Loading...
HomeMy WebLinkAboutNCG060292_Assessment of BMP Report_20131203W6R0 SznitliL .filelel Farmland PACKAGED FOOD GROUP 1780 Smithfield Way Kinston, NC 28504 Phone: 252-208-4700 Fax: 252-208-4730 November 29, 2013 Dear Sir or Madam As required by our NPDS general permit NO. NCG060000 and CDC NO. NCG060292 we are submitting our Assessment of Best Management Practices for the Smithfield/Farmland Packaged Food Group Kinston facility. Please contact me with any question. Sincerely, Y � Charlie Prentice Environmental Coordinator DEC - 3 2013 Material handling activities Raw materials are delivered by refrigerated trailers, box trailers and tankers. The raw materials trailers are backed up to receiving dock doors which have overhangs and drains that flow to the on -site wastewater plant. Any trailer containing raw meat that cannot be backed into a receiving door immediately, is staged on a concrete bermed pad with a drain that feeds to our on- site wastewater plant. All oils used in machinery are delivered in 55 gallon steel drums. The facilities procedure is to place all oil drum deliveries inside the building as soon as they are off loaded. SOP KENG-002 Receiving Oils and Lubricants. Used oil is staged inside of the Central utilities Plant and is monitored during the reclaim process. SOP KENG-001 Waste Oil/Waste Oil Materials Used oil filters are drained inside for a minimum of 60 minutes before being placed inside a covered bin that is staged on a concrete pad with a drain to an oil water separator. SOP KENG-001 Waste Oil/Waste Oil Materials. Bulk Tanker Deliveries Chemicals used in the wastewater plant are located inside of the wastewater building in secondary containment. Tanker truck deliveries are monitored during the off load. The tanker is parked on a concrete pad that is sloped to a wastewater drain. All fill ports are locked and must be opened by a trained designated Smithfield employee only. SOP KENG-004 Chemical Receiving at Wastewater Plant. Anhydrous ammonia deliveries are monitored during the entire off-load by a refrigeration mechanic. SOP KENG-003 Ammonia Receiving which references the facility's PSM program SOP in Vol. 1, Section 1 on page 1. Refrigeration mechanics review the SOP annually. Bulk Salt, Lactate, Corn syrup, and Liquid Smoke tanks are outside of the facility in secondary containment. Fill ports are locked and must be opened by a trained designated Smithfield employee who monitors the entire off load of product. SOP KPOC-003 procedure for Filling a Silo Diesel tanks and Gasoline are located outside of the central utilities Plant. Fill ports are located on a concrete pad that is sloped to a drain that is an oil water separator. Both tanks are double walled and the _fill ports are locked. Fill ports must be unlocked by a trained designated Smithfield employee and the off load monitored continuously. Feasibility Evaluation All bulk storage tanks are either double walled with alarms or are contained within secondary containments. Weekly, monthly and bi-annual inspections are conducted on all outside areas of the facility. Wastewater mechanics monitor all secondary containments for the presence of accumulated rainwater. That water is then tested and then either discharged to the stormwater system or pumped out into 275 gallon totes and released to the on- site wastewater treatment system. All oil is placed on portable secondary containments inside of either the main facility or the Central Utilities Plant. All deliveries are continuously monitored and if any sign of a leak or spill is found, the off load is stopped immediately and the spill response team is notified. The facility has a trained Hazmat and Spill Response team on site with the necessary material need to contain any type of spill or release. Do to food safety reasons and the size of the bulk salt, lactate, corn syrup and liquid smoke; it is not feasible to locate these tanks inside of the building. Since opening in 2005 the facility has had no reportable spills of any materials and feels that the location of the tanks within containments and the annual training are working well and no corrective actions are needed. Animals/Wildlife On -Site The facility is a further processing plant and does not keep and hogs on -site. The stormwater pond located behind the facility does however see geese migrate to the pond during certain times of the year. The pond also has fish in it most likely caused by birds carrying eggs and depositing them in the pond. The facility has no time stocked this pond with fish. The pond and surrounding storm ditches are home to many turtles. Fecal coliform concentrations might be correlated to the presence of these animals. Corrective Actions --- The facility will be installing approximately 30 foot of pipe in the storm drain located near our open top_ trash container. The pipe will be covered with concrete so that any leakages from the container will not flow into the storm drain but to a drain that flows to the wastewater plant. The pipe will allow rainwater to continue to flow unimpeded. This project will be completed by 2/1/2014 Table 9 BMP Identification BMP IDENTIFICATION Page 1 of 1 Instructions: Describe the Best Management Practices to be included in the plan. BMPs Brief Description of Activities Plant grounds/facilities monitored by maintenance. Paved areas are swept Good Housekeeping as needed. Leaks/drips/spills are corrected upon discovery. Potential problems noted during inspections are addressed immediately. Preventative Maintenance Tanks, pumps, valves, seals and other equipment are included in the ' facilities ongoing preventive maintenance program. Plant grounds/facilities are inspected by pollution prevention team Inspections members. Irregularities are noted and reported to responsible parties for immediate resolution/correction. A stormwater spill prevention response team has been developed as an Spill Prevention Response extension of the existing spill prevention control and countermeasures plan for the facility. I Plant areas are maintained as paved, grassed or wooded. Plant Sediment and Erosion Control engineering monitors the areas. Discharge from plant property is sheet flow. The property perimeter will Management of Runoff be inspected quarterly for signs of sediment buildup and possible extraneous material. Actions will be taken to correct such occurrences. On going training of the employees in materials handling. Review of Additional BMPs process and facility changes. 22 Annual Re -Evaluation of On -Site BMP's BMPs EFFECTIVENESS OF BMP'S DATE Good Housekeeping Program is effective, no changes needed at this time. 10/7/2013 Preventative Maintenance Program is effective, no changes needed at this time. 10/7/2013 Inspections The facility implemented a deficiency report procedure. If any issues 10/7/2013 are found on an inspection, the discrepancy is noted on the report and emailed to the department supervisor and his superintendent along with the plant Engineer and the Food Safety Manager. Once the issue is corrected the completed report is sent back to the Environmental Coordinator who files the hard copy. Spill Prevention Response Program is effective, no changes needed at this time. 10/7/2013 Sediment and Erosion Control Program is effective, no changes needed at this time. 10/7/2013 Management of Runoff The open top trash container and the two scrap metal containers have 10/7/2013 been moved over beside the west side compactor. A storm drain is located in this area and needs to be covered by installing pipe and concreting over the top to prevent stormwater infiltration. Additional BMPs The facility has expanded in size over the last year and monthly spill 10/7/2013 briefings cover any new areas of concern. ate Environmental Coordinator Date 23