Loading...
HomeMy WebLinkAboutNC0040266_Wasteload Allocation_19840428NPDES DOCYNENT SCANNING COVER SHEET NPDES Permit: NC0040266 Knightdale Estates WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Technical Correction Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: April 28, 1984 This document is printed on reuse paper - ignore any content on the resrerme side NPDES WASTE LOAD ALLOCATION PERMIT NO.: NC0040266 PERMITTEE NAME: Knightdale Estates, Inc. FACILITY NAME: Knightdale Estates Mobile Home Park Facility Status: Existing Permit Status: Renewal Major Minor '1 Pipe No.: 001 Design Capacity: 0.025 MGD Domestic (% of Flow): 100 % Industrial (% of Flow): 0 % Comments: RECEIVING STREAM: an unnamed tributary to the Neuse River Class: C-NSW Sub -Basin: 03-04-02 Reference USGS Quad: D24SE, Raleigh East County: Wake Regional Office: Raleigh Regional Office (please attach) Previous Exp. Date: 9/30/94 Treatment Plant Class: Classification changes within three miles: Requested by: Jay Lijcas Prepared by: Reviewed by: (1441b. 6�•'T!6 c,O E L. wQ !EA- lAgerYL_ Date: 2/25/94 Date: '� L Date: 4 02 k/i y . i Modeler Date Rec. # '11.-- z(z8k k-{, TI to z.. Drainage Area (mi2 ) 1. ct Avg. Streamflow (cfs): z .1 7Q10 (cfs) o. 19 Winter 7Q10 (cfs) a.ya 30Q2 (cfs) o. 6 Toxicity Limits: IWC % Acute/Chronic Instream Monitoring: Parameters Iv_n+am.Arr . Tn_vc,o oxYc e+v, i cn•i, cou " e o apucrtth.i.,i Upstream ✓ Location 5 ' 10b1700,, arnfA 11 Downstream ✓ Location z_pi, • 60.ra,, st4n ►1 Effluent Characteristics Summer Winter BOD5 (mg/1) 2.3- -a 30 NH3-N (mg/1) y.8 ma+vro2- D.O. (mg/1) 6-• o cs•V TSS (mg/1) 3 0 3 v F. Col. (/100 ml) Z v o pH (SU) G _ 1 G - 9 Rt3 IA0 AL CGnt,O&i iE- (A/4-J monwr at 0 n) it 02 Comments: Facility Name: NPDES No.: Type of Waste: Facility Status: Permit Status: Receiving Stream: Stream Classification: Subbasin: County: Regional Office: Requestor: Date of Request: Topo Quad: e (2( FACT SHEET FOR WASTELOAD ALLOCATION<11,1 Request # 7620/9 / r.Rq4 "PO Knightdale Estates NC0040266 Domestic - 100% Existing Renewal unnamed tributary to Neuse River C-NSW 03-04-02 Wake Raleigh Lucas 2/28/94 D23SE Stream Characteristic: USGS # Date: Drainage Area (mi2): Summer 7Q10 (cfs): Winter 7Q10 (cfs): Average Flow (cfs): 30Q2 (cfs): IWC (%): 02.0873.8595 1989 1.95 0.19 0.49 2.1 0.61 17.0 % Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) New ammonia toxicity criteria requires more stringent limits. Request comment from Region as to facility's choice between new limit or Toxicity Test. Facility has a record of flow exceedences and fecal coliform violations. Residual chlorine levels are very excessive. Central Files contain many letters for NOV's as well as Compliance Inspection letters indicating ongoing problems with facility maintnenance. No current Staff Report available for this WLA. Request Region comment as to availability of municipal connection. Request Region check into facility's instream monitoring techniques and locations, especially conductivity. Note new fecal coliform limit. Special Schedule Requirements c.L) ( o/c d additional comments from Reviewers: Recommended by: Farrell Keough Reviewed by Instream Assessment: Regional Supervisor: Permits & Engineering: RETURN TO TECHNICAL 4 BY: Y Date: s Ape<<_ 149-, Date: -4(m471 ate: i/A1--3 Date: i, )c c j Existing Limits: Wasteflow (MGD): BOD5 (mg/1): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): Residual Chlorine (µg/1): Temperature (°C): TP (mg/1): TN (mg/1): Recommended Limits: Wasteflow (MGD): BOD5 (mg/1): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): Residual Chlorine (1.tg/1): Temperature (°C): TP (mg/1): TN (mg/1): 2 PARAMETERS Monthly Average 0.025 27.0 16.0 5.0 30 1,000 6-9 monitor monitor nr nr Monthly Average with Toxicity Test 0.025 27.0 16.0 5.0 30 200 6-9 monitor monitor nr nr 7% WQ WQ Monthly Average with Ammonia limit WQ or EL Summer Winter 0.025 770 ,, 30.0 4.8 ) monitor 5.0 30 200 6-9 monitor monitor nr nr 30 200 6-9 monitor monitor nr nr WQ WQ WQ Facility should recieve choice between Chronic Toxicity testing OR Ammonia limit. Region should TSB of facilities decision. Limits Changes: Fecal Coliform and ammonia new standards and toxicity criteria x Parameter(s) are water quality limited. For some parameters, the available load capacity of the immediate receiving water will be consumed. This may affect future water quality based effluent limitations for additional dischargers within this portion of the watershed. OR No parameters are water quality limited, but this discharge may affect future allocations. 3 INSTREAM MONITORING REQUIREMENTS Upstream Location: 50' above outfall Downstream Location: 200' below outfall Parameters: Temperature, dissolved oxygen, fecal coliform, conductivity Special instream monitoring locations or monitoring frequencies: MISCELLANEOUS INFORMATION & SPECIAL CONDITIONS Adequacy of Existing Treatment Has the facility demonstrated the ability to meet the proposed new limits with existing treatment facilities? Yes No > ,, r If no, which parameters cannot be met? �l% ,`+'7 �-�' V Would a "phasing in" of the new limits be appropriate? Yes No ?� If yes, please provide a schedule (and basis for that schedule) with the regional office recommendations: If no, why not? // c a� Special Instructions or Conditions Wasteload sent to EPA? (Major) _N_ (Y or N) (If yes, then attach schematic, toxics spreadsheet, copy of model, or, if not modeled, then old assumptions that were made, and description of how it fits into basinwide plan) Additional Information attached? _N (Y or N) If yes, explain with attachments. Facility Name: Permit Number: Engineer: Subbasin: Receiving Stream: USGS quad #: Request Number: Date: Expiration date: Knightdale Estates NC0040266 Lucas 03-04-02 unnamed tributary to the Neuse River D24SE 7762 2/28/94 9/30/94 Existing WLA checked: Staff Report: Topo checked: USGS Flows confirmed: PIRF / APAMS: IWC Spreadsheet: Stream Classification: Nutrient Sensitivity: Instream Data: Brief of WLA Analysis Previous WLA's 1977: first modeled in this year with limits of 30 / 30. Model run with 0.1 cfs 7Q10 at that time. 1982: name changed from Bullucks MHP to Knightdale Estates. Re -issued with same limits. 1983: new WLA contained expanded limits of 0.02, 0.025, and 0.03 mgd, (from 0.0125 mgd). each of these expanded flows required more stringent NH3-N treatment while only slightly more stringent BOD5 removal. 1984: facility re -issued with 30 / 30 limits for their previous flow of 0.0125 mgd. 1989: expansion of facility to 0.025 mgd. new USGS flows were requested, (they ended up being higher) and the expansion was modeled with limits of 27 / 16 / 5. instream monitoring was also required at that time. No Staff Report has been submitted for this facility, but the Waste Load Allocation request has been in- house for over a month. Therefore I will go ahead with mailing out the Fact Sheet based on the information I have received. I will request Region input on the front of the Fact Sheet. **new ammonia toxicity criteria require limits of 4.8 / 21.7 mg/I d"`^ 1.1 PXl. pAy DMR's Many flow and fecal coliform violations, as well as very high residual chlorine levels. Central Files This facility has a very poor track record. Many NOV's and Compliance Inspection Letters indicate that ongoing problems are not being attending to. Knlghtdale Estates Mobile Home Park NC0040266 Upstream: 50' upstream Month Temp DO Saturation Fecal Conductivity Deo-93 Nov-93 Oct 93 Sep-93 Aug-93 Jul-93 Jun-93 May-93 Apr-93 Mar-93 Feb-93 Jan-93 9 11 16 21 24 26 24 20 11 12 7 9 9.1 7.3 6.6 6.9 7.4 7.5 7.1 8.2 7.5 9.0 10.9 8.7 78% 66% 67% 77% 88% 92% 84% 90% 68% 84% 89% 75% 87.7 34.6 122.5 107.2 220 434.7 120.5 357 320 50.9 71 73.5 92 98 85 78 70 80 60 72.5 60 62.5 70 72.5 Downstream: 50' downstream Temp DO Saturation Fecal Conductivity 10 12 17 23 23 26 24 20 10 13 9 9 8.8 7.5 6.4 6.2 6.8 6.7 7.4 8.3 9.7 8.9 10.5 9.7 78% 70% 66% 72% 79% 83% 88% 91% 86% 85% 91% 84% 77.5 54.7 179.7 1090.9 10 480 124 264.9 184 104.9 85.4 69.7 85 10 11 163 90 70 62.5 62.5 63 57.5 58 72.5 conductivity values have been assumed to be three decimal places off. thus 0.09 would equal 90 Ammonia [2 / 4 mg/I] - Residual Chlorine - Fecal Coliform Instream Waste Concentrations Residual Chlorine 7010 (cfs) Design Flow (mgd) Design Flow (ds) Stream Std (Nil) Upstream bkgrd level (µg/1) IWC (%) Allowable Concentration (pg/i) Allowable Concentration (mg/l) Fecal Limit Ratio of 5.2 :1 0.►9 0.025 0.039 17 0 raj" t4.off 404:2" 9 9.8 0.104 200/100m1 o. 19 0.025 0.039 1 0.22 I4.d6t6:290 r `i•8 0-49 -0:6- 0.025 0.039 1.8 0.22 Ammonia as NH3 (summer) 7010 (cfs) Design Flow (mgd) Design Flow (cfs) Stream Std (mg/I) Upstream bkgrd level (mg/I) IWC (%) Allowable Concentration (mg/1) Ammonia as NH3 (winter) 7010 (cfs) Design Flow (mgd) Design Flow (cfs) Stream Std (mg/I) Upstream bkgrd level (mg/I) IWC (%) Allowable Concentration (mg/i) 9 APR 7 tt raffia& SUPPORT N c- SOC PRIORITY PROJECT: Yes__No If Yes, SOC No. To: Permits and Engineering Unit Water Quality Section Attention: Date 3 NPDES STAFF REPORT A D RECOMM,NDATION County (•f ; �_,,,rq�,. Permit No. NC dty0� AA r" ?'- PART I - GENERAL INFORMATION 1. FaciIity and Address: 2. Date of Investigation' 3r`lipy 3. Report Prepared by: ps/ Ram 4. Persons Contacted and Telephone rr..__L__ � _Avid ✓a.r (0x0 �s�-dsr3s 5. Directions to Site: 6 (4JGQ# 4pJ. Pare— Re). and pr� Q (zi)j A c i l c 71" S Qk- 6. Discharge Point(s), List for all discharge points: y r; Latitude: 3s- ys, /�7 Longitude: 7ro,'24 Attach a USGS map extract and indicate treatment facility site and discharge point on map. U.S.G.S. Quad No. pay rF U.S.G.S. Quad Name e ' 7. Site s e and expansion area consistent with application ? Yes No If No, explain: 8. Topography (relationship to flood plain included): G ° s Lt7e 9. Location of nearest dwelling: Zoo 10. Receiving stream or affected surface waters: (J-r- yt /VQ,tcQ R.i ✓eT a. Classification: G N 4J b. River Basin and Subbasin No.: Q 3: a = 0 c. Describe receiving stream features and pertinent downstream uses: PART II DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. Volume of Wastewater to be permitted: �Z� MGD(Ultimate Design Capacity) b. What is the current permitted capacity of the Waste Water Treatment facility? d. p�c—rh (r7) c. Actual treatment capacity of the current facility (current design capacity)? 0 . ao. pi g-p d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years: e. PIease provide a description of existing or substantially constructed f wastewater t�reatr ent fac_iliities: 5x� � ,%�!//�,"�- /;sL�rnO'fex-hr, a-e-raf'ax -iKa.t car �. iGaciak, art,avr Gl. 1 1 GQcc7 + f. Pleaseprovide a descri tYon of proposedGcf< p w stewater treatment facilities: g. Possible toxic impacts to surface waters: e't`^ h. Pretreatment Program (POTWs only): in development approved should be required not needed 2. Residuals handling and utilization/disposal scheme: Ga.HJ a. If residuals are being land applied, please specify DEM permit no. 04004Pie-✓irwsib a14-40 k ).50411 XaS vo;d�4/ con.7frc. NPDES Permit Staff Report Version 10/92 Page 2 frjioaJy Wag ce., WSdf Residuals Contractor or_,q ,s SV'U1Ge, Telephone No. b. Residuals stabilization: PSRP PFRP c. Landfill: d. Other disposal/utilization scheme (Specify): 3. Treatment plant classification (attach completed rating sheet): 4. SIC Code(s): 6 Ste/ S Other Wastewater Code(s) of actual wastewater, not particular facilities i.e.., non - contact cooling water discharge from a metal plating company would be 14, not 56. Primary 61 Secondary Main Treatment Unit Code: 11= 0 —:_.(23 PART III - OTHER PERTINENT INFORMATION I. Is this facility being constructed with Construction Grant Funds or are any public monies involved. (municipals only)? ---� 2. Special monitoring or limitations (including toxicity) requests: Rec&1I*ehl S8ODA AM5i G! V 6 i G47y v o w row f ,0 up 3. Im ortant SOC OC r s3 -f o p , j o ompliance Schedule dates: Please indicate) Date Submission of Plans and Specifications Begin Construction Complete Construction 4. Alternative Analysis Evaluation: Has the facility evaluated all of the non - discharge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: A Connection to Regional Sewer System: 410e-r- rKa be. away �01� y / e. /_ �. kelevoCe �.s,) y Subsurface: NPDES Permit Staff Report version 10/92 e.)41//).4. No eri?"61.-- Page 3 • t Other disposal of ns: 5. Other Special lien-. PART IV - •EVAL ATIC i AND RECOMMENDATIONS saev ..d 2-NN3 a.,a;42.eaviu.wAtid R 144"1; 4- s c✓ 700 6• 0 cv sc� . Del / te4'4"4,4f-‘44;g•-- 14)A.;c_4. eile,fre, covet, - re-rostkcierk_.- 4244.46.e., fe4mtivr Signature o port preparer /.*r Water Quality Regi Date NPDES Permit Staff Report Version 10/92 ��,.... SC...- it . , S e ; / -fa cud ervisor Pagc 4 • 7000 FEET 1 KILOMETER 722 32'30" 1 MILE 724 • • INTERIOR —GEOLOGICAL SURVEY. RESTON. VIRGINiA-1987 725000m E. ROAD CLASSIFICATION Primary highway, hard surface........ improved surface Light•duty road, hard or 78° 30' Secondary highway, hard surface . Unimproved road --- a II C. fl....$.. C+..e" Pn,,ln sc