Loading...
HomeMy WebLinkAboutNC0043257_Response to NOV-2022-LM-0017_20220321From: To: Subject: Date: Matthew Raynor Zhanq,Cheng [External] Response for NOVs for Nature Trail NC0043257 NOV-2022-LV-0017 - 0180 Monday, March 21, 2022 3:22:35 PM CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Zhang, The month of December was a very difficult month due to swinging temperatures during the day and night. Our plant experienced biological difficulties that we could not adjust for and scrambled to maintain our limits. No solids were released but the plant did not meet it's parameters. This difficulty stretched into January. The one violation for Effluent Monitoring or the lack of monitoring was due to a holiday, which we are allowed to skip on those days. So I hope you will remove that violation. The plant continues to meet it's limits daily. We have adjusted the plant accordingly. Matt Matthew Raynor, Director REE Va. Inc. 524 Meadow Ave. Loop Banner Elk, NC 28604 919/270-4831 Cell 828/733-5028 Office