Loading...
HomeMy WebLinkAbout20130387 Ver 1_Certification of Completion_20140502DWR Project No.: Certification of Completion #13 -0387 County: Brunswick County Applicant: US Armors of Engineers Wilmington District -7 MAY 2 2014 Project Name: NC Section 14 Emergency Streambank and Shoreline Erosion Protection Project- Southport NC Date of Issuance of Wetland Permit: April 16, 2013 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Teresa R Bullard (USACE Wilmington District, Biologist), hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, a d other su ing materials. Signatur : O� Date: Agent's Certification 1, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: , hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date