From: Jim Mason <james.mason@threeoaksengineering.com>
Sent: Thursday, April 7, 2022 6:48 PM
To: Cohn, Colleen M; Norton, April R CIV USARMY CESAW (USA)
Cc: Nancy Oberle
Subject: RE: [External] FW: Fee Received for Tupelo Junction Residential Cluster Development
ID # 20210885 Ver 1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Colleen -
Thank you very much for the information! We will be sure to submit the new information using the link below and will
use the More Information Response option.
Thanks,
Jim
From: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Sent: Wednesday, April 6, 2022 3:18 PM
To: Jim Mason <james.mason@threeoaksengineering.com>; Norton, April R CIV USARMY CESAW (USA)
<April.R.Norton@usace.army.mil>
Cc: Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: RE: [External] FW: Fee Received for Tupelo Junction Residential Cluster Development ID # 20210885 Ver 1
Jim,
This is a question I do have a quick answer for!
Since it looks like this project hasn't been reviewed/issued based on the email at the bottom saying the fee was paid
today, you can use the Supplemental Information Form to submit any updates/additional files! Link here:
https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form
IMPORTANT: Make sure you choose "More Information Response" not "Modification". If you choose Modification, it
creates a new Version for DWR and will charge a fee again. Please include the DWR ID from below (20210885).
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
i
From: Jim Mason <james.mason@threeoaksengineering.com>
Sent: Wednesday, April 6, 2022 2:50 PM
To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Norton, April R CIV USARMY CESAW (USA)
<April.R.Norton@usace.army.mil>
Cc: Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: [External] FW: Fee Received for Tupelo Junction Residential Cluster Development ID # 20210885 Ver 1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Colleen -
I apologize for the barrage of emails this afternoon, but we have another project that we are working on that we
recently submitted a permit application for (see subject line). This permit application is for a NWP 58 and corresponding
Section 401 Certification. The original application was to cover work associated with directionally -boring a sewer line
under Lake Michael (the stream with that classification name and not the lake itself). The bore was to start and end
outside of the riparian buffer and go under the stream; however, the presence of bedrock was going to result in the line
casement breaching the streambed in a small area. Therefore, a temporary dewatering plan was developed for
installation and the client was planning to install sills to promote re -accumulation of native substrate over the casement
to restore the stream bed.
Unfortunately, we were informed by the client after the application and fee were submitted that there was more
bedrock than anticipated and the directional bore would no longer be feasible. Therefore, they are opting to temporarily
open trench the stream bed to install the sewer line. This will require a larger dewatering area than what was included in
the application and also result in more temporary impacts to the stream. The casement will still also be exposed in a
small area after installation, so sills would still be proposed to allow for substrate accumulation after the line is covered.
There will also be some minor buffer impacts, so we would coordinate with the County and/or Mebane to receive
authorization for those impacts.
I wanted to check with you and April about the best approach for revising the application. We are currently working with
the client to get new drawings for the revised impacts and can update the PCN to show the revised impacts. Would it be
possible for us to send that information directly to you for review or should we re -submit an electronic PCN with the
new information and reference this project no.?
If you could email me back when you have an opportunity it would be much appreciated.
Thanks and have a great day,
Jim
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Wednesday, April 6, 2022 1:06 PM
To: Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: Fee Received for Tupelo Junction Residential Cluster Development ID # 20210885 Ver 1
The North Carolina Division of Water Resources has received the application called Tupelo Junction Residential Cluster
Development that you submitted on 3/18/2022 with corresponding fee received on 4/6/2022. The ID number for that
project is 20210885, Version 1.
Reviewer Contact Information: Colleen Cohn - colleen.cohn@ncdenr.gov
2
Reviewing Office: Raleigh Regional Office - (919) 791-4200
If you have questions, please contact one of the staff members listed below:
Transportation Projects Contact: Kristi Lynn Carpenter at kristilynn.carpenter@ncdenr.gov
All other Projects Contact: Sheri Montalvo at sheri.montalvo@ncdenr.gov
Project file link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=1748945