HomeMy WebLinkAboutNCG080959_NOV_20210204ROY COOPER
Governor
MCHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
February 2, 2021
CERTIFIED MAIL 1 70191640 00013337 8317
RETURN RECEIPT REQUESTED
Migway, Inc.
Attention: David Voronin, President
9349 China Grove Church Road
Pineville, North Carolina 28134
Subject: NOTICE OF VIOLATION (NOV-2021-PC-0061)
Migway, Inc.
NPDES Certificate of Coverage: NCGO80959
Mecklenburg County
Dear Mr. Voronin,
FFt3 � 4 9117�
On December 2, 2020, Lauren Goyne of Charlotte -Mecklenburg Storm Water Services (CMSWS),
conducted a site inspection for the Migway, Inc. facility located at 9349 China Grove Church Road,
Mecklenburg, North Carolina. A copy of the Compliance Inspection Report is enclosed for your
review. The site visit and file review revealed that the subject facility is covered under NPDES
Stormwater General Permit NCG080000 by Certificate of Coverage NCG080959. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as Grants
Creek, class C waters in the Catawba River Basin.
As a result of the site inspection, the following permit condition violations are noted:
1) Stormwater Pollution Prevention Plan (SPPP)
The permittee failed to develop and implement a Stormwater Pollution Prevention Plan
(SPPP). [Part H, Section A]
2) Analytical Monitoring
The permittee failed to conduct analytical monitoring of stormwater discharges as specified
in Table 1 and in accordance with the schedule specified in Table 2. [Part H, Section B]
3) Qualitative Monitoring
The permittee failed to conduct qualitative monitoring in accordance with the permit
requirements and schedule. [Part II, Section D]
Required Response
• A written explanation for why the violations occurred must be submitted within 15
calendar days.
• The SPPP must be completed and emailed to this office for verification within 60 calendar
days.
North Carolina DepartmentofEnvlromnental QuaEty I DlvlsfonofEnergy, Mlneraland Land Resources.
Mooresville Regional office 1 610 East Center Avenue, Suite 301. I Mooresville, North Carolna28115
D E Q' onn ccaicaa
Migway, Inc.
Notice of Violation
February 2, 2021
Page 2 of 2
Thank you for your attention to this matter. This office requires that the violations, as detailed above, be
properly resolved. These violations and any future violations are subject to a civil penalty assessment of
up to $25,000 per day for each violation. Should you have any questions, please contact Lily Kay or me at
(704)663-1699.
Sincerely,
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Compliance Inspection Report (12/2/2020)
cc: Annette Lucas, PE Stormwater Program Supervisor
Alain Morman, Environmental Specialist
Y
Permit: NCGO80959
SOC:
County: Mecklenburg
Region: Mooresville
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Migway Inc
Effective: Expiration: Facility: Migway, Inc.
9349 China Grove Church Rd
Contact Person:Aleksandr Volk Title:
Directions to Facility:
intersection of westinghouse blvd and china grove church rd.
System Classifications:
Primary ORC: Certification:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Pineville NC 28134
Phone:980-255-3200
Phone:
Inspection Date: 12/02/2020 Entry Time 01:OOPM Exit Time: 02:OOPM
Primary Inspector: Water Quality Program Meckenburg County Phone: 704-336-5449
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: ❑ Compliant E Not Compliant
Question Areas:
Storm Water
(See attachment summary)
EN 0 4 91m
Page 1 of 3
1
Permit: NCGO80959 Owner - Facility: Migway Inc
Inspection Date: 12/02/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
At the time of inspection, the facility was observed to be in compliance with the City of Charlotte
Pollution Control Ordinance. However, the facility is not in compliance with the industrial stormwater permit.
Page 2 of 3
I
W
permit NCGO80959 Owner - Facility: Mlgway Inc
Inspection Date: 12/02/2020. Inspection Type: Compliance Evaluation'
Reason for visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution'Prevention Plan?
1101111
# Does the Plan include a General Location (USGS) map?
ND
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
[] []
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
[) []
# Does the facility provide all necessary secondary containment?
❑ 0 []
# Does the Plan include a BMP summary?
D 0
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
N El ❑
# Does the facility provide and document Employee Training?
0 11❑
# Does the Plan include a list of Responsible Party(s)?
p 0 ❑ []
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
N D El
Has the Stormwater Pollution Prevention Plan been implemented?
[]
Comment: A Stormwater Pollution Prevention Plan (SPPP) has not been developed,
recorded, or
implemented. The SPPP should be developed and implemented within 12 months of the
effective date of the Certificate of Coverage (November 1.2018) and updated thereafter on an
annual basis.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
[]
Comment: Qualitative monitoring has not been conducted or recorded. Qualitative monitoring should be
performed semi-annually during a measurable storm event.
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ El
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? []
Comment: Analytical monitoring has not been conducted or recorded. Analytical monitoring should be
performed semi-annually_ during a measurable storm event.
Permit and Outfalls Yes No Na NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? [] El
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division? []
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment: No stormwater pollution issues were observed.
Page 3 of 3