HomeMy WebLinkAboutRE_ 20170239_Ellerbe Bypass Project_C204368 - Silt lossCarpenter, Kristi
From: Cranford, Darren L
Sent: Monday, May 23, 2022 10:07 AM
To: Conchilla, Ryan; King, Art C; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Attachments: Resized_20220520_170240001 jpeg; Resized952022052095170544jpg;
Resized952022052095170610jpg
Rya n,
I didn't realize the follow up pictures didn't send I guess I had to many photos attached please see the next couple
emails for photos.
Thanks,
Darren Cranford
Assistant Resident Engineer
NCDOT Highway Division 8
District 1 Resident Engineer's Office
336 318 4020 office
336 479 1360 mobile
dlcranforda-ncdot.gov
300 DOT Drive
Asheboro, NC 27204
From: Conchilla, Ryan <ryan.conchiIla@ncdenr.gov>
Sent: Monday, May 16, 2022 11:30 AM
To: Cranford, Darren L <dlcranford@ncdot.gov>; King, Art C <acking@ncdot.gov>; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M <jmyoung@ncdot.gov>
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Hi Darren,
I'm following up on the repairs from the email below. In addition to the photo documentation being prepared, please
include an aerial site map depicting the location of the off -site sediment loss, the approximate impact area outlined and
the estimated quantity of loss.
If you can forward this information by the end of week (5/20), I'd appreciate it.
Thanks
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
From: Cranford, Darren L <dlcranford@ncdot.gov>
Sent: Tuesday, May 10, 2022 9:18 AM
To: King, Art C <acking@ncdot.gov>; Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M <jmyoung@ncdot.gov>
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Rya n,
I am still waiting on an email from the property owner he has been hard to contact. We have a text confirmation that he
did not want any extra disturbance on his land. We did seed and mulch the areas of loss the best that the contractor
could without disturbing the existing thick vegetation in this area. The property owner did not want any vegetation
disturbed and without cutting through the vegetation it was difficult to get a full coverage of seed and mulch on these
areas. I will send follow up photos today of all efforts made for the seeding and mulching.
If you have any further questions please let me know.
Thanks,
Darren Cranford
Assistant Resident Engineer
NCDOT Highway Division 8
District 1 Resident Engineer's Office
336 318 4020 office
336 479 1360 mobile
dlcranforda-ncdot.gov
300 DOT Drive
Asheboro, NC 27204
From: King, Art C <acking@ncdot.gov>
Sent: Monday, May 9, 2022 9:03 PM
To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M <imyoung@ncdot.gov>; Cranford, Darren L <dlcranford@ncdot.gov>
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Rya n,
I have not been given any updates about the site since my last email to you. I was on the project site about a week ago,
before the last big rain event. I spoke briefly with one of the contractors project managers (I don't recall his name), he
had the notion that the residents office and some of his people were still talking to the property owner about access to
the site. Darren would have more/better information about this than I would.
On another issue; just to let you know, I am working shorthanded at this time. My DES Rex Badgett has been out on an
extended medical leave for over a month. As of today I don't have a projected date for his return to work. Because of
that, I am spread a little thin right now so, It may take me a little more time to reply to you with the information you've
requested. If I don't get back to you in a couple of days, just send me another email or, call me on the cell (910-690-
6581).
Thanks,
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 773 8015 office
ackingAncdot.aov
121 Dot Drive
Carthage, NC 28327
From: Conchilla, Ryan <rvan.conchilla@ncdenr.gov>
Sent: Monday, May 9, 2022 2:59 PM
To: King, Art C <acking@ncdot.gov>; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M <imyoung@ncdot.gov>; Cranford, Darren L <dlcranford@ncdot.gov>
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Art,
Good afternoon. I'm following up on the status of the repairs below.
Is there an estimated quantity of sediment released off -site into potential wetlands and/or streams?
If you could provide a short summary of the findings and current status, I'd appreciate it. Thanks -
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
From: King, Art C <acking@ncdot.gov>
Sent: Tuesday, April 19, 2022 10:00 AM
To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; James. C.Lastinger@usace.army.miI
Cc: Young, Joshua M <jmyoung@ncdot.gov>; Cranford, Darren L <dlcranford@ncdot.gov>
Subject: RE: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Ryan, James,
I just wanted to give you a quick update on the sediment clean up on R-3421AB. Work on the project was shut down
prior to yesterday's rain event so the contractor could focus on clean up and repair of basins in the affected area. The
upland sediment loss area has been stabilized and mulched at the direction of Area Roadside Environmental. The off -site
property owner seems to be agreeable to allowing the contractor to go on to his property to clean up but, as of now
hasn't made a formal agreement. However; I am told that he is pretty adamant about not agreeing to having a wetland
delineation done on his property. I think the Resident's Office is still talking to him.
I'll let you know when I get any updates.
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 773 8015 office
acking ncdot.gov
121 Dot Drive
Carthage, NC 28327
From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>
Sent: Wednesday, April 6, 2022 12:07 PM
To: King, Art C <acking@ncdot.gov>; James.C.Lastinger@usace.army.mil
Subject: 20170239_Ellerbe Bypass Project_C204368 - Silt loss
Art,
Thanks for the report.
What is the anticipated timeframe for the off -site delineation and assessment?
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
From: King, Art C <acking@ncdot.gov>
Sent: Monday, April 4, 2022 6:58 PM
To: James.C.Lastinger@usace.army.mil; Conchilla, Ryan <rvan.conchilla@ncdenr.gov>
Subject: FW: C204368 - Silt loss
Gentlemen,
I am reporting a sediment loss at the project and location listed below.
Please see the brief synopsis and, pictures of a sediment loss situation submitted by the assistant resident engineer for
project C204368 (R-3421A&B). I visited the site today. There is a substantial amount of sediment that has gotten
outside of the erosion control measures and migrated outside of the right of way. While it appears that much of the
deposition is in an upland area within the right of way, there is also sediment deposition in an area of undetermined
jurisdiction outside of the right of way. That area has not been delineated because it is outside of the projects study
area. There also appears to be a jurisdictional tributary involved, which is also outside of the study area. I have
suggested to the assistant resident that we speak to the property owners to get access to the area to see if a delineation
would be needed to determine jurisdiction. The area in question is several hundred feet off of the roadway, heavily
overgrown with vegetation and, very difficult to reach. I will forward some additional information and pictures as I
receive it.
Because of the forecast for rain the next few days access to the project site may be limited. We have asked the
contractor to take measures to limit any further damage and to initiate clean up where they have access.
Please let me know if you have questions.
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 773 8015 office
acking ncdot.gov
121 Dot Drive
Carthage, NC 28327
From: Cranford, Darren L <dlcranford@ncdot.gov>
Sent: Monday, April 4, 2022 5:38 PM
To: Young, Joshua M <jmyoung@ncdot.gov>
Cc: Fine, Cary A <cafine@ncdot.gov>; Owens, Lonnie H <Ihowens@ncdot.gov>; Dunn, Thomas B <tbdunn@ncdot.gov>;
King, Art C <acking@ncdot.gov>
Subject: C204368 - Silt loss
Josh,
Attached is the information from the silt loss from the 1-1/2" Rainfall event on 3/31/2022. Silt loss at STA 225+00 has
been walked again, this is the same are we had silt loss in the last rainfall event. The basin 136 filled up with silt and the
slope drain in the basin clogged and caused the silt ditch into the basin to fail and the berm to blow out causing silt loss
off the project in this area. This material was followed all the way to the Jurisdictional Stream at culvert 6, this red clay
material is present all the way to the edge of the Jurisdictional Stream. I will send follow up pictures to this email
showing the material. It is evident that some material may have entered the Jurisdictional Feature but all evidence has
been washed downstream. Art King was notified and him and myself walked this area this afternoon.
At station 238+00 RT RSS Slope failure slid into Basin 143 causing the basin to overfill and sediment to overtop the silt
fence above the Jurisdictional Stream on the flat bank. No loss was found inside the JS in this area.
At station 247+00 RT erosion control devices were not installed in the ditch line per plans and no diversions were cut in
this area before rainfall event. 5 Rock checks are installed in this area but the plans call for 9 rock checks to be installed
between STA 248+00 RT to STA 253+00 RT No JS features were disturbed.
Basins in the waste site and on the job are above the 50% capacity to be cleaned out, the contractor is refusing to clean
out these basins due to extra for these task. Today was the final day of the routine maintenance for these basins and
none have been touched. Also due to the basins filling up to around 70% over the last rainfall event they have been
switched to urgent. It is very important to have this fixed before the next rainfall event tomorrow. I recommend that
hauling be shut down due to these areas not being fixed and the times frames will be over today.
If you have any questions or concerns please let me know.
Thanks,
Darren Cranford
Assistant Resident Engineer
NCDOT Highway Division 8
District 1 Resident Engineer's Office
336 318 4020 office
336 479 1360 mobile
dlcranford(c)ncdot.gov
300 DOT Drive
Asheboro, NC 27204
From: Owens, Lonnie H <Ihowens@ncdot.gov>
Sent: Monday, April 4, 2022 9:43 AM
To: Cranford, Darren L <dlcranforddlcranford@ncdotgov>
Subject: Silt loss
Silt loss at Sta 247+00 +/- RT-L- approximately 2 to 3 CY downstream.
2. Silt loss at Sta 238+00 +/- RT-L- approximately 3 five gallon buckets
behind Basin 143.
3. Silt loss at Sta 227+50 +/- LT-L- approximately 10 CY of silt in cutover.
4. Silt loss at Sta 225+00 +/- LT-L- approximately 6 to 8 CY of Silt behind
Basin 2 in Waste Site 5.
AL -
IL
pq
e , . . 1 1. ji
�y k i
4�'1 ELT_ ` y,. 4;+ �' '; •7>
hw
r` 4+ �`. ",. 5 '" `'• ; Y t lip+-F rr•'' ,}
�'t s• * + { ALL.#,° t fl -r� }'*
# k.. KW
: — x j � fix '
.�, � .'�� •Y. � y l*'� '��• 'r�� � R ;may `� � � -
Ir
` R4�ft� r
x'
�f,.� _.- 7Ri tirt�W. __ !_f� - _ -i +� L _ � _ +S'1 ., _ •1 1� 4Y:�k�
ice' ;�I� %_ ,- Y Y. �'k' �iL •i '*;w ++ � �� 4 � �.•t' ' *� +i�•, � ��y3�*+�i ��
1 #i dL�Lrt �'7#� �} fl *•f .. _ _ A 4l .Y _ k y{
IL
x. l'; -.,A- `•�VI
}h 1 i 4 LFF � L'. k 'r� • 1
n to :!+ :� •�; .> i' h + j ~
ql� op
i 4 ,Y t +,�
16
4PF
f
J
.10
X ONSTRU
k r
IL
Sent from my Wad
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
12