCUMENTATION AND RECORD KEEPING
• Stormwater Infrastructure Inventory- ArcGIS Online and ArcGIS Server Database
• Stormwater Infrastructure Inspections- ArcG]S Online and ArcGIS Server Database, Inspection
Dashboard
• Repair Prioritization List- ArcGIS Online Stormwater Inspection Dashboard
• Service Requests & Work Orders- iWorQ.net
4.3 Streets, Roads, and Public Parking Lots
4.3.1 STREET SWEEPING PROGRAM
As of September 2021, the Town owns two Street Sweepers with one full-time position dedicated to
sweeping supervised under the Stormwater Department. The Street Sweeper works to remove dirt and
debris from the streets and gutters within Town and minimize the amount of pollutants that are washed
off the streets and gutters and into the storm drains.
4.3.1.1 STREET INVENTORY
The Town of Mooresville Powell Map found on the ArcGIS Enterprise Server is used to track which
streets and roads within the corporation limits are maintained by the Town or will eventually be turned
over to the Town for maintenance.
4.3.1.2 SWEEPER ROUTES
The street sweeper runs 4-5 days a week and works off of 10 different routes developed to follow brush
pick-up routes from the sanitation department and to assure main roads and frequent problem areas
reach a greater level of service throughout the year. Routes are as follows:
Red Monday
Red Tuesday
Red Wednesday
Red Thursday
Red Friday
• Blue Monday
• Blue Tuesday
• Blue Wednesday
• Blue Thursday
• Blue Friday
As there is only 1 designated street sweeper the Red and Blue routes run on alternating weeks in hopes of
reaching adequate coverage of serviced areas. It is the responsibility of the street sweeper operator to
keep track their completion of their routes.
Sweeper Example Scenarios
The operator decides to kick off the fiscal year on a red week. The operator starts the work week at a
designated point on the Monday Red Route. The operator will work their way through the route until the
end of their designated shift that day and note the area they stopped at to pick up on in 2 weeks on the
next Red Monday. The same procedure will be followed for the rest of the week utilizing the Tuesday -
Friday Red Routes and for the following week utilizing Monday -Friday Blue Routes. Upon completion of
a full route the operator will start the route over from their last designated starting point.
P a g e 120
If the street sweeper operator works on a 4-day work week such as Monday -Thursday, it is the
responsibility of the operator to assure the Friday route is completed/ receives adequate coverage another
day during the week. The Stormwater Maintenance Supervisor may approve a modified schedule for the
operator to have an earlier start time one or more days to accommodate this.
*Operator may be pulledfrom street sweeping routes if there is an area that needs immediate attention, or if there
are wet weather conditions that day that would prevent the sweeperfrom effectively cleaning the roadways.
4.3.1.3 TRACKING MECHANISMS
Effectiveness of the street sweeping program will be tracked based on the frequency in which streets are
swept and by the quantity of pollutants removed.
4.3.1.3.1 STREETS CLEANED
The Town has one GPS unit dedicated to the Street Sweeper. This GPS unit is used to track completion of
routes through Fleetmatics. At the end of each month, the Stormwater Program Specialist will pull the
data from the Fleetmatics website to load into a hosted feature layer on ArcGIS Online. This Web Map
can be used to determine the current level of service at the end of each year, see which areas are not
receiving enough attention and address citizen inquiries. The Stormwater Program Specialist will also
develop a map at the end of each month to provide to the Stormwater Maintenance Supervisor to review
with the operator. Maps will be saved in the Storrawater OneDrive under Street Sweeping.
4.3.1.3.2 ESTIMATED QUANTITY OF POLLUTANTS REMOVED
Pollutants that are removed utilizing the street sweeper are dumped in the decant area located at the
Public Services Operations Facility. When the decant area is full the waste is to be disposed of at the
Iredell County Landfill. Each load is weighed upon arrival and the quantity is billed to the Town of
Mooresville. The decant area is primarily used by the street sweeper but is also utilized to dispose of
waste from several other departments. The tonnage removed from decant is to be used as an estimate of
the quantity of pollutants removed from street sweeping activities with some margin of error. The
following table shows the quantity of pollutants removed monthly from decant in the most recent fiscal
year:
MONTH
TONNAGE
AMOUNT
Jul-20
29.42
1176.8
Aug-20
9.73
389.2
Oct- 20
27.62
1104.8
Nov-20
22.47
898.8
Jan-21
55.17
2206.8
Feb-21
28.08
1132.2
Mar-21
44.26
1770.4
M 21
43.86
1754.4
13.54
541.6
TOTALS
274.15
10975
Page 121
4.3.1.4 ESTIMATED LEVEL OF SERVICE
STREET
Frequency
Residential
5 times per year
Main Street
Bi-WeekIy
NC150
Monthly
Brawley School Road
Every 6 weeks
*Table to be updated at the end of each Fiscal Year based off monthly averages of streets swept
4.3.2 PARKING LOT MAINTENANCE AND CLEANING
The Town of Mooresville maintains approximately 51 Parking lots between Town owned facilities, parks
and public parking areas. Parking lots equipped with curbs are routinely cleaned by the Street Sweeper
on an as needed basis. Parking lots are also to be regularly inspected and cleaned by facility personnel
per the guidelines in the facility specific Operation and Maintenance Plans and the Parking Lot
Maintenance and Cleaning Standard Operating Procedure.
4.3.3 PERSONNEL
The Stormwater Equipment Operator responsible for Street Sweeping duties is the primary personnel
responsible for carrying out street and parking lot cleaning. This position reports to the Stormwater
Maintenance Supervisor who is responsible for delegating tasks to the operator. The Stormwater
Maintenance Supervisor is responsible for obtaining the billing totals from Iredell County Land Fill to
determine the quantity of pollutants removed from decant area at the end of the Fiscal Year.
The Stormwater Program Specialist is responsible for documentation of this program element. The
Stormwater Program Specialist is to modify routes, track completion of sweeping and develop maps to
detern-dne the effectiveness of this program
4.3.4 DOCUMENTATION AND RECORD KEEPING
Street Inventory- POWELL Map on ArcGIS Online
Street Sweeper Routes- Map on ArcGIS Online, printed copies
Streets Sweeping Completion- Fleetmatics, ArcGLS Online, Individual Maps on Stormwater
OneDrive
0 Quantity of Pollutants Removed- Spreadsheet on Stormwater OneDrive
4.4 Program evaluation
This program will be evaluated at least once annually by the Stormwater Program Specialist with the
assistance of other personnel responsible for executing the MS4 Operation and Maintenance Program. An
amendment log can be found in Appendix E of this Manual.
P a g e 122
5.1 General Program Information
The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this program. The implementation
schedule and frequency for these BMP's were established in the StormwateT Management Plan which can
be found in the NPDES Phase Il Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
Implementation
Schedule
Frequency
6.9
Staff tramimg
The permittee shall implement an
Implemented in
Staff training
employee training program for
first year of permit
for the
employees involved in implementing
cycle.
employees
pollution prevention and good
described here
housekeeping practices.
will be
conducted at
least once per
5.2 Types of Employee Training
All employees of the Town of Mooresville play a role, whether it be big or small, in Municipal Pollution
Prevention and Good Housekeeping. Taking this into consideration, it was decided that all Town
employees should receive basic Stormwater training at least once during the fiscal year. Certain
departments are more likely to deal with Stormwater concerns as a part of their day-to-day duties and
may receive additional trainings as discussed below,
5.2.1 NEW EMPLOYEE TRAINING
All Town employees are to attend New Employee Orientation put on by the Human Resources
Department within the first quarter of their employment. Employees that attend this orientation receive
an introductory handout that discusses general stormwater information such as the definition of
stormwater, stormwater pollution, and what employees can do to prevent or minimize stormwater
pollution.
5.2.1.1 DEPARTMENT SPECIFIC CHECKLISTS
New employees based in the maintenance departments at the Public Operations Services facility and
Building and Grounds Maintenance Shop receive additional training in the form of a New Employee
checklist. The checklist describes specific actions employees can take to minimize or prevent stormwater
pollution at the Public Services Operations Center/ Building & Grounds Maintenance Shop, as well as at
their work sites.
P a g e 123
5.2.2 ANNUAL EMPLOYEE TRAINING
All Town employees who have a registered Safety Skills account are required to complete Annual
Stormwater Training. These trairdngs become active in Safety Skills January 1st of each calendar year and
are due by December 31$1. Three separate trainings are loaded into Safety Skills:
• Illicit Discharge and Elimination Presentation (created in 2020 by Stormwater Program Specialist)
• Pollution Prevention and Good Housekeeping Presentation (created in 2020 by Stormwater
Program Specialist)
• Stormwater Pollution: Baseline Best Management Practices'Microlearning' (training video with
an interactive quiz provided by Safety Skills)
5.2.3 FACILITY MANAGER TRAINING
In 2020 the 2016 versions of each facilit/,s Operation and Maintenance Plan were collected and updated
by the Stormwater Program Specialist When these plans were updated and redistributed to the facility
managers (or appropriate building/operation contact) the Stormwater Program Specialist completed a
training called "Introduction to the O&M". Upon completion of this brainin& the facility manager was
presented with a Stormwater Facility Manager Checklist to sign off on verifying they received training on
the contents of the O&M plan and would follow the Best Management Practices specific to their facility.
5.2.4 ADDITIONAL TRAININGS
Additional training may be provided under the discretion of the Stormwater Program Specialist.
Trainings may be developed based off findings during routine or annual facility inspections, if
reoccurring stormwater issues arise in the Town that need to be addressed, or if job specific duties call for
additional stormwater pollution prevention or illicit discharge detection training. Trainings may be
provided in person or in an online presentation format depending on the number of personnel the lesson
is targeted to and the feasibility to conduct in person training.
5.3 Training Frequency
New Employee Training- Once, upon hire with The Town of Mooresville (all employees)
Department Specific Checklists (Ops & B&G)- once, upon hire within a field position working out of
the Building and Grounds Maintenance Shop or Public Operations Center
Pollution Prevention and Good Housekeeping- Annually (all employees)
Illicit Discharge Detection and Elimination- Annually (all employees)
Stormwater Pollution: Baseline Best Management Practices- Annually (all employees)
Introduction to Operation and Maintenance Plans- Once, upon receival of new O&M plan or entering a
new facility manager position (managers or designated facility contact only)
Facility Manager Checklist- Once, upon receival of new O&M plan or entering a new facility manager
position (managers or designated facility contact only)
Page 124
5.4 Training Procedures
5.4.1 NEW EMPLOYEE TRAINING PROCEDURES
HR was provided with a PDF version of the updated'New Employee Stormwater Brochure' in 2021. This
brochure is to be distributed at New Hire Orientation by the HR personnel responsible for leading these
sessions.
*In past years, the Stormwater Program Specialist attended these sessions in person to present a short slide shozv on Stormwater
Services in addition to the handout. This practice was discontinued due to time limitations and the extensive amounts of other
information covered during orientation.
The following steps should be taken to assure New Employee Stormwater Brochures are updated,
distributed, and tracked:
Check with Human Resources to assure they have adequate copies on hand of the New
Employee Stormwater Brochure
o The brochure is saved on the Stormwater OneDrive under FY21 Training and can be
provided to the HR office to print additional copies.
• Assure the brochure is up to date with current contact information for the Stormwater
Program Specialist & Stormwater Maintenance Supervisor
• At the end of the Fiscal Year (June 30th) reach out to Human Resources for a count of how
many new employees went to Orientation during the reporting year.
• The number of employees who received this brochure should be logged in the'FY##
Training Log' for that reporting year.
• A list of all new employees can be requested from HR as well if further
documentation is deemed necessary.
5.4.1.1 DEPARTMENT SPECIFIC CHECKLISTS
Blank copies of New Employee Checklists are located in the Training Tab of the Operation and
Maintenance Plans for the Building and Ground Maintenance Shop and Public Operations Center.
Facility Managers/designated facility stormwater contacts for these facilities are the primary personnel
responsible for assuring the checklist gets distributed.
The following steps should be taken to assure New Employee Checklists are completed and returned to
the Stormwater Program Specialist
• When a new employee is hired out of one of these locations the facility manager or supervisor
will provide the employee with the checklist to complete.
• The facility manager or supervisor is to provide a copy of this checklist to the Stormwater
Program Specialist upon completion.
• The number of employees who completed facility specific checklists should be logged in the
'FY## Training Log' for that reporting year.
"*Stormwater Program Specialist may request a list of all new hires from Human Resources at the end of
the year to assure all necessary personnel completed a checklist
P a g e 125
5.4.2 ANNUAL EMPLOYEE TRAINING
Employee training runs on the calendar year January 1st -December 316t. Completion of these trainings is
mandatory for all employees. Risk Management personnel tracks completion of assigned trainings. At the
end of the calendar year, Supervisors and Department Heads will be notified of the employees who have
outstanding training to be completed by December 315t. At the end of the Fiscal Year, the Stormwater
Program Specialist is to contact Risk Management to obtain records of employees who completed
training for NPDES Permit Annual Reporting. The number of employees who completed annual training
should be logged in the'FY## Training Log' for that reporting year.
At the beginning of each calendar year, the Stormwater Program Specialist is to contact Risk Management
Personnel to assure stormwater training will be assigned to all employees to complete that year and
provide them with any updated trainings. Content included in Annual Training is to be reviewed for
relevancy once annually. The content is to be updated accordingly based off results of facility inspections,
documented town issues, implementation of new BMP`s, etc.
5.4.3 FACILITY MANAGER TRANING
All existing Facility Managers completed a Facility Manager Checklist in Fiscal Year 2021. Completed
checklists are kept with the Stormwater Program Specialist's files. Blank copies of this form are saved
under FY21 Employee Training on the Stormwater OneDrive.
In the event of a change in personnel, the Stormwater Program Specialist is to schedule a meeting with
the new facility manager within 90 days of their employment to complete Introduction to the O&M
training. At this meeting, the new facility manager will complete the Stormwater Facility Manager
Checklist and return it to the Stormwater Program Specialist to retain with employee training files. The
number of employees who received this brochure should be logged in the'FY## Training Log' for that
reporting year.
5.5 Documentation and Record Keeping
New Employee Training- records of New Employee Orientation attendees are kept with Human
Resources. The number of employees who attended Orientation and received the introductory brochure
are logged in the Employee Training spreadsheet for each Fiscal Year.
Department Specific Checklists (Ops & B&G)-
Pre-2020: completed checklists are kept in a binder in the Stormwater Program Specialist's office
2020-Present. completed checklists are stored digitally on the Stormwater OneDrive and logged
in Employee Training spreadsheet for each Fiscal Year.
Annual Employee Training (Safety Skills)- Records of employees who completed the 3 required
stormwater trainings on Safety Skills are kept with Risk Management. The number of employees who
completed training each year are logged on Stormwater OneDrive in the Employee Training spreadsheet
for each Fiscal Year.
Facility Manager Checklist- Completed checklists are stored digitally on the Stormwater OneDrive and
logged in Employee Training spreadsheet for each Fiscal Year.
P a g e 126
5.6 Program Evaluation
This program will be evaluated at least once annually by the Stormwater Program Specialist with the
assistance of other personnel responsible for executing the Stormwater Employee Training Program. An
amendment log can be found in Appendix E of this Manual.
The table below outlines the BMI's of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this section. The implementation
schedule and frequency for these BMP`s were established in the Stormwater Management Plan which can
be found in the NPDES Phase 11 Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
Implementation
Frequency
Schedule
6.3
Spill Response
The permittee shall have written spill
Implemented in
Review
Procedures
response procedures for municipal
first year of permit
annually and
operations.
cycle.
update if
needed.
6.1 General Procedures
General spill response guidelines from NCDEQ are contained within the facility specific Operation and
Maintenance Plans along with blank copies of a Spill Response Report to keep on file at the facility.
General Procedures are as follows:
All spill response should be conducted with safety in mind first and protection of the environment and
property as a secondary concern. Response to spills that can be handled by personnel on -site and the
time of the spill should be conducted as follows:
Safety First - Don't take risks
Keep people away from the area where the spill occurred
Do not touch or walk in the spilled material
Be on the guard for any gas or vapor
Stay up wind and at a higher elevation
Do not inhale any gases, fumes, or smoke
Stop the spill at its source if it can be done safely, i.e., close valves, shut down pumps, and/or
rotate or upend leaking containers
Cover storm drains and sanitary sewer drains
Dig a ditch or build a temporary berm with absorbent material or sand to contain spill
Pump or remove access material and use absorbent material or sand to clean up the spill
Collect and package used absorbent and waste
Report spill and arrange for waste pick-up
Response to spills that present a risk to health or safety of personnel should be conducted as follows:
Page 127
• Evacuate area to ensure personnel safety
• Set up barricades to keep people away from the area
• Report spill information to appropriate emergency responders
In the event of a spill of a hazardous material or chemical, call 911.
In the event of a spill of petroleum of 25 gallons or more or if the petroleum cases a sheen on nearby
surface water or if the petroleum is discharged at a distance of 100 feet or less from any surface water
body, report the discharge to the Department within 24 hours of the discharge and begin to restore the
area affected by the discharge.
North Carolina Department of Environmental Quality
24 Hour Emergency Response Number for Reporting Spills
Em��
6.2 Petroleum Spills
All Drivers and Equipment Operators for the Town of Mooresville are to follow the Safe Operating
Procedure for Prevention and Control of Petroleum Spills, last revised August 25, 2020.
The table below outlines the BMVs of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this section. The implementation
schedule and frequency for these BMP`s were established in the Stormwater Management Plan which can
be found in the NPDES Phase Il Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual Report/SWMP is available to the public on the Town of
Mooresville website.
No.
BMP
Measurable Goal
Implementation
Schedule
Frequency
6.8
Pesticide,
The permittee shall ensure municipal
Implemented in
All training and
Herbicide and
employees and contractors are properly
first year of permit
certifications
Fertilizer
trained and all permits, certifications,
cycle.
are
Application
and other measures for applicators are
continuously
Management.
followed.
maintained and
updated as
-needed.
7.1 Training and Certification
Per North Carolina State standards only a certified pesticide applicator or someone working under his or
her supervision may apply restricted use pesticides. The Town strictly upholds to this standard and all
employees with this licensure undergo annual required training to maintain their status. Records of the
necessary training and certifications for each employee are maintained by the employee's supervisor.
P a g e 128
7.2 Storage Practices
At the Building and Grounds Maintenance Shop pesticides are stored in a room with restricted access.
Only employees that hold a pesticide application license are able to access this room through their
employee identification badge.
At all Town facilities, fertilizers are stored under cover or within secondary containment where they are
prevented from coming into contact with stormwater. For applicable facilities, the site -specific Operation
and Maintenance Plan will contain additional Best Management Practices for this measure in Section 3 of
the binder.
The table below outlines the BMP's of the Pollution Prevention and Good Housekeeping permit
requirements (as found in Section 1) that are addressed through this section. The implementation
schedule and frequency for these BMPs were established in the Stormwater Management Plan which can
be found in the NPDES Phase H Annual Stormwater Reports. Previous Annual Reports are saved in the
Stormwater OneDrive and the current Annual ReportlSWMP is available to the public on the Town of
Mooresville website.
6ao
Prevent or
The permittee shall describe and
Implemented in
Review annually
Minimize
implement measures to prevent or
year one of
and update if
Contamination
minimize contamination of the
permit cycle.
needed.
of Stormwater
stormwater runoff from all areas used for
Runoff from all
vehicle and equipment cleaning.
areas used for
Vehicle and
Equipment
Cleaning
8.1 Wash Bay at Fleet Services
The Wash Bay is located at the Public Services Operations Facility located at 2523 Charlotte Highway
Mooresville, NC 28117. The wash bay discharges to the oil water separator and then the sanitary sewer.
Soaps and deodorizers are stored in a closed room with a drain that leads to the oil water separator and
sanitary sewer system.
8.2 Fire -Rescue Department
Fire -Rescue Department vehicles will be washed following procedures detailed in the Fire
Administration and Operations Department Apparatus Washing General Order. This Order went into
effect March 7, 2012.
8.3 Best Management Practices
When it is not feasible to use the Wash Bay at Fleet Services, the following Best Management Practices
should be followed to reduce discharges to storm drains:
P a g e 129
• Use a commercial car wash whenever possible
• Use dry cleaning methods to remove debris and sweep area; avoid washing with water when
possible
• Wash cars and equipment on gravel, grass or other permeable areas
• Use only biodegradable, phosphate -free detergents
• Block off storm drains or utilize a catch basin insert to filter out soaps and debris
Certain Town facilities will have additional Best Management Practices for vehicle and equipment
washing located within their facility specific Stormwater Operation & Maintenance Plan.
* Farjurther guidance please reference the EPA Mu nicipal Vehicle and Equipinen t Wasidng Fact Sheet
P a g e 130
9.1 Appendix A: Reference Materials
I , �, , 1 31
0
tkO
m
5;
4
4K
.0
I
Il i z
Heil
'I "Elf �fj
� 61 � J
if
Ln
LO
0
E
0
u
-2
0
t 5
If
12
4M
Nit
NO
IIA
1:7
m
E
0
U-
CY
0
0
0
m
IA
cr
cu
am
p
z
>1
H JIM
11111,18.0 SIMI I MUM
9 h
m
9.2 Appendix B: Inspection Forms
I � ,i g (, 1 32
9.3 Appendix C: Training Examples
I � t-I , 1 33
Routine Inspection Log
Facility Name:
Address: 80(
Inspection Corrective Actions
Conducted I
Year:
Date Corrective
Action Completed
*Corrective Actions- detail the items needed to be corrected based on inspection report
*All inspections will be completed through Survey123. Within 3 days of inspection completion, the
facility manager will be provided with a digital copy.
*If there is evidence ofstormwater pollution, describe the problem and location in space providedfor
corrective actions required andlor comments
Routine Inspection Form
Facility Name: Golf Course
Facility Address: 800 Golf Course Drive
Weather:
Inspection Completed By:
Inspection Date:
Question
Yes No
Tank and Container Management (if section not applicable, put N/A for questi
1. Are any materials or products stored outside in tanks and/or containers?
2. Are any waste materials stored outside?
3. Are any empty containers stored outside?
4. Is secondary containment provided for tanks and containers?
S. Is the secondary containment free of any debris, cracks, holes, or evidence
ofleaks?
6. Are all containers in good condition and properly store, labeled, and
closed?
7. Are the tank and container storage areas in good condition?
Corrective Actions Required/Comments:
General Site Conditions
8. Are any activities conducted outside where chemicals could be exposed to
stormwater runoff7
If yes to 8, detail:
9. Are there any signs of residual or past spills, leaks, releases or illicit
discharges? Check vehicle and equipment maintenance and storage areas,
material storage and handling areas, fueling areas, areas in and around
storm drains, areas where activities may have been conducted outside, and
any outfalls.
If yes to 9, detail and describe cleanup methods and whether log notes past spill:
10. Are any material handling equipment, industrial machinery
equipment and vehicles stored outside?
If yes to 10, describe:
Question
I Yes
No-
11. Are materials protected from rainfall, run-on and run-off?
Describe:
12. Are stormwater inlets and outlets clearly identified and accessible?
13. Are catch basins and inlets in good condition?
14. Are catch basins and inlets free of trash and debris, floatables, pollutants,
oil and grease?
15. Are vegetated ditches in good condition and free of debris �nd —sediment?
16. Are the solid waste containers free of recyclable materials, hazardous
materials, tires, and liquids?
17. Do solid waste collection containers have lids?
—waste
18.-�re solid collection containers free of any leaks?
19. Are solid waste containers in good condition?
20. Are solid waste collection containers of sufficient size to contain —all
materials?
21. Is there any evidence of offsite tracidng of industrial or �waste materials, or
sediment where vehicles exit or enter the site?
22. Is there any evidence of tracidng or blowing of raw, final or waste —materials
from areas of no exposure to exposed areas?
Corrective Actions Required/Comments:
Additional Comments:
Annual Inspection Log
Facility Name: Golf Course
Address: 800 Golf Course Drive
Year
Date/
Time _
Inspection
Com leted By
Corrective Actions Completed
Date Corrective
Action Completed
*Use Corrective Actions Required numbersfirom Annual Inspection Form to note when each corrective
action was completed and who completed each item
*All inspections will be completed through Survey123. Within 3 days of inspection completion, the
facility manager will be provided with a digital copy.
*Inspect all exposed areas of thefacilityfor evidence of contamination of runoff. Areas that need to be
inspected include all areas identified in the O&M Plan, areas where spills have or are likely to occur, all
structural and non-structural BMPs, the stormwater collection system, and all discharge pointsfirom
thefacility.
Facility Name:
Facility Address:
Weather:
Annual Inspection Form
Golf Course
800 Golf Course Drive
Inspection Completed By:
Inspection Date: Year:
Question
Yes
No
1. Has the facility developed an inspection program to minimize/prevent
exposure?
2. Are copies of inspections and follow-up records maintained?
3. Does the facility keep records of any deficiencies observed?
Corrective Actions Required/Comments:
Stormwater Control Devices
4. Other than secondary containment and oil water separators, does the
facility have any structural stormwater controls, i.e. ponds, sediment
basins, etc.?
S. Are the stormwater control devices maintained and functioning properly?
Corrective Actions Required/Comments:
Tank and Container Management
6. Are any materials or products stored outside in tanks andZor containers?
7. Are any waste materials stored outside?
8. Are any empty containers stored outside?
9. Is secondary containment provided for tanks and contain�—rs—?
10. Is the secondary containment free of any debris, cracks, holes, or evidence
ofleaks?
11. Is secondary containment free of accumulated water?
12. Are all containers in good condition and properly store, labeled, �nd
closed?
13. Are the tank and container storage areas in good condition?
Corrective Actions Required/Comments:
General Site Conditions
14. Are any activities conducted outside ere chemicals could be exposed to
stormwater runoff7
If yes to 14, detail:
Question
Yes
No
15. Are there any signs of residual or past spills, leaks, releases or illicit
discharges? Check vehicle and equipment maintenance and storage areas,
material storage and handling areas, fueling areas, areas in and around
storm drains, areas where activities may have been conducted outside, and
any outfalls.
If yes to 15, detail and describe cleanup methods and whether log notes past spill:
16. What precautions are taken to minimize exposure?
17. Are any material handling equipment, industrial machinery and/or
equipment and vehicles stored outside?
If yes to 19, describe:
18. Are materials protected from rainfall, run-on and run -ow.
Describe:
19. Are loading/unloading areas designed to minimize stormwater run-on?
Describe:
20. Do employees know where the drains discharge?
21. Are stormwater inlets and outlets clearly identified and accessible?
22. Are catch basins and inlets in good condition?
23. Are catch basins and inlets free of trash and debris, floatables, pollutants,
oil and grease?
24. Are there catch basins and inlets that are clogged?
2S. Are the vegetated ditches in good condition and free of debris and
sediment?
26. Are the solid waste containers free of recyclable materials, hazardous
materials, tires, and liquids?
27. Do solid waste collection containers have lids?
28. Are solid waste collection containers free of any leaks?
29. Are solid waste containers in good condition?
30. Are solid waste collection containers of sufficient size to contain all
materials?
No.
Name of Attendee
Department
Training Topic
-5a—te
Initials
28
29
30-
31
32
33
34
35
36
37
38
39
40
43
44
45
46
47
48
49
Town Project
(Town Use Only)
Dry Extended Detention Basin Operation and Maintenance Inspection Report
Town of Mooresville, North Carolina
Project Name:
Inspector Phone #:
Inspector Name:
Recent Rainfall: 00-2 days 03-5 days 05+ days
Inspection Date:
Inspector Email:
Inspector Signature:
DInitial Inspection ElFollow-up inspection
D Aerial Photo of Site and Photographs of BMP Attached (Required)
Code Key:
N/A
WN -
Not Applicable M = Monitor (potential for future problem)
Work Needed S = Satisfactory (or no maintenance needed at tim, of inspection)
Potential Pr M
Comments
E"tire BMP
�ash/debds is
present
Perimeter of the Dry Detention Basin
Bare soil/erosive gullies
Other (describe)
Inlet Device: Pipe or Swale
The pipe is clogged (if applicable)
The pipe is cracked or otherwise damaged
Erosion is occurring in the swale (if applicable)
Other (describe)
Forebay
Sediment accumulation
Erosion has occurred or riprap is displaced
Weeds are Present
Other (describe)
ent Area
Sediment accumulation
Standinq water more than 5 dayi after storm -event
Weeds/noxious plants present
Other(clescribe)
Town of Mooresville Dry Detention Inspection Report — October 2017
Page I I
Town Project
(Town Use Only)
Dry Extended Detention Basin Operation and Maintenance Inspection
Town of Mooresville, North Carolina
1.* zkos�
Embankment
Shrubs/trees present
Grass cover is unhealthy or eroding
Signs
of seepage on the downstream face
Evidence
of muskrat or beaver activity is present
Needs repair (determined by appropriate professional)
Other (describe)
Outlet Device
Clogging has occurred
Device is damaged
Debris on trash rack
Other (describe)
� Meiv Water
Erosiorl other signs of damage at the outlet
Other (describe)
Miscellaneous
Access
Vandalism
Signage (if applicable)
Other (describe)
Additional Comments/Recommendations:
Please notify us when work is complete or if you have questions.
Town of Mooresville Dry Detention Inspection Report — October 2017
Page 12
Town Project Number (Town Use Only)
I I ow
Dry Extended Detention Basin Operation and Maintenance Inspection Report
Town of Mooresville, North Carolina
1. Name of the land owner:
Address of the land owner:
2. Recorded book and page number of the lot for this structural SCM: Book Pag
3. The following repairs and maintenance are needed at this time: If no repairs or maintenance are needed at
this time, insert N/A and move to item 4.
Town of Mooresville Dry Detention Inspection Report — October 2017
Page 13
Town Project Number
(Town Use Only)
1 10--,
Dry Extended Detention Basin Operation and Maintenance Inspection Report
Town of Mooresville, North Carolina
4. Compliance Certification:
Please complete Section A or B as appropriate.
A. Certificate of Compliance
I do certify that I conducted an inspection of the SCM described herein. I certify that at the time of my inspection
this SCM was performing properly and was in compliance with the terms and conditions of the approved
maintenance agreement as required by the Town of Mooresville Phase 11 Post Construction and Illicit Discharge
and Connection Ordinance.
Original signature and seal of the engineer, surveyor, or landscape architect.
Signature and title Date Seal
B. Conditional Certificate of Compliance
I do certify that I conducted an inspection of the SCM described herein. I certify that at the time of my inspection
this SCM was performing properly and was in compliance with the terms and conditions of the approved
maintenance agreement as required by the Town of Mooresville Phase 11 Post Construction and Illicit Discharge
and Connection Ordinance with the exception of the items listed in the above inspection sheet that require
correction by the owner/permittee. I will inspect once the repairs are complete and submit a certified report.
Estimated Date of Compliance:
Original signature and seal of the engineer, surveyor, or landscape architect.
Signature and title
Date Seal
Town of Mooresville Dry Detention Inspection Report — October 2017
Palge 14
C:
0
4�
E
TO:
0
Ln
Ul
LU
4-J
LLJ
z
9�
0
0
E
0.0
-C
4-J
0
Z;
Gj
4--
LO
0
E-
0
4-j
Ln
4-J
Ul
-6
c-
o
0
S-.
4�
U
0
E
m
M
c
0
4z
0
0
C
U
c
0
4�
a-
o
4-
D
0
0
0
C)
4-J
cl)
4�
r
4�
Z7)
of
0
0
0
E
(MI)
4�
0
-4L
C
M
z
m
(1)
>
u
(L)
>
W
u
Z5
-
0
>
.2
4-
L-
4�
V)
L.-
0-
0
LLI
C:
u
c
0
c
0
u
u
4�
u
L)
4�
LA
CL
a-
u
0
CL
0
0-
C:
Qj
—0
0
0
0
E
Q)
cu 0—
a) "
Ci)
-2
0-
E E
CD
0
�0-
2-
-C
ra
LA 0
pN30V 4�
0/
oo'�
0
RL W A� m
c
0
op
u
(1) (L)
M
L.0
m
E
=3
.2
M
O.S
E
cu
E —o
.5
cr
Ul
,::I,
Lf)
m
M
4-J
W
L-
m
tm
>
0
"
4-J
* 71
0
In
CL
4�
-0
+-
m
-I--
4�
E
4-
- Fa
>
m
0
EL
a)
'i�
+�
c
m
o
c
0
4-1
-0
c
bn
-P
Ln
a)
+�
0
4-0
tu
a
o
>�
+,
m
cu
>
0-
0
Ln
o
0
-0
W
(U
-�z
u
ro
=
>
0
0
u
m
\>
CV
LZ
C:
(3) Q)
u
4-J
> "S--
Ln 0=
(1) 4�
L- Ln
0 4-j V)
0 :t L- 0 ru Ul)
0 4-J
4-J 4-J
0-0.2 4-J 0
4-j ro V)
u
ro a) r- (1)
0 c: C: < .2 4-J
m-- o
0 cy, u (a
u U bb --
C: Q-
4-J ro a)
06 4-J V)
4-J
t).o CA ra m
0 Li-
U G E
_I_- E 'E Q)
U E aj +-j
Ln Ln u 0 Ln
0 i5
m = tnj +05 E L>n-
C
E
-AAA
IA
z
0
cc
L.L
0
ui
:03
c
:D 75 E
0
W
=3 C)
z 0
0 0
ui -0
4-j -0
Fa
C)
4-J
4�
0 0 4-JI
+j 0
0 m C
(D C)_ 4-J V)
LU M
CO E 3:
+j
0 0 C)
-1-j
M Ln c:
V)
a)
buo
V)
4--)
4-J
4-J
0 4-J
_0
0
W
E m
E -0
(U — c L-
-�-j C: ro M
0 <
Ln
Ln V)
U
tj ur E
< u
0 -u
L-
i2L
40
0
0
(3)
Q)
(3)
4-j
C)
E
cu—
m
0
X
LLJ
4-J
c
C-
u
L40
_0
C)
0
L-
r)
4-
0
a)
CDL
E
m
x
LU
-a
co
c
0
4�
>
0
4�
0
a_
V)
c
=3
L-
LI.-
+j
0
4-J
4-J
4-J
Ln
a)
+j
a)
E
tn
0
V,
44
M
C)
E
0
4a
ai
+j
ai
ai
>
Ln
4-1
0
0
0
4-1
E
lu
u
0
0
a)
4-1
co
-0
a)
bn
4-j
ai
a)
u
Zn
-70
4-j
mom
00000 f
MMVWNMWM!
c-
0
4--J
D
0
r)
L.-
Q)
E
S..-
0
4-j
Ul
CL
E
OJ
12
Q)
E
4mi
>
4-J
0
aj
-;.1
Ln
0
fu
CL
M
fu
m
Ln
E
C
"
un
CL
43
0
o
CML
CL
C;-
*E
E
ai
(u
o
QJ
:3
4-d
0
co
E
-�E
(>A�
N 0 /Vf,
0
CO
Ir
li�AIVIRO
cn
4-0
E
cu
cr
4-j
E
Ln
LU
z
Iffol
(a)
L-
0
0
0
F14-
0
S-.
L4--
:t
E
(U
4-j
E
0
Ln
-C
L/)
LU
C)
a_
P�
r-i
r--A
0
r%j
cu
u
c
M,
4�
L-
0
0
4-j
V)
*a,-
4-j
4-j
:3
4S
76
c
0
4-j
H
V)
U-i
0
0
E
Gi
V)
c
0
E
U.j
u
Ln
We
4-J
.4�
W
u
Q)
4-j
E
Ln
(A
V)
0
.4�
=
>,
u
4�
4�
0
0
Q)
4—
Ln
C)
0
Q)
4�
Ln
u
CU
Q)
ra
4�
LZ
0
0
V)
LU
z
E
LU
0
.C:
a)
4-J
0
0
a)
4-J
E
01
E
CU
L.Li
-6
Q)
Uc
a)
0
o
CL)
0)
0
4-J
V)
C:
Z5
V)
E
E
0
=3
u
u
Z5
E
D
u
4-j
Ul
-E
LU
LI)
u
Z5
c
0
u
u
0
4�
u
�A
4�
L/)
Z5
:3
0
0
0
0-
u
0-
m
r�
ry)*
4
Lfi
�0,
P.10,
�Gzllk
LO
Q)
4--)
u
m
Lj-
QL
u
C:
D
2
0
4—)
4-0
0 co
0
4-J
E
E (U c
4�
p
E E
OFZ-
4�
0
S
U (A 4-J
4� 0
up)
V) =
0
U CL
M4�
M-C-
u cn
V) 0
(U.
u
c --'E
Or-
0
0
4�
u
-1E
4� U
M
u
C
c
0
M
CL
M Q) M 0.—
Ln 0
4� ca
0 a- (n -0
a4�
M
CL (U=
o
" c
u
L-
u cu U
0-.—
CL
cc
(U
V`4� E
4� 4—
V)
w
S?
it'
+� M
X
Ln
m--
u
(u
ai
W.�-
mv
too
ra
4�
E E a
0
=-F6
EM--Q
CL
E >-
u C) dj -0 :3
4� 0
49
M
-0
U ul)
C
�E
V)
W
LU v)
M
00
E
-0
0
cu
un
0
cm
u
>
cu
0
u
Ln
0
0
E
fu
V)
Q)
CL)
Q.
E
0
LO
U
D
0
4�
c
(V
4�
c
V)
CU
0
uo
Q)
E
Ln
0
E 25
Q)
U,
ro
Lor)
r)
7�;
V)
Q)
u
4—J
u
4-j
C-
Q)
E
C)
4—J
V)
r)
7�;
rn
V)
(1)
u
4--J
u
r)
Q)
E
4--d
Lr)
(a)
co
V)
r)
7->
co
Lf)
(1)
u
4-J
u
4-)
c-
Q)
E
Q)
tD.0
V)
(1)
ry)
2: -E!
0
E
0-
Lo
V)
0
u
(3)
= --z
u
>
0
0 4�
o E
c 0-
0 . 5
(U
u
E Ln
0
Q)
E
>
u
Ln
o
C)
0-0
U.S
8
Ln
m
Ln
Q)
>
m
is
Ul)
r)
V)
(1)
u
4-)
u
m
4—j
E
Q)
co
0
4�
-C
U)
V)
0
CU
a)
U)
V)
-0
Q)
4�
Le)
0
(11
-2
-0
u
0)
Q)
*4
L
CL
0
E
0
Ln
E
-5
E
0
1
4�
0
C:
=
E
CU
Ln
-0
E
V)
>
Ln
E
4�
0
0
4�
0
(U
Ll
c
0
U
m
3:
_r_
V)
4�
Ln
lu
m
U
u
V)
tA
Ln
U
W
_0
tn
.—
m
UO
-0
E
"
o
C:
o
c
-a
mo
4-
Ln
U
Q_-a
4�
CL
—
0
N
0
C�
0
u
m
LI)
L)
4�
Ln
E
Ln
Ln
0
a)
C:
0
M
U
L.L
-C
V)
4�
--1
0
+,
(D
(A
3:
U
V)
cu
0
-C
E
�:
4�
M
m
0
4�
D
0
4�
0
E
CL
0
L-
4-j
4�
V)
E
c
tn
4�
E
0
4r'
0
0
(U
4�
co
4�
Ln
M
V)
fu
4�
4�
>-
aj
E
4�
-C
cu
0
-0
-0
Ln
0
LU
(u
c
0)
+j
E
CA
cu
CL
CL
D C
L
m
cu
U
M
0)
V)
CU
40-
C:
"
aj
>
Z
Ln
0
0
0
>
CU
u
CU
4-J
U
E
V)
CU
E
Ln
0
V)
4-
0
4�
Ln
'—
U
C:
0
4�
m
0
c
o
+�
c
3:
ro
-0
Ln
m
u
cu
*zl-
w
C
0
cu
Q)
E
E
Q-
4�
V)
CU
CL
L-.
=3
V)
E
o
kn
<
CL
=3
0
4�
V)
4-
0
0
4�
m
CL
V)
G)
0
0
I
C-
ro
u
LLJ
4—J
ro
C—
C
0
0
U
m m
72
u
,u V)
E
0 M
u 2 w
Co
iL
.a w
m
0 E mo
0 CL 0
X o 0� m
c E
M 0
0
'o M
0
E
0
r
o E 0
E 2
0
E 0
o E
0
0 0
Z, =
r M CL
m u 0
E
Lo m
E 0—
u 0
u c 0 0
cm
M E
m 0
cu 0
0 om�
a CL
M
0
E
di 0 W
M
3: 0
E
om c to r C
C w
0 ,
W CL.s 02
m 0 0
E = E
:L�
m
0)
m
Ln
cu
m
E
0
Ln
0
4-
0
u
m
4�
a
0
m
c
0
m
E
0
4--
0
m
0
U-
E
0
0
C
Ln
0
tw
J
C
a)
a)
0
0
E
9.4 Appendix D: Standard Operating Procedures
g �U �) L) � -V 0-,)C) 3 � V � C- � k �) �
P i g e 1 34
9.5 Appendix E: Amendment Logs
Page 135
40_
_K3
z
0
4 a
CL
2� Q�
CL
�3
(b
zs
rb U�
z
0
Cr
rb
S,
UD
Ln
(b
rb m
Z
lb
z
Z3
Ll
r
CL